Passed by the House April 21, 2003 Yeas 97   ________________________________________ Speaker of the House of Representatives Passed by the Senate April 10, 2003 Yeas 48   ________________________________________ President of the Senate | I, Cynthia Zehnder, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is SUBSTITUTE HOUSE BILL 1854 as passed by the House of Representatives and the Senate on the dates hereon set forth. ________________________________________ Chief Clerk | |
Approved ________________________________________ Governor of the State of Washington | Secretary of State State of Washington |
State of Washington | 58th Legislature | 2003 Regular Session |
READ FIRST TIME 03/05/03.
AN ACT Relating to joint operating agencies; adding a new section to chapter 43.52 RCW; adding a new section to chapter 54.16 RCW; adding a new section to chapter 35.92 RCW; adding a new section to chapter 35.22 RCW; adding a new section to chapter 35.23 RCW; adding a new section to chapter 35.27 RCW; and adding a new section to chapter 35A.80 RCW.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 A new section is added to chapter 43.52 RCW
to read as follows:
A city or district may contract to purchase from an operating
agency electric power and energy required for its present or future
requirements. For projects the output of which is limited to qualified
alternative energy resources as defined by RCW 19.29A.090(3), the
contract may include the purchase of capability of the projects to
produce electricity in addition to the actual output of the projects.
The contract may provide that the city or district must make the
payments required by the contract whether or not a project is
completed, operable, or operating and notwithstanding the suspension,
interruption, interference, reduction, or curtailment of the output of
a project or the power and energy contracted for. The contract may
also provide that payments under the contract are not subject to
reduction, whether by offset or otherwise, and shall not be conditioned
upon the performance or nonperformance of the operating agency or a
city or district under the contract or other instrument.
NEW SECTION. Sec. 2 A new section is added to chapter 54.16 RCW
to read as follows:
A district may contract to purchase from a joint operating agency
electric power and energy required for its present or future
requirements. For projects the output of which is limited to qualified
alternative energy resources as defined by RCW 19.29A.090(3), the
contract may include the purchase of capability of the projects to
produce electricity in addition to the actual output of the projects.
The contract may provide that the district must make the payments
required by the contract whether or not a project is completed,
operable, or operating and notwithstanding the suspension,
interruption, interference, reduction, or curtailment of the output of
a project or the power and energy contracted for. The contract may
also provide that payments under the contract are not subject to
reduction, whether by offset or otherwise, and shall not be conditioned
upon the performance or nonperformance of the joint operating agency or
a city, town, or district under the contract or other instrument.
NEW SECTION. Sec. 3 A new section is added to chapter 35.92 RCW
to read as follows:
A city or town may contract to purchase from a joint operating
agency electric power and energy required for its present or future
requirements. For projects the output of which is limited to qualified
alternative energy resources as defined by RCW 19.29A.090(3), the
contract may include the purchase of capability of the projects to
produce electricity in addition to the actual output of the projects.
The contract may provide that the city or town must make the payments
required by the contract whether or not a project is completed,
operable, or operating and notwithstanding the suspension,
interruption, interference, reduction, or curtailment of the output of
a project or the power and energy contracted for. The contract may
also provide that payments under the contract are not subject to
reduction, whether by offset or otherwise, and shall not be conditioned
upon the performance or nonperformance of the joint operating agency or
a city, town, or public utility district under the contract or other
instrument.
NEW SECTION. Sec. 4 A new section is added to chapter 35.22 RCW
to read as follows:
A city of the first class may contract to purchase from a joint
operating agency electric power and energy required for its present or
future requirements. For projects the output of which is limited to
qualified alternative energy resources as defined by RCW 19.29A.090(3),
the contract may include the purchase of capability of the projects to
produce electricity in addition to the actual output of the projects.
The contract may provide that the city must make the payments required
by the contract whether or not a project is completed, operable, or
operating and notwithstanding the suspension, interruption,
interference, reduction, or curtailment of the output of a project or
the power and energy contracted for. The contract may also provide
that payments under the contract are not subject to reduction, whether
by offset or otherwise, and shall not be conditioned upon the
performance or nonperformance of the joint operating agency or a city,
town, or public utility district under the contract or other
instrument.
NEW SECTION. Sec. 5 A new section is added to chapter 35.23 RCW
to read as follows:
A city of the second class may contract to purchase from a joint
operating agency electric power and energy required for its present or
future requirements. For projects the output of which is limited to
qualified alternative energy resources as defined by RCW 19.29A.090(3),
the contract may include the purchase of capability of the projects to
produce electricity in addition to the actual output of the projects.
The contract may provide that the city must make the payments required
by the contract whether or not a project is completed, operable, or
operating and notwithstanding the suspension, interruption,
interference, reduction, or curtailment of the output of a project or
the power and energy contracted for. The contract may also provide
that payments under the contract are not subject to reduction, whether
by offset or otherwise, and shall not be conditioned upon the
performance or nonperformance of the joint operating agency or a city,
town, or public utility district under the contract or other
instrument.
NEW SECTION. Sec. 6 A new section is added to chapter 35.27 RCW
to read as follows:
A town may contract to purchase from a joint operating agency
electric power and energy required for its present or future
requirements. For projects the output of which is limited to qualified
alternative energy resources as defined by RCW 19.29A.090(3), the
contract may include the purchase of capability of the projects to
produce electricity in addition to the actual output of the projects.
The contract may provide that the town must make the payments required
by the contract whether or not a project is completed, operable, or
operating and notwithstanding the suspension, interruption,
interference, reduction, or curtailment of the output of a project or
the power and energy contracted for. The contract may also provide
that payments under the contract are not subject to reduction, whether
by offset or otherwise, and shall not be conditioned upon the
performance or nonperformance of the joint operating agency or a city,
town, or public utility district under the contract or other
instrument.
NEW SECTION. Sec. 7 A new section is added to chapter 35A.80 RCW
to read as follows:
A code city may contract to purchase from a joint operating agency
electric power and energy required for its present or future
requirements. For projects the output of which is limited to qualified
alternative energy resources as defined by RCW 19.29A.090(3), the
contract may include the purchase of capability of the projects to
produce electricity in addition to the actual output of the projects.
The contract may provide that the code city must make the payments
required by the contract whether or not a project is completed,
operable, or operating and notwithstanding the suspension,
interruption, interference, reduction, or curtailment of the output of
a project or the power and energy contracted for. The contract may
also provide that payments under the contract are not subject to
reduction, whether by offset or otherwise, and shall not be conditioned
upon the performance or nonperformance of the joint operating agency or
a city, town, or public utility district under the contract or other
instrument.