BILL REQ. #: S-3491.2
State of Washington | 58th Legislature | 2004 Regular Session |
Read first time 01/15/2004. Referred to Committee on Land Use & Planning.
AN ACT Relating to permit timelines; and adding a new section to chapter 43.42 RCW.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 A new section is added to chapter 43.42 RCW
to read as follows:
(1) The legislature finds that there are numerous efforts ongoing
to streamline and improve permitting processes. These include the work
of the transportation permit efficiency and accountability committee,
chapter 47.06C RCW, and the efforts of the office of regulatory
assistance to develop an integrated permit system, chapter 245, Laws of
2003. While these efforts are ongoing and likely to yield procedural
improvements in permit processing by 2006, there is an immediate need
to coordinate permitting timelines for large, multiagency permit
streamlining efforts.
(2) With the agreement of all involved agencies and the permit
applicant, state permitting agencies may make a determination of the
timelines that will be used by each participating permit agency to make
permit decisions, including the time periods required to determine if
the permit applications are complete, to review the application or
applications, and to process the component permits. The time periods
may not be less than those otherwise required for each individual
permit, but may extend and coordinate those time periods. The goal of
the concurrent timeline is to achieve the maximum efficiencies possible
through concurrent studies, consolidated applications, permit review,
hearings, and comment periods. A timeline established under this
subsection, with the assent of each permitting agency, must commit each
permitting agency to act on each component permit within these time
periods.