BILL REQ. #: H-4783.2
State of Washington | 58th Legislature | 2004 Regular Session |
READ FIRST TIME 02/06/04.
AN ACT Relating to impact fees for residential construction; adding a new section to chapter 82.02 RCW; and adding a new section to chapter 43.21C RCW.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 A new section is added to chapter 82.02 RCW
to read as follows:
Impact fees for residential construction shall only be collected by
the county, city, or town imposing the impact fee either:
(1) At the time of final inspection of the residence. A final
inspection shall be conditioned on the payment of the impact fees; or
(2) At the time the certificate of occupancy is issued. Issuance
of a certificate of occupancy shall be conditioned on the payment of
the impact fees.
NEW SECTION. Sec. 2 A new section is added to chapter 43.21C RCW
to read as follows:
Impact fees under this chapter for residential construction shall
only be collected by the county, city, or town imposing the impact fee
either:
(1) At the time of final inspection of the residence. A final
inspection shall be conditioned on the payment of the impact fees; or
(2) At the time the certificate of occupancy is issued. Issuance
of a certificate of occupancy shall be conditioned on the payment of
the impact fees.