CERTIFICATION OF ENROLLMENT

ENGROSSED SENATE BILL 5343

Chapter 328, Laws of 2003

58th Legislature
2003 Regular Session



WATERSHED PLANNING



EFFECTIVE DATE: 7/27/03

Passed by the Senate April 21, 2003
  YEAS 47   NAYS 0

BRAD OWEN
________________________________________    
President of the Senate
Passed by the House April 11, 2003
  YEAS 86   NAYS 2

FRANK CHOPP
________________________________________    
Speaker of the House of Representatives


 
CERTIFICATE

I, Milton H. Doumit, Jr., Secretary of the Senate of the State of Washington, do hereby certify that the attached is ENGROSSED SENATE BILL 5343 as passed by the Senate and the House of Representatives on the dates hereon set forth.

MILTON H. DOUMIT JR.
________________________________________    
Secretary
Approved May 16, 2003.








GARY LOCKE
________________________________________    
Governor of the State of Washington
 
FILED
May 16, 2003 - 3:41 p.m.







Secretary of State
State of Washington


_____________________________________________ 

ENGROSSED SENATE BILL 5343
_____________________________________________

AS AMENDED BY THE HOUSE

Passed Legislature - 2003 Regular Session
State of Washington58th Legislature2003 Regular Session

By Senators Parlette, Doumit, Mulliken, Hale and Deccio

Read first time 01/22/2003.   Referred to Committee on Natural Resources, Energy & Water.



     AN ACT Relating to watershed planning; and amending RCW 90.82.060.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

Sec. 1   RCW 90.82.060 and 2001 c 229 s 1 are each amended to read as follows:
     (1) Planning conducted under this chapter must provide for a process to allow the local citizens within a WRIA or multi-WRIA area to join together in an effort to: (a) Assess the status of the water resources of their WRIA or multi-WRIA area; and (b) determine how best to manage the water resources of the WRIA or multi-WRIA area to balance the competing resource demands for that area within the parameters under RCW 90.82.120.
     (2) Watershed planning under this chapter may be initiated for a WRIA only with the concurrence of: (a) All counties within the WRIA; (b) the largest city or town within the WRIA unless the WRIA does not contain a city or town; and (c) the water supply utility obtaining the largest quantity of water from the WRIA or, for a WRIA with lands within the Columbia Basin project, the water supply utility obtaining from the Columbia Basin project the largest quantity of water for the WRIA. To apply for a grant for organizing the planning unit as provided for under RCW 90.82.040(2)(a), these entities shall designate the entity that will serve as the lead agency for the planning effort and indicate how the planning unit will be staffed. For purposes of this chapter, WRIA 40 shall be divided such that the portion of the WRIA located entirely within the Stemilt and Squilchuck subbasins shall be considered WRIA 40a and the remaining portion shall be considered WRIA 40b. Planning may be conducted separately for WRIA 40a and 40b. WRIA 40a shall be eligible for one-fourth of the funding available for a single WRIA, and WRIA 40b shall be eligible for three-fourths of the funding available for a single WRIA.
     (3) Watershed planning under this chapter may be initiated for a multi-WRIA area only with the concurrence of: (a) All counties within the multi-WRIA area; (b) the largest city or town in each WRIA unless the WRIA does not contain a city or town; and (c) the water supply utility obtaining the largest quantity of water in each WRIA.
     (4) If entities in subsection (2) or (3) of this section decide jointly and unanimously to proceed, they shall invite all tribes with reservation lands within the management area.
     (5) The entities in subsection (2) or (3) of this section, including the tribes if they affirmatively accept the invitation, constitute the initiating governments for the purposes of this section.
     (6) The organizing grant shall be used to organize the planning unit and to determine the scope of the planning to be conducted. In determining the scope of the planning activities, consideration shall be given to all existing plans and related planning activities. The scope of planning must include water quantity elements as provided in RCW 90.82.070, and may include water quality elements as contained in RCW 90.82.090, habitat elements as contained in RCW 90.82.100, and instream flow elements as contained in RCW 90.82.080. The initiating governments shall work with state government, other local governments within the management area, and affected tribal governments, in developing a planning process. The initiating governments may hold public meetings as deemed necessary to develop a proposed scope of work and a proposed composition of the planning unit. In developing a proposed composition of the planning unit, the initiating governments shall provide for representation of a wide range of water resource interests.
     (7) Each state agency with regulatory or other interests in the WRIA or multi-WRIA area to be planned shall assist the local citizens in the planning effort to the greatest extent practicable, recognizing any fiscal limitations. In providing such technical assistance and to facilitate representation on the planning unit, state agencies may organize and agree upon their representation on the planning unit. Such technical assistance must only be at the request of and to the extent desired by the planning unit conducting such planning. The number of state agency representatives on the planning unit shall be determined by the initiating governments in consultation with the governor's office.
     (8) As used in this section, "lead agency" means the entity that coordinates staff support of its own or of other local governments and receives grants for developing a watershed plan.


         Passed by the Senate April 21, 2003.
         Passed by the House April 11, 2003.
         Approved by the Governor May 16, 2003.
         Filed in Office of Secretary of State May 16, 2003.