1606-S AMH DAHL RICH 066

                

SHB 1606 - H AMD 1065

By Representative Dahlquist

 

    On page 3, line 13, after "Beginning" strike "October 1, 2011" and insert "sixty days after the director determines that production of biodiesel fuel in this state from feedstock grown or produced in Washington has reached a level of at least fifteen million gallons over the preceding twelve months"

 

    On page 3, line 25, after "requirement))" strike all material through "(3)" on line 31

 

     Renumber the remaining subsection consecutively and correct any internal references accordingly.

 

 

    EFFECT:  Specifies that the implementation date for the B2 standard is sixty days after the director of the department of agriculture determines that production of biodiesel fuel in this state from feedstock grown or produced in Washington has reached a level of at least fifteen million gallons over the preceding twelve months. Removes the B5 standard.

 

--- END ---