1092-S.E AMS WM S3136.4

ESHB 1092  - S COMM AMD
     By Committee on Ways & Means

ADOPTED AS AMENDED 03/31/2007

     Strike everything after the enacting clause and insert the following:

NEW SECTION.  Sec. 1   (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2009, out of the several funds specified in this act.
     (2) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.
     (a) "Fiscal year 2008" or "FY 2008" means the fiscal year ending June 30, 2008.
     (b) "Fiscal year 2009" or "FY 2009" means the fiscal year ending June 30, 2009.
     (c) "Lapse" or "revert" means the amount shall return to an unappropriated status.
     (d) "Provided solely" means the specified amount may be spent only for the specified purpose.
     Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.

PART 1
GENERAL GOVERNMENT

NEW SECTION.  Sec. 1001   FOR THE OFFICE OF THE SECRETARY OF STATE
     Acquisition of Fredericks Collection (08-2-950)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 1002   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (88-2-002)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $2,773,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,122,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,895,000

NEW SECTION.  Sec. 1003   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Cancer Research Facility Grant (01-S-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $667,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $667,000

NEW SECTION.  Sec. 1004   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Coastal Erosion Grants (01-S-019)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $316,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $316,000

NEW SECTION.  Sec. 1005   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (04-4-003)

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $156,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,075,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,231,000

NEW SECTION.  Sec. 1006   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Highline School District Aircraft Noise Mitigation (03-H-001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is subject to the Highline school district, the port of Seattle, and the federal aviation administration each matching the appropriation in section 150, chapter 26, Laws of 2003, 1st sp. sess.
     (2) This reappropriation does not commit the state to make future appropriations for this program.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,699,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,300,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,999,000

NEW SECTION.  Sec. 1007   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     City of Woodland Infrastructure Development (04-4-959)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
     (2) The reappropriation is provided solely for allocation by the department to the city of Woodland for infrastructure development, including drainage improvements and a dike access road.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $79,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $222,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $301,000

NEW SECTION.  Sec. 1008   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Account (04-4-002)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) Expenditures of the appropriation shall comply with RCW 70.119A.170.
     (2)(a) The state building construction account reappropriation is provided solely to provide assistance to counties, cities, and special purpose districts to identify, acquire, and rehabilitate public water systems that have water quality problems or have been allowed to deteriorate to a point where public health is an issue. Eligibility is confined to applicants that already own at least one group A public water system and that demonstrate a track record of sound drinking water utility management. Funds may be used for: Planning, design, and other preconstruction activities; system acquisition; and capital construction costs.
     (b) The state building construction account reappropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this reappropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to the appropriation in section 201, chapter 277, Laws of 2004.

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $5,227,000
     State Building Construction Account--State . . . . . . . . . . . . $1,249,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $4,200,000
          Subtotal Reappropriation . . . . . . . . . . . . $10,676,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,024,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,700,000

NEW SECTION.  Sec. 1009   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water SRF - Authorization to Use Loan Repayments (04-4-010)

Reappropriation:
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $15,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,200,000

NEW SECTION.  Sec. 1010   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Lewis & Clark Confluence Project (04-2-954)

     The reappropriation in this section is subject to the following conditions and limitations: The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,017,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,983,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1011   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local/Community Projects (04-4-011)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department, except that the Highline historical society project is land acquisition.
     (2) The reappropriation is subject to the project list in section 204, chapter 277, Laws of 2004.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,936,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,379,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,315,000

NEW SECTION.  Sec. 1012   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Funds (04-4-001)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $112,309,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $249,714,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $362,023,000

NEW SECTION.  Sec. 1013   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building for the Arts (06-4-005)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.750.
     (2) The reappropriation is subject to the project list in section 104, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,263,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $427,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,690,000

NEW SECTION.  Sec. 1014   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Services Facilities Program (06-4-006)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.125.
     (2) The reappropriation is subject to the project list in section 123, chapter 488, Laws of 2005 and section 111, chapter 8, Laws of 2001 2nd sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $952,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,394,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,346,000

NEW SECTION.  Sec. 1015   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local/Community Projects (06-4-008)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
     (2) Funding for the Inland Northwest Science and Technology Center shall be held in reserve until the balance of phase I funding has been secured or committed from local government and community sources.
     (3) The Washington state arts commission shall design a plaque that shall be affixed to buildings or displayed as part of a project receiving any appropriation from this section. The plaque shall provide information to the public that the building or project has been made possible by the tax dollars of Washington citizens. The commission may contact the secretary of state to obtain approval for use of the Washington seal in the design of the plaque. The final design shall be approved by the chairs and ranking members of the house of representatives capital budget committee and the senate ways and means committee.
     (4) The reappropriation is subject to the project list in section 106, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $29,192,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,608,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $49,800,000

NEW SECTION.  Sec. 1016   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Youth Recreational Facilities Program (06-4-007)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.135.
     (2) The reappropriation is subject to the project list in section 136, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,323,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,977,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,300,000

NEW SECTION.  Sec. 1017   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization Board (CERB) (06-4-011)

     The reappropriation in this section is subject to the following conditions and limitations: A maximum of twenty-five percent of the reappropriation in this section may be used for grants.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $20,209,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $241,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,450,000

NEW SECTION.  Sec. 1018   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Program (06-4-003)

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $8,100,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $21,780,000
          Subtotal Reappropriation . . . . . . . . . . . . $29,880,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,880,000

NEW SECTION.  Sec. 1019   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (06-4-001)

Reappropriation:
     State Taxable Building Construction
          Account--State . . . . . . . . . . . . $43,308,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $70,792,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $114,100,000

NEW SECTION.  Sec. 1020   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (06-4-851)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) $7,800,000 of the reappropriation from the Washington housing trust account is provided solely for the backlog, as defined by the department, of projects determined by the department to be eligible under chapter 43.185 or 43.185A RCW.
     (2) $4,500,000 of the reappropriation from the Washington housing trust account is provided solely for weatherization administered through the energy matchmakers program.
     (3) $850,000 of the reappropriation from the Washington housing trust account is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social
and health services.
     (4) $500,000 of the reappropriation from the Washington housing trust account is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.
     (5) $3,000,000 of the reappropriation from the Washington housing trust account is provided solely for farm worker housing projects and programs to meet the full spectrum of housing needs of Washington's farm workers and their families. The department shall work with stakeholders representing a diversity of farm worker housing interests
to develop a strategic plan in implementing this provision.
     (6) $200,000 of the reappropriation from the Washington housing trust account is provided solely for the implementation and management of a manufactured/mobile home landlord-tenant ombudsman conflict resolution program by the office of mobile home affairs as generally described in section 3, chapter 429, Laws of 2005. The office of mobile home affairs shall also determine the number of complaints made to the department since May of 2005 that, in the best estimate of the department, do in fact present violations of chapter 59.20 RCW and shall produce a summary of the number and types of complaints. The office of mobile home affairs shall also continue to maintain and update a database with information about all mobile home parks and manufactured housing communities. The office of mobile home affairs shall provide a report regarding the activities and results of the program to the appropriate committees of the house of representatives and the senate by December 31, 2007.
     (7) $150,000 of the appropriation from the Washington housing trust account is provided solely for a program to assist individuals and communities in the home-buying process, including, but not limited to: Homebuyer education classes, credit and budget counseling, financial literacy training, and down payment assistance programs. The department shall contract with a nonprofit organization as defined under section 501(c)(3) of the Internal Revenue Code or similar successor provision that has experience and expertise in addressing language access barriers in the home-buying process to implement this program.
     (8) The reappropriation in this section must be included in the calculation of annual funds available for determining the administrative costs of the department, which shall not exceed five percent of the annual funds available for the housing assistance program and the affordable housing program as authorized under RCW 43.185.050 and 43.185A.030.

Reappropriation:
     Washington Housing Trust Account--State . . . . . . . . . . . . $16,502,000
     Homeless Families Services Account--State . . . . . . . . . . . . $4,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $20,502,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $499,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,001,000

NEW SECTION.  Sec. 1021   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Job/Economic Development Grants (06-4-950)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the project list in section 107, chapter 371, Laws of 2006.
     (2) $1,000,000 of the reappropriation for the Pacific Northwest national labs campus infrastructure project is provided solely for giga-pop infrastructure.
     (3) $5,000,000 of the reappropriation is provided solely for military communities infrastructure projects. Military communities infrastructure projects shall include:
     (a) Grants to counties and cities for the purchase of development easements to restrict the use of accident potential zones and clear zones. The office of financial management shall establish a competitive process for selecting projects to receive the grants. Final allocation of these grants shall be at the discretion and with the approval of the director of the office of financial management.
     The grants are subject to the following conditions:
     (i) The county or city must be subject to and in compliance with RCW 36.70A.530;
     (ii) The grants may not be used to remove encroachments into these zones allowed by county or city zoning or permitting actions;
     (iii) The county or city must have an encroachment prevention plan preventing future encroachment into these zones; and
     (iv) The grant provided by the state must not exceed one-third of the project cost with funds from local and federal sources providing the balance of the funds.
     (b) Up to $481,000 of the reappropriation is provided solely for improvements to a military department site on Fairchild air force base.

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $31,481,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,519,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 1022   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Jobs in Communities (06-4-951)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
     (2) The reappropriation is subject to the project list in section 140, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,965,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,286,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,251,000

NEW SECTION.  Sec. 1023   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (06-4-004)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $288,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $288,900,000

NEW SECTION.  Sec. 1024   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (06-4-010)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $3,937,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $191,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,128,000

NEW SECTION.  Sec. 1025   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Water System Acquisition and Rehabilitation Program (06-4-850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this reappropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to this appropriation.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,706,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $295,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,001,000

NEW SECTION.  Sec. 1026   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Grays Harbor Public Utility District Bioenergy Project (06-4-852)

Reappropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $2,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 1027   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Building for the Arts Grants (07-4-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of RCW 43.63A.750.
     (2) The appropriation is provided solely for the following list of projects:

ProjectsLocationRecommendation
Wing Luke Asian museumSeattle$2,000,000
Friends of GladishPullman$48,000
Town hall associationSeattle$750,000
Duwamish tribal servicesSeattle$275,000
Seattle art museumSeattle$1,750,000
Village theatreIssaquah$575,000
Artspace projects, Inc.Seattle$1,000,000
Suquamish foundationSuquamish$550,000
Edmonds center for the artsEdmonds$1,000,000
The Merc playhouse societyTwisp$9,500
Orcas open artsEastsound$70,000
Whatcom film associationBellingham$325,000
Whatcom museum societyBellingham$1,000,000
Seattle theatre groupSeattle$750,000
Confluence galleryTwisp$77,000
Columbia theatre associationLongview$750,000
San Juan community theatreFriday Harbor$193,000
Harlequin productionsOlympia$75,000
Northshore performing arts centerBothell$350,000
Tacoma musical playhouseTacoma$75,000
Wing it productionsSeattle$20,000
826 SeattleSeattle$7,500
Cornish College of the ArtsSeattle$350,000
 
Total$12,000,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $48,000,000
          TOTAL . . . . . . . . . . . . $60,000,000

NEW SECTION.  Sec. 1028   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Economic Revitalization Board (07-4-015)

     The appropriation in this section is subject to the following conditions and limitations: A maximum of twenty-five percent of the appropriation may be used for grants.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,711,000
     Public Facility Construction Loan Revolving
     Account--State . . . . . . . . . . . . $7,289,000
          Subtotal Appropriation . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $44,000,000

NEW SECTION.  Sec. 1029   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Community Services Facilities Grants (07-4-002)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of RCW 43.63A.125.
     (2) The appropriation is provided solely for the following list of projects:

ProjectsLocationRecommendation
West Seattle food bankSeattle$400,000
Compass healthLynnwood$37,000
Neighborhood houseSeattle$1,000,000
White Center emergency food associationWhite Center$184,000
Garden-raised bountyOlympia$170,000
Food lifelineSeattle$122,000
Marysville food bankMarysville$187,000
Maple Valley food bankMaple Valley$117,000
The Arc of Whatcom countyBellingham$158,000
CAC of Lewis, Mason, and Thurston countyLacey$260,000
South county senior centerEdmonds$200,000
Chief Seattle clubSeattle$350,000
Senior center of West SeattleSeattle$500,000
YMCA of Snohomish countyMonroe$1,000,000
The Salvation Army - SpokaneSpokane$275,000
Asian counseling and referral servicesSeattle$1,000,000
Camas institute foundationUsk$650,000
Youth eastside servicesBellevue$750,000
YMCA of Snohomish countyEverett$275,000
Bellingham food bankBellingham$400,000
N.A.T.I.V.E. projectSpokane$375,000
Brigid Collins family support centerBellingham$400,000
Family resource centerRedmond$150,000
MorningsideOlympia$587,000
First step family support centerPort Angeles$200,000
Olympic community action programsPort Townsend$400,000
 
Total$10,147,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,147,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $50,147,000

NEW SECTION.  Sec. 1030   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Drinking Water Assistance Program (07-4-004)

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $7,200,000
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $21,100,000
          Subtotal Appropriation . . . . . . . . . . . . $28,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $155,400,000
          TOTAL . . . . . . . . . . . . $183,700,000

NEW SECTION.  Sec. 1031   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Housing Assistance, Weatherization, and Affordable Housing (07-4-009)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $9,000,000 of the appropriation is provided solely for weatherization administered through the energy matchmakers program.
     (2) $5,000,000 of the appropriation is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.
     (3) $2,500,000 of the appropriation is provided solely for grants to nonprofit organizations and public housing authorities for revolving loan, self-help housing programs for low and moderate income families.
     (4) $1,000,000 of the appropriation is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.
     (5) $8,000,000 of the appropriation is provided solely for facilities housing low-income migrant, seasonal, or temporary farmworkers. The operation of the facilities built under this section shall be in compliance with 8 U.S.C. Sec. 1342. The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need. Funding may also be provided, to the extent qualified projects are submitted, for health and safety projects.
     (6) $5,000,000 of the appropriation is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children.
     (7) $2,500,000 of the appropriation is provided solely for the development of farm infrastructure improvements.
     (8) $1,500,000 of the appropriation is provided solely for the development of housing for low-income or homeless Native Americans. The department shall work with Native American tribes, not-for–profit organizations with experience in serving Native American populations, and Native American housing development organizations to prioritize projects located in the areas of highest identified need.
     (9) $4,000,000 of the appropriation is provided solely for loans and grants to eligible organizations to purchase manufactured/mobile home communities with the intent of preserving the communities for affordable housing.
     (10) The appropriation in this section shall not be used for the administrative costs of the department. The amount of the appropriation shall be included in the calculation of annual funds available for determining the administrative costs authorized under RCW 43.185.050.

Appropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $100,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $560,000,000
          TOTAL . . . . . . . . . . . . $660,000,000

NEW SECTION.  Sec. 1032   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Job Development Fund Grants (07-4-010)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Up to $429,000 of the appropriation in this section is for administration.
     (2) The appropriation is provided solely for the following list of projects:

ProjectsLocationRecommendation
Mint farm industrial park phase 2 infrastructure improvements
City of Longview

$1,982,000
Fruitdale road/McGarigle road improvementsSkagit county$2,277,000
Valentine road corridor improvementsCity of Pacific$4,946,000
Wenatchee waterfront revitalization projectCity of Wenatchee$10,000,000
Northeast Lacey public infrastructure and economic stimulus packageCity of Lacey$9,912,000
Soap Lake spa and wellness centerCity of Soap Lake$1,000,000
Port of Ephrata transportation centerPort of Ephrata$471,000
Project Pier 1Port of Anacortes$5,610,000
Totem Lake mall and business centerCity of Kirkland$3,000,000
Burnham/Borgen interchange improvementsCity of Gig Harbor$5,000,000
Satsop development park turbine/administration building improvementsGrays Harbor public development authority
$5,053,000
Technical and scientific service incubatorCity of Tacoma$250,000
 
Total$49,501,000

Appropriation:
     Job Development Account--State . . . . . . . . . . . . $49,930,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $49,930,000

NEW SECTION.  Sec. 1033   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Belfair Sewer Improvements (08-4-852)

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $4,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,800,000

NEW SECTION.  Sec. 1034   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Public Works Trust Fund (07-4-005)

     The appropriation in this section is subject to the following conditions and limitations: The department and the public works board shall immediately revise policy for interest rates for loans so that the minimum rate is not less than one percent and the criteria for setting the rate is based on the fiscal capacity of the applicant, with lower interest rates awarded to applicants with lower fiscal capacity. Fiscal capacity shall include a determination of the impact of the project on rate payers compared to rates typically seen in the region. The department and the board shall review all waste water and storm water projects with the department of ecology to determine which projects would result in the greatest improvement to water quality. The department and the public works board shall prioritize waste water and storm water projects to achieve the greatest improvement in water quality and to assist jurisdictions with the lowest fiscal capacity. The list of projects submitted to the legislature for approval in accordance with RCW 43.155.070(6) shall include a summary of the information obtained from the department of ecology and information on fiscal capacity for each project. The department and the public works board shall not count prior loans or grants from any state sources as local matching funds.

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $327,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,400,000,000
          TOTAL . . . . . . . . . . . . $1,727,000,000

NEW SECTION.  Sec. 1035   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Rural Washington Loan Fund (07-4-008)

Appropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $4,127,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,508,000
          TOTAL . . . . . . . . . . . . $20,635,000

NEW SECTION.  Sec. 1036   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Youth Recreational Facilities Grants (07-4-003)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of RCW 43.63A.135.
     (2) Up to $8,000,000 of the appropriation is provided solely for the following list of projects:

ProjectsLocationRecommendation
YMCA of the inland northwestSpokane$800,000
Boys and girls clubs of south Puget SoundLakewood$300,000
YMCA of Snohomish countyMukilteo$385,000
YMCA of Snohomish countyEverett$800,000
Boys and girls club of south Puget SoundGig Harbor$600,000
Toutle river ranchLongview$525,000
Boys and girls club of BellevueBellevue$800,000
YMCA of Tacoma-Pierce countyGig Harbor$800,000
Wenatchee valley YMCAWenatchee$213,000
YMCA of greater SeattleSeattle$250,000
Maple Valley community centerMaple Valley$100,000
Boys and girls clubs of King countySeattle$618,000
Filipino community of SeattleSeattle$146,000
Boys and girls clubs of King countySeattle$800,000
Ferndale boys and girls clubFerndale$863,290
Total$8,000,000

     (3) Up to $2,000,000 of the appropriation is for a supplemental list of projects to be selected by the department under the same rules and criteria used for selecting the list of projects in subsection (2) of this section.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $42,000,000

NEW SECTION.  Sec. 1037   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     High Risk Forests Program (08-2-853)

     The appropriation in this section is subject to the following conditions and limitations: $3,000,000 of the appropriation is provided solely for grants to an independent nonprofit land stewardship organization to purchase or lease development rights or conservation easements from willing family forest landowners facing pressure to convert their lands and who desire to keep their land as working forest. The organization shall award grants only for transfer of development rights programs approved by the local government participants.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 1038   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Infrastructure Assistance (08-4-004)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for an infrastructure grant to the city of Tieton for water system improvements.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,627,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,627,000

NEW SECTION.  Sec. 1039   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Innovation Partnership Zones (08-2-003)

     The appropriation in this section is subject to the following conditions and limitations: Pursuant to chapter . . . (House Bill No. 1091/Senate Bill No. 5090), Laws of 2007 (innovation partnership zones), the state will designate unique areas of the state as innovation partnership zones, where globally competitive companies, research institutions, and advanced training are creating special competitive advantages for the state. From among the innovation partnership zones, using a competitive process based on need, estimated economic impact, geographic diversity, and local matches, five zones or projects will be selected to receive funding authorized by chapter . . . (House Bill No. 1091/Senate Bill No. 5090), Laws of 2007. The appropriation in this section is provided solely for shared telecommunications within the zone, shared infrastructure and facilities, long-term capital purchases, and up to 10 percent for zone administration through the locally-designated innovation partnership zone administrator. If chapter . . . (House Bill No. 1091/Senate Bill No. 5090), Laws of 2007 is not enacted by June 30, 2007, the funds in this section shall lapse.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1040   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Water System Acquisition Rehabilitation Program (07-4-006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1041   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local and Community Projects (08-4-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.
     (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement shall not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(2)(c).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
     (7) Funding for preconstruction activities for the Camas and Washougal community and recreation center is contingent on voter approval of a metropolitan park district.
     (8) The appropriation provided in this section for the bridge for kids project shall not be released until the department obtains a report from the project sponsor updating the cost of the project and the current fund raising plan.
     (9) The appropriation provided in this section for the Fox theater shall be provided only under an agreement that the theater shall retain its current name as the Fox theater.
     (10) The appropriation is provided solely for the following list of projects:

Project Name       Amount

Aberdeen union gospel mission       $562,000
Arts west playhouse and gallery       $150,000
Ashford cultural center and mountaineering museum       $800,000
Asian counseling/referral services       $2,000,000
Ballard Corners park       $125,000
Beaver mitigation of Little Spokane river       $75,000
Benton City food bank       $200,000
Blueberry park improvements       $5,000
Bowen field       $500,000
Bremerton downtown economic revitalization -
     harborside commons       $1,000,000
Bridge for kids       $500,000
Brightwater education facility       $675,000
Burien town square       $1,600,000
Camp Kilworth land acquisition - Federal Way       $1,100,000
CASA latina       $1,000,000
Chehalis branch of timberland library       $500,000
Chehalis veterans wall of honor security enclosure       $25,000
Cities of Camas and Washougal community/recreation
     center design       $500,000
City of Everett minor league baseball - aquasox       $433,000
City of Kent event center       $3,000,000
City of Mount Vernon downtown and waterfront flood
     control       $1,000,000
City of Spokane minor league baseball - indians       $2,000,000
City of Tacoma minor league baseball - rainiers       $2,500,000
City of Yakima minor league baseball       $433,000
Civil war cemetery near Volunteer park       $5,000
Confluence project       $500,000
Counter-Balance park       $100,000
Covered Bridge park land acquisition and roof
     repair (Grays river)       $90,000
Cowlitz drug center       $580,000
Darrington water system improvements       $100,000
Daybreak star in Discovery park       $300,000
Des Moines beach flood project       $250,000
Dining car historic preservation       $50,000
Discover park - Fort Lawton       $700,000
Duwamish longhouse project       $275,000
El Centro de la Raza center       $821,000
Emmanuel family life center       $500,000
Federal Way little league field lighting       $50,000
Fish Lake trail       $2,000,000
Fort Dent sewer       $450,000
Foss waterway       $1,000,000
Fox theater       $2,000,000
Goodwill of Tacoma       $1,500,000
High Point neighborhood center in West Seattle       $1,000,000
Innovative services northwest       $1,900,000
Institute for community leadership       $500,000
Japanese cultural center of Washington       $750,000
Jewish federation of greater Seattle       $900,000
Kent alliance center       $500,000
Kitsap community resources       $900,000
Kitsap SEED program       $1,100,000
Klickitat law enforcement firing range       $20,000
Korean women's association center       $1,500,000
Kruckeberg botanical garden       $150,000
Lake Stevens civic center       $800,000
Lake Stevens senior center       $200,000
Lake Waughop/department of ecology aquatic weeds       $50,000
Library connection at Greenbridge       $200,000
Lions club renovation       $110,000
Long Lake nutrient reduction       $300,000
Loon Lake wood waste removal pilot study       $350,000
Lucy Lopez center land acquisition       $750,000
McCaw hall       $3,000,000
Mirabeau Point Children's Universal park       $800,000
Morning star cultural center       $300,000
Mountain to sound - state route 18/I90 interchange       $1,100,000
Nisei veterans committee       $250,000
Nordic heritage museum       $1,500,000
Northwest harvest       $3,000,000
Northwest museum of arts and culture       $1,000,000
Palouse street safety improvements       $210,000
Pedestrian overpass state route 395 and court street       $400,000
Perry technical institute hanger       $250,000
Pike Place market       $1,070,000
Prime time repairs (terminally ill kids)       $250,000
River walk trail--Puyallup       $600,000
Salishan housing community       $3,000,000
Sea Mar family housing community       $800,000
Seatac World War I memorial plaza       $300,000
Seattle art museum       $1,250,000
Seattle Chinese garden       $500,000
Shoreline YMCA       $800,000
Spokane east central community center       $150,000
Spokane northeast community center       $1,000,000
Spokane Valley community center and foodbank       $260,000
Spokane YWCA/YMCA joint project       $2,500,000
Springwood youth center in Kent       $500,000
Suquamish inviting house construction       $1,000,000
Tacoma Narrows bridge lights       $1,500,000
Tanaskat viewing platform       $100,000
Tanbara clinic - East Tacoma community       $750,000
The Northwest maritime center       $1,000,000
The Tri-Cities minor league baseball       $666,000
Thurston county small business incubator       $750,000
Tokeland/North Cove water tank for fire       $10,000
Turning point domestic violence shelter       $700,000
University Place town square plaza       $1,000,000
ValHalla hall       $700,000
Vancouver national historic reserve       $1,000,000
Wapato Filipino-American center       $118,000
White Center Heights park       $400,000
White Salmon water improvement       $1,500,000
Willapa Harbor community center       $300,000
Wing-It production's historic theater       $20,000
Yakima domestic violence shelter       $200,000
Yakima downtown futures initiative phase 3       $1,000,000
YMCA of Snohomish county: Ebey Island project       $2,200,000

Total       $83,788,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $83,788,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $83,788,000

NEW SECTION.  Sec. 1042   FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Grays Harbor Wind Project (08-4-950)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1043   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Graving Dock Settlement (08-4-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation in this section is provided solely for the purposes of settling all identified and potential claims from the port of Port Angeles and the city of Port Angeles related to the construction of a graving dock facility on the graving dock property. In conjunction with the settlement agreement in Lower Elwha Klallam Tribe et al v. State et al, Thurston county superior court, cause no. 05-2-01595-8, the city of Port Angeles, port of Port Angeles, and the state of Washington entered into an economic development agreement which settles all claims related to graving dock property and associated construction and releases the state from all claims related to the construction of the graving dock facilities. The expenditure of this appropriation is contingent on the conditions and limitation set forth in subsections (2), (3), and (4) of this section.
     (2) $7,500,000 of the state building construction account--state appropriation is provided solely for the city of Port Angeles for funding capital projects intended to enhance economic development.
     (3) $7,500,000 of the state building construction account--state appropriation is provided solely for the port of Port Angeles for funding capital projects intended to enhance economic development.
     (4) $480,000 of the state building construction account--state appropriation is provided solely for the city of Port Angeles for archaeological work as specified in the settlement agreement.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,480,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,480,000

NEW SECTION.  Sec. 1044   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Snohomish, Island, and Skagit County Regional Higher Education (08-2-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Up to $1,500,000 is for the office of financial management to assess options and make recommendations on the siting of a higher education institution in the Snohomish-Island-Skagit county region. The office of financial management shall develop the operational and management plans needed to establish the institution, including but not limited to: A master business plan for design and implementation; governance; site selection; and programs to be offered to address demographic pressures and workforce needs. Planning and analysis shall be done in coordination with the local community and existing higher education institutions. The office of financial management shall evaluate sites based on, but not limited to, the following criteria: Meeting the objectives of the master business plan; meeting the unmet baccalaureate needs in the region including high demand program needs; compliance with provisions of the state's growth management act; and accessibility from existing and planned transportation infrastructure.
     (2) The office of financial management shall report its findings to the governor and the appropriate committees of the senate and house of representatives by December 1, 2007.
     (3) The office of financial management may contract with outside sources to carry out the provisions of this section.
     (4) $2,500,000 is provided solely for the office of financial management to purchase or to secure purchase options on a site for the institution. If a site is available for the recommended development alternative at no cost, or for less than the amount appropriated, the remainder shall instead be applied to predesign of recommended facilities and infrastructure.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 1045   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Higher Education Cost Escalation (08-2-854)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for the office of financial management to assist public baccalaureate higher education institutions in managing unanticipated cost escalation for projects bid during the 2007-2009 biennium. Not more than $750,000 shall be made available to any single project and amounts used must be matched equally from nonstate resources. The office of financial management shall manage the distribution of funds to ensure that the requesting college has managed its project within the current appropriation through preparation of bid documents and that the scope of the project is no greater than originally specified in the design. For purposes of this section, "nonstate resources" may include tuition revenues and funds appropriated from an institution's local capital project account for a minor works project under this act. Prior to approving use of a local account appropriation as a match, and its transfer to the project with unanticipated cost escalation, the office of financial management shall require the institution to describe what it has done to identify and develop alternative nonstate resources for a match, and the specific minor works projects that would be deferred as a result of the transfer. The office of financial management shall report to the appropriate fiscal committees of the legislature on the use of these funds.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1046   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Oversight of State Facilities (08-2-855)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is this section is provided solely for the office of financial management to strengthen its oversight role in state facility analysis and decision making as generally described in chapter . . . (Substitute House Bill No. 2366), Laws of 2007.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,015,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,015,000

NEW SECTION.  Sec. 1047   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Transportation Building Preservation (02-1-008)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,928,000
Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $3,425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,252,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,605,000

NEW SECTION.  Sec. 1048   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capitol Public/Historic Facilities: Preservation Minor Works (06-1-006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $327,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $673,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 1049   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Heritage Park Development (01-H-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,676,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,678,000

NEW SECTION.  Sec. 1050   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Engineering and Architectural Services (06-2-012)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $874,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,724,000

NEW SECTION.  Sec. 1051   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Highway-License Building Repair and Renewal (06-1-013)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $497,000
Appropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,598,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $354,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,639,000
          TOTAL . . . . . . . . . . . . $5,088,000

NEW SECTION.  Sec. 1052   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Natural Resources Building Repairs and Renewal (06-1-014)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $269,000
Appropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $258,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $2,223,000
          Subtotal Appropriation . . . . . . . . . . . . $2,481,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $233,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,266,000
          TOTAL . . . . . . . . . . . . $8,249,000

NEW SECTION.  Sec. 1053   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Statewide Infrastructure: Preservation Minor Works (06-1-004)

Reappropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $31,000
     State Building Construction Account--State . . . . . . . . . . . . $246,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,824,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,101,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $918,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,019,000

NEW SECTION.  Sec. 1054   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Statewide Office Facilities: Preservation Minor Works (06-1-003)

Reappropriation:
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $812,000
     General Administration Service Account--State . . . . . . . . . . . . $510,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,322,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,558,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,880,000

NEW SECTION.  Sec. 1055   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Statewide Parking Facilities: Preservation Minor Works (06-1-007)

Reappropriation:
     State Vehicle Parking Account--State . . . . . . . . . . . . $697,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $183,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $880,000

NEW SECTION.  Sec. 1056   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capitol Campus High Voltage System Improvements (08-1-010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,204,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,204,000

NEW SECTION.  Sec. 1057   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Deferred Maintenance (08-1-018)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 1058   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Emergency Repairs (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $350,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $900,000
     General Administration Service Account--State . . . . . . . . . . . . $150,000
          Subtotal Appropriation . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,000,000
          TOTAL . . . . . . . . . . . . $7,400,000

NEW SECTION.  Sec. 1059   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Engineering and Architectural Services (08-2-013)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $380,000
     State Vehicle Parking Account--State . . . . . . . . . . . . $133,000
     State Building Construction Account--State . . . . . . . . . . . . $12,340,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $461,000
     General Administration Service Account--State . . . . . . . . . . . . $104,000
          Subtotal Appropriation . . . . . . . . . . . . $13,418,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $42,815,000
          TOTAL . . . . . . . . . . . . $56,233,000

NEW SECTION.  Sec. 1060   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building Improvements (08-1-011)

     The appropriation in this section is subject to the following conditions and limitations: $25,000 of the appropriation is provided solely to establish a legislative gift center created in chapter . . . (Second Substitute House Bill No. 1896), Laws of 2007. If the bill is not enacted by June 30, 2007, the appropriation shall lapse.

Appropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $676,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,836,000
          TOTAL . . . . . . . . . . . . $3,512,000

NEW SECTION.  Sec. 1061   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works - Facility Preservation (08-1-015)

Appropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $1,715,000
     State Building Construction Account--State . . . . . . . . . . . . $1,456,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $3,634,000
     General Administration Service Account--State . . . . . . . . . . . . $1,386,000
          Subtotal Appropriation . . . . . . . . . . . . $8,191,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,365,000
          TOTAL . . . . . . . . . . . . $28,556,000

NEW SECTION.  Sec. 1062   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works - Infrastructure Preservation (08-1-004)

Appropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $600,000
     State Vehicle Parking Account--State . . . . . . . . . . . . $22,000
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000
     Thurston County Capital Facilities Account--State . . . . . . . . . . . . $1,899,000
     General Administration Service Account--State . . . . . . . . . . . . $200,000
          Subtotal Appropriation . . . . . . . . . . . . $5,721,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,006,000
          TOTAL . . . . . . . . . . . . $12,727,000

NEW SECTION.  Sec. 1063   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works - Program (08-2-012)

     The appropriation in this section is subject to the following conditions and limitations: The department shall post signs on eastbound and westbound 5th avenue in Olympia, Washington over Capitol Lake dam to notify cyclists that the bike lanes discontinue.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $370,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,720,000
          TOTAL . . . . . . . . . . . . $3,090,000

NEW SECTION.  Sec. 1064   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     O'Brien Building Improvements (08-1-007)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,981,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,501,000
          TOTAL . . . . . . . . . . . . $18,482,000

NEW SECTION.  Sec. 1065   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Pritchard Building Rehabilitation (08-2-017)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 1066   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Heritage Center/Executive Office Building Development (08-2-954)

     The appropriation in this section is subject to the following conditions and limitations: Planning funds are provided for the development of a heritage center and executive office building on the west capitol campus. The project shall be procured under a general contractor construction management contract. Prior to issuing the request for proposals for the project, the department shall report to the appropriate committees of the legislature the results of: (1) A detailed analysis of the soils of the proposed development site, including the stability of the soils and the affect on the cost of the project; and (2) cost reduction options resulting from a detailed "best study" or value engineering study. The report to the legislature shall be submitted prior to January 1, 2008. The request for proposal shall not be released prior to February 1, 2008.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 1067   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Wheeler Block Development--Department of Information Services, State Patrol, and General Office (08-2-950)

     The appropriation in this section is subject to the following conditions and limitations: Planning funds are provided to lease/develop state office buildings and facilities for the department of information services on the "Wheeler block" of the east capitol campus. The office buildings shall be constructed and financed so that agencies' occupancy costs will not exceed comparable private market rental rates. The comparable general office space rate shall be calculated based on recent Thurston county leases of new space of at least 100,000 rentable square feet adjusted for known escalation clauses, expected inflation, and differences in the level of service provided by the comparable leases as determined by the department of general administration. In addition to the department of information services, state agency tenants shall include the state patrol and other state agencies specified in LEAP capital document No. 2007-xx. The department shall also coordinate with state agency tenants of the existing general administration building that will not be relocated to the new facilities of the "Wheeler block" for occupancy of state-owned or existing leased facilities vacated by the state patrol or the department of information services.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 1068   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Emergency Newhouse Repairs and South Campus Plan (08-2-952)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 1069   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capital Lake Plan Completion (08-2-953)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 1070   FOR THE MILITARY DEPARTMENT
     Omnibus Support to Federal Preservation Projects (06-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,993,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,493,000

NEW SECTION.  Sec. 1071   FOR THE MILITARY DEPARTMENT
     Auditorium and Instructor Support Facility (06-2-003)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,240,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,240,000

NEW SECTION.  Sec. 1072   FOR THE MILITARY DEPARTMENT
     Omnibus Support for Federal Minor Works Projects-Statewide (06-2-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $846,000
     General Fund--Federal . . . . . . . . . . . . $7,200,000
          Subtotal Reappropriation . . . . . . . . . . . . $8,046,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,154,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,200,000

NEW SECTION.  Sec. 1073   FOR THE MILITARY DEPARTMENT
     Modular Building Reutilization (08-2-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,850,000

NEW SECTION.  Sec. 1074   FOR THE MILITARY DEPARTMENT
     Energy Conservation Project (08-2-005)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $275,000
     State Building Construction Account--State . . . . . . . . . . . . $275,000
          Subtotal Appropriation . . . . . . . . . . . . $550,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $550,000

NEW SECTION.  Sec. 1075   FOR THE MILITARY DEPARTMENT
     Minor Works - Facility Preservation (08-1-004)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $5,522,000
     State Building Construction Account--State . . . . . . . . . . . . $2,801,000
          Subtotal Appropriation . . . . . . . . . . . . $8,323,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,867,000
          TOTAL . . . . . . . . . . . . $44,190,000

NEW SECTION.  Sec. 1076   FOR THE MILITARY DEPARTMENT
     Minor Works - Program (08-2-003)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,938,000
     State Building Construction Account--State . . . . . . . . . . . . $1,665,000
          Subtotal Appropriation . . . . . . . . . . . . $6,603,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,215,000
          TOTAL . . . . . . . . . . . . $42,818,000

NEW SECTION.  Sec. 1077   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Historical Preservation (06-4-009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1078   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Historical Courthouse Rehabilitation (08-2-851)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for courthouse protection and preservation, including character defining architectural features, general repairs, system upgrades, payments for renovations completed since January 1, 2006, and improvements to access and accommodations for persons with disabilities. By July 1, 2007, the department shall revise the existing eligibility criteria and grant application process to include review of projects selected for funding by the courthouse advisory committee. Those projects chosen for funding shall undergo a review by the department of general administration's barrier free program to ensure that they meet Americans with disabilities act standards and accessibility and all other Americans with disabilities act requirements are maintained during the construction. The existing historic courthouse advisory committee shall continue to review grant applications and make funding recommendations to the state historic preservation officer. All rehabilitation work shall comply with the secretary of interior's standards for rehabilitation. Grants shall not be used for expenditures for courthouse maintenance. Only counties with historic courthouses that continue to maintain county functions are eligible for grants. Counties receiving grants shall provide an equal amount of matching funds from public or private sources. The department shall use up to two percent of the appropriation for program administration.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 1079   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Historic Barn Preservation (08-4-851)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for implementation of the historic barn preservation program created in chapter . . . (Substitute House Bill No. 2115), Laws of 2007. If the bill is not enacted by June 30, 2007, the appropriation shall lapse.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 1080   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Inventory of Historic Theaters (08-2-950)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 1081   FOR THE STATE CONVENTION AND TRADE CENTER
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     State Convention and Trade Center Account--State . . . . . . . . . . . . $5,990,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,990,000

NEW SECTION.  Sec. 1082   FOR THE STATE CONVENTION AND TRADE CENTER
     Omnibus Minor Works (06-1-001)

Reappropriation:
     State Convention and Trade Center Account--State . . . . . . . . . . . . $995,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $995,000

(End of part)


PART 2
HUMAN SERVICES

NEW SECTION.  Sec. 2001   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Mapping of K-8 Schools (08-4-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,236,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,236,000

NEW SECTION.  Sec. 2002   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Minor Works - Preservation (08-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $598,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $598,000

NEW SECTION.  Sec. 2003   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center-Housing Units (00-1-041)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,292,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,992,000

NEW SECTION.  Sec. 2004   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Developmental Disabilities: Omnibus Programmatic Projects (06-2-465)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 2005   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital-Westlake Building: Fire Alarm Upgrades (06-1-370)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,650,000

NEW SECTION.  Sec. 2006   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Fircrest School - Health and Safety Improvements (06-1-852)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $650,000

NEW SECTION.  Sec. 2007   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Green Hill School: New IMU, Health Center, and Administration (06-2-202)

     The appropriation in this section is subject to the following conditions and limitations: The new appropriation is provided solely for a new intensive management unit and health center at either Green Hill school or Maple Lane school. The department shall not expend any of the funds until May 1, 2008. The department shall submit a report to the appropriate committees of the legislature by January 1, 2008, containing the following information: (1) Unused bed capacity in state and county juvenile rehabilitation facilities; (2) an analysis of the distinguishing characteristics of resident populations at the different state facilities and the residents in county facilities; and (3) the different utilization rates of intensive management beds at Green Hill, Maple Lane, and Echo Glenn. This analysis shall include the number of occupied intensive management unit beds at each facility, the average length of stay in intensive management unit beds at each facility, and rate of repeated use of intensive management unit beds for the same residents.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $900,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,325,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,575,000

NEW SECTION.  Sec. 2008   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Juvenile Rehabilitation: Omnibus Programmatic Projects (06-2-265)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 2009   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Lakeland Village-Nine Cottages: Renovation, Phase 4, 5, and 6 (06-1-402)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,990,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,390,000

NEW SECTION.  Sec. 2010   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Mental Health Division-CLIP Facilities: Preservation (06-4-353)

     The appropriations in the section are subject to the following conditions and limitations: The department shall evaluate options for maximizing federal fund contributions for capital needs of privately-owned facilities that contract with the department for children's long-term inpatient program services and report to the appropriate fiscal committees of the legislature by September 1, 2007.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,381,000
     State and Local Improvements Revolving
     Account--State . . . . . . . . . . . . $20,000
          Subtotal Appropriation . . . . . . . . . . . . $2,401,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,701,000

NEW SECTION.  Sec. 2011   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Mental Health Division-Eastern Washington: Evaluation and Treatment (06-4-352)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 2012   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Mental Health: Omnibus Programmatic Projects (06-2-365)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 2013   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Omnibus Preservation: Facility Preservation (06-1-112)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 2014   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Omnibus Preservation: Health, Safety, and Code Requirements (06-1-111)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 2015   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Omnibus Preservation: Infrastructure Preservation (06-1-113)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 2016   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Rainier School: Storm and Sanitary Sewer, Phase 3 (06-1-853)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $60,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $665,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $40,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $765,000

NEW SECTION.  Sec. 2017   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Emergency and Unanticipated Repair Projects (06-1-101)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $170,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $630,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 2018   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Hazards Abatement and Demolition (06-1-119)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,300,000

NEW SECTION.  Sec. 2019   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Statewide: Facilities Assessment and Cultural Resources Planning (06-1-120)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $270,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $270,000

NEW SECTION.  Sec. 2020   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Capital Project Management (08-1-110)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $2,555,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,870,000
          TOTAL . . . . . . . . . . . . $14,425,000

NEW SECTION.  Sec. 2021   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center: Housing Units Renovation (08-1-041)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,185,000
          TOTAL . . . . . . . . . . . . $18,585,000

NEW SECTION.  Sec. 2022   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Emergency Repairs (08-1-101)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $933,000
     State Social and Health Services Construction
     Account--State . . . . . . . . . . . . $67,000
          Subtotal Appropriation . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 2023   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Hazards Abatement and Demolition (08-1-119)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,200,000
          TOTAL . . . . . . . . . . . . $6,200,000

NEW SECTION.  Sec. 2024   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Facility Preservation (08-1-112)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $50,500,000
          TOTAL . . . . . . . . . . . . $59,500,000

NEW SECTION.  Sec. 2025   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Health, Safety, and Code Requirements (08-1-111)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $26,000,000

NEW SECTION.  Sec. 2026   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Infrastructure Preservation (08-1-113)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $23,000,000
          TOTAL . . . . . . . . . . . . $29,500,000

NEW SECTION.  Sec. 2027   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works - Program Projects (08-2-365)

     The appropriation in this section is subject to the following conditions and limitations: Up to $250,000 is provided for roof repairs of historic homes on the grounds of western state hospital.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,480,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $11,480,000

NEW SECTION.  Sec. 2028   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center Medium Management Housing Addition (08-2-505)

     The appropriation in this section is subject to the following conditions and limitations: Funding is for the evaluation of design alternatives to meet programmatic needs.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 2029   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Upgrade Eastern State Hospital Communications Systems (08-1-306)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,280,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,280,000

NEW SECTION.  Sec. 2030   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Utility Replacements at the Special Commitment Center (08-1-504)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,040,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,040,000

NEW SECTION.  Sec. 2031   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital Laundry Upgrades (08-1-325)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $885,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $885,000

NEW SECTION.  Sec. 2032   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital New Kitchen and Commissary Building (08-1-319)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of a new kitchen and commissary building at western state hospital. The office of financial management shall not allot design funding until a predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval. The predesign must assess cook chill alternatives showing staffing and other operating efficiencies such as providing food for the special commitment center and other facilities located in Pierce county.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $650,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,820,000
          TOTAL . . . . . . . . . . . . $10,470,000

NEW SECTION.  Sec. 2033   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Rainier School Waste Treatment Plant (08-2-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,200,000

NEW SECTION.  Sec. 2034   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     JRA Camp Outlook-Basic Training Camp (08-2-205)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for a final site selection and preliminary plans for a permanent facility for camp outlook. The department shall further explore possible existing facilities that would support the privately operated program. If the preferred location remains at Connell, Washington, the department shall ensure that the planned facility shall be designed to minimize the added cost for the program, and retain its cost effectiveness when debt service costs for the new facility are included. The department shall submit a report to the appropriate committees of the legislature before September 1, 2008, with the recommended plan for the facility.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $4,150,000

NEW SECTION.  Sec. 2035   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: Chiller Plant Upgrade (02-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $474,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,380,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,854,000

NEW SECTION.  Sec. 2036   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: Roof Replacement (06-1-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $898,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $727,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,625,000

NEW SECTION.  Sec. 2037   FOR THE DEPARTMENT OF HEALTH
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $386,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,531,000
          TOTAL . . . . . . . . . . . . $2,917,000

NEW SECTION.  Sec. 2038   FOR THE DEPARTMENT OF HEALTH
     Minor Works - Program (08-2-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $135,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,542,000
          TOTAL . . . . . . . . . . . . $1,677,000

NEW SECTION.  Sec. 2039   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory Addition (08-2-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,184,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,984,000
          TOTAL . . . . . . . . . . . . $10,168,000

NEW SECTION.  Sec. 2040   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory Heating, Ventilation, and Air Conditioning Systems Upgrades (08-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,912,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,912,000

NEW SECTION.  Sec. 2041   FOR THE DEPARTMENT OF HEALTH
     Shoreline Campus Master Plan (08-2-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $255,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $255,000

NEW SECTION.  Sec. 2042   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (06-4-001)

Reappropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $18,588,000
Appropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $54,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,086,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $99,360,000
          TOTAL . . . . . . . . . . . . $179,334,000

NEW SECTION.  Sec. 2043   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Building 10 Assisted Living Upgrades (08-2-005)

Appropriation:
Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,242,000
     State Building Construction Account--State . . . . . . . . . . . . $571,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,813,000

NEW SECTION.  Sec. 2044   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works - Facility Preservation (08-1-003)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $722,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,283,000
          TOTAL . . . . . . . . . . . . $2,005,000

NEW SECTION.  Sec. 2045   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works - Program (08-2-002)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $344,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $231,000
          TOTAL . . . . . . . . . . . . $575,000

NEW SECTION.  Sec. 2046   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     State Veterans Cemetery (08-2-004)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $6,886,000
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $939,000
          Subtotal Appropriation . . . . . . . . . . . . $7,825,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,825,000

NEW SECTION.  Sec. 2047   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Emergency Repairs (08-1-004)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 2048   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works - Health, Safety, and Code Requirements (08-1-002)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $596,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,680,000
          TOTAL . . . . . . . . . . . . $2,276,000

NEW SECTION.  Sec. 2049   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works - Infrastructure Preservation (08-1-001)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,025,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,377,000
          TOTAL . . . . . . . . . . . . $3,402,000

NEW SECTION.  Sec. 2050   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Retsil Energy Assessment and Audit (08-2-850)
     The appropriation in this section is subject to the following conditions and limitations:
     (1) Up to $40,000 of the appropriation is for a department of general administration assessment of the use of digester gas fuel generated by a nearby wastewater treatment facility to heat the veterans home in Retsil.
     (2) Up to $60,000 of the appropriation is for a department of general administration energy audit of the veterans home in Retsil.

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 2051   FOR THE DEPARTMENT OF CORRECTIONS
     Coyote Ridge Corrections Center: Design and Construct Medium Security Facility (98-2-011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $155,459,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $75,449,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $244,608,000

NEW SECTION.  Sec. 2052   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Regional Infrastructure (04-2-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,208,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,521,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,729,000

NEW SECTION.  Sec. 2053   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: North Close Security Compound (04-2-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,482,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $130,276,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $140,758,000

NEW SECTION.  Sec. 2054   FOR THE DEPARTMENT OF CORRECTIONS
     Clallam Bay Corrections Center: Install Close Custody Slider Doors (06-2-070)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $660,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $90,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,581,000
          TOTAL . . . . . . . . . . . . $12,331,000

NEW SECTION.  Sec. 2055   FOR THE DEPARTMENT OF CORRECTIONS
     Clallam Bay Corrections Center: Replace Support Building Roof (06-1-044)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,930,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $822,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,752,000

NEW SECTION.  Sec. 2056   FOR THE DEPARTMENT OF CORRECTIONS
     Cedar Creek Corrections Center: Add 100 Minimum Security Beds (06-2-851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,022,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $207,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,229,000

NEW SECTION.  Sec. 2057   FOR THE DEPARTMENT OF CORRECTIONS
     Larch Corrections Center: 80 Bed Expansion (06-2-852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,915,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $157,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,072,000

NEW SECTION.  Sec. 2058   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Complex: Improve C and D Units Security Features (06-1-046)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $280,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,618,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,898,000

NEW SECTION.  Sec. 2059   FOR THE DEPARTMENT OF CORRECTIONS
     McNeil Island Corrections Center: Replace/Stabilize Housing Unit Siding (06-1-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $445,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $349,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,024,000
          TOTAL . . . . . . . . . . . . $12,818,000

NEW SECTION.  Sec. 2060   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Kitchen Improvements (06-1-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $569,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $61,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $630,000

NEW SECTION.  Sec. 2061   FOR THE DEPARTMENT OF CORRECTIONS
     Mission Creek: Add 120 Beds (06-2-017)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,861,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $564,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,425,000

NEW SECTION.  Sec. 2062   FOR THE DEPARTMENT OF CORRECTIONS
     Omnibus Preservation: Facility Preservation (Minor Works) (06-1-035)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,268,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,565,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,833,000

NEW SECTION.  Sec. 2063   FOR THE DEPARTMENT OF CORRECTIONS
     Omnibus Preservation: Health, Safety, and Code (Minor Works) (06-1-027)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,039,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,061,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,100,000

NEW SECTION.  Sec. 2064   FOR THE DEPARTMENT OF CORRECTIONS
     Omnibus Preservation: Infrastructure Preservation (Minor Works) (06-1-025)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,183,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $643,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,826,000

NEW SECTION.  Sec. 2065   FOR THE DEPARTMENT OF CORRECTIONS
     Omnibus Program: Programmatic Projects (Minor Works) (06-2-033)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,554,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $361,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,915,000

NEW SECTION.  Sec. 2066   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: Health Care Facility (06-2-043)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $360,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $340,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $76,027,000
          TOTAL . . . . . . . . . . . . $76,727,000

NEW SECTION.  Sec. 2067   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Health Care Facility (06-2-072)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,039,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $161,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $17,592,000
          TOTAL . . . . . . . . . . . . $18,792,000

NEW SECTION.  Sec. 2068   FOR THE DEPARTMENT OF CORRECTIONS
     Stafford Creek Corrections Center: Correct Security Deficiencies (06-1-013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $593,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,593,000

NEW SECTION.  Sec. 2069   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide: Add Minimum Security Beds (06-2-950)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,361,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,082,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,443,000

NEW SECTION.  Sec. 2070   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women Healthcare Center (06-2-066)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $758,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,858,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $442,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,058,000

NEW SECTION.  Sec. 2071   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Replace Steamlines (06-1-018)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $641,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,179,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $375,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,195,000

NEW SECTION.  Sec. 2072   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Replace Correctional Industry Roof (06-1-023)

Reappropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,619,000
     State Building Construction Account--State . . . . . . . . . . . . $1,338,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,957,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $494,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,451,000

NEW SECTION.  Sec. 2073   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: South Close Security Complex (06-2-021)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,983,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $61,294,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,017,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $69,193,000
          TOTAL . . . . . . . . . . . . $134,487,000

NEW SECTION.  Sec. 2074   FOR THE DEPARTMENT OF CORRECTIONS
     100 Bed Expansion at Mission Creek Corrections Center for Women (08-2-020)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,627,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,627,000

NEW SECTION.  Sec. 2075   FOR THE DEPARTMENT OF CORRECTIONS
     Airway Heights Heating and Cooling Loop Replacement (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,925,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,925,000

NEW SECTION.  Sec. 2076   FOR THE DEPARTMENT OF CORRECTIONS
     Close Sewer Lagoon at Monroe Correctional Complex (08-2-022)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $229,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,736,000
          TOTAL . . . . . . . . . . . . $6,965,000

NEW SECTION.  Sec. 2077   FOR THE DEPARTMENT OF CORRECTIONS
     Emergency Repairs (08-1-035)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $500,000
          Subtotal Appropriation . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $13,000,000

NEW SECTION.  Sec. 2078   FOR THE DEPARTMENT OF CORRECTIONS
     Expand Reception Center at Washington Corrections Center (08-2-016)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $470,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $45,353,000
          TOTAL . . . . . . . . . . . . $45,823,000

NEW SECTION.  Sec. 2079   FOR THE DEPARTMENT OF CORRECTIONS
     Laundry Improvements at Washington State Penitentiary (08-1-033)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,051,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,051,000

NEW SECTION.  Sec. 2080   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Facility Preservation (08-1-024)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 2081   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Health, Safety, and Code Requirements (08-1-031)

Appropriation:
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 2082   FOR THE DEPARTMENT OF CORRECTIONS
     Minor Works - Infrastructure Preservation (08-1-018)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
     Charitable, Educational, Penal, and Reformatory
          Institutions Account--State . . . . . . . . . . . . $1,000,000
          Subtotal Appropriation . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 2083   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Barge Slip Pilings at McNeil Island Corrections Center (08-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,900,000

NEW SECTION.  Sec. 2084   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Cell Door and Electronics at Washington State Reformatory (08-1-010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,545,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,545,000

NEW SECTION.  Sec. 2085   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Electrical Distribution Building at Special Offenders Unit (08-1-009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,222,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,222,000

NEW SECTION.  Sec. 2086   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Fire Alarm System at Washington Corrections Center (08-1-008)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,524,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,524,000

NEW SECTION.  Sec. 2087   FOR THE DEPARTMENT OF CORRECTIONS
     Replace G Building Roof at Washington Corrections Center (08-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,431,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,431,000

NEW SECTION.  Sec. 2088   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Kitchen Roofs at Monroe Correctional Complex (08-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,062,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,062,000

NEW SECTION.  Sec. 2089   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Roofs at Washington Corrections Center (08-1-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,666,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,666,000

NEW SECTION.  Sec. 2090   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Roofs at Washington State Penitentiary (08-1-007)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,789,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,789,000

NEW SECTION.  Sec. 2091   FOR THE DEPARTMENT OF CORRECTIONS
     Replace Telecommunications Infrastructure at Clallam Bay (08-1-013)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,691,000
          TOTAL . . . . . . . . . . . . $15,541,000

NEW SECTION.  Sec. 2092   FOR THE DEPARTMENT OF CORRECTIONS
     Sex Offender Treatment Program Building at Airway Heights (08-2-028)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,947,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,947,000

NEW SECTION.  Sec. 2093   FOR THE EMPLOYMENT SECURITY DEPARTMENT
     Employment Resource Center (05-2-001)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for services and activities including the purchase and installation of state of the art equipment for a 40,000 square foot facility supporting work force development programs using funds available to the state in section 903(d) of the Social Security Act (Reed act).

Reappropriation:
     Unemployment Compensation Administration
          Account--Federal . . . . . . . . . . . . $3,354,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,646,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 2094   FOR THE EMPLOYMENT SECURITY DEPARTMENT
     Employment Security Headquarters Building Assessment (08-1-002)

Appropriation:
     Unemployment Compensation Administration
          Account--Federal . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 2095   FOR THE EMPLOYMENT SECURITY DEPARTMENT
     Walla Walla WorkSource Expansion Project (06-2-001)

Reappropriation:
     Unemployment Compensation Administration
          Account--Federal . . . . . . . . . . . . $250,000

Appropriation:
     Unemployment Compensation Administration
          Account--Federal . . . . . . . . . . . . $578,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $828,000

(End of part)


PART 3
NATURAL RESOURCES

NEW SECTION.  Sec. 3001   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (74-2-006)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $2,756,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,543,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,299,000

NEW SECTION.  Sec. 3002   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Fund (86-2-007)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $678,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $351,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,029,000

NEW SECTION.  Sec. 3003   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants for Cleanup and Prevention (88-2-008)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,191,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,591,000

NEW SECTION.  Sec. 3004   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (90-2-002)

Reappropriation:
     Water Pollution Control Revolving Account--
          Federal . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,306,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,706,000

NEW SECTION.  Sec. 3005   FOR THE DEPARTMENT OF ECOLOGY
     Low-Level Nuclear Waste Disposal Trench Closure (97-2-012)

Reappropriation:
     Site Closure Account--State . . . . . . . . . . . . $4,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,045,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,845,000

NEW SECTION.  Sec. 3006   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (01-H-010)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $1,318,000
     Water Quality Capital Account--State . . . . . . . . . . . . $310,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,628,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,449,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,077,000

NEW SECTION.  Sec. 3007   FOR THE DEPARTMENT OF ECOLOGY
     Water Measuring Devices (01-H-009)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for water measuring devices and gauges. The department shall prioritize the distribution of water measuring devices and gauges to locations participating in the department of fish and wildlife's fish screens and cooperative compliance programs.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,201,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,943,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,144,000

NEW SECTION.  Sec. 3008   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Fund (02-4-007)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the conditions and limitations of section 315, chapter 8, Laws of 2001 2nd sp. sess.

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $1,625,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,974,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,599,000

NEW SECTION.  Sec. 3009   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (02-4-002)

Reappropriation:
     Water Pollution Control Revolving Account--
          State . . . . . . . . . . . . $7,000,000
     Water Pollution Control Revolving Account--
          Federal . . . . . . . . . . . . $79,000
          Subtotal Reappropriation . . . . . . . . . . . . $7,079,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $37,134,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $44,213,000

NEW SECTION.  Sec. 3010   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (02-4-006)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $2,110,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,889,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,999,000

NEW SECTION.  Sec. 3011   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Fund (04-4-007)

     Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,650,000
     Water Quality Capital Account--State . . . . . . . . . . . . $1,400,000
          Subtotal Reappropriation . . . . . . . . . . . . $6,050,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,702,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,752,000

NEW SECTION.  Sec. 3012   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants for Cleanup and Prevention (04-4-008)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,296,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,396,000

NEW SECTION.  Sec. 3013   FOR THE DEPARTMENT OF ECOLOGY
     Site Closure - Nuclear Waste Trench Site Investigation (04-4-010)

Reappropriation:
     Site Closure Account--State . . . . . . . . . . . . $1,120,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,146,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,266,000

NEW SECTION.  Sec. 3014   FOR THE DEPARTMENT OF ECOLOGY
     Twin Lake Aquifer Recharge Project (04-2-951)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely to recover the department of ecology's cost in evaluating and issuing decisions on water applications and restoration of the Twin Lakes in the Methow Valley.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $643,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $106,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $749,000

NEW SECTION.  Sec. 3015   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (04-4-002)

Reappropriation:
     Water Pollution Control Revolving Account--
          State . . . . . . . . . . . . $13,000,000
     Water Pollution Control Revolving Account--
          Federal . . . . . . . . . . . . $6,200,000
          Subtotal Reappropriation . . . . . . . . . . . . $19,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $65,228,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $84,428,000

NEW SECTION.  Sec. 3016   FOR THE DEPARTMENT OF ECOLOGY
     Water Rights Purchase/Lease (04-1-005)

Reappropriation:
     State Drought Preparedness--State . . . . . . . . . . . . $804,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $696,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3017   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (04-4-006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,389,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $1,438,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,827,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,799,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,626,000

NEW SECTION.  Sec. 3018   FOR THE DEPARTMENT OF ECOLOGY
     Quad Cities Water Right Mitigation (05-2-852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,047,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $153,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,200,000

NEW SECTION.  Sec. 3019   FOR THE DEPARTMENT OF ECOLOGY
     State Drought Preparedness (05-4-009)

Reappropriation:
     State Drought Preparedness--State . . . . . . . . . . . . $1,464,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,865,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,329,000

NEW SECTION.  Sec. 3020   FOR THE DEPARTMENT OF ECOLOGY
     Sunnyside Valley Irrigation District Water Conservation (05-2-851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,187,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,544,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,133,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,132,000
          TOTAL . . . . . . . . . . . . $8,996,000

NEW SECTION.  Sec. 3021   FOR THE DEPARTMENT OF ECOLOGY
     Water Conveyance Infrastructure Projects (05-2-850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,168,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $1,415,000
     Water Quality Capital Account--State . . . . . . . . . . . . $293,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,876,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $954,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,830,000

NEW SECTION.  Sec. 3022   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (06-4-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,900,000
     Water Quality Capital Account--State . . . . . . . . . . . . $8,500,000
     State Toxics Control Account--State . . . . . . . . . . . . $10,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $24,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $32,024,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $56,424,000

NEW SECTION.  Sec. 3023   FOR THE DEPARTMENT OF ECOLOGY
     Cleanup Toxic Sites - Puget Sound (06-4-001)

     The reappropriation in this section is subject to the following conditions and limitations: Funding is provided solely for the clean up of contaminated sites that lie adjacent to and are within one-half mile of Puget Sound. Clean ups must include orphaned and abandoned sites that pose a threat to Puget Sound with the highest priority sites being cleaned up first.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $2,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,233,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,983,000

NEW SECTION.  Sec. 3024   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Basin Water Supply Development Program (06-2-950)

Reappropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $10,000,000
Appropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $34,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $155,500,000
          TOTAL . . . . . . . . . . . . $200,000,000

NEW SECTION.  Sec. 3025   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Program (06-2-010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,542,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,458,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,000,000

NEW SECTION.  Sec. 3026   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants for Cleanup and Prevention (06-4-008)

Reappropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $56,470,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $42,430,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $98,900,000

NEW SECTION.  Sec. 3027   FOR THE DEPARTMENT OF ECOLOGY
     Low Impact Development for Storm Water Management (06-2-006)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for grants to local governments in Puget Sound to fund innovative, low-impact development storm water management projects to meet critical storm water management needs and protect or restore water quality. Projects may include use of bioretention, rainwater harvest, permeable pavement, vegetated roofs, and other low-impact development techniques. Projects funded in Puget Sound must meet the design guidelines contained in the low-impact development technical guidance manual for Puget Sound, unless the municipality can demonstrate that site conditions warrant a deviation from the design guidelines and the deviations in design provides similar performance. All projects must include performance monitoring.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3028   FOR THE DEPARTMENT OF ECOLOGY
     Minor Works (06-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $30,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $270,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 3029   FOR THE DEPARTMENT OF ECOLOGY
     Motor Vehicle Mercury Removal Program (06-2-850)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3030   FOR THE DEPARTMENT OF ECOLOGY
     Puget Sound Aquatic Cleanup and Restoration (06-1-005)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $3,129,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,871,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3031   FOR THE DEPARTMENT OF ECOLOGY
     Safe Soil Remediation and Awareness Projects (06-2-001)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,059,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,909,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,968,000

NEW SECTION.  Sec. 3032   FOR THE DEPARTMENT OF ECOLOGY
     Waste Tire Piles (06-1-002)

Reappropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,500,000

NEW SECTION.  Sec. 3033   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (06-2-009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,435,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $64,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,499,000

NEW SECTION.  Sec. 3034   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (06-4-002)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The department shall give priority loan funding consideration to on-site septic system rehabilitation and replacement programs in Mason, Kitsap, and Jefferson counties for up to $1,000,000 from the water pollution control revolving account--state in the second year of the funding cycle.
     (2) Up to $5,000,000 of the water pollution control revolving account--state reappropriation is for loans for on-site sewage replacement. This reappropriation may be used to: (a) Establish new or expand existing on-site sewage repair and replacement loan programs by county governments or tribes; or (b) develop a pilot program to administer an on-site sewage repair and replacement loan program through a qualified private or nonprofit lending institution. This appropriation must be used in conjunction with water quality capital account--state appropriation in section 3022 of this act provided for this purpose. The department must work with the department of health, the Puget Sound water quality action team, local governments, and the lending industry in developing and piloting this program. The department shall provide a status report on the loan program to the governor and the appropriate legislative fiscal committees by June 30, 2008, including any recommendations for improving the program.

Reappropriation:
     Water Pollution Control Revolving Account--
          State . . . . . . . . . . . . $124,000,000
     Water Pollution Control Revolving Account--
          Federal . . . . . . . . . . . . $65,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $189,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $50,617,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $239,617,000

NEW SECTION.  Sec. 3035   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (06-2-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,849,000
     Water Quality Capital Account--State . . . . . . . . . . . . $386,000
          Subtotal Reappropriation . . . . . . . . . . . . $11,235,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,563,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,798,000

NEW SECTION.  Sec. 3036   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (08-4-010)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) Up to $10,000,000 of the state building construction account--state appropriation is for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.
     (2) $5,000,000 of the state building construction account--state appropriation is provided solely for water quality grants for hardship communities with a population of less than 5,000. The department shall give priority consideration to: (a) Communities subject to a regulatory order from the department of ecology for noncompliance with water quality rules; (b) projects for which design work has been completed; and (c) projects with a local match from reasonable water quality rates and charges.
     (3) $2,000,000 of the state building construction account--state appropriation is provided solely for the Adams and Lincoln counties ground water mapping project. The project shall submit a report to the appropriate committees of the legislature describing the dynamic relationship between groundwater and surface water in the region. The report shall be submitted by January 1, 2009.
     (4) $2,100,000 of the state toxics control account appropriation is provided solely for wastewater and clean water improvement projects at Illahee state park, Fort Flagler state park, and Larrabee state park.
     (5)(a) $16,545,000 of the state building construction account--state appropriation is provided solely for the following projects:

Project       Amount
Rock Island waste water treatment system       $870,000
Enumclaw waste water treatment system       $750,000
Snohomish waste water treatment system       $4,925,000
Freeland sewer district       $1,000,000
North Clark county regional sewer demonstration project       $4,000,000
Town of Warden waste water       $3,000,000

     (b) The appropriation for entities that are listed in (a) of this subsection shall not affect the entities' eligibility for centennial fund hardship assistance and shall be excluded from any financial hardship calculation that would have the effect of reducing other moneys for which the entity is currently contracted and eligible under WAC 173-95A-030(8), as it existed on the effective date of this section.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $51,495,000
     Water Quality Capital Account--State . . . . . . . . . . . . $7,550,000
     State Toxics Control Account--State . . . . . . . . . . . . $2,100,000
          Subtotal Appropriation . . . . . . . . . . . . $61,145,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $178,400,000
          TOTAL . . . . . . . . . . . . $239,545,000

NEW SECTION.  Sec. 3037   FOR THE DEPARTMENT OF ECOLOGY
     Cleanup Toxic Sites in Puget Sound (08-4-005)

     The appropriation in this section is subject to the following conditions and limitations: Funding is provided solely for the clean up of contaminated sites that lie adjacent to and are within one-half mile of Puget Sound. Clean ups shall include orphan and abandoned sites that pose a threat to Puget Sound with the highest priority sites being cleaned up first. The department shall provide the Puget Sound partnership, as created by sections 111 and 112, chapter . . . (Substitute Senate Bill No. 5372) Laws of 2007, the opportunity to review and provide comment on project evaluation ranking criteria, and proposed projects and activities recommended for funding.

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $18,820,000
          TOTAL . . . . . . . . . . . . $22,820,000

NEW SECTION.  Sec. 3038   FOR THE DEPARTMENT OF ECOLOGY
     Coordinated Prevention Grants (08-4-015)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $4,000,000 of the appropriation is provided solely for grants to local governments for local waste and pollution prevention projects. Grants shall fund new organics composting and conversion, green building, and moderate risk waste initiatives described in the state "beyond waste" plan.
     (2) Up to $2,000,000 of the appropriation may be used for grants to local governments to provide alternatives to backyard burning of organic materials. Priority for these grants shall be given to: (a) Urban growth areas of less than 5,000 people affected by the January 1, 2007, ban on outdoor burning; (b) projects that develop infrastructure for an on-going program; and (c) projects that coordinate regionally.

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $25,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $114,000,000
          TOTAL . . . . . . . . . . . . $139,500,000

NEW SECTION.  Sec. 3039   FOR THE DEPARTMENT OF ECOLOGY
     On-Site Septic Replacement Program (08-4-012)

     The appropriation in this section is subject to the following conditions and limitations: Up to $3,000,000 of the water quality capital account--state appropriation is for a contract with a nonprofit organization that is familiar with on-site sewage repair and replacement in Hood Canal to coordinate improvements to sewage systems. As part of a pilot project, the nonprofit organization may provide funds to a qualified private or nonprofit lending institution to provide financial assistance to local governments and private landowners for the repair, replacement, or upgrade of on-site sewage systems.

Appropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3040   FOR THE DEPARTMENT OF ECOLOGY
     Puget Sound Aquatic Cleanup and Restoration (08-4-004)

     The appropriation in this section is subject to the following conditions and limitations: The department shall provide the Puget Sound partnership, as created by sections 111 and 112, chapter . . . (Substitute Senate Bill No. 5372) Laws of 2007, the opportunity to review and provide comment on project evaluation ranking criteria, and proposed projects and activities recommended for funding.

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $5,905,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $23,620,000
          TOTAL . . . . . . . . . . . . $29,525,000

NEW SECTION.  Sec. 3041   FOR THE DEPARTMENT OF ECOLOGY
     Puget Sound Storm Water Projects (08-2-002)

     The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely for grants to local governments within Puget Sound for municipal storm water projects that would prevent the contamination or recontamination of hazardous waste cleanup sites, including but not limited to, retrofit of existing storm water projects in urban areas where storm water is a significant source of contamination, identification and removal of nonstorm water discharges into municipal storm sewer systems, and local innovative storm water projects that implement low-impact development. The department shall provide the Puget Sound partnership, as created by sections 111 and 112, chapter . . . (Substitute Senate Bill No. 5372) Laws of 2007, the opportunity to review and provide comment on project evaluation ranking criteria, and proposed projects and activities recommended for funding.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $19,170,000
     Local Toxics Control Account--State . . . . . . . . . . . . $5,000,000
          Subtotal Appropriation . . . . . . . . . . . . $24,170,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $56,680,000
          TOTAL . . . . . . . . . . . . $80,850,000

NEW SECTION.  Sec. 3042   FOR THE DEPARTMENT OF ECOLOGY
     Storm Water Projects (08-2-003)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3043   FOR THE DEPARTMENT OF ECOLOGY
     Rebuild East Wall of Ecology Headquarters (08-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 3044   FOR THE DEPARTMENT OF ECOLOGY
     Reclaimed Water (08-4-002)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for grants to local governments in Puget Sound to complete reclaimed water projects. Priority shall be given to projects in water short areas where reclaimed water can be used to replace other water sources and where reclaimed water can be used to restore important ecosystem functions in Puget Sound.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,080,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,320,000
          TOTAL . . . . . . . . . . . . $30,400,000

NEW SECTION.  Sec. 3045   FOR THE DEPARTMENT OF ECOLOGY
     Reduce Health Risks from Toxic Diesel Pollution (08-4-024)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $4,840,000 of the appropriation is provided solely for school bus diesel retrofits for local school districts.
     (2) $2,330,000 of the appropriation is provided solely for emission reduction projects for local governments to retrofit public sector diesel engines to allow public sector fleets to reduce their emissions.

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $7,170,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,170,000

NEW SECTION.  Sec. 3046   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grants (08-4-008)

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $84,475,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $180,000,000
          TOTAL . . . . . . . . . . . . $264,475,000

NEW SECTION.  Sec. 3047   FOR THE DEPARTMENT OF ECOLOGY
     Repair Exterior Surfaces and Expand Emergency Power Supply (08-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $475,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $475,000

NEW SECTION.  Sec. 3048   FOR THE DEPARTMENT OF ECOLOGY
     Safe Soils Remediation Grants (08-4-009)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3049   FOR THE DEPARTMENT OF ECOLOGY
     Reduce Public Health Risks from Wood Stove Pollution (08-4-019)

Appropriation:
     Wood Stove Education Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3050   FOR THE DEPARTMENT OF ECOLOGY
     Skykomish Cleanup (08-4-020)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 3051   FOR THE DEPARTMENT OF ECOLOGY
     Waste Tire Pile Cleanup (08-4-022)

Appropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,000,000
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 3052   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (08-4-028)

     The appropriation in this section is subject to the following conditions and limitations: $250,000 is provided solely for emergency repairs for the South Naches irrigation district.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,250,000

NEW SECTION.  Sec. 3053   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Loan Program (08-4-011)

Appropriation:
     Water Pollution Control Revolving Account--
          State . . . . . . . . . . . . $90,000,000
     Water Pollution Control Revolving Account--
          Federal . . . . . . . . . . . . $50,000,000
          Subtotal Appropriation . . . . . . . . . . . . $140,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $500,000,000
          TOTAL . . . . . . . . . . . . $640,000,000

NEW SECTION.  Sec. 3054   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (08-4-029)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for grants for projects that improve water supplies and help achieve instream flows by implementing watershed plans, as follows:
     (1) Surface or ground water storage projects, where such projects are consistent with the recommendations of the water storage task force. The department shall consult the departments of agriculture and fish and wildlife before issuing water storage grants.
     (2) Infrastructure or water management projects that resolve conflicts among water needs for municipal, agricultural, rural, and fish restoration purposes. The stream flow improvements and other public benefits secured from these projects must be commensurate with the investment of state funds.
     (3) Agricultural water supply projects that improve water conservation and water use efficiency.
     (4) Purchase and installation of water measuring devices in salmon critical basins and areas participating in the department of fish and wildlife fish screening and cooperative compliance program, and basins where watershed plans call for additional water use measurement.
     (5) Acquisition of water to achieve instream flows or to establish water banks. The department shall give priority to acquisitions in salmon critical basins. The department shall place acquired water into the state's trust water rights program (chapters 90.38 and 90.42 RCW).
     (6) Up to $200,000 of the appropriation is provided for a portion of the costs of the Ahtanum creek watershed restoration program, including construction of the Pine Hollow reservoir, provided there is agreement among the Yakama nation, Ahtanum irrigation district, and other jurisdictional federal, state, and local agencies and entities to proceed with the environmental impact statement.
     (7) $560,000 is provided solely for the Chehalis watershed.
     (8) $300,000 is provided solely for the Nisqually watershed.
     (9) Up to $1,200,000 of the appropriation is provided for grants to lead local government entities for planning unit administrative support to watershed planning units. Such grants shall only be provided to those entities that have completed, approved plans that are actively being implemented. Grant amounts will range from $30,000 to $60,000, based on criteria to be developed by the department. Criteria should consider factors including complexity of water issues, geographical size, population growth pressure, rate of plan implementation, and others issues to be determined by the department.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $64,000,000
          TOTAL . . . . . . . . . . . . $80,000,000

NEW SECTION.  Sec. 3055   FOR THE DEPARTMENT OF ECOLOGY
     Yakima River Basin Water Storage Feasibility Study (08-4-026)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for completion of the United States bureau of reclamation's Yakima Basin storage feasibility study, including the associated joint national environmental policy act, the state environmental policy act, and environmental impact statement. The appropriated funds shall be used by the bureau of reclamation and the department of ecology to evaluate potential in-basin storage facilities such as the proposed Black Rock and Wymer reservoirs and other reasonable alternatives that will enhance water supply in the Yakima Basin.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,250,000

NEW SECTION.  Sec. 3056   FOR THE DEPARTMENT OF ECOLOGY
     Transfer of Water Rights for Cabin Owners (08-1-951)

     The appropriation in this section is subject to the following conditions and limitations: $450,000 is appropriated to purchase water for domestic water users in the Yakima Basin (WRIAs 37, 38, and 39) that have a surface water right with a priority date later than May 10, 1905, as well as for all out-of-priority surface water users in the Yakima Basin. A portion of the appropriation may be used for administrative and other costs associated with acquiring and transferring the water rights. The department shall recover all costs from participating domestic water users for their prorated portion of the cost of securing a water right or rights for this purpose and associated annual operational costs owed to the United States bureau of reclamation. Funds recovered in this manner shall be placed in the drought preparedness account.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $450,000

NEW SECTION.  Sec. 3057   FOR THE STATE PARKS AND RECREATION COMMISSION
     Spokane Centennial Trail - Unanticipated Receipt (03-2-001)

Reappropriation:
     General Fund--Private/Local . . . . . . . . . . . . $34,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $39,000

NEW SECTION.  Sec. 3058   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cowan Barn and House (06-2-851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $51,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $301,000

NEW SECTION.  Sec. 3059   FOR THE STATE PARKS AND RECREATION COMMISSION
     Deception Pass - Renewed Traditions (06-2-013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $770,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $870,000

NEW SECTION.  Sec. 3060   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility Preservation - Facilities (06-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,419,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,419,000

NEW SECTION.  Sec. 3061   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Worden - Facilities (06-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $432,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $838,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,270,000

NEW SECTION.  Sec. 3062   FOR THE STATE PARKS AND RECREATION COMMISSION
     Historic Stewardship - Stewardship (06-1-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,485,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $117,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,602,000

NEW SECTION.  Sec. 3063   FOR THE STATE PARKS AND RECREATION COMMISSION
     Ice Age Floods - Cherished Resources (06-2-014)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $78,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $228,000

NEW SECTION.  Sec. 3064   FOR THE STATE PARKS AND RECREATION COMMISSION
     Natural Resources - Stewardship (06-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $89,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $689,000

NEW SECTION.  Sec. 3065   FOR THE STATE PARKS AND RECREATION COMMISSION
     Park Development (06-1-950)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $415,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $715,000

NEW SECTION.  Sec. 3066   FOR THE STATE PARKS AND RECREATION COMMISSION
     Revenue Creation - Financial Strategy (06-2-010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,350,000

NEW SECTION.  Sec. 3067   FOR THE STATE PARKS AND RECREATION COMMISSION
     Rocky Reach - Chelan County Public Utility District (06-1-023)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided to construct and surface the northern mile of Rocky Reach trail, and partially fund installation of signs, interpretive panels, and bridges related to the 5.1 mile project.

Reappropriation:
     Parks Renewal and Stewardship Account--
          Private/Local . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3068   FOR THE STATE PARKS AND RECREATION COMMISSION
     Southeast Washington Parks (06-2-852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $219,000

NEW SECTION.  Sec. 3069   FOR THE STATE PARKS AND RECREATION COMMISSION
     Statewide Boat Pumpout - Federal Clean Vessel Act (06-4-018)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $696,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $40,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $736,000

NEW SECTION.  Sec. 3070   FOR THE STATE PARKS AND RECREATION COMMISSION
     Trails (06-2-017)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $441,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $208,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $649,000

NEW SECTION.  Sec. 3071   FOR THE STATE PARKS AND RECREATION COMMISSION
     Hood Canal Wastewater (06-1-850)

Reappropriation:
     Hood Canal Aquatic Rehabilitation Bond
          Account--State . . . . . . . . . . . . $5,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $702,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,802,000

NEW SECTION.  Sec. 3072   FOR THE STATE PARKS AND RECREATION COMMISSION
     Puget Sound Wastewater (06-1-851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,095,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,195,000

NEW SECTION.  Sec. 3073   FOR THE STATE PARKS AND RECREATION COMMISSION
     Sustainable Development and Restoration (06-1-011)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $80,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $412,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $492,000

NEW SECTION.  Sec. 3074   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cama Beach - New Destinations (06-2-011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,015,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $305,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,120,000

NEW SECTION.  Sec. 3075   FOR THE STATE PARKS AND RECREATION COMMISSION
     Bay View Park Wide Wastewater Treatment System (08-2-041)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,187,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,187,000

NEW SECTION.  Sec. 3076   FOR THE STATE PARKS AND RECREATION COMMISSION
     Beacon Rock-Pierce Trust Grant (08-4-034)

Appropriation:
     Parks Renewal and Stewardship Account--
          Private/Local . . . . . . . . . . . . $25,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $100,000
          TOTAL . . . . . . . . . . . . $125,000

NEW SECTION.  Sec. 3077   FOR THE STATE PARKS AND RECREATION COMMISSION
     Belfair Major Park Upgrade (08-1-018)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,500,000
          TOTAL . . . . . . . . . . . . $2,900,000

NEW SECTION.  Sec. 3078   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cape Disappointment Major Park Upgrade (08-1-012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,219,000
          TOTAL . . . . . . . . . . . . $4,719,000

NEW SECTION.  Sec. 3079   FOR THE STATE PARKS AND RECREATION COMMISSION
     Clean Vessel Boating Pumpout Grants (08-4-035)

     The appropriation in this section is subject to the following conditions and limitations: The commission shall coordinate with the department of natural resources to develop a plan to transition the boat pumpout grant program to the department of natural resources. The legislature intends to accelerate the use of the federal money for boat pumpouts and integrate the grant program with the aquatic lands leasing program of the department of natural resources. The transition plan shall be submitted to the office of financial management and the appropriate committees of the legislature by September 1, 2007. The plan shall include the necessary supplemental budget adjustments to accomplish the transition by July 1, 2008.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3080   FOR THE STATE PARKS AND RECREATION COMMISSION
     Deferred Maintenance (08-1-025)

     The appropriation in this section is subject to the following conditions and limitations: The department shall develop a plan of action, agreed upon between the office of financial management and the appropriate fiscal committees of the legislature by September 1, 2007. Up to $200,000 of the appropriation may be used for systems necessary to implement the plan. The plan shall address the conclusions and key findings in the 2006 study of the department's capital development, execution, and monitoring process, including but not limited to:
     (1) The capital budget submittal and approval process;
     (2) Emergent needs and unforeseen cost overruns;
     (3) Adherence to project budgets and schedules;
     (4) Project completion rate;
     (5) Agency expenditure of capital budget appropriations;
     (6) Permitting delays;
     (7) The number of projects with complete close-out;
     (8) Project funding sources by project, phase, and/or activity;
     (9) Movement of project funding sources from original appropriation;
     (10) Satisfaction levels of operations staff and end users; and
     (11) Instances of noncompliance with environmental regulations.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
          TOTAL . . . . . . . . . . . . $17,500,000

NEW SECTION.  Sec. 3081   FOR THE STATE PARKS AND RECREATION COMMISSION
     Visible Park Improvements (08-1-951)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 3082   FOR THE STATE PARKS AND RECREATION COMMISSION
     Emergency Repairs (08-1-024)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . $1,800,000

NEW SECTION.  Sec. 3083   FOR THE STATE PARKS AND RECREATION COMMISSION
     Federal Grant Authority (08-4-032)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3084   FOR THE STATE PARKS AND RECREATION COMMISSION
     Historic Preservation (08-1-002)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $500,000 of the appropriation is provided solely for the design, permits, and drawings for the seminary building at St. Edward State Park.
     (2) $500,000 of the appropriation is provided solely for improvements to prevent further degradation of the seminary building.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,101,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,500,000
          TOTAL . . . . . . . . . . . . $21,601,000

NEW SECTION.  Sec. 3085   FOR THE STATE PARKS AND RECREATION COMMISSION
     Ice Age Flood (08-2-037)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $3,000,000 of the appropriation is provided solely for a grant for the Hanford Reach national monument heritage and visitor center. The funds may be used for preconstruction activities.
     (2) $100,000 is provided for the department to prepare interpretive materials describing the ice age floods.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,100,000

NEW SECTION.  Sec. 3086   FOR THE STATE PARKS AND RECREATION COMMISSION
     Local Grant Authority (08-4-033)

Appropriation:
     Parks Renewal and Stewardship Account--Private/Local . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3087   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 3088   FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Acquisition (08-2-031)

     The appropriation in this section is subject to the following conditions and limitations: The state parks and recreation commission shall provide lists of potential purchases and sales to the office of financial management and the appropriate policy and fiscal committees of the legislature prior to committing the state parks and recreation commission to any sale or purchase of land or buildings and prior to any allotments made for those purchases. The list shall include any potential operating or capital cost impacts known to the state parks and recreation commission.

Appropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3089   FOR THE STATE PARKS AND RECREATION COMMISSION
     Pearrygin Lake Major Park Upgrade (08-2-016)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,367,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,633,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3090   FOR THE STATE PARKS AND RECREATION COMMISSION
     Road Preservation (08-1-036)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,700,000

NEW SECTION.  Sec. 3091   FOR THE STATE PARKS AND RECREATION COMMISSION
     Storm Water Improvements (08-1-027)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $571,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $3,571,000

NEW SECTION.  Sec. 3092   FOR THE STATE PARKS AND RECREATION COMMISSION
     Trail Development (08-1-008)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $500,000 of the appropriation is provided solely to construct the ecological trail from Baker Bay to the Pacific ocean at Cape Disappointment state park, as identified in the commission's master capital plan.
     (2) $350,000 of the appropriation is provided solely for upgrades to the Squak mountain trail.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,350,000

NEW SECTION.  Sec. 3093   FOR THE STATE PARKS AND RECREATION COMMISSION
     Statewide Boat Pumpout (04-4-014)

     The appropriation in this section is subject to the following conditions and limitations: The commission shall coordinate with the department of natural resources to develop a plan to transition the boat pumpout grant program to the department of natural resources. The legislature intends to accelerate the use of the federal money for boat pumpouts and integrate the grant program with the aquatic lands leasing program of the department of natural resources. The transition plan shall be submitted to the office of financial management and the appropriate committees of the legislature by September 1, 2007. The plan shall include the necessary supplemental budget adjustments to accomplish the transition by July 1, 2008.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $497,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $497,000

NEW SECTION.  Sec. 3094   FOR THE STATE PARKS AND RECREATION COMMISSION
     Cama Beach Donation (06-2-853)

Reappropriation:
     General Fund--Private/Local . . . . . . . . . . . . $1,716,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,716,000

NEW SECTION.  Sec. 3095   FOR THE STATE PARKS AND RECREATION COMMISSION
     Lake Sammamish Major Park Upgrade (08-1-014)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,400,000

NEW SECTION.  Sec. 3096   FOR THE STATE PARKS AND RECREATION COMMISSION
     City to Mountains Regional Gap Fund (08-1-950)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,600,000

NEW SECTION.  Sec. 3097   FOR THE STATE PARKS AND RECREATION COMMISSION
     Nisqually Mashel State Park (08-1-953)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3098   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Projects (98-2-001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $1,369,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,187,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,556,000

NEW SECTION.  Sec. 3099   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Program (98-2-004)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $25,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $549,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $574,000

NEW SECTION.  Sec. 3100   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway Off-Road Vehicle Program (NOVA) (98-2-002)

Reappropriation:
     Nonhighway and Off-Road Vehicle Activities
          Program Account--State . . . . . . . . . . . . $249,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,847,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,096,000

NEW SECTION.  Sec. 3101   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Washington Wildlife and Recreation Program (98-2-003)

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $1,767,000
     Habitat Conservation Account--State . . . . . . . . . . . . $2,252,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,019,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $73,582,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $77,601,000

NEW SECTION.  Sec. 3102   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Funding Board Programs (00-2-001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $166,000
     Salmon Recovery Account--State . . . . . . . . . . . . $1,175,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,341,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,284,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $101,625,000

NEW SECTION.  Sec. 3103   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (02-4-001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $766,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,167,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,933,000

NEW SECTION.  Sec. 3104   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Infrastructure Grant (02-4-010)

Reappropriation:
     Recreation Resources Account--Federal . . . . . . . . . . . . $529,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,471,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3105   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Program (02-0-001)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $43,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $357,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

NEW SECTION.  Sec. 3106   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Hatchery Management Program (02-4-009)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,482,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,719,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,201,000

NEW SECTION.  Sec. 3107   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Land and Water Conservation Fund (02-4-005)

Reappropriation:
     Recreation Resources Account--Federal . . . . . . . . . . . . $1,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,500,000

NEW SECTION.  Sec. 3108   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway Off-Road Vehicle Program (NOVA) (02-4-002)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation for the nonhighway and off road vehicle program under RCW 46.09.170(2)(d)(i) is subject to the following conditions and limitations: A portion of the reappropriation may be used for grants to projects to research, develop, publish, and distribute informational guides and maps of nonhighway and off road vehicle trails and associated facilities meeting the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act.
     (2) The reappropriation for the nonhighway and off road vehicle program under RCW 46.09.170(2)(d)(ii) is subject to the following conditions and limitations: The portion of the reappropriation that applies to grants for capital facilities may be used for grants to projects that meet the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act and do not compromise or impair sensitive natural resources. The portion of the reappropriation that applies to grants for management, maintenance, and operation of existing off road vehicle recreation facilities may be used to bring the facilities into compliance with the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act.
     (3) The reappropriation for the nonhighway and off road vehicle program under RCW 46.09.170(2)(d)(iii) is subject to the following conditions and limitations: Funds may be expended for nonhighway road recreation facilities which may include recreational trails that are accessed by nonhighway roads and are intended solely for nonmotorized recreational uses.

Reappropriation:
     Nonhighway and Off-Road Vehicle Activities
          Program Account--State . . . . . . . . . . . . $69,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,459,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,528,000

NEW SECTION.  Sec. 3109   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Funding Board Programs (02-4-007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $8,470,000
     State Building Construction Account--State . . . . . . . . . . . . $2,786,000
          Subtotal Reappropriation . . . . . . . . . . . . $11,256,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $63,737,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $74,993,000

NEW SECTION.  Sec. 3110   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Washington Wildlife and Recreation Program (02-4-003)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund projects in the following order: (1) The department of natural resources Cypress Island project; and (2) alternate projects approved by the legislature from the same account in biennia succeeding that in which the funds were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $299,000
     Habitat Conservation Account--State . . . . . . . . . . . . $1,164,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,463,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $43,537,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 3111   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Aquatic Lands Enhancement (04-4-018)

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $1,395,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,962,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,357,000

NEW SECTION.  Sec. 3112   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (04-4-003)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $1,501,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,006,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,507,000

NEW SECTION.  Sec. 3113   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Infrastructure Grant (04-4-009)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $720,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,280,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3114   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Family Forest Fish Blockages Program (04-4-011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $188,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,812,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3115   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Program (04-4-006)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $82,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $169,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $251,000

NEW SECTION.  Sec. 3116   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Hatchery Management Program (04-4-010)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,002,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,997,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,999,000

NEW SECTION.  Sec. 3117   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Land and Water Conservation Fund (04-4-007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,133,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,602,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,735,000

NEW SECTION.  Sec. 3118   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     National Recreation Trails Program (04-4-008)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $226,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,034,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,260,000

NEW SECTION.  Sec. 3119   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway and Off-Road Vehicle Activities Program (NOVA) (04-4-004)

Reappropriation:
     Nonhighway and Off-Road Vehicle Activities
          Program Account--State . . . . . . . . . . . . $2,665,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,262,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,927,000

NEW SECTION.  Sec. 3120   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Fund Board Programs (04-4-001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $15,132,000
     State Building Construction Account--State . . . . . . . . . . . . $5,682,000
          Subtotal Reappropriation . . . . . . . . . . . . $20,814,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,561,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,375,000

NEW SECTION.  Sec. 3121   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Washington Wildlife and Recreation Program (04-4-002)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $4,394,000
     Habitat Conservation Account--State . . . . . . . . . . . . $10,267,000
          Subtotal Reappropriation . . . . . . . . . . . . $14,661,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $30,339,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,000,000

NEW SECTION.  Sec. 3122   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Hood Canal Aquatic Rehabilitation Program (06-4-850)

Reappropriation:
     Hood Canal Aquatic Rehabilitation Bond
          Account--State . . . . . . . . . . . . $996,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3123   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Aquatic Lands Enhancement Account (06-4-018)

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $2,010,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,015,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,025,000

NEW SECTION.  Sec. 3124   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (06-4-003)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $3,340,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,931,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,271,000

NEW SECTION.  Sec. 3125   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Infrastructure Grant (06-4-009)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $80,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $120,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 3126   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Family Forest Fish Passage Program (06-4-011)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriation is provided solely for the salmon recovery funding board in consultation with the small forest landowner office of the department of natural resources and the department of fish and wildlife to provide grants to correct fish passage blockages on nonindustrial forest lands. Selection of projects must be coordinated with the other salmon recovery grant programs provided in section 3132 of this act.
     (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the committee shall file quarterly project progress reports with the office of financial management.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $35,000
     State Building Construction Account--State . . . . . . . . . . . . $2,502,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,537,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,830,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,367,000

NEW SECTION.  Sec. 3127   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearm and Archery Range Program (06-4-006)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $113,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $109,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $222,000

NEW SECTION.  Sec. 3128   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Improve Hatchery Management (06-4-010)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3129   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Land and Water Conservation Fund (06-4-007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 3130   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     National Recreation Trails Program (06-4-008)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,830,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $970,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,800,000

NEW SECTION.  Sec. 3131   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway and Off-Road Vehicle Program (NOVA) (06-4-004)

     The reappropriation in this section is subject to the following conditions and limitations: Up to $100,000 of the reappropriation is for the following studies:
     (1) The committee shall prepare cost estimates for creating a database of motorized and nonmotorized off-road trails and facilities in Washington state. The cost estimate shall consider the possibility of a database that allows the downloading of maps formatted for the most widely used GPS devices, including the feasibility and cost to make GPS maps readily available for all users of Washington recreational lands and facilities. For this purpose, available GPS maps shall include GPS maps developed by state agencies, by federal agencies, and proprietary maps offered by private companies.
     (2) The committee shall recommend a program for enhanced education and enforcement regarding excessive noise from off-road vehicles. The study shall include a review of relevant existing laws and regulations. The recommendations shall address the appropriate equipment needed for enforcement, model ordinances, enhanced educational strategies, and a proposed grant program to assist local governments to more effectively reduce the impact of excessive ORV noise in rural residential neighborhoods and nonresidential areas, including consideration of grant programs for planning departments, code enforcement departments, health departments, or other entities of local government.

Reappropriation:
     Nonhighway and Off-Road Vehicle Activities
          Program Account--State . . . . . . . . . . . . $5,157,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,422,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,579,000

NEW SECTION.  Sec. 3132   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Fund Board Programs (06-4-001)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are provided solely for grants for salmon recovery efforts. These grants may include a grant to any regional recovery board and/or may include grants for additional restoration projects, monitoring activities, or other salmon recovery actions.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $25,739,000
     State Building Construction Account--State . . . . . . . . . . . . $13,412,000
          Subtotal Reappropriation . . . . . . . . . . . . $39,151,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,849,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $62,000,000

NEW SECTION.  Sec. 3133   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Washington Wildlife and Recreation Program (06-4-002)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriation is provided for the approved list of projects in LEAP capital document No. 2005-14 as developed on April 9, 2005.
     (2) Funds reappropriated for distribution according to RCW 79A.15.050 shall fulfill the uses and restrictions of each category whether the funds are distributed according to the statutory allotment, the unallocated distribution, or a reassignment of reappropriations. If the cumulative total for acquisition projects is less than the statutory requirement, the difference may be allocated to the remaining development projects.
     (3) Funds reappropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) shall be allocated forty percent to local government projects and sixty percent to state agency projects. If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $13,363,000
     Habitat Conservation Account--State . . . . . . . . . . . . $17,062,000
          Subtotal Reappropriation . . . . . . . . . . . . $30,425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,575,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 3134   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Youth Athletic Fields (06-2-952)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for competitive grants for acquisition, development, and renovation of youth athletic fields. The committee shall follow the applicable rules of the youth athletic facilities program, except that grants for maintenance are not eligible and the amount of a grant need not be in proportion to the population of the city or county where the community outdoor athletic facility is located.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3135   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Aquatic Lands Enhancement Account (08-4-005)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation in this section is provided solely for the list of projects in LEAP capital document No. 2007-1, developed March 17, 2007.
     (2) The committee shall submit a list of recommended projects to be funded from the aquatic lands enhancement account in the 2009-2011 capital budget to the office of financial management and the appropriate legislative committees. The list shall result from a competitive grants program developed by the committee based upon, at a minimum: (a) Uniform criteria for selecting projects and awarding grants for up to fifty percent of the total projects cost; (b) local community support for the projects; and (c) environmental benefits to be derived from projects.

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $5,025,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,100,000
          TOTAL . . . . . . . . . . . . $25,125,000

NEW SECTION.  Sec. 3136   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Facilities Program (08-4-001)

Appropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $8,021,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,688,000
          TOTAL . . . . . . . . . . . . $43,709,000

NEW SECTION.  Sec. 3137   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Boating Improvement Grants (08-4-002)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $800,000
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3138   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Family Forest and Fish Passage Program (08-2-001)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation in this section is provided solely for the salmon recovery funding board in consultation with the small forest landowner office of the department of natural resources and the department of fish and wildlife to provide grants to correct fish passage blockages on nonindustrial forest lands. Selection of projects must be coordinated with the other salmon recovery grant programs provided in section 3140 of this act.
     (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the committee shall file quarterly project progress reports with the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $30,000,000

NEW SECTION.  Sec. 3139   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Firearms and Archery Range Recreation (08-4-003)

Appropriation:
     Firearms Range Account--State . . . . . . . . . . . . $472,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,007,000
          TOTAL . . . . . . . . . . . . $1,479,000

NEW SECTION.  Sec. 3140   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Salmon Recovery Funding Board Programs (SRFB) (08-4-851)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The appropriations in this section are provided solely for grants for salmon recovery efforts. These grants may include grants to any regional recovery board and/or may include grants for additional restoration projects, monitoring activities, or other salmon recovery actions.
     (2) The administrative funding currently provided by the salmon recovery funding board for the regional salmon recovery organization in Puget Sound shall be redirected to the Puget Sound partnership created in chapter . . . ([House][Senate] Bill No. ....), Laws of 2007 (Z-0369, Puget Sound partnership).
     (3) Prior to awarding project grants for projects in Puget Sound, the salmon recovery funding board shall submit the list of proposed projects to the Puget Sound partnership for their review. The Puget Sound partnership shall provide their comments back to the salmon recovery funding board within forty-five days of receiving the proposed list of projects.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $42,000,000
     State Building Construction Account--State . . . . . . . . . . . . $18,000,000
          Subtotal Appropriation . . . . . . . . . . . . $60,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $240,000,000
          TOTAL . . . . . . . . . . . . $300,000,000

NEW SECTION.  Sec. 3141   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Hatchery Reform Program (08-4-006)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $38,000,000

NEW SECTION.  Sec. 3142   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Land and Water Conservation (08-4-007)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3143   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     National Recreational Trails Program (08-4-009)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
          TOTAL . . . . . . . . . . . . $17,500,000

NEW SECTION.  Sec. 3144   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Nonhighway Off-Road Vehicle Activities (08-4-008)

     The appropriation in this section is subject to the following conditions and limitations: $450,000 of the appropriation is provided solely for grants to local law enforcement agencies for the enforcement of existing state noise laws and regulations. Grants may be used to acquire noise monitoring equipment and to compensate law enforcement agencies for staff overtime and administrative expenses.

Appropriation:
     Nonhighway Off-Road Vehicle Activities Program
          Account--State . . . . . . . . . . . . $9,036,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $42,945,000
          TOTAL . . . . . . . . . . . . $51,981,000

NEW SECTION.  Sec. 3145   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Puget Sound Restoration and Acquisition (08-4-004)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Prior to awarding project grants, the department shall provide the Puget Sound partnership, as created by sections 111 and 112, chapter . . . (Substitute Senate Bill No. 5372) Laws of 2007, the opportunity to review and provide comment on project evaluation ranking criteria, and proposed projects and activities recommended for funding.
     (2) All estuary projects shall be submitted for review and coordination with the executive committee of the Puget Sound nearshore partnership between the department of fish and wildlife and the United States army corps of engineers.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $47,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $168,000,000
          TOTAL . . . . . . . . . . . . $215,000,000

NEW SECTION.  Sec. 3146   FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
     Washington Wildlife Recreation Grants (08-4-011)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The appropriations are provided solely for the approved list of projects in LEAP capital document No. 2007-3 as developed on March 17, 2007.
     (2) If additional funds are available after funding the farmlands preservation account projects approved in subsection (1) of this section, the commission may:
     (a) Provide one-time grants of up to $25,000 each to counties requesting assistance in developing farmlands preservation strategies for the purpose of seeking grants from the farmlands preservation account in future grant cycles.
     (b) Conduct a second grant cycle in the 2007-2009 biennium for farmlands preservation projects. A ranked list of farmlands preservation projects may be submitted to the governor by November 1, 2007, for approval in the 2008 supplemental capital budget. The governor may remove projects from the list recommended by the committee and shall submit this amended list in the supplemental capital budget request to the legislature.
     (3) $627,299 of the appropriation from the habitat conservation account is provided solely for the Chehalis river surge plain natural area preserve. This amount shall not be expended for the project until the department of natural resources has completed a management plan for the preserve that maintains recreational access and that management plan is presented to the house of representatives capital budget and senate ways and means committees.

Appropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $36,000,000
     Farmlands Preservation Account--State . . . . . . . . . . . . $9,000,000
     Riparian Protection Account--State . . . . . . . . . . . . $19,000,000
     Habitat Conservation Account--State . . . . . . . . . . . . $36,000,000
          Subtotal Appropriation . . . . . . . . . . . . $100,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $280,000,000
          TOTAL . . . . . . . . . . . . $380,000,000

NEW SECTION.  Sec. 3147   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program (06-4-001)

     The reappropriation in this section is subject to the following conditions and limitations: The total cumulative dollar value of state conservation reserve enhancement program grant obligations incurred by the conservation commission and conservation districts shall not exceed $20,000,000, as provided in the conservation reserve enhancement program agreement between the United States department of agriculture, commodity credit corporation, and the state of Washington executed on October 19, 1998, and subsequent amendments.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,936,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $64,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3148   FOR THE STATE CONSERVATION COMMISSION
     Livestock Water Quality - Landowner Cost Share (06-4-006)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $10,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,490,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3149   FOR THE STATE CONSERVATION COMMISSION
     Puget Sound District Grants (06-4-003)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,605,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,705,000

NEW SECTION.  Sec. 3150   FOR THE STATE CONSERVATION COMMISSION
     Water Quality Grants Program (06-4-007)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,450,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,750,000

NEW SECTION.  Sec. 3151   FOR THE STATE CONSERVATION COMMISSION
     Skokomish Anaerobic Digester (06-4-009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $60,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $560,000

NEW SECTION.  Sec. 3152   FOR THE STATE CONSERVATION COMMISSION
     Land Restoration (07-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $587,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $587,000

NEW SECTION.  Sec. 3153   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program Cost Share (08-4-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,170,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,170,000

NEW SECTION.  Sec. 3154   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program Water Quality (08-4-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $709,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $709,000

NEW SECTION.  Sec. 3155   FOR THE STATE CONSERVATION COMMISSION
     Practice Incentive Payment Loan Program (08-4-004)

Appropriation:
     Conservation Assistance Revolving Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3156   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Deschutes Watershed Center (06-2-008)

     The reappropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the design of the Deschutes Watershed center.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $582,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,345,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $268,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $21,500,000
          TOTAL . . . . . . . . . . . . $24,695,000

NEW SECTION.  Sec. 3157   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Department of Natural Resources Land Exchange - Shrub Steppe (06-2-851)

     The reappropriation in this section is subject to the following conditions and limitations: Funding is provided solely to appraise the value of lands for exchange with the department of natural resources. Forest lands transferred to the department of natural resources under this section shall be actively managed by the department under a cooperative agreement with surrounding public and private landowners to implement landscape scale restoration and other management objectives.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3158   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Facility, Infrastructure, Lands, and Access Condition Improvements (06-1-002)

     The reappropriation in this section is subject to the following conditions and limitations: Up to $5,000 of the reappropriation in this section is for bank stabilization of the south Toledo access road.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,937,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,520,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,457,000

NEW SECTION.  Sec. 3159   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Fish and Wildlife Opportunity Improvements (06-2-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $155,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $345,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3160   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Hatchery Reform, Retrofits, and Condition Improvements (06-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,195,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,076,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,271,000

NEW SECTION.  Sec. 3161   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Fish and Wildlife Population and Habitat Protection (06-1-003)

Reappropriation:
     Wildlife Account--State . . . . . . . . . . . . $20,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $580,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 3162   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Sinlahekin Creek Dams - Flood Damage Repair (07-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $70,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $70,000

NEW SECTION.  Sec. 3163   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Region 1 Office - Complete Phase 1 (07-2-009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $588,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $588,000

NEW SECTION.  Sec. 3164   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     2006 Flood Damage (08-1-006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $630,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $630,000

NEW SECTION.  Sec. 3165   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Aquatic Lands Enhancement Account (08-2-017)

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $350,000

NEW SECTION.  Sec. 3166   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Chambers Creek Adult Trap - Phase 2 (08-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $252,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $252,000

NEW SECTION.  Sec. 3167   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Dole Bee Be Property (06-1-950)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $380,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $570,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $950,000

NEW SECTION.  Sec. 3168   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Emergency Projects (08-1-019)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3169   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Methow Culverts Replacement (08-1-027)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $754,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $994,000
          TOTAL . . . . . . . . . . . . $1,748,000

NEW SECTION.  Sec. 3170   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Facility Preservation (08-1-013)

     The appropriation in this section is subject to the following conditions and limitations: The department shall develop a plan of action, agreed upon between the office of financial management and the appropriate fiscal committees of the legislature by September 1, 2007. Up to $200,000 of the appropriation may be used for systems necessary to implement the plan. The plan shall address the conclusions and key findings in the 2006 study of the department's capital development, execution, and monitoring process, including but not limited to:
     (1) The commitment and role of senior management to improve and change the department's capital budget practices;
     (2) The clarification of the commission's role and responsibility for the capital budget process;
     (3) The development of capital program performance measures;
     (4) The alignment of the capital budget process with the department's strategic plan and priorities;
     (5) The implementation of a project scoping process;
     (6) The prioritization of capital projects, including both maintenance and other capital activities;
     (7) The review of business lines; and
     (8) The review of construction project delivery and organization.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,525,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,525,000

NEW SECTION.  Sec. 3171   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Health Safety and Code Requirements (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,100,000

NEW SECTION.  Sec. 3172   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works - Infrastructure Preservation (08-1-014)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3173   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Mitigation Projects and Dedicated Funding (08-2-048)

     The appropriations in this section are subject to the following conditions and limitations: $2,300,000 of the appropriation is provided solely for capital projects and engineering to pay the total cost of labor and materials provided by the department of fish and wildlife.

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $22,800,000
     General Fund--Private/Local . . . . . . . . . . . . $3,700,000
     Game Special Wildlife Account--Federal . . . . . . . . . . . . $1,000,000
     Game Special Wildlife Account--Private/Local . . . . . . . . . . . . $625,000
          Subtotal Appropriation . . . . . . . . . . . . $28,125,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $106,800,000
          TOTAL . . . . . . . . . . . . $134,925,000

NEW SECTION.  Sec. 3174   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Puget Sound Initiative - Nearshore Salmon Restoration (06-2-001)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The appropriations in this section are provided solely for efforts to restore nearshore habitat and estuaries in Puget Sound. The department shall focus on restoring natural nearshore processes, including protection and restoration of beach sediments and removal of existing bulkheads.
     (2) The department shall provide the Puget Sound partnership, as created by sections 111 and 112, chapter . . . (Substitute Senate Bill No. 5372), Laws of 2007 the opportunity to review and provide comment on proposed projects and activities recommended for funding, and project evaluation ranking criteria.
     (3) Funded projects require a nonstate match or in-kind contributions. The department shall seek to maximize the amount of nonstate match from local, state, tribal, and federal partners. Individual projects require a minimum 33 percent cash or in-kind match.
     (4) Eligible projects must be within Puget Sound and identified by a salmon recovery lead entity or marine resource committee and identified in a current salmon recovery, watershed, or nearshore habitat restoration and protection plan.
     (5) Project evaluation criteria shall be developed by the Puget Sound nearshore steering committee. The criteria shall be consistent with the technical guidance developed by the Puget Sound nearshore science team and shall be coordinated with the salmon recovery funding board to ensure that project funding and matching requirements are maximized to the greatest extent possible.
     (6) The department shall not utilize any amount of this appropriation to support administration or overhead. Funding to support the administration of the funds and the implementation of selected projects shall be obtained from the department's operating budget.
     (7) In recognition of the urgent need to complete the Puget Sound nearshore ecosystem restoration project general investigation, up to $723,000 of this appropriation may be used to match federal funds implementing the cost-share agreement between the department and the United States army corps of engineers.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,000,000
     General Fund--Federal . . . . . . . . . . . . $1,000,000
          Subtotal Appropriation . . . . . . . . . . . . $13,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,000,000
          TOTAL . . . . . . . . . . . . $43,500,000

NEW SECTION.  Sec. 3175   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Ranch Lands Irrigation Efficiencies (06-2-952)

     The reappropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for irrigation efficiency projects on ranch lands owned by the department.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 3176   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Skookumchuck Hatchery Renovation - Phase 2 (08-2-015)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $528,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,389,000
          TOTAL . . . . . . . . . . . . $3,917,000

NEW SECTION.  Sec. 3177   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Spokane Region One Office - Phase 2 (08-2-008)

     As of the effective date of this section, the department of fish and wildlife's Spokane region one building shall be known as the "Fred Shiosaki" building.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,830,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,230,000

NEW SECTION.  Sec. 3178   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Statewide Fencing Renovation and Replacement (08-1-009)

     The appropriation is this section is subject to the following conditions and limitations: $1,000,000 of the appropriation is provided solely for the replacement of elk fencing lost in the 2005 school fire in the Wooten wildlife area. The department shall contract with another state agency to construct the fence.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,100,000

NEW SECTION.  Sec. 3179   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Sustainability and Energy Savings (06-1-009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $360,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $140,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3180   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Wiley Slough Restoration (08-1-028)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,500,000
     State Building Construction Account--State . . . . . . . . . . . . $295,000
          Subtotal Appropriation . . . . . . . . . . . . $2,795,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,795,000

NEW SECTION.  Sec. 3181   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Tokul Creek Hatchery (08-1-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $435,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,857,000
          TOTAL . . . . . . . . . . . . $5,292,000

NEW SECTION.  Sec. 3182   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Grazing Monitoring on Fish and Wildlife Lands (08-2-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 3183   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Voights Creek Hatchery - Phase 1 (08-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $505,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,402,000
          TOTAL . . . . . . . . . . . . $6,907,000

NEW SECTION.  Sec. 3184   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Bee Be Property (08-1-029)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $502,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $502,000

NEW SECTION.  Sec. 3185   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Combined State Agency Aviation Facility (08-1-950)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $66,000
     Wildlife Account--State . . . . . . . . . . . . $66,000
          Subtotal Appropriation . . . . . . . . . . . . $132,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,608,000
          TOTAL . . . . . . . . . . . . $1,740,000

NEW SECTION.  Sec. 3186   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Community and Technical College Trust Land Acquisitions (08-2-004)

Appropriation:
     Community and Technical College Forest Reserve
          Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $950,000
          TOTAL . . . . . . . . . . . . $1,150,000

NEW SECTION.  Sec. 3187   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Creosote Removal in Puget Sound (08-2-017)

     The appropriation in this section is subject to the following conditions and limitations: The department shall provide the Puget Sound partnership, as created by sections 111 and 112, chapter . . . (Substitute Senate Bill No. 5372) Laws of 2007, the opportunity to review and provide comment on project evaluation ranking criteria, and proposed projects and activities recommended for funding.

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 3188   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Legacy (04-2-015)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $8,186,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $8,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,520,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $39,000,000
          TOTAL . . . . . . . . . . . . $63,206,000

NEW SECTION.  Sec. 3189   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Storm Damage (07-1-850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $282,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $282,000

NEW SECTION.  Sec. 3190   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Riparian Easement Program (08-2-022)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $40,000,000

NEW SECTION.  Sec. 3191   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Acquisition Grants (05-2-021)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,247,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $26,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $43,271,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $113,363,000
          TOTAL . . . . . . . . . . . . $185,881,000

NEW SECTION.  Sec. 3192   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Marine Station Public Access (04-2-019)

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $72,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $236,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,145,000
          TOTAL . . . . . . . . . . . . $2,453,000

NEW SECTION.  Sec. 3193   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Minor Works - Preservation (08-1-007)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $413,000
     Resources Management Cost Account--State . . . . . . . . . . . . $430,000
     State Building Construction Account--State . . . . . . . . . . . . $607,000
          Subtotal Appropriation . . . . . . . . . . . . $1,450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,154,000
          TOTAL . . . . . . . . . . . . $5,604,000

NEW SECTION.  Sec. 3194   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Minor Works - Programmatic (08-2-016)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $534,000
     Resources Management Cost Account--State . . . . . . . . . . . . $556,000
     State Building Construction Account--State . . . . . . . . . . . . $85,000
          Subtotal Appropriation . . . . . . . . . . . . $1,175,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,515,000
          TOTAL . . . . . . . . . . . . $3,690,000

NEW SECTION.  Sec. 3195   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Areas Facilities Preservation and Access (08-1-014)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $942,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,958,000
          TOTAL . . . . . . . . . . . . $10,900,000

NEW SECTION.  Sec. 3196   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Recreation Capital Renovations (08-2-006)

     The appropriation in this section is subject to the following conditions and limitations: $200,000 of the appropriation is provided solely for trail system signage.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,065,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,278,000
          TOTAL . . . . . . . . . . . . $16,343,000

NEW SECTION.  Sec. 3197   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Right-of-Way Acquisition (08-2-020)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $250,000
     Resources Management Cost Account--State . . . . . . . . . . . . $750,000
          Subtotal Appropriation . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3198   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Riparian Open Space Program (08-2-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,000,000
          TOTAL . . . . . . . . . . . . $12,500,000

NEW SECTION.  Sec. 3199   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Statewide Aquatic Restoration Projects (06-2-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000
Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . $2,150,000

NEW SECTION.  Sec. 3200   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Road Maintenance and Abandonment Projects (06-2-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $87,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $500,000
          TOTAL . . . . . . . . . . . . $1,987,000

NEW SECTION.  Sec. 3201   FOR THE DEPARTMENT OF NATURAL RESOURCES
     State Lands Maintenance (08-1-019)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $250,000
     Resources Management Cost Account--State . . . . . . . . . . . . $2,350,000
          Subtotal Appropriation . . . . . . . . . . . . $2,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,400,000
          TOTAL . . . . . . . . . . . . $13,000,000

NEW SECTION.  Sec. 3202   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Statewide Aquatic Restoration Projects (06-2-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $465,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . $1,815,000

NEW SECTION.  Sec. 3203   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Trust Land Transfer (08-2-005)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) The total appropriation is provided to the department solely to transfer from trust status, or enter into fifty year leases for, certain trust lands of statewide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes. The approved list of projects is identified in the LEAP capital document 2007-4, developed March 20, 2007.
     (2) Property transferred under this section shall be appraised and transferred at fair market value. The value of the timber transferred shall be deposited by the department to the common school construction account in the same manner as timber revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040. The value of the land transferred shall be deposited in the natural resources real property replacement account. These funds shall be expended by the department for the exclusive purpose of acquiring forest lands of equal value to be managed as common school trust land.
     (3) Property subject to lease agreements under this section shall be appraised at fair market value. Lease payments shall be lump sum payments for the entire term of the lease at the beginning of the lease. The department shall calculate such lump sum payments using professional appraisal standards. These lease payments may not exceed the fee simple purchase price based on current fair market value and shall be deposited by the department to the common school construction account in the same manner as lease revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040.
     (4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of the appropriations. Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs.
     (5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.
     (6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section. Transfer and lease agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose. Transfer and lease agreements may include provisions for receiving agencies to request alternative uses of the property, provided the alternative uses are compatible with the original intended public purpose and the department and legislature approves such uses.
     (7) The department and receiving agencies shall work in good faith to carry out the intent of this section. However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.
     (8) The department shall execute trust land transfers that, after the deduction of reasonable costs as provided in subsection (4) of this section, eighty percent of the total value of transferred property is timber value and is deposited in the common school construction account. To achieve the eighty percent requirement, the department may choose to lease properties originally intended as transfers.
     (9) On June 30, 2009, the state treasurer shall transfer all remaining uncommitted funds from this appropriation to the common school construction account and the appropriations in this section shall be reduced by an equivalent amount.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $96,485,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $287,000,000
          TOTAL . . . . . . . . . . . . $383,485,000

NEW SECTION.  Sec. 3204   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Federal Habitat Conservation Program Land Acquisition Grants (06-2-950)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $705,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,015,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,720,000

NEW SECTION.  Sec. 3205   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Loomis Natural Resources Conservation Area Restoration (07-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $271,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $271,000

NEW SECTION.  Sec. 3206   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Deep Water Geoduck/Sea Cucumber Population Surveys (06-2-850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $491,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $159,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $650,000

NEW SECTION.  Sec. 3207   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Riparian Open Space Program (06-2-018)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $800,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3208   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Port Angeles Armory (08-1-851)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $135,000
     Resource Management Cost Account--State . . . . . . . . . . . . $151,000
     State Building Construction Account--State . . . . . . . . . . . . $157,000
          Subtotal Appropriation . . . . . . . . . . . . $443,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $443,000

NEW SECTION.  Sec. 3209   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Colville Armory (08-2-851)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $313,000
     Resource Management Cost Account--State . . . . . . . . . . . . $330,000
     State Building Construction Account--State . . . . . . . . . . . . $299,000
          Subtotal Appropriation . . . . . . . . . . . . $942,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $942,000

NEW SECTION.  Sec. 3210   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Combined State Agency Aviation Facility (08-1-952)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $87,000
     Resource Management Cost Account--State . . . . . . . . . . . . $94,000
     State Building Construction Account--State . . . . . . . . . . . . $211,000
          Subtotal Appropriation . . . . . . . . . . . . $392,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,783,000
          TOTAL . . . . . . . . . . . . $4,175,000

NEW SECTION.  Sec. 3211   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Blanchard Mountain (08-1-951)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for acquisition of working forest lands as an initial purchase in support of an approved plan to preserve the core of Blanchard mountain in Skagit county. The department shall consult with the University of Washington college of forestry resources' northwest environmental forum and with other interest groups prior to the purchase. The department shall coordinate purchases funded under this section with purchases funded under section 3213 of this act to block up and preserve working forest lands at risk of conversion in Skagit county.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3212   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Marine Station (08-1-015)

Appropriation:
     Resource Management Cost Account--State . . . . . . . . . . . . $750,000
     State Building Construction Account--State . . . . . . . . . . . . $750,000
          Subtotal Appropriation . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3213   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Conversion Land Acquisition (08-1-950)

     The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely for acquisition of working forest lands at risk of conversion to nonforest uses. The legislature finds that the chronic loss of working forest lands threatens the long-term prospects of the timber products industry, which in turn threatens the long-term economic return for the beneficiaries of state trust lands. Acquisition of these conversion lands is intended to help stabilize the primary source of revenue to trust land beneficiaries. The department shall submit a report to the appropriate committees of the legislature by October 1, 2008, indicating the lands purchased under this section, showing the locations, acres, purchase price, and within that purchase price, the value of the property attributed to the future value of timber harvests given an expected rate of return for timber lands, and the value of the property attributed to future development of the property. It is the intention of the legislature to lease the development rights of these conversion lands and retain them as long-term working forest lands under the sustainable harvest plan. Working forest lands acquired under this section shall be managed at a level equal to or greater than seventy-five percent of the expected harvest under the sustainable harvest plan. The appropriation provided in this section shall lapse unless chapter . . . (Substitute House Bill No. 2382 (An act relating to leasing state lands and development rights on state lands to public agencies), Laws of 2007, or similar provisions contained in other legislation, is enacted prior to June 30, 2007.

Appropriation:
     Resource Management Cost Account--State . . . . . . . . . . . . $40,000,000
     Natural Resources Real Property Replacement
          Account--State . . . . . . . . . . . . $20,000,000
          Subtotal Appropriation . . . . . . . . . . . . $60,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $60,000,000

NEW SECTION.  Sec. 3214   FOR THE DEPARTMENT OF AGRICULTURE
     Fair Improvements (06-4-850)

     The appropriation in this section is subject to the following conditions and limitations: $850,000 is provided solely for renovations and repairs to the historic pavilion at the Walla Walla fairgrounds.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,250,000

NEW SECTION.  Sec. 3215   FOR THE DEPARTMENT OF AGRICULTURE
     Energy Freedom Program (06-2-851)

     The reappropriation in this section is subject to the following conditions and limitations: If chapter . . . (House Bill No. 1303/Senate Bill No. 5586 (cleaner energy)), Laws of 2007 is enacted, then the amounts in this section are appropriated to the department of community, trade, and economic development.

Reappropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $8,529,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,529,000

NEW SECTION.  Sec. 3216   FOR THE DEPARTMENT OF AGRICULTURE
     Energy Freedom Program (E3SHB No. 2939) (06-2-850)

     The reappropriation in this section is subject to the following conditions and limitations: If chapter . . . (House Bill No. 1303/Senate Bill No. 5586 (cleaner energy)), Laws of 2007 is enacted, then the amounts in this section are appropriated to the department of community, trade, and economic development.

Reappropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $5,971,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,971,000

(End of part)


PART 4
TRANSPORTATION

NEW SECTION.  Sec. 4001   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy Sanitary System (08-2-002)

Appropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,500,000

NEW SECTION.  Sec. 4002   FOR THE WASHINGTON STATE PATROL
     Minor Works - Preservation (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $480,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $2,480,000

NEW SECTION.  Sec. 4003   FOR THE WASHINGTON STATE PATROL
     Replace Existing Dormitory (08-2-003)

     The appropriation in this section is subject to the following conditions and limitations: The state building construction account appropriation is provided solely for one-half of the construction cost for replacement of the student dormitory at the fire training academy and is contingent upon the remaining construction cost being funded with a certificate of participation that is repaid with revenues from fees charged by the fire training academy. Any expenditures from this appropriation must be matched by an equal expenditure from the certificate of participation.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,360,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,360,000

NEW SECTION.  Sec. 4004   FOR THE WASHINGTON STATE PATROL
     Combined State Agency Aviation Facility (08-2-951)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $67,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $813,000
          TOTAL . . . . . . . . . . . . $880,000

NEW SECTION.  Sec. 4005   FOR THE DEPARTMENT OF TRANSPORTATION
     Columbia River Dredging (03-H-001)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely to fund the second phase of a multiphase cooperative project with the state of Oregon to dredge the Columbia river. The amount in this section lapses unless the state of Oregon appropriates a dollar-for-dollar match to fund its share of the project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,980,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,720,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,700,000

(End of part)


PART 5
EDUCATION

NEW SECTION.  Sec. 5001   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2001-2003 School Construction Assistance Grant Program (02-4-001)

Reappropriation:
     Common School Construction Account--State . . . . . . . . . . . . $3,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,000,000

NEW SECTION.  Sec. 5002   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2003-2005 School Construction Assistance Grant Program (04-4-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,961,000
     Common School Construction Account--State . . . . . . . . . . . . $10,682,000
          Subtotal Reappropriation . . . . . . . . . . . . $22,643,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $171,568,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $194,211,000

NEW SECTION.  Sec. 5003   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2005-2007 Apple Achievement Awards (06-4-850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 196, chapter 371, Laws of 2006.


Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $302,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $198,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5004   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2005-2007 High Performance School Building Grants (06-4-852)

     The reappropriation in this section is subject to the following conditions and limitations: Additional funding will be provided to school districts constructing public schools to recognized standards for high performance public buildings for a transition period of three years. The districts building high performance public schools will be granted funding per school project for capital-related costs associated with the design and construction of public K-12 schools that meet or exceed comprehensive design, construction, and operating standards for high performance and sustainable school buildings. No more than $250,000 will be allotted for each elementary school built to high performance standards, no more than $350,000 will be allotted for each middle school built to high performance standards, and no more than $500,000 will be allotted to each high school built to high performance standards. These levels may be modified, in a limited manner, if specific project conditions warrant and as determined by the office of the superintendent of public instruction.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,078,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,103,000

NEW SECTION.  Sec. 5005   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2005-2007 School Construction Assistance Grant Program (06-4-100)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $117,539,000
     Common School Construction Account--State . . . . . . . . . . . . $218,896,000
          Subtotal Reappropriation . . . . . . . . . . . . $336,435,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $305,331,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $641,766,000

NEW SECTION.  Sec. 5006   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Capital Project Administration (08-4-100)

Appropriation:
     Common School Construction Account--State . . . . . . . . . . . . $2,528,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,049,000
          TOTAL . . . . . . . . . . . . $14,577,000

NEW SECTION.  Sec. 5007   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     School Construction Assistance Grants (08-4-200)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) For state assistance grants for purposes of calculating square foot eligibility, kindergarten student headcount shall not be reduced by fifty percent.
     (2) The legislature has made a commitment to phase in all-day kindergarten programs beginning with the 2007-08 school year. However, the legislature finds that one potential barrier to successful expansion of all-day kindergarten programs may be a lack of facilities that meet the requirements of an all-day kindergarten program. The office of the superintendent of public instruction, in consultation with the school facilities citizen advisory panel, shall examine alternatives for addressing school facilities needs for all-day kindergarten programs, including adapting existing unused space, creating innovative public-private partnerships and partnerships with early learning providers, shifting the location of current programs within a district or a school, and temporary, limited use of portables. The office of the superintendent of public instruction shall submit a report to the capital budget committee of the house of representatives and the ways and means committee of the senate by September 1, 2007, with recommendations on preferred alternatives and an analysis of the feasibility and cost of implementing the alternatives.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $113,195,000
     Common School Construction Account--State . . . . . . . . . . . . $768,888,000
          Subtotal Appropriation . . . . . . . . . . . . $882,083,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,500,725,000
          TOTAL . . . . . . . . . . . . $4,382,808,000

NEW SECTION.  Sec. 5008   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Small Repair Grants (08-4-402)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 5009   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Vocational Skills Centers (08-4-300)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $9,362,000 from this appropriation is provided solely for minor capital projects at all of the state's skills centers ranked with a "severity score" of 40 points or more.
     (2) $24,400,000 from this appropriation is provided solely for the design and construction of the Skagit Valley vocational skills center.
     (3) $16,366,000 from this appropriation is provided solely for the design and construction of the Yakima Valley technical skills center.
     (4) $23,161,000 from this appropriation is provided solely for the design and construction of the Sno-Isle skills center.
     (5) $1,118,000 from this appropriation is provided solely for the design and construction of the Clark county skills center.
     (6) $300,000 from this appropriation is provided solely for the completion of the new market skills center project and to address storm water issues.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $74,707,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $83,984,000
          TOTAL . . . . . . . . . . . . $158,691,000

NEW SECTION.  Sec. 5010   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Island Wood Environmental Learning Center (08-4-406)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5011   FOR THE STATE SCHOOL FOR THE BLIND
     Campus Preservation (06-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $400,000

NEW SECTION.  Sec. 5012   FOR THE STATE SCHOOL FOR THE BLIND
     Minor Works - Facility Preservation (08-1-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $770,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,500,000
          TOTAL . . . . . . . . . . . . $3,270,000

NEW SECTION.  Sec. 5013   FOR THE STATE SCHOOL FOR THE BLIND
     New Physical Education Center (08-2-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,000,000

NEW SECTION.  Sec. 5014   FOR THE STATE SCHOOL FOR THE DEAF
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,325,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,000,000
          TOTAL . . . . . . . . . . . . $2,325,000

NEW SECTION.  Sec. 5015   FOR THE STATE SCHOOL FOR THE DEAF
     Vocational Education, Cafeteria, and Maintenance Support Building (08-2-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,900,000

NEW SECTION.  Sec. 5016   FOR THE UNIVERSITY OF WASHINGTON
     UW Bothell/Cascadia Community College - State Route 522 Off Ramp (02-2-014)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $255,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,495,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,750,000

NEW SECTION.  Sec. 5017   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Land Acquisition/Soils Remediation (01-2-029)

Reappropriation:
     Education Construction Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,950,000

NEW SECTION.  Sec. 5018   FOR THE UNIVERSITY OF WASHINGTON
     Facility Preservation Backlog Reduction (04-1-951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $21,214,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,314,000

NEW SECTION.  Sec. 5019   FOR THE UNIVERSITY OF WASHINGTON
     UW Emergency Power Expansion - Phase II (04-1-024)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,148,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,648,000

NEW SECTION.  Sec. 5020   FOR THE UNIVERSITY OF WASHINGTON
     Classroom Improvements (05-1-850)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,850,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5021   FOR THE UNIVERSITY OF WASHINGTON
     Infectious Disease Laboratory Facilities (05-2-850)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5022   FOR THE UNIVERSITY OF WASHINGTON
     Playhouse Theater (05-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,578,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,578,000

NEW SECTION.  Sec. 5023   FOR THE UNIVERSITY OF WASHINGTON
     Architecture Hall Renovation (06-1-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,324,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,324,000

NEW SECTION.  Sec. 5024   FOR THE UNIVERSITY OF WASHINGTON
     Clark Hall Renovation (06-1-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $554,000
     Education Construction Account--State . . . . . . . . . . . . $15,000,000
          Subtotal Appropriation . . . . . . . . . . . . $15,554,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,300,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,054,000

NEW SECTION.  Sec. 5025   FOR THE UNIVERSITY OF WASHINGTON
     Cleanup More Hall and Other Toxics (06-1-950)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,125,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,375,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 5026   FOR THE UNIVERSITY OF WASHINGTON
     Guggenheim Hall Renovation (06-1-006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000
     Education Construction Account--State . . . . . . . . . . . . $4,000,000
          Subtotal Reappropriation . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,312,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,312,000

NEW SECTION.  Sec. 5027   FOR THE UNIVERSITY OF WASHINGTON
     Health Sciences - H Wing (06-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,000,000
     University of Washington Building Account--State . . . . . . . . . . . . $3,000,000
          Subtotal Appropriation . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 5028   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Facility Preservation (06-1-002)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $9,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $21,200,000

NEW SECTION.  Sec. 5029   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Health, Safety, and Code Requirements (06-1-003)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,000,000

NEW SECTION.  Sec. 5030   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Infrastructure Preservation (06-1-004)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 5031   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Program (06-2-009)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,700,000

NEW SECTION.  Sec. 5032   FOR THE UNIVERSITY OF WASHINGTON
     Savery Hall Renovation (06-1-005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000
Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $54,910,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $61,510,000

NEW SECTION.  Sec. 5033   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma - Assembly Hall (06-2-007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,500,000

NEW SECTION.  Sec. 5034   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Land Acquisition (06-2-852)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5035   FOR THE UNIVERSITY OF WASHINGTON
     Balmer Hall Reconstruction (08-1-004)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of the reconstruction/replacement of Balmer hall. The office of financial management shall not allot funding for the design until after sine die adjournment of the 2008 regular legislative session and only if the predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval under RCW 43.88.110(6) prior to the start of the 2008 regular legislative session.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $42,800,000
          TOTAL . . . . . . . . . . . . $46,800,000

NEW SECTION.  Sec. 5036   FOR THE UNIVERSITY OF WASHINGTON
     Denny Hall Renovation (08-1-002)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of the renovation of Denny hall. The office of financial management shall not allot funding for the design until after sine die adjournment of the 2008 regular legislative session and only if the predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval under RCW 43.88.110(6) prior to the start of the 2008 regular legislative session.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $52,915,000
          TOTAL . . . . . . . . . . . . $56,915,000

NEW SECTION.  Sec. 5037   FOR THE UNIVERSITY OF WASHINGTON
     Interdisciplinary Academic Building (08-2-003)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of the interdisciplinary academic building. The office of financial management shall not allot funding for the design until after sine die adjournment of the 2008 regular legislative session and only if the predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval under RCW 43.88.110(6) prior to the start of the 2008 regular legislative session.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $57,500,000
          TOTAL . . . . . . . . . . . . $62,500,000

NEW SECTION.  Sec. 5038   FOR THE UNIVERSITY OF WASHINGTON
     Intermediate Student Service and Classroom Improvements (08-1-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $13,281,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,281,000

NEW SECTION.  Sec. 5039   FOR THE UNIVERSITY OF WASHINGTON
     Lewis Hall Renovation (08-1-003)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of the renovation of Lewis hall. The office of financial management shall not allot funding for the design until after sine die adjournment of the 2008 regular legislative session and only if the predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval under RCW 43.88.110(6) prior to the start of the 2008 regular legislative session.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,501,000
          TOTAL . . . . . . . . . . . . $18,501,000

NEW SECTION.  Sec. 5040   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $23,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $140,000,000
          TOTAL . . . . . . . . . . . . $163,000,000

NEW SECTION.  Sec. 5041   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works - Program (08-2-001)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,610,000
          TOTAL . . . . . . . . . . . . $37,610,000

NEW SECTION.  Sec. 5042   FOR THE UNIVERSITY OF WASHINGTON
     Infrastructure Savings (08-1-151)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6003 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5043   FOR THE UNIVERSITY OF WASHINGTON
     Preventive Facility Maintenance and Building System Repairs (08-1-150)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
     (2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds must be allocated at local discretion to achieve the performance goal stated in this subsection (2), with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
     (3) Section 6003 of this act does not apply to this appropriation.
     (4) There is no intent to reappropriate amounts not expended by June 30, 2009.

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $25,825,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,825,000

NEW SECTION.  Sec. 5044   FOR THE UNIVERSITY OF WASHINGTON
     UW Bothell Phase 3 - Predesign (08-2-006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $62,850,000
          TOTAL . . . . . . . . . . . . $63,000,000

NEW SECTION.  Sec. 5045   FOR THE UNIVERSITY OF WASHINGTON
     UW Tacoma Phase 3 (08-2-005)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of UW Tacoma phase 3. The office of financial management shall not allot funding for the design until after sine die adjournment of the 2008 regular legislative session and only if the predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval under RCW 43.88.110(6) prior to the start of the 2008 regular legislative session.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $54,000,000
          TOTAL . . . . . . . . . . . . $60,150,000

NEW SECTION.  Sec. 5046   FOR THE UNIVERSITY OF WASHINGTON
     Computing and Communications Upgrades and Data Center (08-2-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,000,000
          TOTAL . . . . . . . . . . . . $47,000,000

NEW SECTION.  Sec. 5047   FOR WASHINGTON STATE UNIVERSITY
     WSU Spokane Riverpoint - Academic Center Building (00-2-906)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $32,100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,850,000

NEW SECTION.  Sec. 5048   FOR WASHINGTON STATE UNIVERSITY
     WSU Vancouver - Student Services Center (00-2-905)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,126,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,626,000

NEW SECTION.  Sec. 5049   FOR WASHINGTON STATE UNIVERSITY
     WSU Pullman - Biotechnology/Life Sciences 2 (04-2-085)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $2,600,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,022,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $48,978,000
          Subtotal Appropriation . . . . . . . . . . . . $58,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,050,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $72,650,000

NEW SECTION.  Sec. 5050   FOR WASHINGTON STATE UNIVERSITY
     WSU Spokane - Nursing Building at Riverpoint (04-2-941)

     The reappropriation in this section is subject to the following conditions and limitations: Upon completion of construction of this facility at the Riverpoint campus in Spokane, the existing land and facilities housing the intercollegiate nursing center adjacent to Spokane Falls Community College shall be transferred to the state board for community and technical colleges for the use of community college district 17, community colleges of Spokane.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $34,600,000

NEW SECTION.  Sec. 5051   FOR WASHINGTON STATE UNIVERSITY
     WSU Tri-Cities - Bioproducts Facility (04-2-940)

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $23,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,750,000

NEW SECTION.  Sec. 5052   FOR WASHINGTON STATE UNIVERSITY
     Campus Infrastructure (06-1-073)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 5053   FOR WASHINGTON STATE UNIVERSITY
     Minor Capital Improvements (06-2-002)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 5054   FOR WASHINGTON STATE UNIVERSITY
     Minor Works - Facility Preservation (06-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,500,000
     Washington State University Building Account--State . . . . . . . . . . . . $500,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $26,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,500,000

NEW SECTION.  Sec. 5055   FOR WASHINGTON STATE UNIVERSITY
     Minor Works - Health, Safety, and Code (06-1-002)

Reappropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5056   FOR WASHINGTON STATE UNIVERSITY
     Center for Precision Agriculture (06-2-850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,800,000

NEW SECTION.  Sec. 5057   FOR WASHINGTON STATE UNIVERSITY
     WSU Vancouver - Undergraduate Classroom Building (06-2-951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $24,350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,450,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,000,000

NEW SECTION.  Sec. 5058   FOR WASHINGTON STATE UNIVERSITY
     Intermediate Preservation Projects (08-1-702)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,119,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $31,240,000
          TOTAL . . . . . . . . . . . . $34,359,000

NEW SECTION.  Sec. 5059   FOR WASHINGTON STATE UNIVERSITY
     Library Road Infrastructure (08-1-703)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,000,000
     Washington State University Building Account--State . . . . . . . . . . . . $3,000,000
          Subtotal Appropriation . . . . . . . . . . . . $15,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,000,000

NEW SECTION.  Sec. 5060   FOR WASHINGTON STATE UNIVERSITY
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $18,900,000
     Washington State University Building
          Account--State . . . . . . . . . . . . $20,000,000
          Subtotal Appropriation . . . . . . . . . . . . $38,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $155,900,000
          TOTAL . . . . . . . . . . . . $194,800,000

NEW SECTION.  Sec. 5061   FOR WASHINGTON STATE UNIVERSITY
     Infrastructure Savings (08-1-151)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6003 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5062   FOR WASHINGTON STATE UNIVERSITY
     Minor Works - Program (08-2-002)

Appropriation:
     Washington State University Building
          Account--State . . . . . . . . . . . . $17,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $73,000,000
          TOTAL . . . . . . . . . . . . $90,000,000

NEW SECTION.  Sec. 5063   FOR WASHINGTON STATE UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (08-1-150)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
     (2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds must be allocated at local discretion to achieve the performance goal stated in this subsection (2), with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
     (3) Section 6003 of this act does not apply to this appropriation.
     (4) There is no intent to reappropriate amounts not expended by June 30, 2009.

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $10,115,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,115,000

NEW SECTION.  Sec. 5064   FOR WASHINGTON STATE UNIVERSITY
     University Wide Infrastructure (08-1-701)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $72,500,000
          TOTAL . . . . . . . . . . . . $80,500,000

NEW SECTION.  Sec. 5065   FOR WASHINGTON STATE UNIVERSITY
     Utilities Extension (08-1-100)

Appropriation:
     Washington State University Building Account--State . . . . . . . . . . . . $11,536,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,536,000

NEW SECTION.  Sec. 5066   FOR WASHINGTON STATE UNIVERSITY
     WSU Vancouver: Applied Technology and Classroom Building (06-2-950)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,770,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,300,000
          TOTAL . . . . . . . . . . . . $40,220,000

NEW SECTION.  Sec. 5067   FOR EASTERN WASHINGTON UNIVERSITY
     Patterson Hall Remodel (06-2-002)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $40,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $160,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,000,000
          TOTAL . . . . . . . . . . . . $30,200,000

NEW SECTION.  Sec. 5068   FOR EASTERN WASHINGTON UNIVERSITY
     Infrastructure Savings (06-1-751)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $377,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,177,000

NEW SECTION.  Sec. 5069   FOR EASTERN WASHINGTON UNIVERSITY
     Hargreaves Hall Renovation (06-1-701)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,821,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $914,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,235,000

NEW SECTION.  Sec. 5070   FOR EASTERN WASHINGTON UNIVERSITY
     Martin Williamson Hall Renovation (06-1-706)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $40,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $160,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,000,000
          TOTAL . . . . . . . . . . . . $26,200,000

NEW SECTION.  Sec. 5071   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (06-1-710)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 5072   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works - Health Safety and Code Compliance (06-1-711)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,700,000

NEW SECTION.  Sec. 5073   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (06-1-712)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5074   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works Program (06-2-006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,500,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,600,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,600,000

NEW SECTION.  Sec. 5075   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,500,000
     State Building Construction Account--State . . . . . . . . . . . . $500,000
          Subtotal Appropriation . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $28,000,000

NEW SECTION.  Sec. 5076   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code Requirements (08-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $28,000,000

NEW SECTION.  Sec. 5077   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (08-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,000,000
          TOTAL . . . . . . . . . . . . $26,000,000

NEW SECTION.  Sec. 5078   FOR EASTERN WASHINGTON UNIVERSITY
     Minor Works - Program (08-2-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $7,000,000
          Subtotal Appropriation . . . . . . . . . . . . $11,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $62,400,000
          TOTAL . . . . . . . . . . . . $73,400,000

NEW SECTION.  Sec. 5079   FOR EASTERN WASHINGTON UNIVERSITY
     Infrastructure Savings (08-1-151)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6003 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5080   FOR EASTERN WASHINGTON UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (08-1-150)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
     (2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds must be allocated at local discretion to achieve the performance goal stated in this subsection (2), with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
     (3) Section 6003 of this act does not apply to this appropriation.
     (4) There is no intent to reappropriate amounts not expended by June 30, 2009.

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $2,217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,217,000

NEW SECTION.  Sec. 5081   FOR CENTRAL WASHINGTON UNIVERSITY
     Dean Hall Renovation (06-1-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $924,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $23,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,276,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,400,000

NEW SECTION.  Sec. 5082   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (06-1-003)

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,808,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,058,000

NEW SECTION.  Sec. 5083   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (06-1-002)

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $27,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,073,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,100,000

NEW SECTION.  Sec. 5084   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works Program (06-2-005)

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $669,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,721,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,390,000

NEW SECTION.  Sec. 5085   FOR CENTRAL WASHINGTON UNIVERSITY
     Nicholson Pavilion Indoor Air/Asbestos (06-1-008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $375,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,725,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,100,000

NEW SECTION.  Sec. 5086   FOR CENTRAL WASHINGTON UNIVERSITY
     Combined Utilities (08-1-011)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,000,000
          TOTAL . . . . . . . . . . . . $21,800,000

NEW SECTION.  Sec. 5087   FOR CENTRAL WASHINGTON UNIVERSITY
     Hogue Hall Renovation and Addition (08-2-003)

Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,000,000
          TOTAL . . . . . . . . . . . . $38,000,000

NEW SECTION.  Sec. 5088   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,175,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,700,000
          TOTAL . . . . . . . . . . . . $15,875,000

NEW SECTION.  Sec. 5089   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code Requirements (08-1-009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $660,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,675,000
          Subtotal Appropriation . . . . . . . . . . . . $3,335,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,340,000
          TOTAL . . . . . . . . . . . . $16,675,000

NEW SECTION.  Sec. 5090   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (08-1-010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,165,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,125,000
          Subtotal Appropriation . . . . . . . . . . . . $3,290,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,160,000
          TOTAL . . . . . . . . . . . . $16,450,000

NEW SECTION.  Sec. 5091   FOR CENTRAL WASHINGTON UNIVERSITY
     Minor Works - Program (08-2-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,800,000
          Subtotal Appropriation . . . . . . . . . . . . $7,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $17,500,000
          TOTAL . . . . . . . . . . . . $25,300,000

NEW SECTION.  Sec. 5092   FOR CENTRAL WASHINGTON UNIVERSITY
     Infrastructure Savings (08-1-151)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6003 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5093   FOR CENTRAL WASHINGTON UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (08-1-150)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
     (2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds must be allocated at local discretion to achieve the performance goal stated in this subsection (2), with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
     (3) Section 6003 of this act does not apply to this appropriation.
     (4) There is no intent to reappropriate amounts not expended by June 30, 2009.

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $2,422,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,422,000

NEW SECTION.  Sec. 5094   FOR THE EVERGREEN STATE COLLEGE
     Seminar Building Phase II - Construction (02-2-004)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $47,350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,500,000

NEW SECTION.  Sec. 5095   FOR THE EVERGREEN STATE COLLEGE
     Daniel J. Evans Building - Modernization (04-2-006)

     The reappropriation in this section is subject to the following conditions and limitations: Should updated bids related to this project exceed the reappropriation due to unexpected inflation in the cost of construction, the office of financial management may authorize a transfer or transfers of appropriations from the minor works -infrastructure preservation project in section 5103 of this act; from the minor works - preservation project in section 5105 of this act; or from the minor works - program project in section 5107 of this act. The appropriations transferred from one or more of these three minor works projects shall not exceed $2,500,000 in total. Prior to approval of the transfer, The Evergreen State College shall report to the office of financial management, the house of representatives capital budget committee, and the senate committee on ways and means on alternatives examined to negotiate a reduction in the bid price pursuant to RCW 39.04.105, and on the specific minor works projects that would be deferred as a result of the transfer.

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $20,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $44,750,000

NEW SECTION.  Sec. 5096   FOR THE EVERGREEN STATE COLLEGE
     Health, Safety, and Code Requirements (06-1-002)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5097   FOR THE EVERGREEN STATE COLLEGE
     Infrastructure Preservation (06-1-004)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $175,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $825,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5098   FOR THE EVERGREEN STATE COLLEGE
     Lab I First Floor Class/Laboratory Renovation (06-2-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,100,000

NEW SECTION.  Sec. 5099   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Facility Preservation (06-1-003)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $1,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5100   FOR THE EVERGREEN STATE COLLEGE
     Minor Works Program (06-2-005)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $75,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $425,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5101   FOR THE EVERGREEN STATE COLLEGE
     College Activities Building Renovation (08-2-009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,900,000

NEW SECTION.  Sec. 5102   FOR THE EVERGREEN STATE COLLEGE
     Longhouse Expansion (08-2-007)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,700,000

NEW SECTION.  Sec. 5103   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Infrastructure Preservation (08-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $700,000

NEW SECTION.  Sec. 5104   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Health, Safety, and Code Requirements (08-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 5105   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Preservation (08-1-001)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $5,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,300,000

NEW SECTION.  Sec. 5106   FOR THE EVERGREEN STATE COLLEGE
     Infrastructure Savings (08-1-151)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6003 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5107   FOR THE EVERGREEN STATE COLLEGE
     Minor Works - Program (08-2-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $930,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $930,000

NEW SECTION.  Sec. 5108   FOR THE EVERGREEN STATE COLLEGE
     Preventive Facility Maintenance and Building System Repairs (08-1-150)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
     (2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds must be allocated at local discretion to achieve the performance goal stated in this subsection (2), with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
     (3) Section 6003 of this act does not apply to this appropriation.
     (4) There is no intent to reappropriate amounts not expended by June 30, 2009.

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $760,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $760,000

NEW SECTION.  Sec. 5109   FOR WESTERN WASHINGTON UNIVERSITY
     Academic Instructional Center (02-2-026)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $48,000,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,895,000
     Western Washington University Capital Projects Account--
          State . . . . . . . . . . . . $1,178,000
          Subtotal Appropriation . . . . . . . . . . . . $7,073,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,171,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $64,244,000

NEW SECTION.  Sec. 5110   FOR WESTERN WASHINGTON UNIVERSITY
     Miller Hall Renovation (04-1-953)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,523,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $52,227,000
          TOTAL . . . . . . . . . . . . $58,000,000

NEW SECTION.  Sec. 5111   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (06-1-083)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,440,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,290,000

NEW SECTION.  Sec. 5112   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code (06-1-082)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,240,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,090,000

NEW SECTION.  Sec. 5113   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (06-1-084)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,375,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,225,000

NEW SECTION.  Sec. 5114   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Program (06-2-085)

Reappropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,522,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,722,000

NEW SECTION.  Sec. 5115   FOR WESTERN WASHINGTON UNIVERSITY
     Academic Facilities Modernization Projects (08-2-099)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,000,000

NEW SECTION.  Sec. 5116   FOR WESTERN WASHINGTON UNIVERSITY
     Carver Academic Renovation (08-1-060)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $51,587,000
          TOTAL . . . . . . . . . . . . $51,987,000

NEW SECTION.  Sec. 5117   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Facility Preservation (08-1-091)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,051,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $18,000,000
          TOTAL . . . . . . . . . . . . $23,051,000

NEW SECTION.  Sec. 5118   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Health, Safety, and Code Requirements (08-1-090)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,933,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $14,933,000

NEW SECTION.  Sec. 5119   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Infrastructure Preservation (08-1-092)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,016,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $10,016,000

NEW SECTION.  Sec. 5120   FOR WESTERN WASHINGTON UNIVERSITY
     Infrastructure Savings (08-1-151)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6003 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1
          Subtotal Appropriation . . . . . . . . . . . . $2

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5121   FOR WESTERN WASHINGTON UNIVERSITY
     Minor Works - Program (08-2-093)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $7,000,000
          Subtotal Appropriation . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 5122   FOR WESTERN WASHINGTON UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (08-1-150)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
     (2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds must be allocated at local discretion to achieve the performance goal stated in this subsection (2), with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
     (3) Section 6003 of this act does not apply to this appropriation.
     (4) There is no intent to reappropriate amounts not expended by June 30, 2009.

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $3,614,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,614,000

NEW SECTION.  Sec. 5123   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Pacific - Lewis and Clark Station Camp Park Project (02-S-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $666,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,885,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,551,000

NEW SECTION.  Sec. 5124   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Lewis and Clark Trail Interpretive Infrastructure Grant (02-4-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,081,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $646,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,727,000

NEW SECTION.  Sec. 5125   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Projects (04-4-004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,947,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,053,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5126   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Olympia - State Capital Museum: Building Preservation (06-1-003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $314,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $331,000

NEW SECTION.  Sec. 5127   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Statewide - Washington Heritage Project Grants (06-4-004)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the project list in section 733, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,821,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $843,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,664,000

NEW SECTION.  Sec. 5128   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Tacoma - State History Museum: Building Preservation (06-1-001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $381,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $481,000

NEW SECTION.  Sec. 5129   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Tacoma - Research Center: Building Preservation (06-1-002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $82,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $182,000

NEW SECTION.  Sec. 5130   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Tacoma Research Center Building Preservation (07-1-002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $537,000
          TOTAL . . . . . . . . . . . . $737,000

NEW SECTION.  Sec. 5131   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Tacoma State History Museum Building Preservation (07-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,000,000
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 5132   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Grants (07-4-004)

     The appropriation in this section is subject to the following conditions and limitations:

     (1) The appropriation is subject to the provisions of RCW 27.34.330.

     (2) The appropriation is provided solely for the following list of projects:

Project       Recommended

Cascade land conservancy       $202,000
Suquamish museum and arts center       $1,000,000
Moses Lake museum and arts center       $1,000,000
White River Valley museum       $245,000
The Tulalip tribe       $1,000,000
City of Mukilteo       $490,000
Lewis county historical museum       $43,000
Pacific county historical society       $186,000
City of Gig Harbor       $1,000,000
Bainbridge Island metro parks and recreation       $70,000
Polson museum       $171,000
Washington trust for historic preservation       $83,000
Historic Seattle PDA       $500,000
City of Tacoma       $77,000
City of Des Moines       $1,000,000
Fort Walla Walla museum       $859,000
Foss waterway seaport       $300,000
LaConner quilt museum       $125,000
Cowlitz River Valley historical society       $158,000
Western forest industries museum       $158,000
San Juan historical society       $25,000
Central Washington fair association       $48,000
Urban league of metro Seattle       $650,000
The center for wooden boats       $235,000
Jefferson county historical society       $200,000
Mansfield museum       $10,000
Martin Luther King Ballet       $50,000
The northwest railway museum       $75,000
Northpoint cooperative preschool       $40,000

Total       $10,000,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 5133   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Women's History Preservation Grants (07-4-950)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the preservation of documents that are important in revealing the role of women in the history of the region and the role Washington women played in the nation's history.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 5134   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Building Management System (08-1-003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $196,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $196,000

NEW SECTION.  Sec. 5135   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Campbell House Long-Term Preservation (08-1-002)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely to repair the foundation, sandstone, mortar, brick, chimney, and roof of state-owned National Register property "Campbell house" and its carriage house.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $402,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $293,000
          TOTAL . . . . . . . . . . . . $695,000

NEW SECTION.  Sec. 5136   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Computer Catalog System (08-2-010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $63,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $63,000

NEW SECTION.  Sec. 5137   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Museum Preservation (08-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,154,000
          TOTAL . . . . . . . . . . . . $1,304,000

NEW SECTION.  Sec. 5138   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Security System and Technology Infrastructure (08-1-005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $408,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $408,000

NEW SECTION.  Sec. 5139   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Storage and Exhibit Equipment for Collections (08-2-012)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $42,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $114,000
          TOTAL . . . . . . . . . . . . $156,000

NEW SECTION.  Sec. 5140   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Clark Center at WSU Vancouver (00-2-680)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,624,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,774,000

NEW SECTION.  Sec. 5141   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Puyallup: Phase III Expansion (00-2-676)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,335,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,335,000

NEW SECTION.  Sec. 5142   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Science Building (01-2-688)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,804,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,804,000

NEW SECTION.  Sec. 5143   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Science Building (01-2-687)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $21,496,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,996,000

NEW SECTION.  Sec. 5144   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bates Technical College: Learning Resource Center/Vocational (02-2-684)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,760,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,060,000

NEW SECTION.  Sec. 5145   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Cascadia Community College/UW Bothell: Phase 2B Off Ramp (02-2-999)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $320,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,430,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,750,000

NEW SECTION.  Sec. 5146   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Instructional Lab Building - Construction (02-2-685)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,488,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,488,000

NEW SECTION.  Sec. 5147   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Information Technology Vocational Center (02-2-683)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,280,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,730,000

NEW SECTION.  Sec. 5148   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Basic Skills/Computer Lab (02-2-686)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,178,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,178,000

NEW SECTION.  Sec. 5149   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College: Science and Technology (04-2-690)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,400,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $31,332,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,066,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,798,000

NEW SECTION.  Sec. 5150   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College: Welding/Auto Collision Replacement (04-1-213)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $2,600,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,638,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,838,000

NEW SECTION.  Sec. 5151   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Cascadia Community College: Center for Arts, Technology, and Communications (04-2-693)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $2,100,000
Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $32,636,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,091,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $35,827,000

NEW SECTION.  Sec. 5152   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia Community College: Science Building (04-2-850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000
Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $28,716,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,697,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $32,113,000

NEW SECTION.  Sec. 5153   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: East County Satellite (04-1-689)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $2,000,000

Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $27,184,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $693,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,877,000

NEW SECTION.  Sec. 5154   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Renovation - Mountlake Terrace Hall (04-1-311)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $230,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,596,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,826,000

NEW SECTION.  Sec. 5155   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Pilchuck/Glacier (04-1-205)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $130,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,815,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,945,000

NEW SECTION.  Sec. 5156   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Replacement - Monte Cristo Hall (04-1-305)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $45,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,307,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,352,000

NEW SECTION.  Sec. 5157   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: University Center - North Puget Sound (04-2-692)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,900,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $3,844,000
          Subtotal Reappropriation . . . . . . . . . . . . $5,744,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $40,604,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,590,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $51,938,000

NEW SECTION.  Sec. 5158   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Preservation Backlog Reduction (04-1-951)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the reappropriation is provided solely to accomplish preservation work that improves existing state facilities in the worst relative condition for housed programs and current building occupants.
     (2) With this reappropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preservation backlog reduction project funds shall be prioritized at local discretion to achieve the above stated goal, with particular attention given to buildings currently rated in adequate to marginal condition.
     (3) This section is subject to the same allotment procedures as a minor works category.
     (4) Section 6003 of this act does not apply to this reappropriation.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $52,298,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $64,298,000

NEW SECTION.  Sec. 5159   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Replacement - Instructional Building (04-1-204)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $420,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,314,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,734,000

NEW SECTION.  Sec. 5160   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Riverview Education Center (07-1-850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $498,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $498,000

NEW SECTION.  Sec. 5161   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Computer Technology Center (04-2-682)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $580,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,419,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,999,000

NEW SECTION.  Sec. 5162   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Redmond Land Acquisition (04-2-403)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The purpose of the reappropriation is to purchase property for expansion, storm water retention, and parking requirements.
     (2) State funds must be matched with nonstate resources of at least $500,000.
     (3) Allotment of funds shall be in accordance with RCW 43.88.150.

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5163   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Renovation - East/West Buildings (04-1-312)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,271,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,421,000

NEW SECTION.  Sec. 5164   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College: Instructional Fine Arts Building (04-1-214)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $13,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $13,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,861,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,661,000

NEW SECTION.  Sec. 5165   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (Minor Improvements) (04-2-130)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $730,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $1,400,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,130,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,850,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,980,000

NEW SECTION.  Sec. 5166   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: Science and Technology Building Replacement (04-1-202)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,998,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,998,000

NEW SECTION.  Sec. 5167   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Replacement Science and Technology Building (04-1-208)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,640,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,640,000

NEW SECTION.  Sec. 5168   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College - Fort Steilacoom: Science and Technology (04-2-694)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $850,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $30,407,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,327,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $32,584,000

NEW SECTION.  Sec. 5169   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom: Childcare Center (04-2-401)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $40,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $460,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5170   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Puyallup: Communication Arts/Health Building (04-2-691)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $900,000
Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $25,303,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,196,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,399,000

NEW SECTION.  Sec. 5171   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Renton Technical College: Portable Replacement (04-1-215)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,396,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,396,000

NEW SECTION.  Sec. 5172   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "A" (04-1-010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $640,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,626,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,266,000

NEW SECTION.  Sec. 5173   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (04-1-090)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,006,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,306,000

NEW SECTION.  Sec. 5174   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College: Science Building Replacement (04-1-209)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,500,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $325,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,825,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $28,068,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,217,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,110,000

NEW SECTION.  Sec. 5175   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College: Science Complex (04-2-695)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $2,000,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $25,867,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,253,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,120,000

NEW SECTION.  Sec. 5176   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Instructional Technology Center (04-2-681)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,711,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,861,000

NEW SECTION.  Sec. 5177   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College: Science Building Replacement (04-1-212)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,521,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,721,000

NEW SECTION.  Sec. 5178   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Replacement - Portable Buildings (04-1-206)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $175,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,447,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,622,000

NEW SECTION.  Sec. 5179   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Renovation - Building 7 (04-1-313)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,988,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,988,000

NEW SECTION.  Sec. 5180   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Health Science Facility (04-1-211)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,762,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,262,000

NEW SECTION.  Sec. 5181   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Glenn/Anthon Hall - Replacement (04-1-207)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,645,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,645,000

NEW SECTION.  Sec. 5182   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College: Health Sciences Center (05-2-851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $50,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,950,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 5183   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Training Facility (05-1-854)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,752,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,752,000

NEW SECTION.  Sec. 5184   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls: Business and Social Science Building (05-1-853)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,312,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,312,000

NEW SECTION.  Sec. 5185   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Wenatchee Valley College: Anderson Hall and Portable Replacement (05-1-852)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $17,660,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $24,660,000

NEW SECTION.  Sec. 5186   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Big Bend Community College: Performing Arts and Fine Arts (06-1-309)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $398,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,698,000

NEW SECTION.  Sec. 5187   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Gaiser Hall Renovation (06-1-302)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,374,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,374,000

NEW SECTION.  Sec. 5188   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: O'Connell Sports Center Improvements (06-2-403)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $480,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $170,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $650,000

NEW SECTION.  Sec. 5189   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park Technical College: Allied Health Care Facility (06-2-699)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,285,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $115,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,340,000
          TOTAL . . . . . . . . . . . . $26,760,000

NEW SECTION.  Sec. 5190   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park Technical College: Personal Care Services Facility (06-1-310)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $599,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,499,000

NEW SECTION.  Sec. 5191   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Brier Hall Renovation (06-1-307)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $433,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,133,000

NEW SECTION.  Sec. 5192   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Paine Field Technical Center (06-2-408)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $980,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5193   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs (06-1-050)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $12,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,927,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,327,000

NEW SECTION.  Sec. 5194   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Vocational Education Renovation (06-1-303)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,710,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $661,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,371,000

NEW SECTION.  Sec. 5195   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Humanities and Classroom Building (06-1-205)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $40,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,744,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $97,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,427,000
          TOTAL . . . . . . . . . . . . $28,308,000

NEW SECTION.  Sec. 5196   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Physical Education Renovation (06-1-313)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $477,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,818,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,295,000

NEW SECTION.  Sec. 5197   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Water System Replacement (06-1-501)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,951,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,951,000

NEW SECTION.  Sec. 5198   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Skills Support Center Addition (06-2-405)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $640,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $160,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 5199   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Highline Community College: Marine Science and Technology (06-2-406)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $490,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5200   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Infrastructure Savings (06-1-751)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $2,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $116,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,716,000

NEW SECTION.  Sec. 5201   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Allied Health Building (06-2-697)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,732,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $197,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,085,000
          TOTAL . . . . . . . . . . . . $28,014,000

NEW SECTION.  Sec. 5202   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Science Lab Renovation (06-1-308)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $290,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,469,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,759,000

NEW SECTION.  Sec. 5203   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works Preservation (RMI) (06-1-001)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $6,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,700,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 5204   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works: Program (06-2-130)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,363,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,263,000

NEW SECTION.  Sec. 5205   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College: Employment Resource Center (06-2-851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $325,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $195,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $520,000

NEW SECTION.  Sec. 5206   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College: Wellness Center Repairs (06-1-330)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $970,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,030,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 5207   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: Humanities and Student Services (06-1-204)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $37,889,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $999,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $41,388,000

NEW SECTION.  Sec. 5208   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: Bremer Student Center (06-2-411)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $30,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $570,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 5209   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Library Renovation (06-1-305)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,000,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 5210   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Phase II Cultural and Arts Center (06-2-412)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 5211   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom: Cascade Core Phase I (06-1-326)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,602,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,952,000

NEW SECTION.  Sec. 5212   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs (06-1-010)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $3,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,940,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,840,000

NEW SECTION.  Sec. 5213   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Maritime Academy Repairs (06-1-502)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $268,000
Appropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,688,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,956,000

NEW SECTION.  Sec. 5214   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Greenhouse/Educational Center (06-2-410)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $240,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 5215   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Information Technology and Visual Communications (06-1-304)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $696,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,096,000

NEW SECTION.  Sec. 5216   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College: Annex Renovation (06-1-312)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $840,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,899,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,739,000

NEW SECTION.  Sec. 5217   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College: Automotive Building (Phase I) (06-2-951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5218   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs (06-1-090)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $2,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,537,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,837,000

NEW SECTION.  Sec. 5219   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College: Campus Fire Loop Replacement (06-1-504)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $230,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,404,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,634,000

NEW SECTION.  Sec. 5220   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College: Learning Resource Center (06-2-698)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,268,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $197,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,382,000
          TOTAL . . . . . . . . . . . . $38,847,000

NEW SECTION.  Sec. 5221   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Automotive Collision Technology (06-1-306)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $272,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,972,000

NEW SECTION.  Sec. 5222   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Seattle Community College: Horticulture/SCGS Classrooms (06-2-404)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $490,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $67,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $557,000

NEW SECTION.  Sec. 5223   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Campus Classrooms (06-2-696)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,802,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $82,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $18,686,000
          TOTAL . . . . . . . . . . . . $20,570,000

NEW SECTION.  Sec. 5224   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Center for Water and Environmental Studies (06-2-853)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $940,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,060,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5225   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Clarkston Health Science Facility (06-2-402)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $490,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $510,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5226   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Wenatchee Valley College: Brown Library Renovation (06-1-311)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $760,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,644,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,404,000

NEW SECTION.  Sec. 5227   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Center for Workforce Education (06-2-407)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $690,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $310,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5228   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Raymond Hall Renovation (06-1-325)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $369,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,169,000

NEW SECTION.  Sec. 5229   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bates Technical College: Mohler Communications Technology Center (08-2-703)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $173,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,567,000
          TOTAL . . . . . . . . . . . . $22,740,000

NEW SECTION.  Sec. 5230   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College: Health Science Building (08-2-702)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $144,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $38,893,000
          TOTAL . . . . . . . . . . . . $39,037,000

NEW SECTION.  Sec. 5231   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College: Instructional Resource Center (08-1-223)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,824,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $28,065,000
          TOTAL . . . . . . . . . . . . $29,889,000

NEW SECTION.  Sec. 5232   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia College: Health and Wellness Education Center (08-2-414)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5233   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Child and Family Studies Center (08-2-417)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5234   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Health and Advanced Technologies Building (08-2-705)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,982,000
          TOTAL . . . . . . . . . . . . $33,232,000

NEW SECTION.  Sec. 5235   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College: Business Education Building (08-1-315)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,020,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,020,000

NEW SECTION.  Sec. 5236   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College: Social Science Center (08-2-704)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $111,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,299,000
          TOTAL . . . . . . . . . . . . $12,410,000

NEW SECTION.  Sec. 5237   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Columbia Basin College: Vocational Building (08-1-217)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,802,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,498,000
          TOTAL . . . . . . . . . . . . $22,300,000

NEW SECTION.  Sec. 5238   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Primary Electrical Replacement (08-1-508)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,466,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,466,000

NEW SECTION.  Sec. 5239   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Edmonds Community College: Meadowdale Hall Renovation (08-1-318)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $9,256,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,256,000

NEW SECTION.  Sec. 5240   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Index Hall Replacement (08-1-221)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $41,005,000
          TOTAL . . . . . . . . . . . . $43,805,000

NEW SECTION.  Sec. 5241   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Child Care Facility (08-2-416)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5242   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Science and Math Building (08-1-226)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $276,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,026,000
          TOTAL . . . . . . . . . . . . $40,302,000

NEW SECTION.  Sec. 5243   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Primary Electrical Replacement (08-1-506)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,870,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,870,000

NEW SECTION.  Sec. 5244   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Trades and Industry Building (08-1-222)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $138,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $29,833,000
          TOTAL . . . . . . . . . . . . $29,971,000

NEW SECTION.  Sec. 5245   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College: Health and Science Building (08-1-225)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $39,915,000
          TOTAL . . . . . . . . . . . . $42,415,000

NEW SECTION.  Sec. 5246   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Facility Preservation (08-1-050)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $21,243,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $80,000,000
          TOTAL . . . . . . . . . . . . $101,243,000

NEW SECTION.  Sec. 5247   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Facility Preservation - Roof Repairs (08-1-010)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,676,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,000,000
          TOTAL . . . . . . . . . . . . $30,676,000

NEW SECTION.  Sec. 5248   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Infrastructure Preservation (08-1-090)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $2,082,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $18,082,000

NEW SECTION.  Sec. 5249   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Preservation - Repairs and Minor Improvements (08-1-001)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $16,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $70,000,000
          TOTAL . . . . . . . . . . . . $86,000,000

NEW SECTION.  Sec. 5250   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works - Program (08-2-130)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $80,000,000
          TOTAL . . . . . . . . . . . . $100,000,000

NEW SECTION.  Sec. 5251   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Business and Humanities Center (08-1-218)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $33,938,000
          TOTAL . . . . . . . . . . . . $36,238,000

NEW SECTION.  Sec. 5252   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom: Cascade Core Phase II (08-1-321)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,242,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,353,000
          TOTAL . . . . . . . . . . . . $24,595,000

NEW SECTION.  Sec. 5253   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Infrastructure Savings (08-1-151)

     The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 6003 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2

NEW SECTION.  Sec. 5254   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Preventive Facility Maintenance and Building System Repairs (08-1-150)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
     (2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds must be allocated at the state board's discretion to achieve the performance goal stated in this subsection (2), with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
     (3) Section 6003 of this act does not apply to this appropriation.
     (4) There is no intent to reappropriate amounts not expended by June 30, 2009.

Appropriation:
     Education Construction Account--State . . . . . . . . . . . . $22,802,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,802,000

NEW SECTION.  Sec. 5255   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Edison North Renovation (08-1-314)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $18,284,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,284,000

NEW SECTION.  Sec. 5256   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Wood Construction Center (08-1-216)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,549,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $23,734,000
          TOTAL . . . . . . . . . . . . $26,283,000

NEW SECTION.  Sec. 5257   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Shoreline Community College: Automotive Training Center (08-2-413)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5258   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College: Academic and Student Services Building (08-1-224)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $136,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,763,000
          TOTAL . . . . . . . . . . . . $26,899,000

NEW SECTION.  Sec. 5259   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College: Building 22 Renovation (08-1-316)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,359,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,001,000
          TOTAL . . . . . . . . . . . . $20,360,000

NEW SECTION.  Sec. 5260   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College: Building 7 Renovation (08-1-319)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,009,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,331,000
          TOTAL . . . . . . . . . . . . $10,340,000

NEW SECTION.  Sec. 5261   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College: Technical Education Building (08-1-220)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,393,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,391,000
          TOTAL . . . . . . . . . . . . $32,784,000

NEW SECTION.  Sec. 5262   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Chemistry and Life Science Building (08-1-219)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,520,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $27,044,000
          TOTAL . . . . . . . . . . . . $29,564,000

NEW SECTION.  Sec. 5263   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Magnuson Building Remodel (08-2-415)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $941,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $941,000

NEW SECTION.  Sec. 5264   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Music Building 15 Renovation (08-1-320)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,142,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,094,000
          TOTAL . . . . . . . . . . . . $14,236,000

NEW SECTION.  Sec. 5265   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Early Childhood Education/Childcare Center (08-2-418)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5266   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Health Careers Center (08-2-701)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $255,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,514,000
          TOTAL . . . . . . . . . . . . $36,769,000

NEW SECTION.  Sec. 5267   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Walla Walla Community College: Culinary Arts/Student Development Center (08-2-419)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5268   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Brown Dental Hygiene Building (08-1-317)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,675,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,675,000

NEW SECTION.  Sec. 5269   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Higher Education Cost Escalation (08-2-850)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the state board for community and technical colleges to establish a process for allocating funds to projects that have experienced unanticipated cost escalation for projects bid during the 2007-2009 biennium. Not more than $750,000 shall be made available to any single project and amounts provided for this purpose must be matched equally from nonstate resources. The board shall manage the distribution of funds to ensure that the requesting college has managed its project within the current appropriation through preparation of bid documents and that the scope of the project is no greater than was originally specified in the design. The board will report to the office of financial management and the appropriate fiscal committees of the legislature on the use of these funds.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

(End of part)


PART 6
MISCELLANEOUS AND SUPPLEMENTAL PROVISIONS

NEW SECTION.  Sec. 6001   (1) Allotments for appropriations in this act shall be provided in accordance with the capital project review requirements adopted by the office of financial management. The office of financial management shall notify the house of representatives capital budget committee and the senate ways and means committee of allotment releases based on review by the office of financial management. No expenditure may be incurred or obligation entered into for appropriations in this act until the office of financial management has given final approval to the allotment of the funds to be expended or encumbered. For allotments under this act, the allotment process includes, in addition to the statement of proposed expenditures for the current biennium, a category or categories for any reserve amounts and amounts expected to be expended in future biennia. Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110. Contracts shall not be executed that call for expenditures in excess of the approved allotment, and the total amount shown in such contracts for the cost of future work that has not been appropriated shall not exceed the amount identified for such work in the level of funding approved by the office of financial management at the completion of predesign.
     (2) The legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.

NEW SECTION.  Sec. 6002   To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act in excess of $5,000,000 shall not be expended or encumbered until the office of financial management has reviewed and approved the agency's predesign. The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management. To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate. Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.

NEW SECTION.  Sec. 6003   (1) To ensure minor works appropriations are carried out in accordance with legislative intent, funds appropriated in this act shall not be allotted until project lists are on file at the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee. All projects must meet the criteria included in subsection (2)(a) of this section. Revisions to the lists must be filed with the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee and include an explanation of variances from the prior lists before funds may be expended on the revisions. No expenditure may be incurred or obligation entered into for minor works appropriations until the office of financial management has approved the allotment of the funds to be expended.
     (2)(a) Minor works projects are single line appropriations that include multiple projects of a similar nature and that are valued between $25,000 and $1,000,000 each, with the exception of higher education minor works projects that may be valued up to $2,000,000. These projects can generally be completed within two years of the appropriation with the funding provided. Agencies are prohibited from including projects on their minor works lists that are a phase of a larger project, and that if combined over a continuous period of time, would exceed $1,000,000, or $2,000,000 for higher education minor works projects. Improvements for accessibility in compliance with the Americans with disabilities act may be included in any of the above minor works categories.
     (b) Minor works appropriations shall not be used for, among other things: Studies, except for technical or engineering reviews or designs that lead directly to and support a project on the same minor works list; planning; design outside the scope of work on a minor works list; moveable, temporary, and traditionally funded operating equipment not in compliance with the equipment criteria established by the office of financial management; software not dedicated to control of a specialized system; moving expenses; land or facility acquisition; or to supplement funding for projects with funding shortfalls unless expressly authorized elsewhere in this act. The office of financial management may make an exception to the limitations described in this subsection (2)(b) for exigent circumstances after notifying the legislative fiscal committees and waiting ten days for comments by the legislature regarding the proposed exception.
     (3) It is generally not the intent of the legislature to make future appropriations for capital expenditures or for maintenance and operating expenses for an acquisition project or a significant expansion project that is initiated through the minor works process and therefore does not receive a policy and fiscal analysis by the legislature. Minor works projects are intended to be one-time expenditures that do not require future state resources to complete.

NEW SECTION.  Sec. 6004   (1) The office of financial management may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer may be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account. No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes that govern the grants.
     (2) The office of financial management may find that an amount is in excess of the amount required for the completion of a project only if: (a) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (b) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.
     (3) For the purposes of this section, the intent is that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
     (4) Transfers of funds to an agency's infrastructure savings appropriation are subject to review and approval by the office of financial management. Expenditures from an infrastructure savings appropriation are limited to projects that have a primary purpose to correct infrastructure deficiencies or conditions that: (a) Adversely affect the ability to utilize the infrastructure for its current programmatic use; (b) reduce the life expectancy of the infrastructure; or (c) increase the operating costs of the infrastructure for its current programmatic use. Eligible infrastructure projects may include structures and surface improvements, site amenities, utility systems outside building footprints and natural environmental changes or requirements as part of an environmental regulation, a declaration of emergency for an infrastructure issue in conformance with RCW 43.88.250, or infrastructure planning as part of a facility master plan.
     (5) A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative fiscal committees of the senate and house of representatives by the office of financial management at least thirty days before the date the transfer is effected. The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.

NEW SECTION.  Sec. 6005   (1) It is expected that projects be ready to proceed in a timely manner depending on the type or phase of the project or program that is the subject of the appropriation in this act. Except for major projects that customarily may take more than two biennia to complete from predesign to the end of construction, or large infrastructure grant or loan programs supporting projects that often take more than two biennia to complete, the legislature generally does not intend to reappropriate funds more than once, particularly for smaller grant programs, local/community projects, and minor works.
     (2) Agencies shall expedite the expenditure of reappropriations and appropriations in this act in order to: (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.
     (3) To the extent feasible, agencies are directed to accelerate expenditure rates at their current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section.

NEW SECTION.  Sec. 6006   The legislature finds that the state's public four-year institutions and the higher education coordinating board have made substantial progress in developing a process to create a single prioritized list of capital project requests as required under RCW 28B.76.220. The legislature also recognizes that continuing work by the institutions and the board is needed to refine the methodology for determining the ranking of project requests, and that this work will benefit from additional legislative guidance. Therefore, the higher education coordinating board and the public four-year institutions, in developing and submitting the single prioritized project list of capital project requests under RCW 28B.76.220, shall use the following guidelines:
     (1) Representatives of the board shall participate in the process of scoring projects using the criteria in the board's biennial budget guidelines. Representatives of the board shall also review the preliminary project list to verify the scoring and ranking of projects. As required under RCW 28B.76.210, institutions must submit the preliminary project list to the board by August 1st of each even-numbered year to enable this review. Any disagreements over project scorings or rankings shall be resolved as provided under RCW 28B.76.220(4).
     (2) The higher education coordinating board's biennial budget guidelines and the prioritization process shall place greater emphasis on:
     (a) Early critical review of project proposals at the predesign phase, rather than deferring critical review and prioritization to the design or construction phases of a project; and
     (b) The capital budget bow wave for a six-year period, beginning with the 2009-2011 biennium through the 2013-2015 biennium.
     (3) When projects are aggregated into single line-item requests, each project must meet the definition of minor works according to section 6003(2)(a) of this act. All major projects must be listed and ranked as individual line-item requests.
     (4) The scoring and ranking of projects shall not be based on assigning an equal number of overall points to each public four-year institution, but shall reflect an assignment of points to individual projects based on the priorities and criteria in this section and in the board's biennial budget guidelines.
     (5) Projects shall not be ranked on the basis of a project funding source.
     (6) In consultation with the appropriate fiscal and policy committees of the legislature, the board shall identify statewide priorities for higher education capital investments and incorporate those priorities into its biennial budget guidelines. The statewide priorities shall address the need for higher education capital projects to:
     (a) Implement a specific legislatively authorized program or planning priority;
     (b) Reduce the backlog of deferred building or system preservation, renewal, or replacement;
     (c) Provide additional capacity or adaptation of space for high demand instructional or research programs;
     (d) Provide additional instructional program capacity for under-served geographic regions or populations; and
     (e) Reflect institutional planning priorities and areas of emphasis.
     (7) The higher education coordinating board's biennial budget guidelines shall include a quantitative method for scoring projects on the identified priorities. The quantitative method shall include use of the facility condition index developed by the joint legislative audit and review committee for assessing building or system condition, and use of the board's space utilization and allocation standards for assessing the need for additional capacity.
     (8) The council of presidents, in consultation with the board, shall report by September 1, 2007, to the appropriate legislative fiscal committees on the use of a proportionality factor in the scoring and ranking of projects. The report shall include:
     (a) A definition of proportionality as it has been used in the scoring and ranking of projects for funding in the 2007-2009 biennium and may be used for subsequent biennia;
     (b) A method for measuring proportionality in a valid and consistent manner; and
     (c) An explanation of how proportionality relates to the statewide priorities established in subsection (6) of this section, including an assessment of the extent to which it promotes the achievement of these statewide priorities.

NEW SECTION.  Sec. 6007   The Washington state auditor shall perform an audit of the Seattle public library and the secretary of state with regard to expenditures related to the facility located at 2021 9th Avenue, Seattle, Washington that houses the Washington talking book and braille library and city of Seattle functions. The audit shall be completed and results available to the legislature by September 1, 2007.

NEW SECTION.  Sec. 6008   Eastern Washington University is authorized to sell its Spokane center. Proceeds from the sale must be deposited into the higher education construction account. Proceeds may be used to acquire or design a facility on or adjacent to the Riverpoint higher education campus for the university's Spokane-based program offerings. Eastern Washington University must report to the office of financial management and the appropriate fiscal committees of the legislature upon the sale of the center and with regard to expenditure of the proceeds.

NEW SECTION.  Sec. 6009   The office of financial management, in consultation with the department of general administration, shall identify capital projects that may benefit from an energy analysis to determine whether there are alternate, more economical, and energy efficient means of completing the work. The office of financial management shall hold appropriations in allotment reserve on the following types of capital projects until this analysis can be completed: Heating, ventilation, and air conditioning modifications, chiller plants, steam plants, boilers, chilled water or steam lines, building control systems, lighting improvements, or other major energy using systems that may warrant additional analysis. Agencies receiving appropriations for such projects are encouraged to utilize energy performance contracts or alternative financing for equipment in lieu of state appropriated funds. The office of financial management may transfer funds remaining in allotment reserve to infrastructure savings projects within the agency that has realized savings from energy efficiency alternatives.

NEW SECTION.  Sec. 6010   The effective use of state-supported space in higher education is an important factor in assessing both effective management and priorities for capital funding. It is also recognized that the facilities of the state vary significantly among the community colleges, the comprehensive regional universities, and the research universities. It is further recognized that the existing higher education coordinating board space study does a good job of highlighting the use of a portion of the space for a specific chosen set of uses.
     In order for the legislature to have a better awareness of all uses of all state-supported space, the council of presidents shall prepare an assessment of facilities use that covers the full scope of uses for all types of state-funded spaces. This assessment should start with the higher education coordinating board report and build upon this to include additional uses, space types, and methodologies, including methodologies and practices used by other higher education institutions.
     To the extent possible, it would be helpful for this assessment to use the same definitions of space types and uses. Based upon the differences in mission and function, the assessment may be divided to look at the comprehensive regional universities along with The Evergreen State College in one group and the research universities as a second group.
     The council of presidents shall coordinate this effort with the office of financial management, staff from the appropriate fiscal and higher education committees of the legislature, and the higher education coordinating board. The assessment shall be completed and delivered to the legislature by January 1, 2008.

NEW SECTION.  Sec. 6011   State agencies, including institutions of higher education, shall allot and report full-time equivalent staff for capital projects in a manner comparable to staff reporting for operating expenditures.

NEW SECTION.  Sec. 6012   Due to the intended replacement of the building adjoining Capital Way and 11th avenue, the department of general administration shall not charge the facility depreciation component of lease charges for nonprofit tenants in that facility during the 2007-2009 biennium.

NEW SECTION.  Sec. 6013   Executive Order No. 05-05, archaeological and cultural resources, was issued effective November 10, 2005. Agencies and higher education institutions shall comply with the requirements set forth in this executive order.

NEW SECTION.  Sec. 6014   ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
     State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
     Those noninstructional facilities of higher education institutions authorized in this section to enter into financial contracts are not eligible for state funded maintenance and operations. Instructional space that is available for regularly scheduled classes for academic transfer, basic skills, and workforce training programs may be eligible for state funded maintenance and operations.
     (1) Washington state patrol: Enter into a financing contract for up to $1,360,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to replace the dormitory facility at the Washington state patrol fire training academy in North Bend, Washington.
     (2) Department of general administration: Enter into a financing contract for up to $685,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the preservation of the transportation building.
     (3) Department of corrections: Enter into a financing contract for up to $17,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to provide additional work release beds.
     (4) Parks and recreation commission: Enter into a financing contract in an amount not to exceed $2,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop Cama Beach state park.
     (5) Community and technical colleges:
     (a) Enter into a financing contract on behalf of Green River Community College for up to $20,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase Kent Station phase 2.
     (b) Enter into a financing contract on behalf of Tacoma Community College for up to $3,600,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an early childhood education and learning center.
     (c) Enter into a financing contract on behalf of Walla Walla Community College for up to $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase up to 40 acres of land.
     (d) Enter into a financing contract on behalf of Columbia Basin College for up to $300,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop an academic support and achievement center.
     (6) Evergreen State College: Enter into a financing contract for up to $16,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the college activities building renovation.
     (7) Washington state convention and trade center: Enter into a financing contract for up to $58,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase and renovate the museum condominium unit located adjacent to the state convention center. The purchase price shall not exceed the appraised fair market value. A purchase agreement shall include the following requirements: (a) Upon completion of the purchase of the property, the buyer shall put $5,750,000 of the purchase price in an interest-bearing escrow account that shall be released to the seller after the seller has raised sixty-five percent of the funds required to develop a museum within the city of Seattle and has executed a development agreement with the city of Seattle; and (b) in the event that the conditions of (a) of this subsection are not met by June 30, 2013, the entire amount in the escrow account shall be transferred to the state general fund and shall represent a recovery of the state's contribution towards the development of the museum. In the event of such a transfer, the rightful ownership of the property by the Washington state convention and trade center shall not be impaired.
     (8) Department of general administration: Enter into a financing contract for an amount approved by the office of financial management for costs and financing expenses and required reserves pursuant to chapter 39.94 RCW to lease develop or lease purchase a state general office building and facilities for the department of information services on the state-owned property called "the Wheeler block" in Olympia. The office buildings shall be constructed and financed so that agencies occupancy costs will not exceed comparable private market rental rates. The comparable general office space rate shall be calculated based on recent Thurston county leases of new space of at least 100,000 rentable square feet adjusted for known escalation clauses, expected inflation, and differences in the level of service provided by the comparable leases as determined by the department of general administration. In addition to the department of information services, state agency tenants shall include the state patrol and other state agencies specified in LEAP capital document No. 2007-xx. The office of financial management shall certify to the state treasurer: (a) The project description and dollar amount; and (b) that all requirements of this subsection (10) have been met. Should the department choose to use a financing contract that does not provide for the issuance of certificates of participation, the financing contract shall be subject to approval by the state finance committee as required by RCW 39.94.010. In approving a financing contract not providing for the use of certificates of participation, the state finance committee should be reasonably certain that the contract is excluded from the computation of indebtedness, particularly that the contract is not backed by the full faith and credit of the state, and the legislature is expressly not obligated to appropriate funds to make payments. For purposes of this section, "financing contract" includes but is not limited to a certificate of participation and tax exempt financing similar to that authorized in RCW 47.79.140.
     (9) Office of the secretary of state: Enter into a financing contract for up to $112,942,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the heritage center. The heritage center is one part of a combined facility of the heritage center and executive office building, authorized in subsection (10) of this section. The authorization for financing under this subsection (9) shall lapse unless chapter ... ([House] [Senate] Bill No. .... (Z-0290/07, providing funding for the heritage building project)), Laws of 2007 is enacted by June 30, 2007.
     (10) Department of general administration: Enter into a financing contract for up to $75,863,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the executive office building. The executive office building is one part of a combined facility of the executive office building and the heritage center authorized in subsection (9) of this section. The authorization for financing under this subsection (10) shall lapse unless chapter ... ([House] [Senate] Bill No. .... (Z-0290/07, providing funding for the heritage building project)), Laws of 2007 is enacted by June 30, 2007.

NEW SECTION.  Sec. 6015   FOR THE ARTS COMMISSION--ART WORK ALLOWANCE POOLING. (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities is provided solely for the purposes of RCW 28A.335.210. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.
     (2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities is provided solely for the purposes of RCW 28B.10.027. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.
     (3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 is provided solely for the purposes of RCW 43.17.200. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.
     (4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 2007-2009 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended solely for direct acquisition of works of art. The commission may use up to $100,000 of this amount to conserve or maintain existing pieces in the state art collection pursuant to chapter 36, Laws of 2005.

NEW SECTION.  Sec. 6016   The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts. "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects. A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2009-2011 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.

NEW SECTION.  Sec. 6017   (1) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 2007, from the 2005-2007 biennial appropriations for each project.
     (2) "Reappropriations" from the water quality capital account in this act shall be limited to the unexpended balance remaining as of the end of fiscal year 2007 from the water quality account in the 2005-2007 biennial appropriations for each project in this act.
     (3) "Reappropriations" in sections 5001, 5002, 5003, and 5005 of this act shall be reduced in this act to the unexpended balances remaining as of the end of fiscal year 2007 for the 2005-2007 biennial appropriation in sections 602, 604, and 607, chapter 488, Laws of 2005, and section 194, chapter 371, Laws of 2006.

NEW SECTION.  Sec. 6018   The water quality capital account is created in the state treasury pursuant to chapter . . . ([House][Senate] Bill No. . . . . (Z-0356.3/07)), Laws of 2007 (water quality capital account). In this act, appropriations from the water quality capital account are defined as appropriations from that account. If chapter . . . ([House][Senate] Bill No. . . . . (Z-0356.3/07)), Laws of 2007 (water quality capital account) is not enacted by June 30, 2007, appropriations in this act either from that account or into that account shall lapse.

NEW SECTION.  Sec. 6019   To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.

NEW SECTION.  Sec. 6020   If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate ways and means committee and the house of representatives capital budget committee.

NEW SECTION.  Sec. 6021   (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply: Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.
     (2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

NEW SECTION.  Sec. 6022   Any capital improvements or capital projects involving construction or major expansion of a state office facility, including, but not limited to, district headquarters, detachment offices, and off-campus faculty offices, must be reviewed by the department of general administration for possible consolidation, colocation, and compliance with state office standards before allotment of funds. The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.

NEW SECTION.  Sec. 6023   NONTAXABLE AND TAXABLE BOND PROCEEDS. Portions of the appropriation authority granted by this act from the state building construction account, or any other account receiving bond proceeds, may be transferred to the state taxable building construction account as deemed necessary by the state finance committee to comply with the federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds. The state treasurer shall submit written notification to the director of financial management if it is determined that a shift of appropriation authority from the state building construction account, or any other account receiving bond proceeds, to the state taxable building construction account is necessary.

NEW SECTION.  Sec. 6024   (1) A study committee on public infrastructure programs and funds is established. The study committee shall consist of eight members, as follows:
     (a) Two members from each of the two largest caucuses of the house of representatives, appointed by the speaker of the house of representatives; and
     (b) Two members from each of the two largest caucuses of the senate, appointed by the president of the senate.
     (2) The study committee members shall, by an affirmative vote of at least five members, select a chair from among its membership.
     (3) The study committee may consult with individuals from the public and private sectors and other interested parties, as may be appropriate, for technical advice and assistance and may request such individuals to establish advisory committees or work groups that report to the study committee.
     (4) The study committee shall make recommendations regarding a comprehensive funding structure and systematic approach to support the integration, consolidation, and standardization of processes, procedures, and infrastructure programs. In order to make recommendations, the study committee shall:
     (a) Review state public infrastructure programs and funds and the purposes each serve using the November 29, 2006, inventory of state infrastructure programs compiled by the joint legislative audit and review committee;
     (b) Review program or fund implementation;
     (c) Consider the types of public infrastructure projects supported by the program or fund; and
     (d) Identify overlaps or gaps in types of public infrastructure projects supported through state programs or funds.
     (5) The study committee shall use staff from the house of representatives office of program research and senate committee services, in consultation with the department of community, trade, and economic development and the office of financial management.
     (6) The study committee shall report its findings and recommendations to the appropriate committees of the house of representatives and the senate by January 1, 2008.
     (7) The study committee expires January 1, 2008.

NEW SECTION.  Sec. 6025   The Washington state historical society shall review its competitive process to solicit proposals for heritage capital projects for potential funding in the state capital budget. The Washington state historical society shall submit a report to the office of financial management with recommendations on how to reduce its reappropriations by June 30, 2008.

NEW SECTION.  Sec. 6026   The interagency committee for outdoor recreation shall review its competitive process to solicit proposals for the wildlife and recreation grant program for potential funding in the state capital budget. The interagency committee for outdoor recreation shall submit a report to the office of financial management with recommendations on how to reduce its reappropriations by June 30, 2008.

NEW SECTION.  Sec. 6027   The office of financial management may authorize a value engineering study of a project's predesign report prior to beginning the design phase for the project. The allotment of the design phase may be delayed to accommodate the study.

NEW SECTION.  Sec. 6028   FOR THE STATE TREASURER--TRANSFERS. The transfer in this section is subject to the following conditions and limitations: The amount transferred shall be added to the irreducible principal of the common school permanent fund. The state investment board shall invest the amount transferred in various types of allowable investments in order to achieve a balance of long-term growth and current income. The treasurer shall calculate the irreducible principal in accordance with the state constitution and state law. The irreducible principal shall not include investment gains on the principal of the amount transferred, and the fund may retain or distribute income and investment earnings attributable to this amount in order to achieve the appropriate balance between growth and income.

Natural Resources Real Property Replacement
     Account: For transfer to the Common School
     Permanent Fund . . . . . . . . . . . . $30,000,000

Sec. 6029   RCW 79.17.210 and 2003 c 334 s 118 are each amended to read as follows:
     (1) The legislature finds that the department has a need to maintain the real property asset base it manages and needs an accounting mechanism to complete transactions without reducing the real property asset base.
     (2) The natural resources real property replacement account is created in the state treasury. This account shall consist of funds transferred or paid for the disposal or transfer of real property by the department under RCW 79.17.200. The funds in this account shall be used solely for the acquisition of replacement real property and may be spent only when, and as, authorized by legislative appropriation. During the 2007-2009 biennium, balances in the account may be transferred to the appropriate permanent funds as directed in the capital budget appropriations act.

NEW SECTION.  Sec. 6030   FOR THE STATE TREASURER--TRANSFERS
     Education Construction Account: For transfer to
          the Common School Construction, an amount
          not to exceed . . . . . . . . . . . . $124,200,000

     Education Savings Account: For transfer to the
          Common School Construction Account, an
          amount not to exceed . . . . . . . . . . . . $43,400,000

Sec. 6031   RCW 70.105D.070 and 2005 c 488 s 926 are each amended to read as follows:
     (1) The state toxics control account and the local toxics control account are hereby created in the state treasury.
     (2) The following moneys shall be deposited into the state toxics control account: (a) Those revenues which are raised by the tax imposed under RCW 82.21.030 and which are attributable to that portion of the rate equal to thirty-three one-hundredths of one percent; (b) the costs of remedial actions recovered under this chapter or chapter 70.105A RCW; (c) penalties collected or recovered under this chapter; and (d) any other money appropriated or transferred to the account by the legislature. Moneys in the account may be used only to carry out the purposes of this chapter, including but not limited to the following activities:
     (i) The state's responsibility for hazardous waste planning, management, regulation, enforcement, technical assistance, and public education required under chapter 70.105 RCW;
     (ii) The state's responsibility for solid waste planning, management, regulation, enforcement, technical assistance, and public education required under chapter 70.95 RCW;
     (iii) The hazardous waste cleanup program required under this chapter;
     (iv) State matching funds required under the federal cleanup law;
     (v) Financial assistance for local programs in accordance with chapters 70.95, 70.95C, 70.95I, and 70.105 RCW;
     (vi) State government programs for the safe reduction, recycling, or disposal of hazardous wastes from households, small businesses, and agriculture;
     (vii) Hazardous materials emergency response training;
     (viii) Water and environmental health protection and monitoring programs;
     (ix) Programs authorized under chapter 70.146 RCW;
     (x) A public participation program, including regional citizen advisory committees;
     (xi) Public funding to assist potentially liable persons to pay for the costs of remedial action in compliance with cleanup standards under RCW 70.105D.030(2)(e) but only when the amount and terms of such funding are established under a settlement agreement under RCW 70.105D.040(4) and when the director has found that the funding will achieve both (A) a substantially more expeditious or enhanced cleanup than would otherwise occur, and (B) the prevention or mitigation of unfair economic hardship; and
     (xii) Development and demonstration of alternative management technologies designed to carry out the top two hazardous waste management priorities of RCW 70.105.150.
     (3) The following moneys shall be deposited into the local toxics control account: Those revenues which are raised by the tax imposed under RCW 82.21.030 and which are attributable to that portion of the rate equal to thirty-seven one-hundredths of one percent.
     (a) Moneys deposited in the local toxics control account shall be used by the department for grants or loans to local governments for the following purposes in descending order of priority: (i) Remedial actions; (ii) hazardous waste plans and programs under chapter 70.105 RCW; (iii) solid waste plans and programs under chapters 70.95, 70.95C, 70.95I, and 70.105 RCW; (iv) funds for a program to assist in the assessment and cleanup of sites of methamphetamine production, but not to be used for the initial containment of such sites, consistent with the responsibilities and intent of RCW 69.50.511; and (v) cleanup and disposal of hazardous substances from abandoned or derelict vessels that pose a threat to human health or the environment. For purposes of this subsection (3)(a)(v), "abandoned or derelict vessels" means vessels that have little or no value and either have no identified owner or have an identified owner lacking financial resources to clean up and dispose of the vessel. Funds for plans and programs shall be allocated consistent with the priorities and matching requirements established in chapters 70.105, 70.95C, 70.95I, and 70.95 RCW. During the 1999-2001 fiscal biennium, moneys in the account may also be used for the following activities: Conducting a study of whether dioxins occur in fertilizers, soil amendments, and soils; reviewing applications for registration of fertilizers; and conducting a study of plant uptake of metals. During the 2005-2007 fiscal biennium, the legislature may transfer from the local toxics control account to the state toxics control account such amounts as specified in the omnibus capital budget bill. During the ((2005-2007)) 2007-2009 fiscal biennium, moneys in the account may also be used for grants to local governments to retrofit public sector diesel equipment and for storm water planning and implementation activities.
     (b) Funds may also be appropriated to the department of health to implement programs to reduce testing requirements under the federal safe drinking water act for public water systems. The department of health shall reimburse the account from fees assessed under RCW 70.119A.115 by June 30, 1995.
     (4) Except for unanticipated receipts under RCW 43.79.260 through 43.79.282, moneys in the state and local toxics control accounts may be spent only after appropriation by statute.
     (5) One percent of the moneys deposited into the state and local toxics control accounts shall be allocated only for public participation grants to persons who may be adversely affected by a release or threatened release of a hazardous substance and to not-for-profit public interest organizations. The primary purpose of these grants is to facilitate the participation by persons and organizations in the investigation and remedying of releases or threatened releases of hazardous substances and to implement the state's solid and hazardous waste management priorities. However, during the 1999-2001 fiscal biennium, funding may not be granted to entities engaged in lobbying activities, and applicants may not be awarded grants if their cumulative grant awards under this section exceed two hundred thousand dollars. No grant may exceed sixty thousand dollars. Grants may be renewed annually. Moneys appropriated for public participation from either account which are not expended at the close of any biennium shall revert to the state toxics control account.
     (6) No moneys deposited into either the state or local toxics control account may be used for solid waste incinerator feasibility studies, construction, maintenance, or operation.
     (7) The department shall adopt rules for grant or loan issuance and performance.
     (((8) During the 2005-2007 fiscal biennium, the legislature may transfer from the state toxics control account to the water quality account such amounts as reflect the excess fund balance of the fund.))

Sec. 6032   RCW 43.43.944 and 2005 c 518 s 929 are each amended to read as follows:
     (1) The fire service training account is hereby established in the state treasury. The fund shall consist of:
     (a) All fees received by the Washington state patrol for fire service training;
     (b) All grants and bequests accepted by the Washington state patrol under RCW 43.43.940; and
     (c) Twenty percent of all moneys received by the state on fire insurance premiums.
     (2) Moneys in the account may be appropriated only for fire service training. During the ((2005-2007)) 2007-2009 fiscal biennium, the legislature may appropriate funds from this account for ((school fire prevention activities within the Washington state patrol)) additional sanitary wastewater treatment capacity at the state fire service training center.

Sec. 6033   RCW 43.135.045 and 2005 c 518 s 931, 2005 c 314 s 401, and 2005 c 72 s 6 are each reenacted and amended to read as follows:
     (1) The emergency reserve fund is established in the state treasury. During each fiscal year, the state treasurer shall transfer an amount from the state general fund to the emergency reserve fund. The amount transferred shall equal the amount by which total state revenue for the general fund and related funds exceeds the state expenditure limit, multiplied by the percentage that general fund expenditures are of total expenditures from the general fund and related funds. Transfers shall be made at the end of each fiscal quarter based on projections of state revenues, expenditures, and the state expenditure limit. The treasurer shall make transfers between these accounts as necessary to reconcile actual annual revenues and the expenditure limit for fiscal year 2000 and thereafter.
     (2) The legislature may appropriate moneys from the emergency reserve fund only with approval of at least two-thirds of the members of each house of the legislature, and then only if the appropriation does not cause total expenditures to exceed the state expenditure limit under this chapter.
     (3) The emergency reserve fund balance shall not exceed five percent of annual general fund -- state revenues as projected by the official state revenue forecast. Any balance in excess of five percent shall be transferred on a quarterly basis by the state treasurer as follows: Seventy-five percent to the student achievement fund hereby created in the state treasury and twenty-five percent to the general fund balance. The treasurer shall make transfers between these accounts as necessary to reconcile actual annual revenues for fiscal year 2000 and thereafter. When per-student state funding for the maintenance and operation of K-12 education meets a level of no less than ninety percent of the national average of total funding from all sources per student as determined by the most recent published data from the national center for education statistics of the United States department of education, as calculated by the office of financial management, further deposits to the student achievement fund shall be required only to the extent necessary to maintain the ninety-percent level. Remaining funds are part of the general fund balance and these funds are subject to the expenditure limits of this chapter.
     (4) The education construction fund is hereby created in the state treasury.
     (a) Funds may be appropriated from the education construction fund exclusively for common school construction or higher education construction. During the 2007-2009 fiscal biennium, funds may also be used for higher education facilities preservation and maintenance.
     (b) Funds may be appropriated for any other purpose only if approved by a two-thirds vote of each house of the legislature and if approved by a vote of the people at the next general election. An appropriation approved by the people under this subsection shall result in an adjustment to the state expenditure limit only for the fiscal period for which the appropriation is made and shall not affect any subsequent fiscal period.
     (5) Funds from the student achievement fund shall be appropriated to the superintendent of public instruction strictly for distribution to school districts to meet the provisions set out in the student achievement act. Allocations shall be made on an equal per full-time equivalent student basis to each school district.

Sec. 6034   RCW 43.155.050 and 2005 c 488 s 925 and 2005 c 425 s 4 are each reenacted and amended to read as follows:
     (1) The public works assistance account is hereby established in the state treasury. Money may be placed in the public works assistance account from the proceeds of bonds when authorized by the legislature or from any other lawful source. Money in the public works assistance account shall be used to make loans and to give financial guarantees to local governments for public works projects. Moneys in the account may also be appropriated to provide for state match requirements under federal law for projects and activities conducted and financed by the board under the drinking water assistance account. Not more than fifteen percent of the biennial capital budget appropriation to the public works board from this account may be expended or obligated for preconstruction loans, emergency loans, or loans for capital facility planning under this chapter; of this amount, not more than ten percent of the biennial capital budget appropriation may be expended for emergency loans and not more than one percent of the biennial capital budget appropriation may be expended for capital facility planning loans. For the ((2005-2007)) 2007-2009 biennium, moneys in the account may be used for grants for projects identified in section 138, chapter 488, Laws of 2005.
     (2) The job development fund is hereby established in the state treasury. Up to fifty million dollars each biennium from the public works assistance account may be transferred into the job development fund. Money in the job development fund may be used solely for job development fund program grants, administrative expenses related to the administration of the job development fund program created in RCW 43.160.230, and for the report prepared by the joint legislative audit and review committee pursuant to RCW 44.28.801(2). Moneys in the job development fund may be spent only after appropriation. The board shall prepare a prioritized list of proposed projects of up to fifty million dollars as part of the department's 2007-09 biennial budget request. The board may provide an additional alternate job development fund project list of up to ten million dollars. The legislature may remove projects from the list recommended by the board. The legislature may not change the prioritization of projects recommended for funding by the board, but may add projects from the alternate list in order of priority, as long as the total funding does not exceed fifty million dollars.

Sec. 6035   RCW 43.155.050 and 2005 c 488 s 925 are each amended to read as follows:
     The public works assistance account is hereby established in the state treasury. Money may be placed in the public works assistance account from the proceeds of bonds when authorized by the legislature or from any other lawful source. Money in the public works assistance account shall be used to make loans and to give financial guarantees to local governments for public works projects. Moneys in the account may also be appropriated to provide for state match requirements under federal law for projects and activities conducted and financed by the board under the drinking water assistance account. Not more than fifteen percent of the biennial capital budget appropriation to the public works board from this account may be expended or obligated for preconstruction loans, emergency loans, or loans for capital facility planning under this chapter; of this amount, not more than ten percent of the biennial capital budget appropriation may be expended for emergency loans and not more than one percent of the biennial capital budget appropriation may be expended for capital facility planning loans. For the ((2005-2007)) 2007-2009 biennium, moneys in the account may be used for grants for projects identified in section 138, chapter 488, Laws of 2005 and section 1033 of this act.

NEW SECTION.  Sec. 6036   For appropriations under this act that contribute to Puget Sound protection and recovery, the department of ecology, the department of fish and wildlife, the department of natural resources, the state conservation commission, the state parks and recreation commission, the department of health, and the interagency committee for outdoor recreation shall sign performance agreements with the Puget Sound partnership as described in chapter . . ., ([House] [Senate] Bill No. . . .) Laws of 2007 (Z-0369 Puget Sound partnership).

NEW SECTION.  Sec. 6037   Section 6034 of this act expires June 30, 2011.

Sec. 6038   2005 c 488 s 955 (uncodified) is amended to read as follows:
     ((Sections)) (1) Section 920 ((and 921)) of this act expires June 30, 2007.
     (2) Section 921 of this act expires June 30, 2009.

Sec. 6039   2006 c 371 s 106 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
     Local/Community Projects (06-4-008)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
     (2) Funding for the Inland Northwest Science and Technology Center shall be held in reserve until the balance of phase I funding has been secured or committed from local government and community sources.
     (3) The Washington state arts commission shall design a plaque that shall be affixed to buildings or displayed as part of a project receiving any appropriation from this section. The plaque shall provide information to the public that the building or project has been made possible by the tax dollars of Washington citizens. The commission may contact the secretary of state to obtain approval for use of the Washington seal in the design of the plaque. The final design shall be approved by the chairs and ranking members of the house of representatives capital budget committee and the senate ways and means committee.
     (4) The appropriation is provided solely for the following list of projects:
     

ProjectsRecommendation
7th street theatre$600,000
Alder creek pioneer association carousel museum$450,000
Asian counseling and referral service$2,000,000
Auburn veterans' memorial park improvements$50,000
Bailey Gatzert children's play area$75,000
Bridge for kids$850,000
Brookside school ADA playground equipment$25,000
Buena library$50,000
Camp prime time repairs--families with terminally ill children$100,000
Cannon house$250,000
Central area motivation program (CAMP)$250,000
Cesar Chavez park$150,000
Chambers creek footbridge$177,000
Childhaven$150,000
Clark Lake park and retreat center$500,000
Colman school preconstruction activities$1,200,000
Colored women's association meeting house$60,000
Columbia breaks fire interpretive center$150,000
Community center at Greenbridge$400,000
Covington aquatics center phase 1$350,000
Crossroads community center and park$250,000
Cutter theater$71,000
Deming library$85,000
Des Moines beach park historic buildings$300,000
Discovery park$1,000,000
East Whatcom regional resource center$1,750,000
Eatonville family park$50,000
El Centro de la Raza$900,000
Filipino community center$200,000
Financial assistance to the town of Hamilton$150,000
Food bank refrigeration projects$365,000
Foster creek$150,000
Fox theater$2,398,000
Garfield county agricultural museum$150,000
GC health clinic$12,000
Grand Army of the Republic cemetery$5,000
Granite Falls museum expansion$50,000
Greenbridge plaza in White Center$200,000
Habitat park south hill$400,000
Hanford reach interpretive center preconstruction activities
$2,000,000
Hidden river environmental education center$50,000
ICL education center$200,000
Japanese cultural and community center$200,000
Joel Pritchard park$2,500,000
Joe's creek project$856,000
Juanita creek channel and riparian restoration$500,000
Juanita highlands$275,000
Julia Butler Hansen home restoration$10,000
Kettle falls park$100,000
Kirkland nonmotorized facilities$200,000
LeRoi smelter smokestack monument$3,000
Lewis and Clark confluence project$2,000,000
McCaw hall$2,000,000
Meridian habitat park$400,000
Miners' memorial$36,500
Miracle league handicapped baseball$57,000
MOBIUS/Inland Northwest science and technology center
$1,500,000
Mt. Baker theater$200,000
Mt. Vernon Jasper Gates statue$12,000
Multicultural center of Kitsap county$250,000
Nathaniel Orr home site museum interpretive center$29,000
Neighborhood house rainier vista$200,000
New Lakewood clinic$350,000
Northeast community center expansion$250,000
Northshore performing arts center$1,000,000
Northwest communities education center$1,000,000
Oak Harbor multi-purpose community and sports facility
$50,000
Omak grandstand$250,000
Orting fire station$250,000
Pacific Northwest salmon center$1,000,000
Pacific science center$900,000
Performing arts center (PACE)$500,000
Pike Place Market health center emergency repairs$1,000,000
Port of Quincy$400,000
Puget Sound freight building warehouse--Thea Foss waterway
$2,000,000
Puyallup river walking trail$200,000
Rainier historical heating system$75,000
Red mountain$200,000
Relocation of Sieke Japanese gardens$250,000
River walk and Sammamish river restoration$200,000
Roslyn city hall$150,000
Ruth Dykeman children's center$27,000
Sandman historical tug restoration$10,000
Seattle Aquarium$2,000,000
Seattle community center (1115 E. Pike street)$13,000
Seattle mental health emerald house$28,000
Seward park environmental and audubon center$400,000
Snohomish senior center$150,000
Sno-Valley senior activity center kitchen$50,000
Sound way property preservation$500,000
Spokane river whitewater course$400,000
Sumas ballpark$250,000
Synthetic sportsfield partnership at Robinswood park$400,000
Tall ships moorage$300,000
Tukwila kayak and canoe launching facility$20,000
Undeveloped woodlands linked to interurban nature trail
$150,000
Vancouver museum$125,000
Vancouver national historical reserve west barracks$1,000,000
Veterans memorial museum$100,000
Wapato Lake renovations and water quality$250,000
West Seattle community resource center$500,000
West central community center$500,000
West Hylebos wetlands boardwalk$100,000
Wilson playfield land acquisition$200,000
Wing Luke Asian art museum$2,000,000
Youth housing/drop-in center$400,000
Total$49,949,500


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $49,949,500

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $49,949,500

Sec. 6040   2005 c 488 s 165 (uncodified) is amended to read as follows:
FOR THE MILITARY DEPARTMENT
     Construct Spokane Readiness Center (04-2-003)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $7,800,000
     State Building Construction Account--State . . . . . . . . . . . . (($3,300,000))
       $2,250,000
          Subtotal Reappropriation . . . . . . . . . . . . (($11,100,000))
       $10,050,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,468,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($13,568,000))
       $12,518,000

NEW SECTION.  Sec. 6041   A new section is added to 2006 c 371 (uncodified) to read as follows:
FOR THE MILITARY DEPARTMENT
     Modular Building Reutilization (08-2-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,850,000

Sec. 6042   2005 c 488 s 347 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Cama Beach - New Destinations (06-2-011)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,820,000))
       $4,320,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,700,000
          TOTAL . . . . . . . . . . . . (($4,520,000))
       $6,020,000

NEW SECTION.  Sec. 6043   A new section is added to 2006 c 371 (uncodified) to read as follows:
FOR THE STATE CONSERVATION COMMISSION
     Land Restoration (07-1-001)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $587,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $587,000

NEW SECTION.  Sec. 6044   A new section is added to 2006 c 371 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Sinlahekin Creek Dams - Floods Damage Repair (2007-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $70,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $70,000

NEW SECTION.  Sec. 6045   A new section is added to 2006 c 371 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Region 1 Office - Complete Phase 1 (2007-2-009)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $588,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $588,000

NEW SECTION.  Sec. 6046   A new section is added to 2006 c 371 (uncodified) to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Loomis Natural Resources Conservation Area Restoration (2007-1-004)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $271,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $271,000

NEW SECTION.  Sec. 6047   A new section is added to 2006 c 371 (uncodified) to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Storm Damage (07-1-850)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $282,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $282,000

NEW SECTION.  Sec. 6048   A new section is added to 2006 c 371 (uncodified) to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Riverview Education Center (07-1-850)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $498,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $498,000

Sec. 6049   2006 c 371 s 192 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF AGRICULTURE
     Energy Freedom Program (06-2-851)

     The appropriation in this section is subject to the following conditions and limitations:
     (1)(a) The appropriation is provided solely for low-interest loans to political subdivisions for renewable energy projects including the development of biofuel oilseed crushers, supporting infrastructure, and facilities. The political subdivision may negotiate an appropriate agreement with the bioenergy industry for the use of the oilseed crushers, supporting infrastructure, and facilities.
     (b) For purposes of this section, political subdivision means any port district, county, city, town, special purpose district, and any other municipal corporations or quasi-municipal corporations in the state.
     (2) The appropriation is provided solely for the following list of projects:

ProjectRecommendation
Spokane Conservation district(($2,000,000))
$1,779,000
Port of Warden$2,500,000
Odessa public development authority(($2,500,000))
$3,500,000
((Port of Columbia county$2,500,000))
$0
Port of Sunnyside$750,000
A public subdivision working with the DeRuyter Farms anaerobic digester project$1,973,000
Total(($10,250,000))
$10,502,000

     (3) All agreements negotiated between the political subdivision and the bioenergy industry for use of the oilseed crushers, supporting infrastructure, or facilities funded in this section must provide for at least a fifty percent match by the industry partner. The industry match may include, but is not limited to, investments in rail, buildings, refining capacity, or seed stock.
     (4) All other project funds must be disbursed prior to energy freedom loans, except where required on a matching basis by other federal or state programs.
     (5) The department shall disburse loans to the political subdivision on a reimbursement basis only.
     (6) The department may defer loan repayment for up to twenty-four months or until the projects start to receive revenue from operations, whichever is sooner.
     (7) Upon written notice to the political subdivision, the department may suspend or cancel its loans if any of the following occur:
     (a) The political subdivision fails to make satisfactory and reasonable progress to complete the project, or the department concludes the political subdivision will be unable to complete the project or any portion of it; or
     (b) The political subdivision or bioenergy industry partners have made misrepresentations in any information furnished to the department or the legislature in connection with the project.
     (8) In the event that any portion of the loan has been paid to the political subdivision under this section at the time of breach, or failure of the political subdivision to satisfactorily perform, the department may require that the full amount of the loan, or a portion thereof, be repaid within a period specified by the department.
     (9) Future loan repayments shall be deposited into the energy freedom account created in section 6, chapter . . . (Engrossed Third Substitute House Bill No. 2939), Laws of 2006.
     (10) It is the intent of the legislature to provide loans for the development of a Washington state biodiesel industry based on Washington grown oilseed. The legislature is aware that in the development of this industry, the start-up process may necessitate the use of other oilseeds until Washington state growers plant sufficient crops to support this industry. The legislature also understands the realities of weather and market conditions in this process. The conversion to maximum Washington grown oilseed must be accomplished as quickly as possible. The political subdivision shall: (a) Develop a plan for outreach to local growers and an estimate of when maximum Washington state oilseed-based production will be reached; (b) develop a goal for the political subdivision to return a portion of the biofuel to local oilseed producers; and (c) report this information to the department of agriculture by December 1, 2006. The department shall report on the implementation of this section by January 1, 2007, to the appropriate committees of the legislature.
     (11) If chapter . . . (House Bill No. 1303/Senate Bill No. 5586 (cleaner energy)), Laws of 2007 is enacted, then the amounts in this section are appropriated to the department of community, trade, and economic development.

Appropriation:
     Energy Freedom Account--State . . . . . . . . . . . . (($10,250,000))
       $10,502,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($10,250,000))
       $10,502,000

Sec. 6050   2006 c 371 s 191 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF AGRICULTURE
     Energy Freedom Program (E3SHB No. 2939) (06-2-850)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely to implement the energy freedom program created in chapter . . . (Engrossed Third Substitute House Bill No. 2939), Laws of 2006. If the bill is not enacted by June 30, 2006, the appropriation shall lapse.
     (2) The department shall not expend more than $202,000 of the appropriation on administrative costs.
     (3) If chapter . . . (House Bill No. 1303/Senate Bill No. 5586 (cleaner energy)), Laws of 2007 is enacted, then the amounts in this section are appropriated to the department of community, trade, and economic development.

Appropriation:
     Energy Freedom Account--State . . . . . . . . . . . . (($6,750,000))
       $3,998,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($6,750,000))
       $3,998,000

NEW SECTION.  Sec. 6051   Part headings in this act are not any part of the law.

NEW SECTION.  Sec. 6052   If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 6053   This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately, except for section 6033 of this act which takes effect July 1, 2007, and section 6035 of this act which takes effect June 30, 2011.

(End of Part)



     INDEX       PAGE #


CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . 173
COMMUNITY AND TECHNICAL COLLEGE SYSTEM . . . . . . . . . . . . 192, 262
CRIMINAL JUSTICE TRAINING COMMISSION . . . . . . . . . . . . 44
DEPARTMENT OF AGRICULTURE . . . . . . . . . . . . 144
DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION . . . . . . . . . . . . 41
DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT . . . . . . . . . . . . 2
DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . 59
DEPARTMENT OF ECOLOGY . . . . . . . . . . . . 71
DEPARTMENT OF FISH AND WILDLIFE . . . . . . . . . . . . 124, 260, 261
DEPARTMENT OF GENERAL ADMINISTRATION . . . . . . . . . . . . 31
DEPARTMENT OF HEALTH . . . . . . . . . . . . 54
DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . 134, 261
DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . 44
DEPARTMENT OF TRANSPORTATION . . . . . . . . . . . . 147
DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . 56
EASTERN WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 191
EMPLOYMENT SECURITY DEPARTMENT . . . . . . . . . . . . 69
INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION . . . . . . . . . . . . 103
MILITARY DEPARTMENT . . . . . . . . . . . . 39, 259
OFFICE OF FINANCIAL MANAGEMENT . . . . . . . . . . . . 29, 30, 31
OFFICE OF THE SECRETARY OF STATE . . . . . . . . . . . . 1
STATE CONSERVATION COMMISSION . . . . . . . . . . . . 122, 260
STATE CONVENTION AND TRADE CENTER . . . . . . . . . . . . 42, 43
STATE SCHOOL FOR THE BLIND . . . . . . . . . . . . 152
STATE SCHOOL FOR THE DEAF . . . . . . . . . . . . 153
STATE TREASURER
     TRANSFERS . . . . . . . . . . . . 247
SUPERINTENDENT OF PUBLIC INSTRUCTION . . . . . . . . . . . . 148
THE EVERGREEN STATE COLLEGE . . . . . . . . . . . . 177
UNIVERSITY OF WASHINGTON . . . . . . . . . . . . 153
WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 187
WASHINGTON STATE PATROL . . . . . . . . . . . . 146
WASHINGTON STATE UNIVERSITY . . . . . . . . . . . . 163
WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 182

ESHB 1092  - S COMM AMD
     By Committee on Ways & Means

ADOPTED AS AMENDED 03/31/2007

     On page 1, line 1 of the title, after "budget;" strike the remainder of the title and insert "making appropriations and authorizing expenditures for capital improvements; amending RCW 70.105D.070, 43.43.944, 43.155.050, and 79.17.210; amending 2005 c 488 ss 165, 347, and 955 (uncodified); amending 2006 c 371 ss 106, 191, and 192 (uncodified); reenacting and amending RCW 43.135.045 and 43.155.050; adding new sections to 2006 c 371 (uncodified); creating new sections; providing effective dates; providing expiration dates; and declaring an emergency."

--- END ---