BILL REQ. #:  H-0802.3 



_____________________________________________ 

HOUSE BILL 1391
_____________________________________________
State of Washington62nd Legislature2011 Regular Session

By Representatives Warnick, Haler, Fagan, Schmick, Chandler, McCune, Armstrong, Condotta, Johnson, Hinkle, and Parker

Read first time 01/20/11.   Referred to Committee on Agriculture & Natural Resources.



     AN ACT Relating to water delivered from the federal Columbia basin project; and amending RCW 90.44.510.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

Sec. 1   RCW 90.44.510 and 2004 c 195 s 3 are each amended to read as follows:
     The department shall issue a superseding water right permit or certificate for a groundwater right where the source of water is an aquifer for which the department adopts rules establishing a groundwater management subarea and water from the federal Columbia basin project is delivered for use by a person who holds such a groundwater right. The superseding water right permit or certificate shall designate that portion of the groundwater right that is replaced by water from the federal Columbia basin project as a standby or reserve right that may be used when water delivered by the federal project is curtailed or otherwise not available. The period of curtailment or unavailability shall be deemed a low flow period under RCW 90.14.140(2)(b). The total number of acres irrigated by the person under the groundwater right and through the use of water delivered from the federal project must not exceed the quantity of water ((used)) authorized by the federal bureau of reclamation and number of acres irrigated under the person's water right permit or certificate for the use of water from the aquifer.

--- END ---