5881-S AMH KRET FORD 074
SSB 5881 - H AMD TO APP COMM AMD (H-3308.1/07) 646
By Representative Kretz
FAILED 4/10/2007
On page 1, line 7, after "Washington for" strike "power development" and insert "((power development)) development of green power"
On page 3, line 12, after "pumping." insert:
"(3) For the purposes of this section, "green power" means all electric power developed by hydroelectric facilities within or bordering upon the state of Washington."
EFFECT: Defines green power as all electric power developed by hydroelectric facilities within or bordering upon the state of Washington. All green power facilities pay the annual license fee.