SB 5575 -
By Senator Nelson
RULED BEYOND SCOPE 03/02/2011
On page 2, line 35, after "services;" strike "or" and insert
"((or))"
On page 2, line 36, after "(b)" insert "Electricity from
hydroelectric generation used to firm, shape, and integrate wind power
into the northwestern electric grid for delivery to Washington
residents; or
(c)"
Reletter the remaining subsection consecutively and correct any internal references accordingly.
EFFECT: Hydroelectricity used to firm, shape, and integrate wind power into the northwest grid for delivery into Washington is recognized as an eligible renewable resource.