BILL REQ. #:  H-2369.12 



_____________________________________________ 

SUBSTITUTE HOUSE BILL 1497
_____________________________________________
State of Washington62nd Legislature2011 Regular Session

By House Capital Budget (originally sponsored by Representatives Dunshee and Warnick; by request of Governor Gregoire)

READ FIRST TIME 04/13/11.   



     AN ACT Relating to the capital budget; making appropriations and authorizing expenditures for capital improvements; amending RCW 39.35B.050, 28B.20.725, 28B.30.750, 28B.50.360, 43.43.944, 43.155.060, 82.16.020, 82.16.020, 82.18.040, 82.45.060, and 43.155.050; amending 2009 c 497 ss 1050, 1015, 1016, 1017, 1020, 1036, 1041, 1042, 1069, 1076, 1078, 2016, 2025, 2012, 2017, 2041, 2045, 2048, 2043, 2044, 2046, 2049, 2050, 2051, 2052, 2053, 2055, 2056, 2057, 2058, 2062, 2063, 2066, 2074, 2073, 3026, 3011, 3006, 3004, 3008, 3005, 3039, 3055, 3077, 3135, 3157, 3186, 3174, 3184, 3166, 3175, 3193, 3194, 3195, 3189, 3192, 5015, 5077, 5082, 5144, 5161, 5228, and 5216 (uncodified); amending 2010 1st sp.s. c 36 ss 1017, 1001, 1002, 1005, 1003, 1008, 1009, 1011, 1014, 1016, 1021, 1034, 2006, 2016, 2010, 3015, 3020, 3017, 3024, 5007, 5012, 5041, 5078, and 5080 (uncodified); reenacting and amending RCW 28B.15.210, 28B.15.310, and 28B.35.370; adding new sections to 2009 c 497 (uncodified); creating new sections; providing effective dates; providing an expiration date; and declaring an emergency.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

NEW SECTION.  Sec. 1   (1) A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2013, out of the several funds specified in this act.
     (2) The definitions in this subsection apply throughout this act unless the context clearly requires otherwise.
     (a) "Fiscal year 2012" or "FY 2012" means the period beginning July 1, 2011, and ending June 30, 2012.
     (b) "Fiscal year 2013" or "FY 2013" means the period beginning July 1, 2012, and ending June 30, 2013.
     (c) "Lapse" or "revert" means the amount shall return to an unappropriated status.
     (d) "Provided solely" means the specified amount may be spent only for the specified purpose.
     (3) Amounts appropriated for fiscal year 2012 may be expended from July 1, 2011, through June 30, 2013. Amounts appropriated for fiscal year 2013 may only be expended from July 1, 2012, through June 30, 2013.
     (4) Unless otherwise specifically authorized in this act, any portion of an amount provided solely for a specified purpose that is not expended subject to the specified conditions and limitations to fulfill the specified purpose shall lapse.
     (5) The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts. "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects. A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2011-2013 biennium and the following three biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.
     (6) "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 2011, from the 2009-2011 biennial appropriations for each project.

PART 1
GENERAL GOVERNMENT

NEW SECTION.  Sec. 1001   FOR THE DEPARTMENT OF COMMERCE
     Rural Washington Loan Fund (19882002)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $209,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,334,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,543,000

NEW SECTION.  Sec. 1002   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water Assistance Account (20044002)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 130, chapter 26, Laws of 2003.

Reappropriation:
     Drinking Water Assistance Repayment Account--State . . . . . . . . . . . . $764,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,936,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,700,000

NEW SECTION.  Sec. 1003   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (20064008)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1001, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,052,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $40,850,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $45,902,000

NEW SECTION.  Sec. 1004   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water Assistance Program (20064003)

Reappropriation:
     Drinking Water Assistance Repayment
          Account--State . . . . . . . . . . . . $13,508,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $16,372,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $29,880,000

NEW SECTION.  Sec. 1005   FOR THE DEPARTMENT OF COMMERCE
     Rural Washington Loan Fund (20064010)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $2,658,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,469,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,127,000

NEW SECTION.  Sec. 1006   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board (20064011)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 121, chapter 488, Laws of 2005.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $2,165,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,284,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,449,000

NEW SECTION.  Sec. 1007   FOR THE DEPARTMENT OF COMMERCE
     Job and Economic Development Grants (20064950)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is subject to the provisions of section 1002, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,418,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $42,523,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,941,000

NEW SECTION.  Sec. 1008   FOR THE DEPARTMENT OF COMMERCE
     Jobs in Communities (20064951)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 140, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,949,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $10,301,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,250,000

NEW SECTION.  Sec. 1009   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water Assistance Program (20074004)

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $3,902,000
     Drinking Water Assistance Repayment
          Account--State . . . . . . . . . . . . $21,100,000
          Subtotal Reappropriation . . . . . . . . . . . . $25,002,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,898,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,900,000

NEW SECTION.  Sec. 1010   FOR THE DEPARTMENT OF COMMERCE
     Public Works Trust Fund (20074005)

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $132,000,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $37,682,000
          Subtotal Reappropriation . . . . . . . . . . . . $169,682,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $157,318,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $327,000,000

NEW SECTION.  Sec. 1011   FOR THE DEPARTMENT OF COMMERCE
     Water System Acquisition and Rehabilitation Program (20074006)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1040, chapter 520, Laws of 2007.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $106,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,550,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,656,000

NEW SECTION.  Sec. 1012   FOR THE DEPARTMENT OF COMMERCE
     Rural Washington Loan Fund (20074008)

Reappropriation:
     Rural Washington Loan Account--State . . . . . . . . . . . . $1,856,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $171,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,027,000

NEW SECTION.  Sec. 1013   FOR THE DEPARTMENT OF COMMERCE
     Housing Assistance, Weatherization, and Affordable Housing (20074009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,000
     State Taxable Building Construction
          Account--State . . . . . . . . . . . . $10,688,000
     Washington Housing Trust Account--State . . . . . . . . . . . . $2,209,000
          Subtotal Reappropriation . . . . . . . . . . . . $12,899,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $187,101,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000,000

NEW SECTION.  Sec. 1014   FOR THE DEPARTMENT OF COMMERCE
     Job Development Fund Grants (20074010)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007 and section 1005, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,864,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $40,931,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $48,795,000

NEW SECTION.  Sec. 1015   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board (20074015)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1028, chapter 520, Laws of 2007.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $7,289,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,711,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 1016   FOR THE DEPARTMENT OF COMMERCE
     Longview Regional Water Treatment Plant Dredging (20081001)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1016, chapter 328, Laws of 2008.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $41,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $109,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 1017   FOR THE DEPARTMENT OF COMMERCE
     Quincy Water Treatment System (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $172,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,328,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 1018   FOR THE DEPARTMENT OF COMMERCE
     Innovation Partnership Zones (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,437,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,563,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 1019   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (20084001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.
     (2) The reappropriation is subject to the provisions of section 1008, chapter 328, Laws of 2008 and section 1003, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,677,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $106,757,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $124,434,000

NEW SECTION.  Sec. 1020   FOR THE DEPARTMENT OF COMMERCE
     Community Development Fund (20084850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1006, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,507,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,409,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,916,000

NEW SECTION.  Sec. 1021   FOR THE DEPARTMENT OF COMMERCE
     Belfair Sewer Improvements (20084852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,294,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,300,000

NEW SECTION.  Sec. 1022   FOR THE DEPARTMENT OF COMMERCE
     Community Schools Program (20084856)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,116,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,469,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,585,000

NEW SECTION.  Sec. 1023   FOR THE DEPARTMENT OF COMMERCE
     2008 Local and Community Projects (20084861)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,918,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,326,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,244,000

NEW SECTION.  Sec. 1024   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water State Revolving Fund Loan Program (30000005)

Reappropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $10,930,000
     Drinking Water Assistance Repayment
          Account--State . . . . . . . . . . . . $31,201,000
          Subtotal Reappropriation . . . . . . . . . . . . $42,131,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $42,131,000

NEW SECTION.  Sec. 1025   FOR THE DEPARTMENT OF COMMERCE
     Building for the Arts Grants (30000006)

     The reappropriation in this section is subject to the provisions of section 1011, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,703,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,047,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,750,000

NEW SECTION.  Sec. 1026   FOR THE DEPARTMENT OF COMMERCE
     Youth Recreational Facilities Grants (30000007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,774,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,776,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,550,000

NEW SECTION.  Sec. 1027   FOR THE DEPARTMENT OF COMMERCE
     Building Communities Fund Grants (30000008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,203,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $21,917,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $27,120,000

NEW SECTION.  Sec. 1028   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board (30000010)

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $6,253,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,253,000

NEW SECTION.  Sec. 1029   FOR THE DEPARTMENT OF COMMERCE
     Innovation Partnership Zones (30000012)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 1030   FOR THE DEPARTMENT OF COMMERCE
     Housing Assistance, Weatherization, and Affordable Housing (30000013)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 1012, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,851,000
     State Taxable Building Construction
          Account--State . . . . . . . . . . . . $40,700,000
     Washington Housing Trust Account--State . . . . . . . . . . . . $9,199,000
          Subtotal Reappropriation . . . . . . . . . . . . $62,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $67,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $130,000,000

NEW SECTION.  Sec. 1031   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (30000019)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to section 1014, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $7,825,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,320,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,145,000

NEW SECTION.  Sec. 1032   FOR THE DEPARTMENT OF COMMERCE
     Energy Freedom Program (30000056)

Reappropriation:
     Energy Recovery Act Account--Federal Stimulus . . . . . . . . . . . . $32,218,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,282,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $38,500,000

NEW SECTION.  Sec. 1033   FOR THE DEPARTMENT OF COMMERCE
     2010 Local and Community Projects (30000082)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1015, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $11,728,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,022,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,750,000

NEW SECTION.  Sec. 1034   FOR THE DEPARTMENT OF COMMERCE
     Community Schools (91000002)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1013, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,280,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,220,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,500,000

NEW SECTION.  Sec. 1035   FOR THE DEPARTMENT OF COMMERCE
     Community Development Block Grants (91000011)

Reappropriation:
     General Fund--Federal Stimulus . . . . . . . . . . . . $911,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,289,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,200,000

NEW SECTION.  Sec. 1036   FOR THE DEPARTMENT OF COMMERCE
     Weatherization (91000013)

Reappropriation:
     General Fund--Federal Stimulus . . . . . . . . . . . . $17,469,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $31,531,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $49,000,000

NEW SECTION.  Sec. 1037   FOR THE DEPARTMENT OF COMMERCE
     Temporary Public Works Grant Program (92000021)

     The reappropriation in this section is subject to the provisions of section 1050, chapter 497, Laws of 2009.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $17,356,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $1,472,000
          Subtotal Reappropriation . . . . . . . . . . . . $18,828,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $23,762,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $42,590,000

NEW SECTION.  Sec. 1038   FOR THE DEPARTMENT OF COMMERCE
     Jobs Act for K-12 Public Schools & Higher Education Institutions (91000085)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1016, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $46,071,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $179,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,250,000

NEW SECTION.  Sec. 1039   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board - Export Assistance Grants and Loans (92000069)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1018, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $2,965,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 1040   FOR THE DEPARTMENT OF COMMERCE
     Drinking Water State Revolving Fund Loan Program (30000095)

     The appropriations in this section are subject to the following conditions and limitations: For projects involving repair, replacement, or improvement of a clean water infrastructure facility or other public works facility for which an investment grade audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade audit. The project sponsor may finance the costs of the audit as part of its drinking water state revolving fund program loan.

Appropriation:
     Drinking Water Assistance Account--State . . . . . . . . . . . . $16,000,000
     Drinking Water Assistance Repayment
          Account--State . . . . . . . . . . . . $32,000,000
          Subtotal Appropriation . . . . . . . . . . . . $48,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $192,000,000
          TOTAL . . . . . . . . . . . . $240,000,000

NEW SECTION.  Sec. 1041   FOR THE DEPARTMENT OF COMMERCE
     Community Economic Revitalization Board (30000097)

Appropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 1042   FOR THE DEPARTMENT OF COMMERCE
     Housing Assistance, Weatherization, Affordable Housing Trust Fund (30000098)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) $3,000,000 of the appropriation is provided solely to construct or rehabilitate facilities to house homeless veterans. The department must consult with the department of veterans affairs and must use these funds as matching resources for funds available from the federal veterans administration and the department of housing and urban development.
     (2) $3,000,000 of the appropriation is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.
     (3) $6,000,000 of the appropriation is provided solely for weatherization administered through the energy matchmakers program.
     (4) $3,000,000 of the appropriation is provided solely for facilities to house low-income migrant, seasonal, or temporary farmworkers. The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need.
     (5) $3,000,000 of the appropriation is provided solely to build low-income housing units in underserved communities and to concurrently develop capacity in these same communities. Underserved communities of concern are those that have high levels of poverty, specifically, thirty percent of the local median income; experience chronic homelessness; and lack affordable housing. Underserved communities include veterans, immigrants, refugees, and those communities of color disproportionately impacted by chronic homelessness and lack of affordable housing. The department must collaborate with representatives of underserved communities and organizations committed to assistance in these efforts to prioritize and plan distribution of funding.

Appropriation:
     State Taxable Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $30,000,000
     State Taxable Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $30,000,000
          Subtotal Appropriation . . . . . . . . . . . . $60,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $163,200,000
          TOTAL . . . . . . . . . . . . $223,200,000

NEW SECTION.  Sec. 1043   FOR THE DEPARTMENT OF COMMERCE
     Building Communities Fund Grants (30000102)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the projects or a distinct phase of the project that is useable to the public for this purpose intended by the legislature.
     (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
     (7) The appropriation is provided solely for the following list of projects:

ProjectAuthorized Amount
Serenity House of Clallam County$52,000
Boys & Girls Clubs of King County$316,000
YMCA of Pierce and Kitsap Counties$1,250,000
Jewish Family Service$2,313,000
Low Income Housing Institute$313,000
The Salvation Army$56,000
Share$581,000
Navos$2,500,000
Kitsap Community Resources$600,000
Transitions$109,000
Boys & Girls Clubs of the Columbia Basin$648,000
Village Green Foundation$1,029,000
Community Action Council of LMT$95,000
United Way of Kitsap County$605,000
ARC of Spokane$862,000
Dynamic Family Services$575,000
University District Food Bank$573,000
Community Health Care$123,000
YWCA Yakima$203,000
SafePlace$778,000
Allen Renaissance, Inc.$800,000
Kent Youth and Family Services$298,000
Total$14,679,000


Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $7,340,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $7,339,000
          Subtotal Appropriation . . . . . . . . . . . . $14,679,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $68,504,000
          TOTAL . . . . . . . . . . . . $83,183,000

NEW SECTION.  Sec. 1044   FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (30000166)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.
     (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(6).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
     (7) The appropriation is provided solely for the following list of projects:

ProjectAuthorized Amount
Adna Athletic and Fitness Facility$80,000
Aviation High School$1,000,000
Bothell North Creek Forest Land Acquisition$200,000
Bucoda Odd Fellows Community Center$150,000
Camano Community Health Clinic (FY 2012)$500,000
Colville Tribal Museum$250,000
Daybreak Youth Services Pre-Construction Activities$100,000
Federal Way Performing Arts Center (FY 2012)$325,000
Kelso Village$200,000
Legion Park Visitors Center and Trailhead Project$110,000
North Mason Senior Center$1,360,000
Redmond Central Connector$1,500,000
Roslyn Renaissance$1,848,000
Seattle Children's Hospital Emergency Department$2,000,000
Skagit Valley Hospital$750,000
Spokane Food Bank Distribution Center Capacity and Renovation$1,250,000
Spokane Valley Partners Boiler Replacement$100,000
Sultan Boys and Girls Club$500,000
Tacoma Hilltop Health Center$2,000,000
Traumatic Brain Injury Center$900,000
US Customs General Aviation Facility$350,000
Vancouver Waterfront Park Pre-Construction Activities$500,000
YMCA Yakima$203,000
Total$16,176,000


Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $825,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $15,351,000
          Subtotal Appropriation . . . . . . . . . . . . $16,176,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,176,000

NEW SECTION.  Sec. 1045   FOR THE DEPARTMENT OF COMMERCE
     Clean Energy Partnership (30000175)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for implementation of the recommendations of the clean energy leadership council by providing state matching funds for projects that:
     (a) Integrate energy efficiency and renewable energy in buildings;
     (b) Integrate renewable energy into the regional electrical grid; or
     (c) Advance bioenergy in the state.
     (2) State funding must not exceed fifty percent of the total program or project funds.
     (3) Eligible projects must:
     (a) Involve a majority of companies that are located in Washington state;
     (b) Represent a substantially new solution that is not widely available today; and
     (c) Be designed to generate solutions that are applicable both inside and outside of the state.

Appropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . $5,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,500,000

NEW SECTION.  Sec. 1046   FOR THE DEPARTMENT OF COMMERCE
     Public Works Assistance Account Program (30000103)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for the list of projects in LEAP capital document No. 2011-1B, developed April 11, 2011.
     (2) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade audit is obtainable, the public works board must require as a contract condition that the project sponsor undertake an investment grade audit. The project sponsor may finance the costs of the audit as part of its public works assistance account loan.
     (3) The public works board is directed to develop a more effective program for the efficient achievement of the goals of RCW 70.235.070. The board shall report to the legislature on this effort by January 1, 2012.

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $321,849,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $321,849,000

NEW SECTION.  Sec. 1047   FOR THE DEPARTMENT OF COMMERCE
     Youth Recreational Facilities Grants (30000100)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of RCW 43.63A.135.
     (2) The appropriation is provided solely for the following list of projects:

ProjectAuthorized Amount
Little Bit Therapeutic Riding Center$560,000
Boys & Girls Clubs of King County -      Mercer Island PEAK
$800,000
Boys & Girls Clubs of Thurston County$163,000
YMCA of Pierce and Kitsap Counties$800,000
YMCA of Greater Seattle$800,000
Boys & Girls Clubs of King County -      Ballard Boys & Girls Club Addition
$475,000
Boys & Girls Clubs of the Columbia Basin$629,000
Boys & Girls Clubs of Whatcom County$26,000
Northeast Youth Center$220,000
Youth Marine Foundation$142,000
YMCA of Columbia-Willamette$728,000
Total$5,343,000


Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,672,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,671,000
          Subtotal Appropriation . . . . . . . . . . . . $5,343,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $25,503,000
          TOTAL . . . . . . . . . . . . $30,846,000

NEW SECTION.  Sec. 1048   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Oversight of State Facilities (91000002)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $700,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $700,000
          Subtotal Appropriation . . . . . . . . . . . . $1,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,600,000
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 1049   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Cowlitz River Dredging (20082856)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $856,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $644,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 1050   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Catastrophic Flood Relief (20084850)

     (1) The appropriations in this section are subject to the following conditions and limitations:
     (a) $1,320,000 of the appropriations are provided solely for the Chehalis basin flood control authority or other local flood districts (i) to study, develop, construct, maintain, operate, and fund flood control measures throughout the basin, (ii) to complete by December 2011 the ongoing study of the effect of possible retention structures on fish in the basin, and (iii) to complete the hydraulic model for the Chehalis river to calculate flood levels, flood damages, and benefits of proposed flood mitigation projects for the lower portions of the river; and
     (b) $1,200,000 of the appropriations are provided solely for nonfederal matching funds and state agency costs associated with the United States army corps of engineers flood hazard mitigation projects for the Chehalis river basin.
     (2) It is the intent of the legislature to fulfill the commitment of section 101, chapter 179, Laws of 2008 and chapter 180, Laws of 2008, by appropriating funds when the federal match requirement is needed.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,980,000

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $448,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $447,000
          Subtotal Appropriation . . . . . . . . . . . . $895,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,610,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,515,000
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 1051   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Graving Dock Settlement (20084001)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $140,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,760,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,900,000

NEW SECTION.  Sec. 1052   FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Emergency Repairs (30000027)

     The appropriations in this section are subject to the following conditions and limitations: Emergency funds shall not be allotted until an emergency declaration signed by the affected agency director, a scope of work, and cost estimate are approved by the office of financial management. Emergency funds may only be used for unexpected building or grounds failures that will impact public health and safety, or the day-to-day operations of the facility. The office of financial management shall report to the house capital budget committee and senate ways and means committee annually on the approved emergency projects.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $5,250,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $5,250,000
          Subtotal Appropriation . . . . . . . . . . . . $10,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,500,000

NEW SECTION.  Sec. 1053   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     O'Brien Building Improvements (20081007)

     The reappropriation in this section is subject to the following conditions and limitations: Upon completion of the project, temporary modular buildings shall be removed, and the parking lot shall be restored and landscaped within budget.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,257,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,944,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $11,201,000

NEW SECTION.  Sec. 1054   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capitol Campus High Voltage System Improvements (20081010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $111,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,093,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,204,000

NEW SECTION.  Sec. 1055   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building Improvements (20081011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $92,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,659,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,751,000

NEW SECTION.  Sec. 1056   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works Preservation (30000012)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $868,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,532,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,400,000

NEW SECTION.  Sec. 1057   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Emergency Repairs (30000033)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 1058   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Powerhouse: Improvements and Preservation (30000056)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $815,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $425,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,240,000

NEW SECTION.  Sec. 1059   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Facility Oversight Program: Staffing (91000003)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $260,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $260,000
          Subtotal Appropriation . . . . . . . . . . . . $520,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $520,000

NEW SECTION.  Sec. 1060   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Transportation Building Preservation (20021008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $924,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,692,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $21,616,000

NEW SECTION.  Sec. 1061   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Critical Campus Steam System Repairs (30000535)

Appropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $90,000
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,210,000
          Subtotal Appropriation . . . . . . . . . . . . $2,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,300,000

NEW SECTION.  Sec. 1062   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Minor Works Preservation (30000550)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,665,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,664,000
          Subtotal Appropriation . . . . . . . . . . . . $3,329,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,420,000
          TOTAL . . . . . . . . . . . . $17,749,000

NEW SECTION.  Sec. 1063   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     NRB Garage Fire Suppression System Repairs (30000578)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,040,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,040,000

NEW SECTION.  Sec. 1064   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Engineering and Architectural Services: Staffing (91000005)

Appropriation:
     Charitable, Educational, Penal and Reformatory
          Institutions Account--State . . . . . . . . . . . . $928,000
     Community and Technical College Capital Projects
          Account--State . . . . . . . . . . . . $755,000
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,817,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $3,500,000
          Subtotal Appropriation . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $34,250,000
          TOTAL . . . . . . . . . . . . $41,250,000

NEW SECTION.  Sec. 1065   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building Critical Hydronic Loop Repairs (30000584)

Appropriation:
     Capitol Building Construction Account--State . . . . . . . . . . . . $1,310,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,310,000

NEW SECTION.  Sec. 1066   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Natural Resource Building Roof Replacement and Exterior Foam Insulation System Repairs (30000546)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $4,980,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,980,000

NEW SECTION.  Sec. 1067   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     East Plaza - Water Infiltration and Elevator Repairs (30000548)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $3,214,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,555,000
          TOTAL . . . . . . . . . . . . $23,769,000

NEW SECTION.  Sec. 1068   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Legislative Building Critical Exterior Repairs (30000577)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,062,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,270,000
          TOTAL . . . . . . . . . . . . $4,332,000

NEW SECTION.  Sec. 1069   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Capitol Lake Dredging (30000571)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely to begin the process of seeking necessary permits to dredge and spot dredge excess sediments as required under all of the proposed long-term management strategies.

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 1070   FOR THE MILITARY DEPARTMENT
     Minor Works Preservation (30000002)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $5,633,000
     State Building Construction Account--State . . . . . . . . . . . . $346,000
          Subtotal Reappropriation . . . . . . . . . . . . $5,979,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,402,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,381,000

NEW SECTION.  Sec. 1071   FOR THE MILITARY DEPARTMENT
     Minor Works Program (30000003)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,596,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $543,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,139,000

NEW SECTION.  Sec. 1072   FOR THE MILITARY DEPARTMENT
     Camp Murray New Primary Gate Entrance (30000482)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $2,994,000
     Military Department Capital Account--State . . . . . . . . . . . . $1,435,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,429,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $498,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,927,000

NEW SECTION.  Sec. 1073   FOR THE MILITARY DEPARTMENT
     Combined Support Maintenance Shop (20082006)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $4,736,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $20,264,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 1074   FOR THE MILITARY DEPARTMENT
     Minor Works Preservation (30000560)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,601,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,198,000
          Subtotal Appropriation . . . . . . . . . . . . $4,799,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,061,000
          TOTAL . . . . . . . . . . . . $30,860,000

NEW SECTION.  Sec. 1075   FOR THE MILITARY DEPARTMENT
     Minor Works Program (30000561)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $9,958,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $59,273,000
          TOTAL . . . . . . . . . . . . $69,231,000

NEW SECTION.  Sec. 1076   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Historic Barn Preservation (20084851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $297,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $503,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 1077   FOR THE DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION
     Courthouse Preservation (30000004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,963,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $37,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

(End of part)


PART 2
HUMAN SERVICES

NEW SECTION.  Sec. 2001   FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
     Fire Alarm Replacement (30000004)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 2002   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center: Utility Replacements (20081504)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,193,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,813,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,006,000

NEW SECTION.  Sec. 2003   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Health, Safety, and Code Requirements (30000366)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,201,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $449,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,650,000

NEW SECTION.  Sec. 2004   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Infrastructure Preservation (30000367)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,195,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,125,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,320,000

NEW SECTION.  Sec. 2005   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Facilities Preservation (30000368)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,951,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,639,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,590,000

NEW SECTION.  Sec. 2006   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Echo Glen Children's Center: Portable Classroom Replacement (30000844)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $751,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $99,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $850,000

NEW SECTION.  Sec. 2007   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Eastern State Hospital: Westlake Building Renovation (30000852)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $840,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,100,000
          TOTAL . . . . . . . . . . . . $3,090,000

NEW SECTION.  Sec. 2008   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Capacity to Replace Maple Lane School (92000005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,635,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $462,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,097,000

NEW SECTION.  Sec. 2009   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Health, Safety, and Code Requirements (30001264)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,750,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,750,000
          Subtotal Appropriation . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,000,000
          TOTAL . . . . . . . . . . . . $17,500,000

NEW SECTION.  Sec. 2010   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Infrastructure Preservation (30001290)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,500,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,500,000
          Subtotal Appropriation . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 2011   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Minor Works Preservation: Facilities Preservation (30001291)

Appropriation:
     Charitable, Educational, Penal and Reformatory
          Institutions Account--State . . . . . . . . . . . . $714,000
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,986,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $4,000,000
          Subtotal Appropriation . . . . . . . . . . . . $7,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $47,700,000

NEW SECTION.  Sec. 2012   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Hazards Abatement and Demolition (30002221)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $500,000
      State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $500,000
          Subtotal Appropriation . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 2013   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     McNeil Island Water Distribution System (91000011)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 2014   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Francis Haddon Morgan Center (91000014)

The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the department of social and health services to develop a predesign with options for the future use of the Francis Haddon Morgan Center site, including the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons. The predesign shall be delivered to the house of representatives fiscal committees and the senate ways and means committee by December 31, 2011. This predesign shall not delay any activities associated with ceasing to operate the facility as a residential habilitation center after December 31, 2011. On and after January 1, 2012, the Francis Haddon Morgan Center property must remain either in public ownership, or may be sold or leased for a nominal amount to a nonprofit organization for the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons.

Appropriation:
     Charitable, Educational, Penal and Reformatory
          Institutions Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 2015   FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Yakima Valley School (91000016)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the department of social and health services to develop a predesign with options for the future use of the Yakima Valley School site, including the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons. The predesign shall be delivered to the house of representatives fiscal committees and the senate ways and means committee by December 31, 2011. This predesign shall not delay any activities associated with ceasing to operate the facility as a residential habilitation center after December 31, 2011. On and after January 1, 2012, the Yakima Valley School property must remain either in public ownership, or may be sold or leased for a nominal amount to a nonprofit organization for the permanent use of the property to support housing or other services for low-income, disabled, or vulnerable persons.

Appropriation:
     Charitable, Educational, Penal and Reformatory
          Institutions Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 2016   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: Addition (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,561,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,616,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,177,000

NEW SECTION.  Sec. 2017   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (20064001)

Reappropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $16,652,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $77,944,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $94,596,000

NEW SECTION.  Sec. 2018   FOR THE DEPARTMENT OF HEALTH
     Public Health Laboratory: HVAC Systems Upgrades (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,439,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $473,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,912,000

NEW SECTION.  Sec. 2019   FOR THE DEPARTMENT OF HEALTH
     Drinking Water Assistance Program (30000013)

Reappropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $38,348,000
     Drinking Water Assistance Account--Federal
          Stimulus . . . . . . . . . . . . $9,373,000
          Subtotal Reappropriation . . . . . . . . . . . . $47,721,000

Appropriation:
     Drinking Water Assistance Account--Federal . . . . . . . . . . . . $49,868,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $29,089,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $199,472,000
          TOTAL . . . . . . . . . . . . $326,150,000

NEW SECTION.  Sec. 2020   FOR THE DEPARTMENT OF HEALTH
     Minor Works Preservation: Facility Preservation (30000027)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $380,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,200,000
          TOTAL . . . . . . . . . . . . $1,580,000

NEW SECTION.  Sec. 2021   FOR THE DEPARTMENT OF HEALTH
     Tulalip Water Supply Pipeline (30000296)

Appropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 2022   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Walla Walla Nursing Facility (20082008)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $125,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $29,141,000
          TOTAL . . . . . . . . . . . . $31,666,000

NEW SECTION.  Sec. 2023   FOR THE DEPARTMENT OF VETERANS AFFAIRS
     Minor Works Preservation: Facilities Preservation (90000001)

Appropriation:
     Charitable, Educational, Penal and Reformatory
          Institutions Account--State . . . . . . . . . . . . $2,722,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $7,728,000
          TOTAL . . . . . . . . . . . . $10,450,000

NEW SECTION.  Sec. 2024   FOR THE DEPARTMENT OF CORRECTIONS
     Clallam Bay Corrections Center: Install Close Custody Slider Doors (20062070)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $881,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,029,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,910,000

NEW SECTION.  Sec. 2025   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Correctional Complex: Close Sewer Lagoon (20082022)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $798,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $593,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,024,000
          TOTAL . . . . . . . . . . . . $9,415,000

NEW SECTION.  Sec. 2026   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide Minor Works: Infrastructure Preservation (30000016)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $456,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $990,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,446,000

NEW SECTION.  Sec. 2027   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide Minor Works: Health, Safety, and Code Requirements (30000047)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,721,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $888,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,609,000

NEW SECTION.  Sec. 2028   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide Minor Works: Facility Preservation (30000086)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,902,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $955,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,857,000

NEW SECTION.  Sec. 2029   FOR THE DEPARTMENT OF CORRECTIONS
     Clallam Bay Corrections Center: Replace 5 Towers and Housing Roofs (30000108)

     The appropriations in this section are subject to the following conditions and limitations: The funding is provided solely for the replacement of roofs on offender housing units.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,102,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $393,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,448,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,943,000

NEW SECTION.  Sec. 2030   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Fire Detection/Suppression (30000123)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $398,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $898,000

NEW SECTION.  Sec. 2031   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Correctional Complex: Water Line Replacements (30000137)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,338,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,538,000

NEW SECTION.  Sec. 2032   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide Minor Works: Programmatic Projects (30000173)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,559,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,175,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,734,000

NEW SECTION.  Sec. 2033   FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Housing Units, Kitchen and Site Work (30000482)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,810,000
     Public Safety Reimbursable Bond Account--State . . . . . . . . . . . . $546,000
          Subtotal Reappropriation . . . . . . . . . . . . $6,356,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $463,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $49,945,000
          TOTAL . . . . . . . . . . . . $56,764,000

NEW SECTION.  Sec. 2034   FOR THE DEPARTMENT OF CORRECTIONS
     Westside Corrections Complex: Siting and Predesign (92000032)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,327,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $273,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,600,000

NEW SECTION.  Sec. 2035   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Regional Infrastructure (20042008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $655,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,974,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,629,000

NEW SECTION.  Sec. 2036   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Roof and Equipment Replacement (30000195)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $3,648,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,307,000
          TOTAL . . . . . . . . . . . . $6,955,000

NEW SECTION.  Sec. 2037   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Correctional Complex: Special Offender Unit Core Building and Wings Roofing (30000528)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,186,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,186,000

NEW SECTION.  Sec. 2038   FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Correctional Complex: Washington State Reformatory Living Units Fixtures and Plumbing (30000531)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,304,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,246,000
          TOTAL . . . . . . . . . . . . $4,550,000

NEW SECTION.  Sec. 2039   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide: Minor Works Preservation: Infrastructure Preservation (30000539)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,250,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,250,000
          Subtotal Appropriation . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,827,000
          TOTAL . . . . . . . . . . . . $12,327,000

NEW SECTION.  Sec. 2040   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide: Minor Works Preservation: Facility Preservation (30000540)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,250,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,250,000
          Subtotal Appropriation . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $72,978,000
          TOTAL . . . . . . . . . . . . $75,478,000

NEW SECTION.  Sec. 2041   FOR THE DEPARTMENT OF CORRECTIONS
     Statewide: Minor Works Preservation: Health, Safety, and Code Requirements (30000541)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,300,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,300,000
          Subtotal Appropriation . . . . . . . . . . . . $2,600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,490,000
          TOTAL . . . . . . . . . . . . $13,090,000

NEW SECTION.  Sec. 2042   FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: 300 Minimum Security Bed Expansion (30000589)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $3,805,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $55,576,000
          TOTAL . . . . . . . . . . . . $59,381,000

NEW SECTION.  Sec. 2043   FOR THE DEPARTMENT OF CORRECTIONS
     WA Corrections Center for Women: Correctional Industries Laundry (30000524)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,856,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,856,000

NEW SECTION.  Sec. 2044   FOR THE DEPARTMENT OF LABOR AND INDUSTRIES
     Labor and Industries Building Repairs and Renewal (30000014)

Appropriation:
     Accident Account--State . . . . . . . . . . . . $284,000
     Medical Aid Account--State . . . . . . . . . . . . $283,000
          Subtotal Appropriation . . . . . . . . . . . . $567,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $567,000

(End of part)


PART 3
NATURAL RESOURCES

NEW SECTION.  Sec. 3001   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (19742006)

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $1,792,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,406,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,198,000

NEW SECTION.  Sec. 3002   FOR THE DEPARTMENT OF ECOLOGY
     Low-Level Nuclear Waste Disposal Trench Closure (19972012)

Reappropriation:
     Site Closure Account--State . . . . . . . . . . . . $12,052,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,381,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,433,000

NEW SECTION.  Sec. 3003   FOR THE DEPARTMENT OF ECOLOGY
     Twin Lake Aquifer Recharge Project (20042951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $343,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $407,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $750,000

NEW SECTION.  Sec. 3004   FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (20044006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $329,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $87,000
          Subtotal Reappropriation . . . . . . . . . . . . $416,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,102,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $13,518,000

NEW SECTION.  Sec. 3005   FOR THE DEPARTMENT OF ECOLOGY
     Water Conveyance Infrastructure Projects (20052850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 322, chapter 488, Laws of 2005.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,569,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,212,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,781,000

NEW SECTION.  Sec. 3006   FOR THE DEPARTMENT OF ECOLOGY
     Sunnyside Valley Irrigation District Water Conservation (20052851)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,968,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,229,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,900,000
          TOTAL . . . . . . . . . . . . $19,097,000

NEW SECTION.  Sec. 3007   FOR THE DEPARTMENT OF ECOLOGY
     Quad Cities Water Right Mitigation (20052852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,325,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $275,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,600,000

NEW SECTION.  Sec. 3008   FOR THE DEPARTMENT OF ECOLOGY
     State Drought Preparedness (20054009)

Reappropriation:
     State Drought Preparedness Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,052,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $15,352,000

NEW SECTION.  Sec. 3009   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (20062003)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 136, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,196,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,604,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,800,000

NEW SECTION.  Sec. 3010   FOR THE DEPARTMENT OF ECOLOGY
     Motor Vehicle Mercury Removal Program (20062850)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 137, chapter 371, Laws of 2006.

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $750,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3011   FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Basin Water Supply Development Program (20062950)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $1,000,000 of the appropriation is provided solely to the Columbia basin ground water management area for the following projects:
     (a) $600,000 of the appropriation is provided solely to construct localized hydrologic models for municipal supply sources and aquifer storage and recovery potential; and
     (b) $400,000 of the appropriation is provided solely to develop and implement methods to identify sustainable wells near the East Low Canal.
     (2) $6,000,000 of the appropriation is provided solely for the Sunnyside Valley Irrigation District Water Conservation program.
     (3) The department must reexamine its method of accounting for in-stream and out-of-stream benefits and develop a means of accounting for the indirect but substantial and tangible out-of-stream benefits that accrue from conservation, pump exchanges, and other projects. The department must report the results of this reexamination to the legislature by September 15, 2011.

Reappropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $23,987,000
Appropriation:
     Columbia River Basin Water Supply Development
          Account--State . . . . . . . . . . . . $47,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,513,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $128,700,000
          TOTAL . . . . . . . . . . . . $220,200,000

NEW SECTION.  Sec. 3012   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Account (20064002)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $11,025,000
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $8,825,000
          Subtotal Reappropriation . . . . . . . . . . . . $19,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $219,766,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $239,616,000

NEW SECTION.  Sec. 3013   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (20064007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,263,000
     Water Quality Capital Account--State . . . . . . . . . . . . $502,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,765,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $44,735,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $47,500,000

NEW SECTION.  Sec. 3014   FOR THE DEPARTMENT OF ECOLOGY
     Local Toxics Grants for Cleanup and Prevention (20064008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,029,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $83,871,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $98,900,000

NEW SECTION.  Sec. 3015   FOR THE DEPARTMENT OF ECOLOGY
     Transfer of Water Rights for Cabin Owners (20081951)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $100,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $450,000

NEW SECTION.  Sec. 3016   FOR THE DEPARTMENT OF ECOLOGY
     Puget Sound Storm water Projects (20082002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,949,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,971,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,920,000

NEW SECTION.  Sec. 3017   FOR THE DEPARTMENT OF ECOLOGY
     Storm water Projects (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $467,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,533,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3018   FOR THE DEPARTMENT OF ECOLOGY
     Reclaimed Water (20084002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,960,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,495,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,455,000

NEW SECTION.  Sec. 3019   FOR THE DEPARTMENT OF ECOLOGY
     Puget Sound Aquatic Cleanup and Restoration (20084004)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,267,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,733,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3020   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grants (20084008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $20,251,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $72,624,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $92,875,000

NEW SECTION.  Sec. 3021   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (20084010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,468,000
     Water Quality Capital Account--State . . . . . . . . . . . . $1,024,000
          Subtotal Reappropriation . . . . . . . . . . . . $7,492,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $58,991,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $66,483,000

NEW SECTION.  Sec. 3022   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Loan Program (20084011)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $18,878,000
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $21,988,000
          Subtotal Reappropriation . . . . . . . . . . . . $40,866,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $99,134,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $140,000,000

NEW SECTION.  Sec. 3023   FOR THE DEPARTMENT OF ECOLOGY
     Yakima River Basin Water Storage Feasibility Study (20084026)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for completion of the United States bureau of reclamation's Yakima basin storage feasibility study, including the associated joint national environmental policy act, the state environmental policy act, and environmental impact statement. The reappropriated funds are to be used by the bureau of reclamation and the department of ecology to evaluate potential in basin storage facilities such as the proposed Bumping Lake and Wymer reservoirs and other reasonable alternatives that will enhance water supplies and streamflows in the Yakima basin.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,150,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,250,000

NEW SECTION.  Sec. 3024   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (20084029)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,789,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,211,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,000,000

NEW SECTION.  Sec. 3025   FOR THE DEPARTMENT OF ECOLOGY
     Mason County Consortium (20084851)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3026   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Fund Program (30000007)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $48,342,000
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $39,475,000
     Water Pollution Control Revolving Account--Federal
          Stimulus . . . . . . . . . . . . $18,050,000
          Subtotal Reappropriation . . . . . . . . . . . . $105,867,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $72,833,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $178,700,000

NEW SECTION.  Sec. 3027   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (30000008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $16,545,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $13,455,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,000,000

NEW SECTION.  Sec. 3028   FOR THE DEPARTMENT OF ECOLOGY
     Cleanup and Prevention of Waste Tire Piles (30000012)

Reappropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $900,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3029   FOR THE DEPARTMENT OF ECOLOGY
     Upper Columbia River Black Sand Beach Cleanup (30000016)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $365,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $135,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3030   FOR THE DEPARTMENT OF ECOLOGY
     Safe Soils Remediation Program (30000019)

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $1,520,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $769,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,289,000

NEW SECTION.  Sec. 3031   FOR THE DEPARTMENT OF ECOLOGY
     Skykomish Cleanup and Restoration (30000020)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,416,000
     Cleanup Settlement Account--State . . . . . . . . . . . . $816,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,232,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,118,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,350,000

NEW SECTION.  Sec. 3032   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (30000028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,973,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,027,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3033   FOR THE DEPARTMENT OF ECOLOGY
     Kittitas Groundwater Study (30000029)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) Funds may be provided to develop and implement water banking and transfer methods and agreements that are fully protective of senior water rights and that protect domestic groundwater users and improve the profitability of farming operations. The legislature finds such activities to be in the public interest because they can help sustain the viability of the agricultural economy and enhance the certainty of water supplies for domestic groundwater users.
     (2) Funds may be provided to lease or purchase water rights to create a reserve water supply for domestic groundwater users that have a groundwater right with a priority date later than May 10, 1905, as well as for all out-of-priority groundwater users. In securing water for such domestic groundwater users, strong preference shall be given to the use of water banking and transfer methods that provide alternatives to permanent purchase and dry-up of agricultural water rights in the basin, including dry-year options, water banking, long-term water supply lease agreements, long-term agricultural land fallowing agreements, and reduced consumptive use through efficiency or alternative cropping arrangements while maintaining historic return flows.
     (3) A portion of the reappropriation may be used for administrative costs, not to exceed four percent, and other costs associated with leasing or acquiring and transferring the water rights. All costs shall be fully recovered from participating domestic water users for their prorated portion of the cost, including but not limited to the costs of securing a water right or rights for this purpose, costs associated with the development and implementation of alternative agricultural water transfer methods, associated annual operational costs, and federal water service contract costs owed to the United States bureau of reclamation. Funds recovered in this manner shall be deposited in the state and local improvement revolving fund and may be used for any purpose provided in this section.

Reappropriation:
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $700,000

NEW SECTION.  Sec. 3034   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grant Program (30000039)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,823,000
     Local Toxics Control Account--State . . . . . . . . . . . . $34,687,000
          Subtotal Reappropriation . . . . . . . . . . . . $45,510,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $30,401,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $75,911,000

NEW SECTION.  Sec. 3035   FOR THE DEPARTMENT OF ECOLOGY
     Storm Water Retrofit and Low-Impact Development Grant Program (30000097)

     The reappropriations in this section are subject to the following terms and conditions: The reappropriation is subject to the provisions of section 3005, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State and Local Improvements Revolving Account--
          State . . . . . . . . . . . . $1,284,000
     State and Local Improvements Revolving Account--
          Waste Facilities 1980--State . . . . . . . . . . . . $325,000
     State Building Construction Account--State . . . . . . . . . . . . $29,879,000
     State Toxics Control Account--State . . . . . . . . . . . . $15,343,000
     Local Toxics Control Account--State . . . . . . . . . . . . $6,080,000
          Subtotal Reappropriation . . . . . . . . . . . . $52,911,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,698,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $54,609,000

NEW SECTION.  Sec. 3036   FOR THE DEPARTMENT OF ECOLOGY
     Reducing Diesel Particle Emissions in Tacoma (30000139)

Reappropriation:
     Air Pollution Control Account--State . . . . . . . . . . . . $996,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3037   FOR THE DEPARTMENT OF ECOLOGY
     Diesel Emissions Reduction (91000003)

Reappropriation:
     General Fund--Federal ARRA . . . . . . . . . . . . $380,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,730,000

NEW SECTION.  Sec. 3038   FOR THE DEPARTMENT OF ECOLOGY
     Diesel Emissions Reduction (91000024)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $347,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $353,000

NEW SECTION.  Sec. 3039   FOR THE DEPARTMENT OF ECOLOGY
     Reducing Wood Smoke Particle Emissions in Tacoma (30000140)

Reappropriation:
     Air Pollution Control Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $300,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $600,000

NEW SECTION.  Sec. 3040   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Fund Program (30000142)

Reappropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $23,750,000
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $11,400,000
          Subtotal Reappropriation . . . . . . . . . . . . $35,150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,850,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $37,000,000

NEW SECTION.  Sec. 3041   FOR THE DEPARTMENT OF ECOLOGY
     Clean Up Toxic Sites - Puget Sound (30000144)

     The reappropriation in this section is subject to the following conditions and limitations: Up to $17,500,000 of the cleanup settlement account--state appropriation may be used for cleanup activities associated with the Asarco contamination in Everett.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $511,000
     Cleanup Settlement Account--State . . . . . . . . . . . . $18,300,000
     State Toxics Control Account--State . . . . . . . . . . . . $20,495,000
          Subtotal Reappropriation . . . . . . . . . . . . $39,306,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,892,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $41,198,000

NEW SECTION.  Sec. 3042   FOR THE DEPARTMENT OF ECOLOGY
     Settlement Funding To Clean Up Toxic Sites (30000145)

Reappropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $7,502,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $998,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,500,000

NEW SECTION.  Sec. 3043   FOR THE DEPARTMENT OF ECOLOGY
     Leaking Underground Tanks (91000002)

Reappropriation:
     General Fund--Federal Stimulus . . . . . . . . . . . . $1,118,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,382,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,500,000

NEW SECTION.  Sec. 3044   FOR THE DEPARTMENT OF ECOLOGY
     Habitat Mitigation (91000007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,900,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,400,000

NEW SECTION.  Sec. 3045   FOR THE DEPARTMENT OF ECOLOGY
     Protect Communities from Flood and Drought (92000002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,475,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,975,000

NEW SECTION.  Sec. 3046   FOR THE DEPARTMENT OF ECOLOGY
     Wastewater Treatment and Water Reclamation (92000041)

     The reappropriation is subject to the provisions of section 3016, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,980,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $450,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,430,000

NEW SECTION.  Sec. 3047   FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (30000208)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) $3,500,000 of the fiscal year 2012 state building construction account--state appropriation is provided solely to the city of Snohomish to implement the near-term wastewater treatment plant improvement project required under agreed order No. 7973 between the department and the city.
     (2) For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade audit. The project sponsor may finance the costs of the audit as part of its centennial clean water program grant.
     (3) $540,000 of the fiscal year 2012 state building construction account--state appropriation is provided solely for the city of Connell Klindworth Campbell waterline distribution project.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $15,000,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $15,000,000
     State Toxics Control Account--State . . . . . . . . . . . . $18,000,000
          Subtotal Appropriation . . . . . . . . . . . . $48,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $120,000,000
          TOTAL . . . . . . . . . . . . $168,000,000

NEW SECTION.  Sec. 3048   FOR THE DEPARTMENT OF ECOLOGY
     Water Pollution Control Revolving Fund Program (30000209)

     The appropriations in this section are subject to the following conditions and limitations: For projects involving repair, replacement, or improvement of a wastewater treatment plant or other public works facility for which an investment grade audit is obtainable, the department of ecology must require as a contract condition that the project sponsor undertake an investment grade audit. The project sponsor may finance the costs of the audit as part of its water pollution control revolving fund program loan.

Appropriation:
     Water Pollution Control Revolving Account--State . . . . . . . . . . . . $102,000,000
     Water Pollution Control Revolving Account--Federal . . . . . . . . . . . . $82,205,000
          Subtotal Appropriation . . . . . . . . . . . . $184,205,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $736,820,000
          TOTAL . . . . . . . . . . . . $921,025,000

NEW SECTION.  Sec. 3049   FOR THE DEPARTMENT OF ECOLOGY
     Waste Tire Pile Prevention and Cleanup (30000210)

Appropriation:
     Waste Tire Removal Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3050   FOR THE DEPARTMENT OF ECOLOGY
     Wood Stove Pollution Reduction (30000211)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,000,000
     Local Toxics Control Account--State . . . . . . . . . . . . $2,000,000
          Subtotal Appropriation . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,000,000
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 3051   FOR THE DEPARTMENT OF ECOLOGY
     Diesel Emissions Reduction (30000212)

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,000,000
          TOTAL . . . . . . . . . . . . $12,000,000

NEW SECTION.  Sec. 3052   FOR THE DEPARTMENT OF ECOLOGY
     Watershed Plan Implementation and Flow Achievement (30000213)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $4,000,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $4,000,000
          Subtotal Appropriation . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 3053   FOR THE DEPARTMENT OF ECOLOGY
     Coordinated Prevention Grants (30000214)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $4,000,000 of the appropriation is provided solely for grants to local governments for local waste and pollution prevention projects. Grants shall fund new organics composting and conversion, green building, and moderate risk waste initiatives described in the state "beyond waste" plan.
     (2) Up to $2,000,000 of the appropriation may be used for grants to local governments to provide alternatives to backyard burning of organic materials. Priority for these grants shall be given to: (a) Urban growth areas of less than 5,000 people affected by the January 1, 2007, ban on outdoor burning; (b) projects that develop infrastructure for an ongoing program; and (c) projects that coordinate regionally.

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $28,610,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $114,440,000
          TOTAL . . . . . . . . . . . . $143,050,000

NEW SECTION.  Sec. 3054   FOR THE DEPARTMENT OF ECOLOGY
     Hood Canal Regional Septic Repair Loan Program (30000215)

Appropriation:
     State Building Construction
          Account--State (FY 2013) . . . . . . . . . . . . $1,500,000
     General Fund--Federal . . . . . . . . . . . . $2,500,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3055   FOR THE DEPARTMENT OF ECOLOGY
     Remedial Action Grant Program (30000216)

     The appropriation in this section is subject to the following conditions and limitations: Up to $13,334,000 of the appropriation from the local toxics control account--state is provided only if the department of revenue's nongeneral fund revenue forecasts for fiscal year 2012 and fiscal year 2013 project revenue increases that fully support this additional appropriation. The department of ecology may only allot and spend these dollars to the extent that (1) they are fully supported by these forecasts and (2) a positive ending fund balance is projected for the local toxics control account.

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $65,334,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $65,334,000

NEW SECTION.  Sec. 3056   FOR THE DEPARTMENT OF ECOLOGY
     Eastern Washington Clean Sites Initiative (30000217)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $4,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,500,000

NEW SECTION.  Sec. 3057   FOR THE DEPARTMENT OF ECOLOGY
     Burlington Northern Santa Fe Skykomish Restoration (30000218)

Appropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $284,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $284,000

NEW SECTION.  Sec. 3058   FOR THE DEPARTMENT OF ECOLOGY
     Safe Soils Remediation Program - Central Washington (30000263)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $3,711,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,711,000

NEW SECTION.  Sec. 3059   FOR THE DEPARTMENT OF ECOLOGY
     Swift Creek Natural Asbestos Cleanup (30000015)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $200,000
          Subtotal Appropriation . . . . . . . . . . . . $1,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,200,000

NEW SECTION.  Sec. 3060   FOR THE DEPARTMENT OF ECOLOGY
     Clean Up Toxics Sites - Puget Sound (30000265)

Appropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $16,400,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,248,000
          TOTAL . . . . . . . . . . . . $27,648,000

NEW SECTION.  Sec. 3061   FOR THE DEPARTMENT OF ECOLOGY
     Yakima Basin Integrated Water Management Plan Implementation (30000278)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3062   FOR THE DEPARTMENT OF ECOLOGY
     ASARCO - Tacoma Smelter Plume and Mines (30000280)

Appropriation:
     Cleanup Settlement Account--State . . . . . . . . . . . . $20,647,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,647,000

NEW SECTION.  Sec. 3063   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Boat Launch (30000281)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $320,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $320,000

NEW SECTION.  Sec. 3064   FOR THE DEPARTMENT OF ECOLOGY
     Padilla Bay Federal Capital Projects (30000282)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 3065   FOR THE DEPARTMENT OF ECOLOGY
     Coastal Wetlands Federal Funds Administration (30000283)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $23,200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,000,000
          TOTAL . . . . . . . . . . . . $63,200,000

NEW SECTION.  Sec. 3066   FOR THE DEPARTMENT OF ECOLOGY
     Water Irrigation Efficiencies (30000285)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,000,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,000,000
          Subtotal Appropriation . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3067   FOR THE DEPARTMENT OF ECOLOGY
     Statewide Stormwater Projects (30000294)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for grants to be awarded on a competitive basis to local governments statewide to meet critical stormwater management needs and protect or restore water quality. Funding must be used for construction projects or design/construction projects that can demonstrate readiness to proceed and a minimum cash match of twenty-five percent.

Appropriation:
     Local Toxics Control Account--State . . . . . . . . . . . . $46,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,000,000

NEW SECTION.  Sec. 3068   FOR THE STATE PARKS AND RECREATION COMMISSION
     Rocky Reach - Chelan County Public Utility District (20061023)

Reappropriation:
     Parks Renewal and Stewardship Account--Private/
          Local . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3069   FOR THE STATE PARKS AND RECREATION COMMISSION
     Hood Canal Wastewater (20061850)

Reappropriation:
     Hood Canal Aquatic Rehabilitation Bond
          Account--State . . . . . . . . . . . . $3,130,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,790,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,920,000

NEW SECTION.  Sec. 3070   FOR THE STATE PARKS AND RECREATION COMMISSION
     Ike Kinswa State Park Improvement (20082950)

Reappropriation:
     Parks Renewal and Stewardship Account--Private/
          Local . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3071   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works: Preservation (30000001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,930,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,930,000

NEW SECTION.  Sec. 3072   FOR THE STATE PARKS AND RECREATION COMMISSION
     Trail Development (30000003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $592,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $208,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 3073   FOR THE STATE PARKS AND RECREATION COMMISSION
     Puget Sound Initiative (30000050)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,400,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3074   FOR THE STATE PARKS AND RECREATION COMMISSION
     Twanoh State Park: Storm Water Improvements (30000054)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $226,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $250,000

NEW SECTION.  Sec. 3075   FOR THE STATE PARKS AND RECREATION COMMISSION
     Dash Point State Park: Sanitary Sewer Collection System (30000269)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,327,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $920,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,247,000

NEW SECTION.  Sec. 3076   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fort Worden State Park: Housing Areas Exterior Improvements (30000433)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $339,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $407,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $746,000

NEW SECTION.  Sec. 3077   FOR THE STATE PARKS AND RECREATION COMMISSION
     Illahee State Park: Wastewater Treatment Upgrade (30000447)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $704,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $868,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,572,000

NEW SECTION.  Sec. 3078   FOR THE STATE PARKS AND RECREATION COMMISSION
     Deception Pass State Park: Wastewater System (30000483)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $262,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $38,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

NEW SECTION.  Sec. 3079   FOR THE STATE PARKS AND RECREATION COMMISSION
     Clean Vessel Boating Pumpout Grants (30000665)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
          TOTAL . . . . . . . . . . . . $15,300,000

NEW SECTION.  Sec. 3080   FOR THE STATE PARKS AND RECREATION COMMISSION
     Parkland Account Authority (91000016)

     The appropriation in this section is subject to the following conditions and limitations: The state parks and recreation commission shall provide lists of potential purchases and sales to the office of financial management and the appropriate policy and fiscal committees of the legislature prior to committing the state parks and recreation commission to any sale or purchase of land or buildings and prior to any allotments made for those purchases. The list shall include any potential operating or capital cost impacts known to the state parks and recreation commission.

Appropriation:
     Parkland Acquisition Account--State . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3081   FOR THE STATE PARKS AND RECREATION COMMISSION
     Deception Pass State Park: Sewer and Storm Water Improvements (30000059)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,232,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $911,000
          TOTAL . . . . . . . . . . . . $2,143,000

NEW SECTION.  Sec. 3082   FOR THE STATE PARKS AND RECREATION COMMISSION
     Fish Barrier Removal (30000540)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $619,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $619,000
          Subtotal Appropriation . . . . . . . . . . . . $1,238,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,940,000
          TOTAL . . . . . . . . . . . . $10,178,000

NEW SECTION.  Sec. 3083   FOR THE STATE PARKS AND RECREATION COMMISSION
     Iron Horse Tunnel Hazard Repair (30000552)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,896,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,896,000

NEW SECTION.  Sec. 3084   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works: Health and Safety (30000667)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,500,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,500,000
          Subtotal Appropriation . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,866,000
          TOTAL . . . . . . . . . . . . $6,866,000

NEW SECTION.  Sec. 3085   FOR THE STATE PARKS AND RECREATION COMMISSION
     Bay View Park Wide Wastewater Treatment System (20082041)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $937,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,187,000

NEW SECTION.  Sec. 3086   FOR THE STATE PARKS AND RECREATION COMMISSION
     Minor Works: Facilities and Infrastructure Preservation (30000766)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,500,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,500,000
          Subtotal Appropriation . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,421,000
          TOTAL . . . . . . . . . . . . $13,421,000

NEW SECTION.  Sec. 3087   FOR THE STATE PARKS AND RECREATION COMMISSION
     Federal Grant Authority (30000768)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $3,750,000

NEW SECTION.  Sec. 3088   FOR THE STATE PARKS AND RECREATION COMMISSION
     Local Grant Authority (30000769)

Appropriation:
     Parks Renewal and Stewardship Account--Private/
          Local . . . . . . . . . . . . $750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . $3,750,000

NEW SECTION.  Sec. 3089   FOR THE STATE PARKS AND RECREATION COMMISSION
     Facility and Infrastructure Backlog Reduction (30000770)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,750,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,750,000
          Subtotal Appropriation . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,000,000
          TOTAL . . . . . . . . . . . . $9,500,000

NEW SECTION.  Sec. 3090   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (19982003)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 158, chapter 371, Laws of 2006.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $396,000
     Habitat Conservation Account--State . . . . . . . . . . . . $487,000
          Subtotal Reappropriation . . . . . . . . . . . . $883,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $76,718,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $77,601,000

NEW SECTION.  Sec. 3091   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (20044001)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $6,892,000
     State Building Construction Account--State . . . . . . . . . . . . $920,000
          Subtotal Reappropriation . . . . . . . . . . . . $7,812,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $38,563,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $46,375,000

NEW SECTION.  Sec. 3092   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (20044002)

     The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriation that is not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $889,000
     Habitat Conservation Account--State . . . . . . . . . . . . $1,062,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,951,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $42,579,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $44,530,000

NEW SECTION.  Sec. 3093   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Youth Athletic Fields (20062952)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 172, chapter 371, Laws of 2006.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $621,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,879,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 3094   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (20064001)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 403, chapter 488, Laws of 2005.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $11,045,000
     State Building Construction Account--State . . . . . . . . . . . . $2,585,000
          Subtotal Reappropriation . . . . . . . . . . . . $13,630,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $48,370,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $62,000,000

NEW SECTION.  Sec. 3095   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife and Recreation Program (20064002)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 404, chapter 488, Laws of 2005.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $1,884,000
     Habitat Conservation Account--State . . . . . . . . . . . . $4,225,000
          Subtotal Reappropriation . . . . . . . . . . . . $6,109,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $43,891,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 3096   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (20064003)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $377,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,894,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,271,000

NEW SECTION.  Sec. 3097   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Activities Program (20064004)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 170, chapter 371, Laws of 2006.

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $986,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,593,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,579,000

NEW SECTION.  Sec. 3098   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest and Fish Passage Program (20082001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) This reappropriation is provided solely for the salmon recovery funding board in consultation with the small forest landowner office of the department of natural resources and the department of fish and wildlife to provide grants to correct fish passage blockages on nonindustrial forest lands. Selection of projects must be coordinated with the other salmon recovery grant programs.
     (2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the committee shall file quarterly project progress reports with the office of financial management.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $841,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,159,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,000,000

NEW SECTION.  Sec. 3099   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (20084001)

Reappropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $2,620,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,401,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,021,000

NEW SECTION.  Sec. 3100   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (20084003)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $284,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $188,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $472,000

NEW SECTION.  Sec. 3101   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Restoration and Acquisition (20084004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,443,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $30,307,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $40,750,000

NEW SECTION.  Sec. 3102   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (20084005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,416,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,609,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,025,000

NEW SECTION.  Sec. 3103   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Activities Program (20084008)

Reappropriation:
     NOVA Program Account--State . . . . . . . . . . . . $3,534,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,502,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,036,000

NEW SECTION.  Sec. 3104   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (20084011)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriations are provided solely for the approved list of projects in LEAP capital document No. 2007-3 as developed on March 17, 2007, and LEAP capital document No. 2008-1 as developed on February 13, 2008.
     (2) If additional funds are available after funding the farmlands preservation account projects approved in subsection (1) of this section, the board may: Provide one-time grants of up to $25,000 each to counties requesting assistance in developing farmlands preservation strategies for the purpose of seeking grants from the farmlands preservation account in future grant cycles.
     (3) Funds reappropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to local government projects and sixty percent to state agency projects. If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.
     (4) Up to $627,299 of the reappropriation from the riparian protection account is for the Chehalis river surge plain natural area preserve. This amount may not be expended for the project until the department of natural resources has completed a management plan for the preserve that maintains recreational access and that management plan is presented to the house of representatives capital budget and senate ways and means committees.

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $10,665,000
     Farmlands Preservation Account--State . . . . . . . . . . . . $2,367,000
     Riparian Protection Account--State . . . . . . . . . . . . $4,262,000
     Habitat Conservation Account--State . . . . . . . . . . . . $13,821,000
          Subtotal Reappropriation . . . . . . . . . . . . $31,115,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $67,377,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $98,492,000

NEW SECTION.  Sec. 3105   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (20084851)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $11,591,000
     State Building Construction Account--State . . . . . . . . . . . . $3,813,000
          Subtotal Reappropriation . . . . . . . . . . . . $15,404,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $44,596,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $60,000,000

NEW SECTION.  Sec. 3106   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (30000002)

Reappropriation:
     Outdoor Recreation Account--State . . . . . . . . . . . . $13,785,000
     Farmlands Preservation Account--State . . . . . . . . . . . . $4,357,000
     Riparian Protection Account--State . . . . . . . . . . . . $7,060,000
     Habitat Conservation Account--State . . . . . . . . . . . . $19,542,000
          Subtotal Reappropriation . . . . . . . . . . . . $44,744,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,701,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $69,445,000

NEW SECTION.  Sec. 3107   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (30000003)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $52,015,000
     State Building Construction Account--State . . . . . . . . . . . . $5,760,000
          Subtotal Reappropriation . . . . . . . . . . . . $57,775,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,225,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $70,000,000

NEW SECTION.  Sec. 3108   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation Fund (30000005)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,877,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $123,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3109   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (30000007)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for the list of projects in LEAP capital document No. 2009-3, developed March 9, 2009.

Reappropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $1,000,000
     State Building Construction Account--State . . . . . . . . . . . . $1,138,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,138,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,887,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,025,000

NEW SECTION.  Sec. 3110   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (30000009)

Reappropriation:
     Firearms Range Account--State . . . . . . . . . . . . $419,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $76,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $495,000

NEW SECTION.  Sec. 3111   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Improvement Grants (30000010)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $948,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $52,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3112   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     National Recreational Trails Program (30000012)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,045,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $955,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 3113   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Acquisition and Restoration (30000080)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $23,421,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,579,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $33,000,000

NEW SECTION.  Sec. 3114   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Estuary and Salmon Restoration Program (30000081)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,095,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,905,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $7,000,000

NEW SECTION.  Sec. 3115   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Salmon Recovery Funding Board Programs (30000140)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $60,000,000
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $10,000,000
     Salmon Recovery Account--State . . . . . . . . . . . . $62,000
          Subtotal Appropriation . . . . . . . . . . . . $70,062,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $280,248,000
          TOTAL . . . . . . . . . . . . $350,310,000

NEW SECTION.  Sec. 3116   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Land and Water Conservation Fund (30000142)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $4,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,000,000
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3117   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Firearms and Archery Range Recreation (30000144)

Appropriation:
     Firearms Range Account--State . . . . . . . . . . . . $365,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,412,000
          TOTAL . . . . . . . . . . . . $1,777,000

NEW SECTION.  Sec. 3118   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Improvement Grants (30000145)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $2,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $10,100,000

NEW SECTION.  Sec. 3119   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Boating Facilities Program (30000138)

Appropriation:
     Recreation Resources Account--State . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $40,000,000

NEW SECTION.  Sec. 3120   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Nonhighway and Off-Road Vehicle Activities Program (30000141)

     The appropriation in this section is subject to the following conditions and limitations: The board shall work with its existing stakeholder groups to suggest priorities and procedures for the use of any funds diverted during the 2009-2011 biennium which in future years might be restored to the program. Established allocations among recreation users shall be respected. Special consideration shall be given to funding of the Reiter Foothills Forest Recreation Motorized Trail system, recreation projects of statewide significance, or recreation projects that would enhance destination facilities.

Appropriation:
     NOVA Program Account--State . . . . . . . . . . . . $5,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $22,000,000
          TOTAL . . . . . . . . . . . . $27,500,000

NEW SECTION.  Sec. 3121   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Recreational Trails Program (30000146)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 3122   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Estuary and Salmon Restoration Program (30000148)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation shall not be expended on the acquisition of lands by state agencies.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,000,000

NEW SECTION.  Sec. 3123   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest Fish Passage Program (91000001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,145,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,855,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 3124   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Puget Sound Restoration (30000147)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation shall not be expended on the acquisition of lands by state agencies.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $13,000,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,000,000
          Subtotal Appropriation . . . . . . . . . . . . $15,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $60,000,000
          TOTAL . . . . . . . . . . . . $75,000,000

NEW SECTION.  Sec. 3125   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Family Forest Fish Passage Program (30000203)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $15,000,000
     State Building Construction
          Account--State (FY 2012) . . . . . . . . . . . . $2,000,000
          Subtotal Appropriation . . . . . . . . . . . . $17,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $34,000,000
          TOTAL . . . . . . . . . . . . $51,000,000

NEW SECTION.  Sec. 3126   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (30000139)

     The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely for the list of projects in LEAP capital document No. 2011-2A, developed March 22, 2011.

Appropriation:
     Riparian Protection Account--State (FY 2012) . . . . . . . . . . . . $2,000,000
     Riparian Protection Account--State (FY 2013) . . . . . . . . . . . . $2,000,000
     Habitat Conservation Account--State (FY 2012) . . . . . . . . . . . . $10,500,000
     Habitat Conservation Account--State (FY 2013) . . . . . . . . . . . . $10,500,000
     Outdoor Recreation Account--State (FY 2012) . . . . . . . . . . . . $10,500,000
     Outdoor Recreation Account--State (FY 2013) . . . . . . . . . . . . $10,500,000
     Farmlands Preservation Account--State (FY 2012) . . . . . . . . . . . . $2,000,000
     Farmlands Preservation Account--State (FY 2013) . . . . . . . . . . . . $2,000,000
          Subtotal Appropriation . . . . . . . . . . . . $50,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $50,000,000

NEW SECTION.  Sec. 3127   FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Aquatic Lands Enhancement Account (30000143)

     The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely for the list of projects in LEAP capital document No. 2011-3B, developed April 6, 2011.

Appropriation:
     Aquatic Lands Enhancement Account--State . . . . . . . . . . . . $6,806,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,806,000

NEW SECTION.  Sec. 3128   FOR THE STATE CONSERVATION COMMISSION
     Flood Assistance for Farm Communities (20084850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $385,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,115,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3129   FOR THE STATE CONSERVATION COMMISSION
     Livestock Nutrient Program (30000001)

Reappropriation:
     State Taxable Building Construction Account--State . . . . . . . . . . . . $780,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,220,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3130   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program (30000003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $897,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $103,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,600,000
          TOTAL . . . . . . . . . . . . $2,600,000

NEW SECTION.  Sec. 3131   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program - Practice Incentive Payment Loan Program (30000005)

Reappropriation:
     Conservation Assistance Revolving Account--State . . . . . . . . . . . . $259,000
Appropriation:
     Conservation Assistance Revolving Account--State . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $141,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $600,000
          TOTAL . . . . . . . . . . . . $1,150,000

NEW SECTION.  Sec. 3132   FOR THE STATE CONSERVATION COMMISSION
     Livestock Nutrient Program (91000002)

Appropriation:
     State Taxable Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $700,000
     State Taxable Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,157,000
          Subtotal Appropriation . . . . . . . . . . . . $1,857,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,857,000

NEW SECTION.  Sec. 3133   FOR THE STATE CONSERVATION COMMISSION
     Conservation Reserve Enhancement Program (91000003)

Appropriation:
     State Building Construction Account--State (FY 2012) . . . . . . . . . . . . $300,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,700,000
          Subtotal Appropriation . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3134   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Puget Sound Initiative - Nearshore Salmon Restoration (20062001)

     The reappropriation in this section is subject to the following conditions and limitations: $495,000 of the state building construction account--state reappropriation is provided solely to complete project design, permitting, bid plans and specifications, and preconstruction monitoring for removal or modification of the Seahurst Park North Seawall.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $145,000
     State Building Construction Account--State . . . . . . . . . . . . $2,132,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,277,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,586,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $14,863,000

NEW SECTION.  Sec. 3135   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Voights Creek Hatchery (20081003)

     The appropriation in this section is subject to the following conditions and limitations: The appropriations in this section are provided solely for property acquisition, design, and permitting. If the department does not acquire property, the amounts provided in this section shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $115,000
Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,182,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,000,000
          TOTAL . . . . . . . . . . . . $15,297,000

NEW SECTION.  Sec. 3136   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Issaquah Hatchery Gravity Intake (20081850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $539,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $23,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $562,000

NEW SECTION.  Sec. 3137   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Stemilt Basin Acquisition (20082029)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $200,000

NEW SECTION.  Sec. 3138   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Facility Preservation (30000149)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $276,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $144,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $420,000

NEW SECTION.  Sec. 3139   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Facility Preservation (30000300)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,279,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,278,000
          Subtotal Appropriation . . . . . . . . . . . . $2,557,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,500,000
          TOTAL . . . . . . . . . . . . $5,057,000

NEW SECTION.  Sec. 3140   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Migratory Waterfowl Habitat (20082045)

Reappropriation:
     State Wildlife Account--State . . . . . . . . . . . . $745,000
Appropriation:
     State Wildlife Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $505,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,400,000
          TOTAL . . . . . . . . . . . . $4,250,000

NEW SECTION.  Sec. 3141   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Road Maintenance and Abandonment Plan (30000022)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $234,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $716,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $950,000

NEW SECTION.  Sec. 3142   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Access Areas Preservation (30000086)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $388,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $20,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $408,000

NEW SECTION.  Sec. 3143   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Skamania Hatchery Intake Replacement (30000088)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $3,829,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $324,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,653,000

NEW SECTION.  Sec. 3144   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Carpenter Creek Estuary Restoration (92000023)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,784,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,784,000

NEW SECTION.  Sec. 3145   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Health, Safety, and Code Requirements (30000135)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $384,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $616,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3146   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Leque Island Highway 532 Road Protection (92000019)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $600,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $80,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $680,000

NEW SECTION.  Sec. 3147   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Dam and Dike (30000145)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $179,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $718,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $897,000

NEW SECTION.  Sec. 3148   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Fish Passage Barrier Corrections (30000173)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $577,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $423,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3149   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Beebe Springs Phase 3 (92000006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $651,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $392,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,043,000

NEW SECTION.  Sec. 3150   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Road Maintenance and Abandonment Plan (30000295)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $913,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $913,000
          Subtotal Appropriation . . . . . . . . . . . . $1,826,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $6,727,000
          TOTAL . . . . . . . . . . . . $8,553,000

NEW SECTION.  Sec. 3151   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Access Areas Preservation (30000296)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $643,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $642,000
          Subtotal Appropriation . . . . . . . . . . . . $1,285,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,300,000
          TOTAL . . . . . . . . . . . . $6,585,000

NEW SECTION.  Sec. 3152   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Dam and Dike (30000297)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $522,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $521,000
          Subtotal Appropriation . . . . . . . . . . . . $1,043,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,000,000
          TOTAL . . . . . . . . . . . . $3,043,000

NEW SECTION.  Sec. 3153   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Puget Sound General Investigation for Nearshore Restoration (92000025)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,023,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,030,000

NEW SECTION.  Sec. 3154   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Mitigation Projects and Dedicated Funding (20082048)

     The reappropriations in this section are subject to the following conditions and limitations: The reappropriations in this section are provided contingent upon the department providing advance notice to the appropriate fiscal committees of the legislature and the office of financial management before applying for federal grants for acquisition of fish and wildlife habitat lands. The department shall submit this information in the form of a report that explains the funding source, the match and use requirements, a description of the project that will be funded, and a description of future impacts to the operating budget.

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $25,411,000
     General Fund--Private/Local . . . . . . . . . . . . $4,802,000
     Special Wildlife Account--Federal . . . . . . . . . . . . $1,533,000
     Special Wildlife Account--Private/Local . . . . . . . . . . . . $1,209,000
          Subtotal Reappropriation . . . . . . . . . . . . $32,955,000

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $30,600,000
     General Fund--Private/Local . . . . . . . . . . . . $2,500,000
     State Wildlife Account--State . . . . . . . . . . . . $500,000
     Special Wildlife Account--Federal . . . . . . . . . . . . $800,000
     Special Wildlife Account--Private/Local . . . . . . . . . . . . $1,450,000
          Subtotal Appropriation . . . . . . . . . . . . $35,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $30,170,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $121,000,000
          TOTAL . . . . . . . . . . . . $219,975,000

NEW SECTION.  Sec. 3155   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Cherry Valley Fish Passage and Stream Restoration (30000105)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,451,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,451,000

NEW SECTION.  Sec. 3156   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Health, Safety, and Code Requirements (30000284)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,241,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,500,000
          TOTAL . . . . . . . . . . . . $5,741,000

NEW SECTION.  Sec. 3157   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Infrastructure Preservation (30000298)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,265,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,265,000
          Subtotal Appropriation . . . . . . . . . . . . $2,530,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,600,000
          TOTAL . . . . . . . . . . . . $7,130,000

NEW SECTION.  Sec. 3158   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Fish Passage Barrier Corrections (30000372)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $640,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $640,000
          Subtotal Appropriation . . . . . . . . . . . . $1,280,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,280,000

NEW SECTION.  Sec. 3159   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Programmatic (30000301)

Appropriation:
     State Building Construction Account--State (FY 2012) . . . . . . . . . . . . $150,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $150,000

NEW SECTION.  Sec. 3160   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Soos Creek Hatchery Redevelopment (20081002)

Appropriation:
     State Building Construction Account--State (FY 2013) . . . . . . . . . . . . $1,770,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $11,274,000
          TOTAL . . . . . . . . . . . . $13,044,000

NEW SECTION.  Sec. 3161   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Minor Works: Hatchery Reform and Broodstock Management (30000402)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $810,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $809,000
          Subtotal Appropriation . . . . . . . . . . . . $1,619,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $9,619,000

NEW SECTION.  Sec. 3162   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Mitchell Act Federal Grant (91000021)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 3163   FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Skookumchuck Hatchery Renovation (20082015)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,456,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,656,000

NEW SECTION.  Sec. 3164   FOR THE PUGET SOUND PARTNERSHIP
     Community Partnership Restoration Grants (30000007)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,950,000

NEW SECTION.  Sec. 3165   FOR THE PUGET SOUND PARTNERSHIP
     Community Partnership Restoration Grants (30000008)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 3166   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Acquisition Grants (20052021)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $47,882,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,636,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,000,000
          TOTAL . . . . . . . . . . . . $112,518,000

NEW SECTION.  Sec. 3167   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Marine Station (20081015)

Reappropriation:
     Resources Management Cost Account--State . . . . . . . . . . . . $524,000
     State Building Construction Account--State . . . . . . . . . . . . $537,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,061,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $439,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3168   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Legacy (30000060)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $6,524,000
Appropriation:
     General Fund--Federal . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,476,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $34,000,000

NEW SECTION.  Sec. 3169   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Hazardous Fuels Reduction, Forest Health, and Ecosystem Improvement (91000001)

Reappropriation:
     General Fund--Federal Stimulus . . . . . . . . . . . . $18,994,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,006,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 3170   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Elk River Estuarine Lands Acquisition (91000007)

Reappropriation:
     General Fund--Federal . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3171   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Forest Riparian Easement Program (30000198)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 3172   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Minor Works: Preservation (30000202)

Appropriation:
     Forest Development Account--State . . . . . . . . . . . . $446,000
     Resources Management Cost Account--State . . . . . . . . . . . . $474,000
          Subtotal Appropriation . . . . . . . . . . . . $920,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,680,000
          TOTAL . . . . . . . . . . . . $4,600,000

NEW SECTION.  Sec. 3173   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Land Bank (30000205)

Appropriation:
     Resources Management Cost Account--State . . . . . . . . . . . . $25,000,000
     Natural Resources Real Property
          Replacement Account--State . . . . . . . . . . . . $50,000,000
     Community and Technical College Forest
          Reserve Account--State . . . . . . . . . . . . $500,000
          Subtotal Appropriation . . . . . . . . . . . . $75,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $302,000,000
          TOTAL . . . . . . . . . . . . $377,500,000

NEW SECTION.  Sec. 3174   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Fire Hazard Reductions (30000201)

     The appropriation in this section is subject to the following conditions and limitations: The appropriations in this section are provided solely for forest improvement treatments on state trust lands in eastern Washington.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,000,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,000,000
          Subtotal Appropriation . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 3175   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Avoiding Forest Conversion (30000204)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $6,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $6,750,000

NEW SECTION.  Sec. 3176   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Road Maintenance and Abandonment Plans (RMAP) (30000206)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,892,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $1,892,000
          Subtotal Appropriation . . . . . . . . . . . . $3,784,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,784,000

NEW SECTION.  Sec. 3177   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Sustainable Recreation (30000207)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $750,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $750,000
          Subtotal Appropriation . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3178   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Areas Facilities Preservation and Access (30000208)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $750,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $750,000
          Subtotal Appropriation . . . . . . . . . . . . $1,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,500,000

NEW SECTION.  Sec. 3179   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Trust Land Transfer (30000200)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The total appropriation is provided solely to the department to transfer from trust status, or enter into fifty year leases for, certain trust lands of statewide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes. The approved list of properties for lease or transfer is identified in the LEAP capital document No. 2011-4A, developed March 22, 2011.
     (2) Property transferred under this section must be appraised and transferred at fair market value. No later than September 30, 2011, the department must deposit in the common school construction account the portion of the appropriation in this section that represents the estimated value of the timber on the transferred properties. This transfer must be made in the same manner as timber revenues from other common school trust lands. No deduction may be made for the resource management cost account under RCW 79.64.040. The portion of the appropriation in this section that represents the value of the land transferred must be deposited in the natural resources real property replacement account.
     (3) Property subject to lease agreements under this section must be appraised at fair market value. Lease terms must be fifty years with options to renew for an additional fifty years. Lease payments must be lump sum payments for the entire term of the lease at the beginning of the lease. The department shall calculate such lump sum payments using professional appraisal standards. These lease payments may not exceed the fee simple purchase price based on current fair market value and must be deposited by the department to the common school construction account in the same manner as lease revenues from other common school trust lands. No deduction may be made for the resource management cost account under RCW 79.64.040. No later than September 30, 2011, the department must transfer to the common school construction account the portion of the appropriation in this section that is attributable to receipts from lease payments.
     (4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of the appropriations. Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs and shall not exceed one and nine-tenths percent of the appropriation.
     (5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.
     (6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section. Transfer and lease agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose. Transfer and lease agreements may include provisions for receiving agencies to request alternative uses of the property, provided the alternative uses are compatible with the original intended public purpose and the department and legislature approves such uses.
     (7) The department and receiving agencies shall work in good faith to carry out the intent of this section. However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.
     (8) $71,000,000 of the appropriation must be deposited in the common school construction account by September 30, 2011. The department shall execute trust land transfers so that after the deduction of reasonable costs as provided in subsection (4) of this section on an aggregate basis eighty percent of the total value of transferred property is timber value or lease payments and is deposited in the common school construction account. To achieve the eighty percent requirement, the department may choose to lease properties originally intended as transfers or transfer properties originally intended as leases.
     (9) By June 30, 2013, the state treasurer shall transfer to the common school construction account any unexpended balance of the appropriation in this section.
     (10) $500,000 of the appropriation is provided solely for the department to process the fee transfer of properties leased to the department of fish and wildlife through the trust land transfer program during the current or previous biennium.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $85,540,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $85,540,000

NEW SECTION.  Sec. 3180   FOR THE DEPARTMENT OF NATURAL RESOURCES
     Replacing State Forest Lands with Productive Forests (91000029)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The total appropriation is provided solely to the department to transfer from state forest land status to natural resources conservation area status certain state forest lands in counties with a population of 25,000 or less which are subject to timber harvest deferrals greater than thirty years due to the presence of wildlife species listed as endangered or threatened under the federal endangered species act. The approved list of properties for transfer is identified in the LEAP capital document No. 2011-5A, developed March 24, 2011.
     (2) Property transferred under this section must be appraised and transferred at fair market value, without consideration of management or regulatory encumbrances associated with wildlife species listed under the federal endangered species act. The value of the timber and other valuable materials transferred must be distributed as provided in RCW 79.64.110, in the same manner as valuable material revenues from other state forest lands in the applicable counties. The value of the land transferred must be deposited in the park land trust revolving account and be solely used to buy replacement state forest land within the same county as the property transferred, consistent with RCW 79.22.060.
     (3) Prior to or concurrent with conveyance of these properties, the department shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section. Transfer agreements for properties identified in subsection (1) of this section must include terms that restrict the use of the property to the intended purpose.
     (4) The department and applicable counties shall work in good faith to carry out the intent of this section. However, the department or applicable counties may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the state forest trust or the natural resources conservation area program.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

(End of part)


PART 4
TRANSPORTATION

NEW SECTION.  Sec. 4001   FOR THE WASHINGTON STATE PATROL
     Minor Works: Preservation (30000050)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $315,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,100,000
          TOTAL . . . . . . . . . . . . $2,415,000

NEW SECTION.  Sec. 4002   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy Stormwater Remediation (30000030)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $350,000

NEW SECTION.  Sec. 4003   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy Burn Building (91000003)

Appropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $100,000

NEW SECTION.  Sec. 4004   FOR THE WASHINGTON STATE PATROL
     Fire Training Academy Burn Building Repairs (91000002)

Reappropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

(End of part)


PART 5
EDUCATION

NEW SECTION.  Sec. 5001   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2007-09 School Construction Assistance Grant Program (20084200)
     
     The reappropriation in this section is subject to the following conditions and limitations: For school construction projects funded through the school construction assistance grant program, the superintendent of public instruction shall require mapping the design of new facilities and remapping the design of facilities to be remodeled.

Reappropriation:
     Common School Construction Account--State . . . . . . . . . . . . $58,711,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $733,048,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $791,759,000

NEW SECTION.  Sec. 5002   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Northeast King County Skills Center (20084855)

Reappropriation:
     School Construction and Skill Centers Building
          Account--State . . . . . . . . . . . . $3,343,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,259,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,602,000

NEW SECTION.  Sec. 5003   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Vocational Skills Centers (20084300)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,187,000
     School Construction and Skills Centers Building
          Account--State . . . . . . . . . . . . $119,000
          Subtotal Reappropriation . . . . . . . . . . . . $3,306,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $67,401,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $70,707,000

NEW SECTION.  Sec. 5004   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Pierce County Skills Center (20084856)

Reappropriation:
     School Construction and Skill Centers Building
          Account--State . . . . . . . . . . . . $2,087,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $7,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,949,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,772,000
          TOTAL . . . . . . . . . . . . $29,908,000

NEW SECTION.  Sec. 5005   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2009-11 School Construction Assistance Grant Program (30000031)

     The reappropriations in this section are subject to the following conditions and limitations: Up to $14,000,000 of the state building construction account--state reappropriation in this section is for the Grand Coulee Dam school district school project, contingent on the availability of sufficient contributions from federal, local, or private sources to make up the remainder of the total cost of the project. The Grand Coulee Dam school district is faced with a unique set of local funding barriers and federal funds may substitute as the usual requirement for school district participation. In the event sufficient matching contributions are not secured by the Grand Coulee Dam school district, these funds shall lapse.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $129,681,000
     Common School Construction Account--State . . . . . . . . . . . . $200,508,000
     Common School Construction Account--Federal . . . . . . . . . . . . $1,391,000
     School Construction and Skill Centers Building
          Account--Bond--State . . . . . . . . . . . . $40,885,000
          Subtotal Reappropriation . . . . . . . . . . . . $372,465,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $145,489,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $517,954,000

NEW SECTION.  Sec. 5006   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Energy Efficiency and Small Repair Grants (91000007)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 5007, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $52,844,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $17,045,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $69,889,000

NEW SECTION.  Sec. 5007   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     2011-13 School Construction Assistance Program (30000071)

     The appropriations in this section are subject to the following conditions and limitations:
     (1) $1,337,000 of the common school construction account--state appropriation is provided solely for study and survey grants and for completing inventory and building condition assessments for all public school districts once every six years.
     (2) In calculating square foot eligibility for state assistance grants, kindergarten student headcount shall not be reduced by fifty percent.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $202,878,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $186,853,000
     Common School Construction Account--State . . . . . . . . . . . . $328,189,000
     Common School Construction Account--Federal . . . . . . . . . . . . $600,000
          Subtotal Appropriation . . . . . . . . . . . . $718,520,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,933,346,000
          TOTAL . . . . . . . . . . . . $3,651,866,000

NEW SECTION.  Sec. 5008   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Urgent Repair Grant Program (91000014)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for nonrecurring costs associated with school facility repairs and renovations necessary for unforeseen health and safety needs.
     (2) The office of the superintendent of public instruction, after consulting with maintenance and operations administrators of school districts, shall develop criteria for providing funding for specific projects to stay within the appropriation level provided in this section. The criteria must include, but are not limited to, the following: (a) Limiting district applications to one hundred thousand dollars; (b) limiting districts eligible to receive the grant to only once every other biennium; and (c) requiring any district receiving funding provided in this section to demonstrate a consistent commitment to addressing school facilities needs.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $5,000,000

NEW SECTION.  Sec. 5009   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Capital Program Administration (30000095)

Appropriation:
     Common School Construction Account--State . . . . . . . . . . . . $3,851,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,111,000
          TOTAL . . . . . . . . . . . . $19,962,000

NEW SECTION.  Sec. 5010   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Skills Centers Minor Works-Facility Preservation (30000079)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,865,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,865,000
          Subtotal Appropriation . . . . . . . . . . . . $5,730,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,000,000
          TOTAL . . . . . . . . . . . . $25,730,000

NEW SECTION.  Sec. 5011   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Yakima Valley Technical Skills Center (30000076)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $28,461,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,461,000

NEW SECTION.  Sec. 5012   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Grant County Branch Campus of Wenatchee Valley Skills Center (30000091)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $18,843,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,430,000
          TOTAL . . . . . . . . . . . . $27,273,000

NEW SECTION.  Sec. 5013   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Energy Operational Savings Project Grants (30000097)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for energy operational cost savings improvements to school facilities.
     (2) Grants shall be awarded for projects using the energy savings performance contracting method under chapter 39.35C RCW or an equivalent method of evaluating and delivering energy operational costs savings improvements. Projects that do not use energy savings performance contracting must: (a) Verify energy and operational cost savings for ten years or until the energy and operational costs savings pay for the project, whichever is shorter; (b) follow the department of general administration's energy savings performance contracting method guidelines; and (c) employ a licensed engineer for the energy audit, design, and construction. The office of the superintendent of public instruction may require third-party verification of savings if a project is not implemented by an energy savings performance contracting method as outlined in chapter 39.35C RCW. If required, third-party verification must be conducted either by an energy savings performance contractor qualified by the department of general administration, or a licensed engineer that is a certified energy manager.
     (3) Projects must be weighted and prioritized based on the following criteria and in the following order:
     (a) Prior grant award: Priority consideration shall be given to applicants that did not receive grant awards from appropriations provided in sections 1016 and 5007, chapter 36, Laws of 2010 1st sp. sess.;
     (b) Leverage ratio: The higher the leverage ratio of guaranteed energy savings and utility or other incentives to state grant, the higher the project ranking;
     (c) Energy savings: The higher the simple payback for energy savings, not to exceed the useful life of the energy conservation measure, the higher the project ranking; and
     (d) Persistence: The more extensively a project ensures the persistence of energy operational cost savings through ongoing measurement, verification, and reporting over the life of a project, the higher the project ranking.
     (4) In order to be eligible for energy cost savings grants under this section, school districts must complete an investment grade audit prior to application, or have completed an audit in the 2009-2011 biennium.
     (5)(a) The superintendent of public instruction must use bond proceeds to pay one-half of the preliminary audit, up to five cents per square foot, if the project does not meet the school district's predetermined cost-effectiveness criteria. Public school districts must pay the other one-half of the cost of the preliminary audit if the project does not meet their predetermined cost-effectiveness criteria.
     (b) The energy savings performance contractor shall not charge for an investment grade audit if the project does not meet the school district's predetermined cost-effectiveness criteria. Public school districts must pay the full price of an investment grade audit if they do not proceed with a project that meets the school district's predetermined cost-effectiveness criteria.
     (6) Applicants must submit documentation that demonstrates energy and operational cost savings resulting from the installation of the energy equipment and improvements. The energy savings analysis shall be performed by a licensed engineer, and the documentation must include, but is not limited to, the following:
     (i) A description of the energy equipment and improvements; and
     (ii) A description of the energy and operational cost savings.
     (7) Each school district is limited to one grant award and no more than $1,000,000.
     (8) The office of the superintendent of public instruction may charge projects administrative fees.
     (9) The superintendent of public instruction must report to the appropriate committees of the legislature and the office of financial management on the timing and use of the funds by the end of each fiscal year, until the funds are fully expended.

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $20,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,000,000

NEW SECTION.  Sec. 5014   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Pre-Disaster Mitigation Planning Grant (91000011)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $800,000

NEW SECTION.  Sec. 5015   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Clark County Skills Center (30000093)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,750,000
          TOTAL . . . . . . . . . . . . $14,850,000

NEW SECTION.  Sec. 5016   FOR THE STATE SCHOOL FOR THE BLIND
     Minor Works - Preservation (30000002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $188,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $432,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $620,000

NEW SECTION.  Sec. 5017   FOR THE STATE SCHOOL FOR THE BLIND
     General Campus Preservation (30000018)

Appropriation:
     Charitable, Educational, Penal and Reformatory
          Institutions Account--State . . . . . . . . . . . . $550,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $2,557,000
          TOTAL . . . . . . . . . . . . $3,107,000

NEW SECTION.  Sec. 5018   FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS
     Well Replacement (91000003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $264,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $264,000

NEW SECTION.  Sec. 5019   FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS
     Minor Public Works (30000013)

Appropriation:
     Charitable, Educational, Penal and Reformatory
          Institutions Account--State . . . . . . . . . . . . $536,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,811,000
          TOTAL . . . . . . . . . . . . $4,347,000

NEW SECTION.  Sec. 5020   FOR THE UNIVERSITY OF WASHINGTON
     Odegaard Undergraduate Learning Center (30000370)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,000,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $17,500,000
          Subtotal Appropriation . . . . . . . . . . . . $19,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $19,500,000

NEW SECTION.  Sec. 5021   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Bothell (20082006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,934,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,216,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $77,435,000
          TOTAL . . . . . . . . . . . . $82,585,000

NEW SECTION.  Sec. 5022   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Tacoma-Soils Remediation (20082852)

Reappropriation:
     State Toxics Control Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5023   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington Tacoma-Land Acquisition (20092003)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,575,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $15,000,000
          TOTAL . . . . . . . . . . . . $19,000,000

NEW SECTION.  Sec. 5024   FOR THE UNIVERSITY OF WASHINGTON
     House of Knowledge Longhouse (30000021)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $53,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,700,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $247,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 5025   FOR THE UNIVERSITY OF WASHINGTON
     Safe Campus (30000022)

Reappropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $6,096,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,904,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,000,000

NEW SECTION.  Sec. 5026   FOR THE UNIVERSITY OF WASHINGTON
     Minor Works: Facility Preservation (30000027)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,366,000
     University of Washington Building Account--State . . . . . . . . . . . . $9,596,000
          Subtotal Reappropriation . . . . . . . . . . . . $19,962,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,213,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $34,175,000

NEW SECTION.  Sec. 5027   FOR THE UNIVERSITY OF WASHINGTON
     High Voltage Infrastructure Improvement Project (30000371)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $4,850,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,850,000

NEW SECTION.  Sec. 5028   FOR THE UNIVERSITY OF WASHINGTON
     University of Washington - Minor Capital Repairs (30000372)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $14,381,000
     University of Washington Building Account--State . . . . . . . . . . . . $24,606,000
          Subtotal Appropriation . . . . . . . . . . . . $38,987,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $106,600,000
          TOTAL . . . . . . . . . . . . $145,587,000

NEW SECTION.  Sec. 5029   FOR THE UNIVERSITY OF WASHINGTON
     Preventive Facility Maintenance and Building System Repairs (30000480)

Appropriation:
     University of Washington Building Account--State . . . . . . . . . . . . $25,825,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $103,300,000
          TOTAL . . . . . . . . . . . . $129,125,000

NEW SECTION.  Sec. 5030   FOR THE UNIVERSITY OF WASHINGTON
     Anderson Hall Renovation (20091002)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,050,000
          TOTAL . . . . . . . . . . . . $21,750,000

NEW SECTION.  Sec. 5031   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Vancouver - Applied Technology and Classroom Building (20062950)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $22,685,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,828,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $28,513,000

NEW SECTION.  Sec. 5032   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Spokane - Riverpoint Biomedical and Health Sciences (20162953)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,200,000
Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $35,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,640,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,000,000
          TOTAL . . . . . . . . . . . . $77,840,000

NEW SECTION.  Sec. 5033   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works: Preservation (30000065)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $10,100,000
     Washington State University Building Account--State . . . . . . . . . . . . $687,000
          Subtotal Reappropriation . . . . . . . . . . . . $10,787,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,341,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,128,000

NEW SECTION.  Sec. 5034   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works: Program (30000066)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $6,192,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,335,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $17,527,000

NEW SECTION.  Sec. 5035   FOR THE WASHINGTON STATE UNIVERSITY
     Bridge Replacement (30000499)

Appropriation:
     Washington State University Building
          Account--State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 5036   FOR THE WASHINGTON STATE UNIVERSITY
     Minor Works: Preservation (30000525)

Appropriation:
     Washington State University Building
          Account--State . . . . . . . . . . . . $27,471,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $89,960,000
          TOTAL . . . . . . . . . . . . $117,431,000

NEW SECTION.  Sec. 5037   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Pullman - Agricultural Animal Health Research Facility (30000514)

Appropriation:
     Washington State University Building
          Account--State . . . . . . . . . . . . $250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $23,096,000
          TOTAL . . . . . . . . . . . . $23,346,000

NEW SECTION.  Sec. 5038   FOR THE WASHINGTON STATE UNIVERSITY
     Clean Technology Laboratory (30000069)

Appropriation:
     Washington State University Building Account--
          State . . . . . . . . . . . . $2,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $61,213,000
          TOTAL . . . . . . . . . . . . $63,713,000

NEW SECTION.  Sec. 5039   FOR THE WASHINGTON STATE UNIVERSITY
     Washington State University Pullman - Design Disciplines Facility Renovation (30000516)

Appropriation:
     Washington State University Building Account--
          State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $17,000,000
          TOTAL . . . . . . . . . . . . $18,000,000

NEW SECTION.  Sec. 5040   FOR THE WASHINGTON STATE UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (30000823)

Appropriation:
     Washington State University Building Account--
          State . . . . . . . . . . . . $10,115,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $40,460,000
          TOTAL . . . . . . . . . . . . $50,575,000

NEW SECTION.  Sec. 5041   FOR THE EASTERN WASHINGTON UNIVERSITY
     Patterson Hall Remodel (20062002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $18,978,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $30,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $7,365,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $56,843,000

NEW SECTION.  Sec. 5042   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works: Health, Safety, Code Compliance (30000053)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,283,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,500,000

NEW SECTION.  Sec. 5043   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works: Facility Preservation (30000054)

Reappropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $113,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,887,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

NEW SECTION.  Sec. 5044   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works: Program (30000056)

Reappropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,153,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,153,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,306,000

NEW SECTION.  Sec. 5045   FOR THE EASTERN WASHINGTON UNIVERSITY
     Minor Works: Facility Preservation (30000427)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,900,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $7,050,000
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $5,150,000
          Subtotal Appropriation . . . . . . . . . . . . $14,100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,000,000
          TOTAL . . . . . . . . . . . . $22,100,000

NEW SECTION.  Sec. 5046   FOR THE EASTERN WASHINGTON UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (30000431)

Appropriation:
     Eastern Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,217,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $8,868,000
          TOTAL . . . . . . . . . . . . $11,085,000

NEW SECTION.  Sec. 5047   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Hogue Hall Renovation and Addition (20082003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,098,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $15,144,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $30,242,000

NEW SECTION.  Sec. 5048   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works: Health, Safety, and Code Requirements (30000002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $380,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $130,000
          Subtotal Reappropriation . . . . . . . . . . . . $510,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,140,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,650,000

NEW SECTION.  Sec. 5049   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works: Infrastructure Preservation (30000009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $253,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,100,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,353,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,387,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,740,000

NEW SECTION.  Sec. 5050   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works: Facility Preservation (30000016)

Reappropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,244,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,366,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,610,000

NEW SECTION.  Sec. 5051   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works: Program (30000025)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $477,000
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $8,000
          Subtotal Reappropriation . . . . . . . . . . . . $485,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,696,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,181,000

NEW SECTION.  Sec. 5052   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Science Building (30000045)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $202,000
Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $3,500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $376,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $52,370,000
          TOTAL . . . . . . . . . . . . $56,448,000

NEW SECTION.  Sec. 5053   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Samuelson Communication and Technology Center (30000451)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $5,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $60,000,000
          TOTAL . . . . . . . . . . . . $65,000,000

NEW SECTION.  Sec. 5054   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Minor Works Preservation: Facility Preservation (30000444)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,417,000
     Central Washington University Capital
          Projects Account--State . . . . . . . . . . . . $4,583,000
          Subtotal Appropriation . . . . . . . . . . . . $7,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,000,000
          TOTAL . . . . . . . . . . . . $17,000,000

NEW SECTION.  Sec. 5055   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Combined Utilities (30000448)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $8,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $19,600,000
          TOTAL . . . . . . . . . . . . $27,600,000

NEW SECTION.  Sec. 5056   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Nutrition Science (30000456)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $39,750,000
          TOTAL . . . . . . . . . . . . $40,050,000

NEW SECTION.  Sec. 5057   FOR THE CENTRAL WASHINGTON UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (30000463)

Appropriation:
     Central Washington University Capital Projects
          Account--State . . . . . . . . . . . . $2,422,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $9,688,000
          TOTAL . . . . . . . . . . . . $12,110,000

NEW SECTION.  Sec. 5058   FOR THE EVERGREEN STATE COLLEGE
     Communications Laboratory Building Preservation and Renovation (30000002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,291,000
Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $10,777,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $530,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $12,598,000

NEW SECTION.  Sec. 5059   FOR THE EVERGREEN STATE COLLEGE
     Minor Works Preservation (30000003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,567,000
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $116,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,683,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,842,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,525,000

NEW SECTION.  Sec. 5060   FOR THE EVERGREEN STATE COLLEGE
     Minor Works: Health, Safety, Code Compliance (30000016)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,288,000
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $63,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,351,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,164,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,515,000

NEW SECTION.  Sec. 5061   FOR THE EVERGREEN STATE COLLEGE
     Laboratory and Art Annex Building Renovation (30000026)

Reappropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $1,834,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,015,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,849,000

NEW SECTION.  Sec. 5062   FOR THE EVERGREEN STATE COLLEGE
     Minor Works: Program (30000031)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,043,000
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $13,000
          Subtotal Reappropriation . . . . . . . . . . . . $1,056,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,014,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,070,000

NEW SECTION.  Sec. 5063   FOR THE EVERGREEN STATE COLLEGE
     Minor Works: Infrastructure (30000046)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $398,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $982,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,380,000

NEW SECTION.  Sec. 5064   FOR THE EVERGREEN STATE COLLEGE
     Facilities Preservation (30000051)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $6,935,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $21,940,000
          TOTAL . . . . . . . . . . . . $28,875,000

NEW SECTION.  Sec. 5065   FOR THE EVERGREEN STATE COLLEGE
     Science Center - Lab I, 2nd Floor Renovation (30000116)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $426,000
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $4,524,000
          Subtotal Appropriation . . . . . . . . . . . . $4,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,950,000

NEW SECTION.  Sec. 5066   FOR THE EVERGREEN STATE COLLEGE
     Preventive Facility Maintenance and Building System Repairs (30000502)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $760,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,040,000
          TOTAL . . . . . . . . . . . . $3,800,000

NEW SECTION.  Sec. 5067   FOR THE EVERGREEN STATE COLLEGE
     Lecture Hall Remodel (30000493)

Appropriation:
     The Evergreen State College Capital Projects
          Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $10,540,000
          TOTAL . . . . . . . . . . . . $10,840,000

NEW SECTION.  Sec. 5068   FOR THE WESTERN WASHINGTON UNIVERSITY
     Miller Hall Renovation (20041953)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $19,075,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $32,442,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $51,517,000

NEW SECTION.  Sec. 5069   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works: Health, Safety, and Code Requirements (30000004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $710,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,862,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,572,000

NEW SECTION.  Sec. 5070   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works: Facilities Preservation (30000005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,030,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,881,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,911,000

NEW SECTION.  Sec. 5071   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works: Infrastructure (30000006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $401,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,380,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,781,000

NEW SECTION.  Sec. 5072   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works: Program (30000007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,023,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $638,000
          Subtotal Reappropriation . . . . . . . . . . . . $2,661,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,587,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $8,248,000

NEW SECTION.  Sec. 5073   FOR THE WESTERN WASHINGTON UNIVERSITY
     Network Infrastructure/Switches (30000011)

Reappropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $834,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,782,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,616,000

NEW SECTION.  Sec. 5074   FOR THE WESTERN WASHINGTON UNIVERSITY
     Classroom and Lab Upgrades (30000425)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $3,506,000
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $1,293,000
          Subtotal Appropriation . . . . . . . . . . . . $4,799,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,799,000

NEW SECTION.  Sec. 5075   FOR THE WESTERN WASHINGTON UNIVERSITY
     Fraser Hall Renovation (30000427)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $4,480,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,480,000

NEW SECTION.  Sec. 5076   FOR THE WESTERN WASHINGTON UNIVERSITY
     Minor Works: Facilities Preservation (30000431)

Appropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $8,264,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $16,600,000
          TOTAL . . . . . . . . . . . . $24,864,000

NEW SECTION.  Sec. 5077   FOR THE WESTERN WASHINGTON UNIVERSITY
     North Campus Utility Upgrade (30000426)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $3,529,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,529,000

NEW SECTION.  Sec. 5078   FOR THE WESTERN WASHINGTON UNIVERSITY
     Performing Arts Exterior Renewal (30000428)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $2,877,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,877,000

NEW SECTION.  Sec. 5079   FOR THE WESTERN WASHINGTON UNIVERSITY
     Preventive Facility Maintenance and Building System Repairs (30000510)

Appropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $3,614,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $14,456,000
          TOTAL . . . . . . . . . . . . $18,070,000

NEW SECTION.  Sec. 5080   FOR THE WESTERN WASHINGTON UNIVERSITY
     Academic Services & Performing Arts Facility (30000424)

Appropriation:
     Western Washington University Capital Projects
          Account--State . . . . . . . . . . . . $350,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $53,552,000
          TOTAL . . . . . . . . . . . . $53,902,000

NEW SECTION.  Sec. 5081   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Pacific-Lewis and Clark Station Camp Park Project (2002S001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,368,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,119,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,487,000

NEW SECTION.  Sec. 5082   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Lewis and Clark Trail Interpretive Infrastructure Grant (20024001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $319,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,681,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5083   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Statewide - Washington Heritage Project Grants (20064004)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of section 212, chapter 371, Laws of 2006.
     (2) The reappropriation in this section is subject to the provisions of section 5043, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $964,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,635,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $4,599,000

NEW SECTION.  Sec. 5084   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Grants (20074004)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the project list in section 5137, chapter 520, Laws of 2007.
     (2) The reappropriation in this section is subject to the provisions of section 5044, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,146,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,759,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,905,000

NEW SECTION.  Sec. 5085   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Project Capital Grants (30000011)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation in this section is subject to the provisions of section 5120, chapter 497, Laws of 2009.
     (2) The reappropriation in this section is subject to the provisions of section 5045, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $5,637,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,788,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,425,000

NEW SECTION.  Sec. 5086   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works: Preservation (30000093)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $572,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $830,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,402,000

NEW SECTION.  Sec. 5087   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Vancouver National Historic Reserve West Barracks (91000002)

     The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is subject to the provisions of section 5040, chapter 36, Laws of 2010 1st sp. sess.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,000,000

NEW SECTION.  Sec. 5088   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Building Preservation (30000111)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $400,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $400,000
          Subtotal Appropriation . . . . . . . . . . . . $800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,200,000
          TOTAL . . . . . . . . . . . . $4,000,000

NEW SECTION.  Sec. 5089   FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Washington Heritage Projects (30000117)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of RCW 27.34.330.
     (2) The appropriation is provided solely for the following list of projects:

ProjectAuthorized Amount
Schooner Martha Foundation$118,000
Cascade Land Conservancy$155,000
Port of Chinook$45,000
City of Bellingham$100,000
La Conner Quilt and Textile Museum$25,000
City of Vancouver$610,000
Blue Mountain Heritage Society$30,000
Metro Parks Tacoma$60,000
Si View Metro Park District$25,000
City of Port Townsend$375,000
San Juan County Parks Department$18,000
Seattle Theatre Group$531,000
Jefferson County$300,000
Sound Experience$288,000
Museum of History and Industry$1,000,000
Seattle Department of Transportation$700,000
Historic Seattle PDA$470,000
Town of Wilkeson$75,000
Grays Harbor Historical Seaport$169,000
Maryhill Museum$57,000
Clymer Museum of Art$8,000
Phinney Neighborhood Association$995,000
Foss Waterway Seaport$750,000
Polson Museum$143,000
Broadway Center for Performing Arts$203,000
Northwest Railway Museum$984,000
Center for Wooden Boats$1,000,000
Seattle Art Museum$31,000
City of Des Moines$735,000
  
Total$10,000,000


Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $5,000,000
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $5,000,000
          Subtotal Appropriation . . . . . . . . . . . . $10,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $10,000,000

NEW SECTION.  Sec. 5090   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Museum System Repair and Upgrades/Preservation (20081013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,264,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $593,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,857,000

NEW SECTION.  Sec. 5091   FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
     Minor Works: Facility Preservation (30000014)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $100,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $400,000
          TOTAL . . . . . . . . . . . . $500,000

NEW SECTION.  Sec. 5092   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Water System Replacement (20061501)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $1,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $951,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $1,951,000

NEW SECTION.  Sec. 5093   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     North Seattle Community College: Technology Building Renewal (30000129)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,478,000
Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $23,278,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $606,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,362,000

NEW SECTION.  Sec. 5094   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lake Washington Technical College: Allied Health Building (20062697)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,462,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,343,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $25,805,000

NEW SECTION.  Sec. 5095   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     South Puget Sound Community College: Learning Resource Center (20062698)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,130,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $35,525,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,976,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $39,631,000

NEW SECTION.  Sec. 5096   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Wood Construction Center (20081216)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $15,922,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,387,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,309,000

NEW SECTION.  Sec. 5097   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Business and Humanities Center (20081218)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $8,957,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $22,987,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,944,000

NEW SECTION.  Sec. 5098   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Chemistry and Life Science Building (20081219)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,696,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $18,831,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,527,000

NEW SECTION.  Sec. 5099   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Community College: Technical Education Building (20081220)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $14,095,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,335,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,430,000

NEW SECTION.  Sec. 5100   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Everett Community College: Index Hall Replacement (20081221)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,468,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $37,633,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,489,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $42,590,000

NEW SECTION.  Sec. 5101   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Trades and Industry Building (20081222)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,127,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $718,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $35,810,000
          TOTAL . . . . . . . . . . . . $37,655,000

NEW SECTION.  Sec. 5102   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Skagit Valley College: Academic and Student Services Building (20081224)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $890,000
Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $29,494,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $976,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $31,360,000

NEW SECTION.  Sec. 5103   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College: Health and Science Building (20081225)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $760,000
Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $37,701,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,927,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $42,388,000

NEW SECTION.  Sec. 5104   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Grays Harbor College: Science and Math Building (20081226)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,863,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $705,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $46,270,000
          TOTAL . . . . . . . . . . . . $48,838,000

NEW SECTION.  Sec. 5105   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Pierce College Fort Steilacoom: Cascade Core (20081321)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $4,590,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $8,119,000
          Subtotal Reappropriation . . . . . . . . . . . . $12,709,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,132,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,841,000

NEW SECTION.  Sec. 5106   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Tacoma Community College: Health Careers Center (20082701)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $906,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,160,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $38,819,000
          TOTAL . . . . . . . . . . . . $40,885,000

NEW SECTION.  Sec. 5107   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellevue Community College: Health Science Building (20082702)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,554,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $42,712,000
          TOTAL . . . . . . . . . . . . $45,766,000

NEW SECTION.  Sec. 5108   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bates Technical College: Mohler Communications Technology Center (20082703)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,123,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $805,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $26,657,000
          TOTAL . . . . . . . . . . . . $28,585,000

NEW SECTION.  Sec. 5109   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clark College: Health and Advanced Technologies Building (20082705)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,941,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $633,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $49,186,000
          TOTAL . . . . . . . . . . . . $51,760,000

NEW SECTION.  Sec. 5110   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "A" (30000010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $578,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $3,534,000
          Subtotal Reappropriation . . . . . . . . . . . . $4,112,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,369,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $9,481,000

NEW SECTION.  Sec. 5111   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (30000036)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $1,835,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $875,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,710,000

NEW SECTION.  Sec. 5112   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs "A" (30000048)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $12,058,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $1,359,000
          Subtotal Reappropriation . . . . . . . . . . . . $13,417,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,118,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $18,535,000

NEW SECTION.  Sec. 5113   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works: Program (30000078)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $2,599,000
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $6,690,000
          Subtotal Reappropriation . . . . . . . . . . . . $9,289,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $6,796,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,085,000

NEW SECTION.  Sec. 5114   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: College/City Library (30000113)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,752,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $248,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5115   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College: Fisheries Program (30000117)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5116   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Lower Columbia College: Myklebust Gymnasium (30000118)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5117   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Wenatchee Valley College: Music and Arts Center (30000119)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $1,689,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $311,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5118   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Seattle Central Community College: Seattle Maritime Academy (30000120)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $1,160,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $177,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $17,954,000
          TOTAL . . . . . . . . . . . . $19,291,000

NEW SECTION.  Sec. 5119   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Yakima Valley Community College: Palmer Martin Building (30000121)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $736,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $261,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $24,584,000
          TOTAL . . . . . . . . . . . . $25,581,000

NEW SECTION.  Sec. 5120   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Olympic College: College Instruction Center (30000122)

Appropriation:
     State Building Construction Account--
          State (FY 2013) . . . . . . . . . . . . $3,369,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $48,885,000
          TOTAL . . . . . . . . . . . . $52,254,000

NEW SECTION.  Sec. 5121   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Peninsula College: Fort Worden Building 202 (30000114)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $2,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $2,000,000

NEW SECTION.  Sec. 5122   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Stadium & Athletic Fields (30000116)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $758,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $758,000

NEW SECTION.  Sec. 5123   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Green River Community College: Science Math Technology Building (30000130)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $942,000
Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $21,838,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $373,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $23,153,000

NEW SECTION.  Sec. 5124   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works: Preservation (30000210)

Reappropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $10,937,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,063,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,000,000

NEW SECTION.  Sec. 5125   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Site Repairs "A" (30000504)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $4,245,000
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $800,000
          Subtotal Appropriation . . . . . . . . . . . . $5,045,000


     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $20,180,000
          TOTAL . . . . . . . . . . . . $25,225,000

NEW SECTION.  Sec. 5126   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Facility Repairs "A" (30000505)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $15,829,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $63,316,000
          TOTAL . . . . . . . . . . . . $79,145,000

NEW SECTION.  Sec. 5127   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Roof Repairs "A" (30000434)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $9,125,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $36,500,000
          TOTAL . . . . . . . . . . . . $45,625,000

NEW SECTION.  Sec. 5128   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works Program (30000674)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $20,002,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $20,002,000

NEW SECTION.  Sec. 5129   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Minor Works: Preservation (30000461)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $16,001,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $16,001,000

NEW SECTION.  Sec. 5130   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Preventive Facility Maintenance and Building System Repairs (30000709)

Appropriation:
     Community/Technical College Capital Projects
          Account--State . . . . . . . . . . . . $22,800,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $91,200,000
          TOTAL . . . . . . . . . . . . $114,000,000

NEW SECTION.  Sec. 5131   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls Community College: Campus Classrooms (20062696)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $20,761,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,317,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $22,078,000

NEW SECTION.  Sec. 5132   FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Clover Park Technical College: Allied Health Care Facility (20062699)

Appropriation:
     State Building Construction Account--
          State (FY 2012) . . . . . . . . . . . . $24,360,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,748,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $26,108,000

(End of part)


PART 6
2011 SUPPLEMENTAL CAPITAL BUDGET

Sec. 6001   2009 c 497 s 1050 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     Temporary Public Works Grant Program (92000021)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for grants for the specified public works projects and competitive public works grant programs specified below. The public works board (board) shall administer the following competitive public works grant programs within the amounts specified, provided that up to ten percent of the amounts provided for competitive grant programs may be transferred to other competitive grant categories if acceptable applications for any category do not total the amount available.
     (1) $9,531,000 is provided solely for a competitive public works grant program for local governments serving communities in rural counties as defined in RCW 43.160.020. The board shall prioritize applications for funding for this small community jobs program based on the following criteria:
     (a) The unemployment rate of the community;
     (b) The ability of the applicant to complete the project promptly; and
     (c) The value the project presents to the community in lasting improvements to public safety, environmental quality, recreation and community life, or economic development.
     (2) $9,531,000 is provided solely for a competitive public works grant program for local governments serving high density urban communities. The board shall prioritize applications for funding from this urban vitality program based on the following criteria:
     (a) The proposed project's ability to decrease the per capita vehicle miles driven in the community by increasing access to mass transit, supporting residential density in proximity to employment opportunities, and improving the safety and appeal of walking and biking in a community;
     (b) The ability of the applicant to complete the project promptly; and
     (c) The local support for the project as indicated by the level of local matching funds devoted to the project. Local matching funds do not include funds from other state sources.
     (3) The state taxable building construction account--state appropriation is provided solely for emergency loans under RCW 43.155.065.
     (4) (($23,535,000)) $21,528,000 is provided solely for the following list of projects. The appropriation for Airway Heights wastewater treatment plant is contingent upon a capacity agreement with the Kalispel Tribe that precludes the need to build multiple wastewater treatment facilities on the West Plains. If any project on the following list is unable to show reasonable progress towards accomplishing the intended project by December 31, 2010, the board may transfer the amount allocated for the project to the competitive grant categories in subsections (1) and (2) of this section.


Airway Heights Water Treatment Plant$1,000,000
Small Community Jobs - Assistance for Grand Coulee School$500,000
Small Community Jobs - Camano Island County Park Development$300,000
Small Community Jobs - Connell Infrastructure$1,100,000
Small Community Jobs - Dayton School Biomass Heating System$100,000
Small Community Jobs - Grandview Downtown Revitalization$500,000
Small Community Jobs - Green Acres Neighborhood Park$200,000
Small Community Jobs - Hoh Tribe Fire Station$623,000
Small Community Jobs - Longview Elementary Safety Underpass$250,000
Small Community Jobs - Mesa Playground$35,000
Small Community Jobs - Pasco Commercial Avenue Construction$800,000
Small Community Jobs - Union Gap School Crossing Improvement$227,000
Small Community Jobs - Yakima Downtown Futures$1,000,000
Small Community Jobs - Yelm Longmire Park$400,000
Urban Vitality - Federal Way Urban Infrastructure$5,000,000
((Urban Vitality - Infrastructure for Puyallup (Parametrix)$2,000,000))
Urban Vitality - Percival Landing$3,000,000
Urban Vitality - Redmond Square Development$2,000,000
Urban Vitality - Renton Hawks Landing$1,700,000
Water - Gig Harbor Waste Water Treatment$2,500,000
Water - Pine Terrace Water Association Project(($300,000)) $293,000
Total$21,528,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($42,597,000))
       $40,590,000
     State Taxable Building Construction Account--State . . . . . . . . . . . . $2,000,000
          Subtotal Appropriation . . . . . . . . . . . . (($44,597,000))
       $42,590,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($44,597,000))
       $42,590,000

Sec. 6002   2010 1st sp.s. c 36 s 1017 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Energy Regional Innovation Cluster Match (91000080)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely to support facilities to be located in Washington state to increase the competitiveness of state or regional proposals for federal energy innovation and research funding. State funding must not exceed twenty percent of the total program or project funds. If a Washington state research organization is not awarded federal funding for energy innovation and research by June 30, 2011, the remaining appropriation in this section may be allotted for export assistance as provided in section 1018 of this act.

Appropriation:
     Public Facility Construction Loan Revolving
          Account--State . . . . . . . . . . . . (($5,500,000))
       $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($5,500,000))
       $0

Sec. 6003   2010 1st sp.s. c 36 s 1001 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (20064008)

     The reappropriation in this section is subject to the following conditions and limitations: (1) $64,319 of the remaining reappropriation for El Centro de la raza may be used for building infrastructure. (2) $10,000 of the remaining reappropriation for miracle league handicapped baseball may be used for pre-grading and resurfacing construction. (3) $1,394,107 of the remaining reappropriation for MOBIUS/inland northwest science and technology center may be used for building design, construction, and renovation. (4) $500,000 of the remaining reappropriation for the Soundway property preservation project may be used by the city of Seattle, in cooperation with the nature consortium for habitat, recreation improvements, or stewardship of the property, if the city of Seattle enacts pending city legislation to preserve the property and place it under the jurisdiction of city of Seattle parks and recreation. (5) The reappropriation is adjusted for the transfer of the Vancouver national historical reserve west barracks project to the Washington state historical society and the termination of the following projects that are no longer viable: (a) Snohomish senior center ((and)), (b) central area motivation program (CAMP), (c) undeveloped woodlands linked to interurban trail, (d) Hamilton improvement project, (e) Chambers Creek footbridge, and (f) Tukwila kayak and canoe launching facility.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($9,258,000))
       $8,761,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $37,141,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($46,399,000))
       $45,902,000

Sec. 6004   2010 1st sp.s. c 36 s 1002 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Job and Economic Development Grants (20064950)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of section 107, chapter 371, Laws of 2006.
     (2) The appropriation is subject to the project list in section 107, chapter 371, Laws of 2006.
     (3) Up to $1,000,000 of the appropriation for the Pacific Northwest national labs campus infrastructure project is provided solely for giga-pop infrastructure.
     (4) Up to $2,200,000 of the appropriation is provided solely for military communities infrastructure projects. Military communities infrastructure projects shall include:
     (a) Grants to counties and cities for the purchase of development easements and the purchase of real property in fee simple to restrict the use of accident potential zones and clear zones. The office of financial management shall establish a competitive process for selecting projects to receive the grants. Final allocation of these grants shall be at the discretion and with the approval of the director of the office of financial management.
     The grants are subject to the following conditions:
     (i) The county or city must be subject to and in compliance with RCW 36.70A.530;
     (ii) The grants may not be used to remove encroachments into these zones allowed by county or city zoning or permitting actions;
     (iii) The county or city must have an encroachment prevention plan preventing future encroachment into these zones; and
     (iv) The grant provided by the state must not exceed one-third of the project cost with funds from local and federal sources providing the balance of the funds.
     (b) Up to $481,000 of the ((re))appropriation is provided solely for improvements to a military department site on Fairchild air force base.

Reappropriation:
     Public Works Assistance Account--State . . . . . . . . . . . . (($1,733,000))
       $1,253,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($12,439,000))
       $9,860,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,828,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($50,000,000))
       $46,941,000

Sec. 6005   2009 c 497 s 1015 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     Building for the Arts Grants (20074001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.750.
     (2) The reappropriation is subject to the provisions of section 1027, chapter 520, Laws of 2007.
     (3) The reappropriation is adjusted for the termination of the Cornish phase 3 project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,240,000))
       $1,890,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $9,760,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($12,000,000))
       $11,650,000

Sec. 6006   2009 c 497 s 1016 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     Community Services Facilities Grants (20074002)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.125.
     (2) The reappropriation is subject to the provisions of section 1029, chapter 520, Laws of 2007.
     (3) The reappropriation is adjusted for the termination of the YMCA of Snohomish county project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,495,000))
       $1,220,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $8,652,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($10,147,000))
       $9,872,000

Sec. 6007   2009 c 497 s 1017 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     Youth Recreational Facilities Grants (20074003)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of RCW 43.63A.135.
     (2) The reappropriation is subject to the provisions of section 1007, chapter 328, Laws of 2008.
     (3) The reappropriation is adjusted for the termination of the Bellevue clubhouse project and the Mukilteo boys and girls club project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($4,000,000))
       $2,950,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,050,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($9,050,000))
       $8,000,000

Sec. 6008   2009 c 497 s 1020 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     Water System Acquisition Rehabilitation Program (20074006)

     The reappropriation in this section is subject to the following conditions and limitations: Up to $1,000,000 of the reappropriation is provided solely for the city of Republic to acquire the Pine Grove water system.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,191,000))
       $2,097,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,559,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($3,750,000))
       $3,656,000

Sec. 6009   2010 1st sp.s. c 36 s 1005 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Job Development Fund Grants (20074010)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is subject to the provisions of section 1032, chapter 520, Laws of 2007.
     (2) $3,000,000 of the appropriation is provided solely for a grant to the port of Grays Harbor for the bulk liquid facility project.
     (3) The reappropriation is adjusted for (a) the termination of the city of Soap Lake project and (b) reduction of the city of Pacific project by $135,000.

Reappropriation:
     Job Development Account--State . . . . . . . . . . . . $4,298,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($20,930,000))
       $19,795,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $24,702,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($49,930,000))
       $48,795,000

Sec. 6010   2010 1st sp.s. c 36 s 1003 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (20084001)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The projects must comply with RCW 43.63A.125 and other requirements for community projects administered by the department.
     (2) The reappropriation is subject to the provisions of section 1008, chapter 328, Laws of 2008.
     (3) $1,000,000 of the remaining reappropriation for the Evergreen school district health and biosciences academy may be used for land acquisition. If the facility is not constructed by June 30, 2015, the school district shall reimburse the state an amount equal to $1,000,000 increased by the average percentage appreciation in property values for undeveloped land in the surrounding area between the date the school district acquired the property and June 30, 2015 or the date the school district disposes of the property.
     (4) $600,000 of the remaining reappropriation for the institute for community leadership may be used for land acquisition.
     (5) $250,000 of the remaining reappropriation for the Pacific Northwest ilocandia association may be used for acquisition and renovation.
     (6) $200,000 of the remaining reappropriation for the library connection at Greenbridge may be used for construction and equipment.
     (7) $1,000,000 of the remaining reappropriation for the Evergreen school district health and biosciences academy may be used for land acquisition.
     (8) The remaining reappropriation for the Mobius/inland northwest science and technology center may be used for building design, construction, and renovation.
     (9) The reappropriation is adjusted for the transfer of the Vancouver national historical reserve project to the Washington state historical society; the reduction of $1,400,000 from the Tacoma narrows bridge lights project and $110,000 from the Seatac world war I memorial plaza; and the termination of the following projects that are no longer viable: (a) Camp kilworth land acquisition - Federal Way, (b) Kitsap SEED, ((and (c) Seatac world war I memorial plaza)) (c) Ashford cultural center and mountaineering museum, (d) dining car historic preservation, (e) Lake Stevens civic center, (f) Mill Creek senior center, (g) mountains to sound - state route no. 18/Interstate 90 interchange project, (h) Simon youth foundation resource center, (i) Shoreline YMCA, and (j) town square grid - Drexler drive project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($56,650,000))
       $52,740,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $71,694,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($128,344,000))
       $124,434,000

Sec. 6011   2010 1st sp.s. c 36 s 1008 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Quillayute Valley Wood-Fire Boiler (20084858)

Reappropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $20,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($980,000))
       $960,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,000,000))
       $980,000

Sec. 6012   2010 1st sp.s. c 36 s 1009 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Snohomish County Biodiesel (20084859)

Reappropriation:
     Energy Freedom Account--State . . . . . . . . . . . . $419,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($81,000))
       $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($500,000))
       $419,000

Sec. 6013   2009 c 497 s 1036 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     2008 Local and Community Projects (20084861)

     The reappropriation in this section is subject to the following conditions and limitations:
     (1) The reappropriation is subject to the provisions of section 1019, chapter 328, Laws of 2008.
     (2) The reappropriation is adjusted for the termination of the (a) Camano community health clinic project, (b) armed forces and aerospace museum project, (c) Cispus environmental learning center project, and (d) the hope center project.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($12,751,000))
       $11,866,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,378,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($18,129,000))
       $17,244,000

Sec. 6014   2010 1st sp.s. c 36 s 1011 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Building for the Arts Grants (30000006)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Projects must be selected based on their readiness to proceed.
     (2) The appropriation is provided solely for the following list of projects:


Admiral Theatre-No Theatre Left Behind$140,000
Building a Foundation for Discovery$250,000
((Campus Consolidation (Cornish)$375,000))
Convert Key Bank to Everett's Plaza      Theatre$500,000
Cottage Renovation (Hedgebrook)$20,000
Downstairs at the 5th$800,000
((Federal Way Performing Arts Center$325,000))
Gateway Center (Lummi)$150,000
((James Center for the Performing Arts      (Sequim)$150,000))
Langston Hughes Performing Arts Center$475,000
Legacy Project (Imagine)$200,000
Modular Classrooms for Dance (Gladish)$30,000
Mt. Baker Theatre$1,000,000
Museum Expansion (Maryhill)$1,500,000
New Hands On Children's Museum$1,000,000
Reconstruction of First Stage (Issaquah)$400,000
Seattle Opera Center$650,000
Stage Two (Whidbey)$450,000
Vashon Arts Center$1,115,000
Visual Arts Education Center      (Snohomish County)$1,000,000
Viva Vera Capital Campaign$70,000
  
Total(($10,600,000))
$9,750,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($10,600,000))
       $9,750,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($48,000,000))
       $0
          TOTAL . . . . . . . . . . . . (($58,600,000))
       $9,750,000

Sec. 6015   2009 c 497 s 1041 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     Youth Recreational Facilities Grants (30000007)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Projects must be selected based on their readiness to proceed.
     (2) The appropriation is provided solely for the following list of projects:

Allen Place$800,000
Auburn Boys & Girls Club$800,000
Central Kitsap Community Campus      YMCA$800,000
Coal Creek Family YMCA$800,000
((East Pierce County HOPE Center$800,000))
Highline YMCA$800,000
((Hough Pool Renovation$150,000))
Jim Parsley Community Center$800,000
Kitsap Girl Scout Center$205,000
Naval Avenue Boys & Girls Club$80,000
Toutle River Ranch$360,000
West Sound Teen Center$305,000
YMCA Spokane Central$800,000
  
Total(($7,500,000)) $6,550,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($7,500,000))
       $6,550,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $30,000,000
          TOTAL . . . . . . . . . . . . (($37,500,000))
       $36,550,000

Sec. 6016   2009 c 497 s 1042 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ((COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT)) COMMERCE
     Building Communities Fund Grants (30000008)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Except as otherwise directed before the effective date of this section, the department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.
     (2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(2)(c).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
     (7) The appropriation is provided solely for the following list of projects:


A Home for Opportunity - CASA Latina$325,000
Building the new Eastside Clinic - Community Health Care$1,900,000
Community Center for Sand Point Housing$350,000
Donald G. Topping HOPE Center - Boys & Girls Clubs of Puget Sound$1,934,250
Dove House (Domestic Violence/Sexual Assault Program of Jefferson County)$240,000
Duvall Multi-Service Center - Hopelink$617,985
((Education and Training Center Mt. Baker Planned Parenthood$881,847))
Emmanuel Family Life Center - Richard Allen Enterprises$400,594
Eritrean Community Center Expansion$300,000
Ferndale Boys & Girls Club$752,847
Giant Step - RRA$520,761
Greenbridge Early Learning Center$1,419,281
High Point Neighborhood Center$2,000,000
Highline YMCA$1,163,000
Milgard Work Opportunity Center - Tacoma Goodwill$1,850,000
Northeast Community Center Expansion$1,300,000
Pierce County Therapy Center$128,000
Rainier Vista & Rainier Valley Teen Center$2,400,000
Repurposing Daybreak Star$87,500
Riverwalk Point Community Building - Spokane Neighborhood Action Program$79,253
Rotary Support Center for Families$3,500,000
Safety & Systems Improvements at El Centro de la raza$250,031
TAF Community Learning Space (CLS)$1,500,000
The Keller House Services Center$600,000
YMCA/YWCA Central Spokane Facility$3,500,000
  
Total(($28,000,349)) $27,120,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($28,001,000))
       $27,120,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($28,001,000))
       $27,120,000

Sec. 6017   2010 1st sp.s. c 36 s 1014 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Local and Community Projects (30000019)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations whose sole purpose is to purchase real property that does not include a construction or renovation component.
     (3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
     (4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
     (5) Projects funded in this section must be held by the recipient for a minimum of ten years and used for the same purpose or purposes intended by the legislature as required in RCW 43.63A.125(2)(c).
     (6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay
state prevailing wages.
     (7) Except as directed otherwise prior to the effective date of this section, the department shall not expend the appropriations in this section unless and until the nonstate share of project costs have been either expended, or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature.
     (8) The appropriation is provided solely for the following list of projects:

Local Community Projects
7th St. Theater$330,000
Arc of Tri-Cities$900,000
Bellevue Clinic--Seattle Children's Hospital$2,000,000
Blessed Sacrament Food and Emergency Facilities Renovation$200,000
Children's Village Expansion Project$500,000
Clark County Food Distribution Facility$1,500,000
Coal Creek YMCA (Newcastle)$800,000
Dawson Place Child Advocacy Center$1,000,000
Federal Way National Little League Field Lighting Project and Monument Entry Sign$177,000
Harlequin Theater$235,000
Home Dialysis Center and Professional Workforce Training$250,000
Kirkland Park Place Redevelopment$2,000,000
Livingston Baker Fire and Life Safety$750,000
Marshland Diking District$500,000
Marysville Boys & Girls Club$500,000
McClure Middle School Energy Saving Performance Contract Demonstration Project$1,000,000
((Mountains to Sound Greenway$100,000))
Mukilteo Boys & Girls Club$150,000
Neighborcare Health Clinic and Rainier Beach Medical Clinic$1,000,000
Parkland at Japanese Gulch$1,000,000
Petrovitsky Park Upgrade$750,000
Phoenix House$200,000
Poulsbo Marine Center$500,000
Public Broadcasting Frequency Expansion$223,000
((Ready by Five Early Learning Center$1,000,000))
Renovations to Mill Creek City Annex Building$30,000
Snohomish County Emergency Center$1,000,000
South Tacoma Community Center$1,000,000
Whatcom Hospice House$700,000
Zina Linnik$950,000
Total$20,145,000


Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($20,245,000))
       $20,145,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($20,245,000))
       $20,145,000

Sec. 6018   2010 1st. sp.s. c 36 s 1016 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
     Jobs Act for K-12 Public Schools and Higher Education Institutions (91000085)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) The appropriation is provided solely for grants to public school districts and public higher education institutions for operational cost savings improvements to public school district and higher education facilities and related projects that result in energy and operational cost savings. Related projects are those projects that must be completed in order for the energy efficiency improvements to be effective. Grants may also be used for loan interest payments over the term of a loan.
     (2) The department of commerce, in consultation with the department of general administration, the office of the superintendent of public instruction, and the Washington State University energy program shall establish a competitive process to solicit and evaluate applications from public school districts and public higher education institutions. Final grant awards shall be determined by the department of commerce.
     (3) The definitions in this section apply throughout this section.
     (a) "Cost-effectiveness" means that the present value to public school districts and public higher education institutions of the energy reasonably expected to be saved or produced by a facility, activity, measure, or piece of equipment over its useful life, including any compensation received from a utility or the Bonneville power administration, is greater than the net present value of the costs of implementing, maintaining, and operating such facility, activity, measure, or piece of equipment over its useful life, when discounted at the cost of public borrowing.
     (b) "Energy equipment" means energy management systems and any equipment, materials, or supplies that are expected, upon installation, to reduce the energy use or energy cost of an existing building or facility, and the services associated with the equipment, materials, or supplies, including but not limited to design, engineering, financing, installation, project management, guarantees, operations, and maintenance. Reduction in energy use or energy cost may also include reductions in the use or cost of water, wastewater, or solid waste.
     (c) "Energy cost savings" means savings realized in expenses for energy use and expenses associated with water, wastewater, or solid waste systems.
     (d) "Energy savings performance contracting" means the process authorized by chapter 39.35C RCW by which a company contracts with a public agency to conduct energy audits and guarantee energy savings from energy efficiency.
     (e) "Operational cost savings" means savings realized from parts, service fees, capital renewal costs, and other measurable annual expenses to maintain and repair systems. This definition does not mean labor savings related to existing facility staff.
     (f) "Public facilities" means buildings, building components, and major equipment or systems owned by public school districts and public higher education institutions.
     (g) "Innovative measures" means advanced or emerging technologies, systems or approaches that may not yet be in common practice but improve energy efficiency, accelerate deployment, or reduce energy usage, and become widely commercially available in the future if proven successful in demonstration programs without compromising the guaranteed performance or measurable energy and operational cost savings anticipated. Examples of innovative measures include, but are not limited to, advanced energy and systems operations monitoring, diagnostics and controls systems for buildings; novel heating, cooling, ventilation and water heating systems; advanced windows and insulation technologies, highly efficient lighting technologies, designs, and controls; and integration of renewable energy sources into buildings, and energy savings verification technologies and solutions.
     (4) Grants must be awarded in competitive rounds, based on demand and capacity, with at least five percent of each grant round awarded to small public school districts with fewer than 1,000 full-time equivalent students, based on demand and capacity.
     (5) Within each competitive round, projects must be weighted and prioritized based on the following criteria and in the following order:
     (a) Leverage ratio: In each round, the higher the leverage ratio of nonstate funding sources to state jobs act grant, the higher the project ranking.
     (b) Energy savings: In each round, the higher the energy savings, the higher the project ranking. Applicants must submit documentation that demonstrates energy and operational cost savings resulting from the installation of the energy equipment and improvements. The energy savings analysis shall be performed by a licensed engineer, and the documentation must include but is not limited to the following:
     (i) A description of the energy equipment and improvements;
     (ii) A description of the energy and operational cost savings; and
     (iii) A description of the extent to which the project employs collaborative and innovative measures and encourages demonstration of new and emerging technologies with high energy-savings or energy cost-reductions.
     (c) Expediency of expenditure: Project readiness to spend funds must be prioritized so that the legislative intent to expend funds quickly is met.
     (6) Projects that do not use energy savings performance contracting must: (a) Verify energy and operational cost savings for ten years or until the energy and operational costs savings pay for the project, whichever is shorter; (b) follow the department of general administration's energy savings performance contracting project guidelines; and (c) employ a licensed engineer for the energy audit and construction. The department of commerce may require third-party verification of savings if a project is not implemented by an energy savings performance contractor selected by the department of general administration through the request of qualifications process. Third-party verification must be conducted either by an energy savings performance contractor selected by the department of general administration through a request for qualifications, a licensed engineer that is a certified energy manager, a project resource conservation manager, or educational service district resource conservation manager.
     (7) To intensify competition, the department of commerce may only award funds to the top eighty-five percent of projects applying in a round until the department of commerce determines a final round is appropriate. Projects that do not receive a grant award in one round may reapply in subsequent rounds.
     (8) To match federal grants and programs that require state matching funds and produce significantly higher efficiencies in operations and utilities, the level of innovation criteria may be increased for the purposes of weighted scoring to capture those federal dollars for selected projects that require a higher level of innovation and regional collaboration.
     (9) Grant amounts awarded to each project must allow for the maximum number of projects funded with the greatest energy and cost benefit.
     (10)(a) The department of commerce must use bond proceeds to pay one-half of the preliminary audit, up to five cents per square foot, if the project does not meet the school district's and higher education institution's predetermined cost-effectiveness criteria. Public school districts and public higher education institutions must pay the other one-half of the cost of the preliminary audit if the project does not meet their predetermined cost-effectiveness criteria.
     (b) The energy savings performance contractor shall not charge for an investment grade audit if the project does not meet the school district's and higher education institution's predetermined cost-effectiveness criteria. Public school districts and public higher education institutions must pay the full price of an investment grade audit if they do not proceed with a project that meets the school district's and higher education institution's predetermined cost-effectiveness criteria.
     (11) The department of commerce may charge projects administrative fees and may pay the department of general administration, the Washington State University energy program, and the office of the superintendent of public instruction administration fees in an amount determined through a memorandum of understanding.
     (12) The department of commerce and the department of general administration must submit a joint report to the appropriate committees of the legislature and the office of financial management on the timing and use of the grant funds, program administrative function, compliance with apprenticeship utilization requirements in RCW 39.04.320, compliance with prevailing wage requirements, and administration fees by the end of each fiscal year, until the funds are fully expended and all savings verification requirements are fulfilled.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($50,000,000))
       $46,250,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($50,000,000))
       $46,250,000

Sec. 6019   2010 1st sp.s. c 36 s 1021 (uncodified) is amended to read as follows:
FOR THE OFFICE OF FINANCIAL MANAGEMENT
     Risk Pool (91000001)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for a risk pool to complete projects within the scope described in budget documents submitted as part of the governor's capital budget request and consistent with legislative history. This section only applies to projects included in this 2010 supplemental capital budget with reduced appropriations. The office of financial management may allot portions of this appropriation ten days after notifying the senate ways and means committee and the house of representatives capital budget committee. The notification must include an explanation of the need and the amount for the allotment to complete the scope of an approved project.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($4,000,000))
       $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($4,000,000))
       $0

Sec. 6020   2010 1st sp.s. c 36 s 1034 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Pro Arts Building (91000002)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($225,000))
       $201,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($225,000))
       $201,000

Sec. 6021   2009 c 497 s 1069 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Infrastructure Relocation (20082028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,500,000))
       $281,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,000,000))
       $781,000

Sec. 6022   2009 c 497 s 1076 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Facility Oversight Program: Staffing (30000063)

     ((The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for the department of general administration to assist the office of financial management with the development and implementation of RCW 43.82.035 and 43.82.055.))

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($740,000))
       $705,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $5,597,000
          TOTAL . . . . . . . . . . . . (($6,337,000))
       $6,302,000

Sec. 6023   2009 c 497 s 1078 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     Engineering and Architectural Services: Staffing (30000086)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($9,300,000))
       $9,169,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $43,033,000
          TOTAL . . . . . . . . . . . . (($52,333,000))
       $52,202,000

NEW SECTION.  Sec. 6024   A new section is added to 2009 c 497 (uncodified) to read as follows:
FOR THE WASHINGTON STATE PATROL
     Fire Training Academy Burn Building Repairs (91000002)

Appropriation:
     Fire Service Training Account--State . . . . . . . . . . . . $300,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $300,000

Sec. 6025   2010 1st sp.s. c 36 s 2006 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Capacity to Replace Maple Lane School (92000005)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($760,000))
       $2,097,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($1,025,000))
       $0
          TOTAL . . . . . . . . . . . . (($1,785,000))
       $2,097,000

Sec. 6026   2009 c 497 s 2016 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Special Commitment Center Medium Management Housing Addition (20082505)

     ((The reappropriation in this section is subject to the following conditions and limitations:
     The reappropriation is to add residential space to existing facilities by remodeling existing residential space and converting existing program space to residential space for additional beds.
))

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($700,000))
       $554,000
     Prior Biennia (Expenditures) . . . . . . . . . . . . $575,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $53,664,000
          TOTAL . . . . . . . . . . . . (($54,939,000))
       $54,793,000

Sec. 6027   2009 c 497 s 2025 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital: Traffic Study Implementation (30000843)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($355,000))
       $39,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $996,000
          TOTAL . . . . . . . . . . . . (($1,351,000))
       $1,035,000

Sec. 6028   2009 c 497 s 2012 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Western State Hospital New Kitchen and Commissary Building (20081319)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $400,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($650,000))
       $540,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,300,000))
       $1,190,000

Sec. 6029   2009 c 497 s 2017 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
     Fircrest Campus Master Plan (20082850)

     ((The reappropriation in this section is subject to the following conditions and limitations:
     (1) The department shall resume and complete a master plan of the portion of the Fircrest campus that is not utilized by the Fircrest school or the department of health.
     (2) In drafting the master plan, the department shall consult with the following:
     (a) The city of Shoreline;
     (b) The department of natural resources;
     (c) The department of health regarding their master planning effort;
     (d) Representatives of institutions of higher education with whom the department has a partnership; and
     (e) Representatives of the Shoreline community and neighboring communities.
))

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($50,000))
       $47,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $395,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($445,000))
       $442,000

Sec. 6030   2009 c 497 s 2041 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Coyote Ridge Corrections Center: Design and Construct Medium Security Beds (19982011)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($4,772,000))
       $4,630,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $228,170,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($232,942,000))
       $232,800,000

Sec. 6031   2009 c 497 s 2045 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Monroe Corrections Center: Health Care Facility (20062043)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($283,000))
       $1,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $417,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($89,446,000))
       $17,604,000
          TOTAL . . . . . . . . . . . . (($90,146,000))
       $18,022,000

Sec. 6032   2009 c 497 s 2048 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Larch Corrections Center: 80-Bed Expansion (20062852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($560,000))
       $425,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,512,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($3,072,000))
       $2,937,000

Sec. 6033   2009 c 497 s 2043 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     McNeil Island Corrections: Replace and Stabilize Housing Unit Siding (20061005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($400,000))
       $211,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,394,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $4,087,000
          TOTAL . . . . . . . . . . . . (($7,881,000))
       $7,692,000

Sec. 6034   2009 c 497 s 2044 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: South Close Security Complex (20062021)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($35,950,000))
       $34,287,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $29,344,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($14,276,000))
       $0
          TOTAL . . . . . . . . . . . . (($79,570,000))
       $63,631,000

Sec. 6035   2009 c 497 s 2046 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Healthcare Center (20062066)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($7,700,000))
       $6,935,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,358,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($19,058,000))
       $18,293,000

Sec. 6036   2009 c 497 s 2049 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Airway Heights Heating and Cooling Loop Replacement (20081001)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($180,000))
       $104,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,745,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,925,000))
       $2,849,000

Sec. 6037   2009 c 497 s 2050 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     McNeil Island Corrections Center: Replace Barge Slip Pilings (20081002)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($3,612,000))
       $3,146,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $288,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($3,900,000))
       $3,434,000

Sec. 6038   2009 c 497 s 2051 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Replace Kitchen Roofs at Monroe Correctional Complex (20081003)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($250,000))
       $157,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,812,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,062,000))
       $1,969,000

Sec. 6039   2009 c 497 s 2052 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace G Building Roof (20081004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($412,000))
       $205,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,019,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($4,431,000))
       $4,224,000

Sec. 6040   2009 c 497 s 2053 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Roofs (20081005)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($900,000))
       $890,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $5,766,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($6,666,000))
       $6,656,000

Sec. 6041   2010 1st sp.s. c 36 s 2016 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Replace Roofs (20081007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($180,000))
       $160,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $589,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($769,000))
       $749,000

Sec. 6042   2009 c 497 s 2055 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Fire Alarm System (20081008)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($600,000))
       $487,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $924,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,524,000))
       $1,411,000

Sec. 6043   2009 c 497 s 2056 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Replace Electrical Distribution Building at Special Offenders Unit (20081009)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($539,000))
       $536,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $683,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,222,000))
       $1,219,000

Sec. 6044   2009 c 497 s 2057 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Reformatory: Replace Cell Door and Electronics (20081010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($230,000))
       $133,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,315,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,545,000))
       $1,448,000

Sec. 6045   2009 c 497 s 2058 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Clallam Bay Corrections Center: Replace Telecommunications Infrastructure (20081013)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,329,000))
       $1,110,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $521,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($19,045,000))
       $19,105,000
          TOTAL . . . . . . . . . . . . (($20,895,000))
       $20,736,000

Sec. 6046   2009 c 497 s 2062 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington State Penitentiary: Laundry Improvements (20081033)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($3,701,000))
       $3,686,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $350,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($4,051,000))
       $4,036,000

Sec. 6047   2009 c 497 s 2063 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Expand Reception Center (20082016)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($73,000))
       $2,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $397,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($64,100,000))
       $55,900,000
          TOTAL . . . . . . . . . . . . (($64,570,000))
       $56,299,000

Sec. 6048   2009 c 497 s 2066 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Airway Heights Corrections Center: Sex Offender Treatment Program Building (20082028)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($550,000))
       $545,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $4,397,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($4,947,000))
       $4,942,000

Sec. 6049   2010 1st sp.s. c 36 s 2010 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Roof Replacement (30000178)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,557,000))
       $860,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,557,000))
       $860,000

Sec. 6050   2009 c 497 s 2074 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center: Replace Fire Detection/Suppression (30000123)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,098,000))
       $898,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,098,000))
       $898,000

Sec. 6051   2009 c 497 s 2073 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
     Washington Corrections Center for Women: Replace Fire Alarm (30000121)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,625,000))
       $661,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,625,000))
       $661,000

Sec. 6052   2009 c 497 s 3026 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Program (20084010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($34,870,000))
       $34,470,000
     Water Quality Capital Account--State . . . . . . . . . . . . $4,698,000
          Subtotal Reappropriation . . . . . . . . . . . . $39,168,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $27,315,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($66,883,000))
       $66,483,000

Sec. 6053   2009 c 497 s 3011 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Columbia River Program (20062010)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,423,000))
       $1,183,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $14,577,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($16,000,000))
       $15,760,000

Sec. 6054   2009 c 497 s 3006 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Water Conveyance Infrastructure Projects (20052850)

Reappropriation:
     Water Quality Capital Account--State . . . . . . . . . . . . $81,000
     State Building Construction Account--State . . . . . . . . . . . . (($1,708,000))
       $1,689,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $438,000
          Subtotal Reappropriation . . . . . . . . . . . . (($2,227,000))
       $2,208,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $3,573,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($5,800,000))
       $5,781,000

Sec. 6055   2009 c 497 s 3004 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Water Supply Facilities (20044006)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,600,000))
       $1,468,000
     State and Local Improvements Revolving Account
          (Water Supply Facilities)--State . . . . . . . . . . . . $392,000
          Subtotal Reappropriation . . . . . . . . . . . . (($1,992,000))
       $1,860,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $11,658,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($13,650,000))
       $13,518,000

Sec. 6056   2009 c 497 s 3008 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Quad Cities Water Right Mitigation (20052852)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,925,000))
       $1,325,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $275,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,200,000))
       $1,600,000

Sec. 6057   2009 c 497 s 3005 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Centennial Clean Water Fund (20044007)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,481,000))
       $1,366,000
     Water Quality Capital Account--State . . . . . . . . . . . . $31,000
          Subtotal Reappropriation . . . . . . . . . . . . (($1,512,000))
       $1,397,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $43,538,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($45,050,000))
       $44,935,000

Sec. 6058   2009 c 497 s 3039 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Flood Protection Study (20082855)

     ((The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely for the department to conduct a study to determine the number of decertified levees in the state and to identify strategies for recertifying the levees so that they provide optimum protection for the communities protected by the levees. The department must prioritize areas to include in the study based on population and the economic impact of potential flood damage.
     The study must include the following components:
     (1) A working group of levee managers to advise and inform the study;
     (2) A technical review of the structural integrity of levee systems;
     (3) An inventory, map, and rate the effectiveness of existing levee systems; and
     (4) The development of strategies and actions needed to improve the existing levee system and to ensure certification by the United States army corps of engineers for one-hundred year flood protection.
     The study must be completed and a report provided to the appropriate legislative committees by July 1, 2010.
))

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($280,000))
       $205,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($280,000))
       $205,000

Sec. 6059   2010 1st sp.s. c 36 s 3015 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Safe Soils Remediation Program (30000019)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,380,000))
       $669,000
     Cleanup Settlement Account--State . . . . . . . . . . . . $1,620,000
          Subtotal Appropriation . . . . . . . . . . . . (($4,000,000))
       $2,289,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($4,000,000))
       $2,289,000

NEW SECTION.  Sec. 6060   A new section is added to 2009 c 497 (uncodified) to read as follows:
     FOR THE DEPARTMENT OF ECOLOGY
     Diesel Emissions Reduction (91000024)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $353,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $353,000

Sec. 6061   2009 c 497 s 3055 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
     Protect Communities from Flood and Drought (92000002)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $2,500,000 of the appropriation is provided solely for the Columbia basin ground water management area ground water hydrologic modeling project. The project shall submit a report to the appropriate committees of the legislature that does the following:
     (a) Describes the physical properties of the aquifer system and the variation of those properties throughout the area of concern,
     (b) Quantifies the rate and location of aquifer recharge and discharge within the subarea,
     (c) Quantifies the water balance for the by land use type,
     (d) Demonstrates with empirical data a viable solution to the observed problems in the area of concern,
     (e) Estimates the quantity of water needed for the solution, and
     (f) Evaluates the physical and legal availability of such water from the Columbia River. The final report must be submitted by June 30, 2011.
     (2) $10,000,000 of the appropriation is provided solely for a grant to repair the Horseshoe Bend levy that protects communities in the Kent valley.
     (3) $150,000 of the appropriation is provided solely for a grant for the King County fire protection district no. 16 to prevent flood damage to the fire station.
     (4) $2,350,000 of the appropriation is provided solely for a competitive grant program for projects that protect communities from flood damage and prepare communities for drought and water shortages. The department shall prioritize applications from communities most at risk to flood damage and drought and who are least able to fund mitigation projects from local resources. The department shall also seek to balance the needs of different regions of the state, and choose projects most ready to proceed.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($15,000,000))
       $14,975,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($15,000,000))
       $14,975,000

Sec. 6062   2010 1st sp.s. c 36 s 3020 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Cama Beach State Park (30000101)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,775,000))
       $1,625,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,775,000))
       $1,625,000

Sec. 6063   2010 1st sp.s. c 36 s 3017 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Flaming Geyser State Park Park-wide Infrastructure Redevelopment (30000173)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($3,003,000))
       $603,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($3,003,000))
       $603,000

Sec. 6064   2009 c 497 s 3077 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
     Bay View Park Wide Wastewater Treatment System (20082041)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,760,000))
       $510,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $427,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,187,000))
       $937,000

Sec. 6065   2010 1st sp.s. c 36 s 3024 (uncodified) is amended to read as follows:
FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (20084011)

     The reappropriations in this section are subject to the following conditions and limitations:
     (1) The reappropriations are provided solely for the approved list of projects in LEAP capital document No. 2007-3 as developed on March 17, 2007, and LEAP capital document No. 2008-1 as developed on February 13, 2008.
     (2) If additional funds are available after funding the farmlands preservation account projects approved in subsection (1) of this section, the committee may: Provide one-time grants of up to $25,000 each to counties requesting assistance in developing farmlands preservation strategies for the purpose of seeking grants from the farmlands preservation account in future grant cycles.
     (3) Funds reappropriated for distribution according to the provisions of RCW 79A.15.040(1)(c) must be allocated forty percent to local government projects and sixty percent to state agency projects. If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.
     (4) Up to $627,299 of the reappropriation from the riparian protection account is provided solely for the Chehalis river surge plain natural area preserve. This amount may not be expended for the project until the department of natural resources has completed a management plan for the preserve that maintains recreational access and that management plan is presented to the house of representatives capital budget and senate ways and means committees.

Reappropriation:
     Farmlands Preservation Account--State . . . . . . . . . . . . (($4,319,000))
       $3,792,000
     Riparian Protection Account--State . . . . . . . . . . . . $12,500,000
     Habitat Conservation Account--State . . . . . . . . . . . . $23,956,000
     Outdoor Recreation Account--State . . . . . . . . . . . . $22,994,000
          Subtotal Reappropriation . . . . . . . . . . . . (($63,769,000))
       $63,242,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $35,250,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($99,019,000))
       $98,492,000

Sec. 6066   2009 c 497 s 3135 (uncodified) is amended to read as follows:
FOR THE RECREATION AND CONSERVATION FUNDING BOARD
     Washington Wildlife Recreation Grants (30000002)

     ((The appropriations in this section are subject to the following conditions and limitations:
     The appropriations are provided solely for the list of projects in LEAP capital document No. 2009-1a, developed April 23, 2009.
))

Appropriation:
     Riparian Protection Account--State . . . . . . . . . . . . $10,000,000
     Habitat Conservation Account--State . . . . . . . . . . . . $27,000,000
     Outdoor Recreation Account--State . . . . . . . . . . . . $27,000,000
     Farmlands Preservation Account--State . . . . . . . . . . . . (($6,000,000))
       $5,445,000
          Subtotal Appropriation . . . . . . . . . . . . (($70,000,000))
       $69,445,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $200,000,000
          TOTAL . . . . . . . . . . . . (($270,000,000))
       $269,445,000

Sec. 6067   2009 c 497 s 3157 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Voights Creek Hatchery (20081003)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) $200,000 of the amount appropriated is provided solely for the repair necessary to restore the facility for limited operations;
     (2) $550,000 of the amount appropriated is provided solely for property acquisition. If the department does not acquire property, the amount provided in this subsection shall lapse; and
     (3) $50,000 of the amount appropriated is provided solely for the department to participate in a work group with the Puyallup Tribe of Indians that will make recommendations no later than December 1, 2009, regarding the options for improving production from hatcheries along the Puyallup river system while reducing cost. Options to be considered include shifting production among the hatcheries, consolidation of hatcheries, and shifting responsibilities for construction, maintenance and operations of hatcheries.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $150,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($800,000))
       $792,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $355,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
          TOTAL . . . . . . . . . . . . (($3,105,000))
       $3,097,000

Sec. 6068   2009 c 497 s 3186 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     ((Bebee)) Beebe Springs Phase 3 (92000006)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,643,000))
       $1,043,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,643,000))
       $1,043,000

Sec. 6069   2009 c 497 s 3174 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Washougal Hatchery Pond Renovation (30000094)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,236,000))
       $1,086,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($1,236,000))
       $1,086,000

Sec. 6070   2009 c 497 s 3184 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Chambers Creek Adult Trap (20081004)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($240,000))
       $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $12,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($450,000))
       $0
          TOTAL . . . . . . . . . . . . (($702,000))
       $12,000

Sec. 6071   2009 c 497 s 3166 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Skookumchuck Hatchery Renovation (20082015)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $200,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($3,728,000))
       $3,128,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $328,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($4,256,000))
       $3,656,000

Sec. 6072   2009 c 497 s 3175 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Grays River Hatchery Intake Replacement (30000089)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($549,000))
       $81,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($3,499,000))
       $4,000,000
          TOTAL . . . . . . . . . . . . (($4,048,000))
       $4,081,000

NEW SECTION.  Sec. 6073   A new section is added to 2009 c 497 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
     Mitchell Act Federal Grant (91000021)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $3,000,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $3,000,000

Sec. 6074   2009 c 497 s 3193 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Road Maintenance and Abandonment Projects (30000071)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($500,000))
       $450,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $1,800,000
          TOTAL . . . . . . . . . . . . (($2,300,000))
       $2,250,000

Sec. 6075   2009 c 497 s 3194 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Natural Areas Facilities Preservation and Access (30000079)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($700,000))
       $665,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $13,923,000
          TOTAL . . . . . . . . . . . . (($14,623,000))
       $14,588,000

Sec. 6076   2009 c 497 s 3195 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Recreation Capital Renovations (30000109)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($816,000))
       $591,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $32,682,000
          TOTAL . . . . . . . . . . . . (($33,498,000))
       $33,273,000

Sec. 6077   2009 c 497 s 3189 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Colville Armory (20082851)

Reappropriation:
     Forest Development Account--State . . . . . . . . . . . . $306,000
     Resource Management Cost Account--State . . . . . . . . . . . . $323,000
     State Building Construction Account--State . . . . . . . . . . . . (($292,000))
       $162,000
          Subtotal Reappropriation . . . . . . . . . . . . (($921,000))
       $791,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $21,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $3,000,000
          TOTAL . . . . . . . . . . . . (($3,942,000))
       $3,812,000

Sec. 6078   2009 c 497 s 3192 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
     Blanchard Mountain (20081951)

     The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely as a continuing compensation for preservation of the core of Blanchard mountain in Skagit County and the subsequent acquisition of replacement working forest lands as Skagit county state forest lands. The department shall consult with the University of Washington college of forest resources' northwest environmental forum and with other interest groups prior to the purchase.

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $3,975,000

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($1,500,000))
       $527,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $25,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($5,500,000))
       $4,527,000

NEW SECTION.  Sec. 6079   A new section is added to 2009 c 497 (uncodified) to read as follows:
FOR THE PUGET SOUND PARTNERSHIP
     Community Partnership Restoration Grants (30000008)

Appropriation:
     General Fund--Federal . . . . . . . . . . . . $500,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $500,000

Sec. 6080   2009 c 497 s 5015 (uncodified) is amended to read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Apple Awards (91000001)

     ((The appropriation in this section is subject to the following conditions and limitations: Grants of $25,000 may be awarded to public elementary schools whose students propose capital projects on school property or on other public property in the community, city, or county in which the school is located. The program must be administered by the office of the superintendent of public instruction which shall determine competitive criteria for awarding the grants. $125,000 of the appropriation is available for five awards of $25,000 each in the 2009-2010 school year and $125,000 of the appropriation for five awards of $25,000 each in the 2010-2011 school year. The funds must be used exclusively for capital projects as proposed by the students in the schools and approved by the district's school board.))

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($250,000))
       $247,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($250,000))
       $247,000

Sec. 6081   2010 1st sp.s. c 36 s 5007 (uncodified) is amended to read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     Energy Efficiency and Small Repair Grants (91000007)

     The appropriation in this section is subject to the following conditions and limitations:
     (1) Up to $3,000,000 of the appropriation is provided solely for nonrecurring costs associated with school facility repairs and renovations necessary for health and safety. The office of the superintendent of public instruction, after consulting with maintenance and operations administrators of school districts, shall develop criteria for providing funding for specific projects to stay within the appropriation level provided in this section. The criteria must include, but are not limited to, the following: (a) Limiting recipient district applications to one hundred thousand dollars per three-year period; (b) limiting districts eligible to receive the grant only once in any three-year period; and (c) requiring any district receiving funding provided in this section to demonstrate a consistent commitment to addressing school facilities needs.
     (2) $50,000,000 of the new appropriation is provided solely for energy operational cost savings improvements to school facilities. The appropriation must be distributed using the performance-based contracting method of delivering energy operational cost savings improvements to public facilities.
     (3) The superintendent of public instruction must report to the appropriate committees of the legislature and the office of financial management on the timing and use of the funds by the end of each fiscal year, until the funds are fully expended.
     (4) $100,000 of the appropriation is provided solely to the Monroe public schools for retrofitting the Frank Wagner Elementary chimney.

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($70,000,000))
       $69,889,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($70,000,000))
       $69,889,000

NEW SECTION.  Sec. 6082   A new section is added to 2009 c 497 (uncodified) to read as follows:
FOR THE WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS
     Well Replacement (91000003)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $264,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . $264,000

Sec. 6083   2010 1st sp.s. c 36 s 5012 (uncodified) is amended to read as follows:
FOR THE UNIVERSITY OF WASHINGTON
     Savery Hall Renovation (20061005)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . (($10,822,000))
       $10,757,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $50,510,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($61,332,000))
       $61,267,000

Sec. 6084   2009 c 497 s 5077 (uncodified) is amended to read as follows:
FOR THE CENTRAL WASHINGTON UNIVERSITY
     Hogue Hall Renovation and Addition (20082003)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . (($1,500,000))
       $1,473,000
Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . $27,265,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $1,500,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . (($18,837,000))
       $0
          TOTAL . . . . . . . . . . . . (($49,102,000))
       $30,238,000

Sec. 6085   2009 c 497 s 5082 (uncodified) is amended to read as follows:
FOR THE CENTRAL WASHINGTON UNIVERSITY
     Science Building (30000045)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($600,000))
       $578,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $55,870,000
          TOTAL . . . . . . . . . . . . (($56,470,000))
       $56,448,000

Sec. 6086   2010 1st sp.s. c 36 s 5041 (uncodified) is amended to read as follows:
FOR THE WASHINGTON STATE HISTORICAL SOCIETY
     Vancouver National Historic Reserve Visitors Center (91000001)

Appropriation:
     State Building Construction Account . . . . . . . . . . . . (($750,000))
       $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($750,000))
       $0

Sec. 6087   2010 1st sp.s. c 36 s 5078 (uncodified) is amended to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Construction Contingency Pool (92000007)

     ((The appropriation in this section is provided solely for allocation by the state board for community and technical colleges for major construction and renovation projects that confront emergent and unavoidable costs in excess of the construction contingency and management reserves included in the project appropriation. The board shall report at least quarterly to the office of financial management and the legislative capital budget committees on requests for and allocations from the pool.))

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($3,076,000))
       $2,835,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . $263,000
          Subtotal Appropriation . . . . . . . . . . . . (($3,339,000))
       $3,098,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($3,339,000))
       $3,098,000

Sec. 6088   2010 1st sp.s. c 36 s 5080 (uncodified) is amended to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Centralia Community College - Science Building (20042850)

Reappropriation:
     State Building Construction Account--State . . . . . . . . . . . . $194,000
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . (($2,737,000))
       $2,445,000
          Subtotal Reappropriation . . . . . . . . . . . . (($2,931,000))
       $2,639,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $28,919,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($31,850,000))
       $31,558,000

Sec. 6089   2009 c 497 s 5144 (uncodified) is amended to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Spokane Falls - Business and Social Science Building (20051853)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . (($1,000,000))
       $416,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $19,313,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($20,313,000))
       $19,729,000

Sec. 6090   2009 c 497 s 5161 (uncodified) is amended to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Infrastructure Savings (20061751)

Reappropriation:
     Gardner-Evans Higher Education Construction
          Account--State . . . . . . . . . . . . (($519,000))
       $402,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $2,197,000
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,716,000))
       $2,599,000

Sec. 6091   2009 c 497 s 5228 (uncodified) is amended to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Bellingham Technical College - Fisheries Program (30000117)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,000,000))
       $0

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,000,000))
       $0

Sec. 6092   2009 c 497 s 5216 (uncodified) is amended to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
     Wenatchee Valley College - Music and Arts Center (30000119)

Appropriation:
     State Building Construction Account--State . . . . . . . . . . . . (($2,000,000))
       $311,000

     Prior Biennia (Expenditures) . . . . . . . . . . . . $0
     Future Biennia (Projected Costs) . . . . . . . . . . . . $0
          TOTAL . . . . . . . . . . . . (($2,000,000))
       $311,000

(End of part)


PART 7
MISCELLANEOUS PROVISIONS

NEW SECTION.  Sec. 7001   (1) Allotments for appropriations in this act shall be provided in accordance with the capital project review requirements adopted by the office of financial management and in compliance with RCW 43.88.110. Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110.
     (2) Each project is defined as proposed in the legislative budget notes or in the governor's budget document.

NEW SECTION.  Sec. 7002   To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act in excess of $5,000,000 shall not be expended or encumbered until the office of financial management has reviewed and approved the agency's predesign. The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management. To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate. Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.

NEW SECTION.  Sec. 7003   (1) To ensure minor works appropriations are carried out in accordance with legislative intent, funds appropriated in this act shall not be allotted until project lists are on file at the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee. All projects must meet the criteria included in subsection (2)(a) of this section. Revisions to the lists must be filed with the office of financial management, the house of representatives capital budget committee, and the senate ways and means committee and include an explanation of variances from the prior lists before funds may be expended on the revisions.
     (2)(a) Minor works projects are single line appropriations that include multiple projects of a similar nature and that are valued between $25,000 and $1,000,000 each, with the exception of higher education minor works projects that may be valued up to $2,000,000. These projects can generally be completed within two years of the appropriation with the funding provided. Agencies are prohibited from including projects on their minor works lists that are a phase of a larger project, and that if combined over a continuous period of time, would exceed $1,000,000, or $2,000,000 for higher education minor works projects. Improvements for accessibility in compliance with the Americans with disabilities act may be included in any of the above minor works categories.
     (b) Minor works appropriations shall not be used for, among other things: Studies, except for technical or engineering reviews or designs that lead directly to and support a project on the same minor works list; planning; design outside the scope of work on a minor works list; moveable, temporary, and traditionally funded operating equipment not in compliance with the equipment criteria established by the office of financial management; software not dedicated to control of a specialized system; moving expenses; land or facility acquisition; or to supplement funding for projects with funding shortfalls unless expressly authorized elsewhere in this act. The office of financial management may make an exception to the limitations described in this subsection (2)(b) for exigent circumstances after notifying the legislative fiscal committees and waiting ten days for comments by the legislature regarding the proposed exception.
     (c) Minor works preservation projects may include program improvements of no more than twenty-five percent of the individual minor works preservation project cost.
     (3) It is generally not the intent of the legislature to make future appropriations for capital expenditures or for maintenance and operating expenses for an acquisition project or a significant expansion project that is initiated through the minor works process and therefore does not receive a policy and fiscal analysis by the legislature. Minor works projects are intended to be one-time expenditures that do not require future state resources to complete.

NEW SECTION.  Sec. 7004   (1) The office of financial management may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer may be used to expand the capacity of any facility beyond that intended in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account. No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes that govern the grants.
     (2) The office of financial management may find that an amount is in excess of the amount required for the completion of a project only if: (a) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (b) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.
     (3) For the purposes of this section, the intent is that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
     (4) The office of financial management shall report any transfer effected under this section to the house of representatives capital budget committee, the senate ways and means committee, and the legislative evaluation and accountability program committee, at least thirty days before the date the transfer is effected. The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer. The governor's capital budget request following any transfer shall reflect that transfer in the affected agency.

Sec. 7005   RCW 39.35B.050 and 2007 c 506 s 3 are each amended to read as follows:
     The office of financial management shall:
     (1) Design and implement a cost-effective life-cycle cost model by October 1, 2008, based on the work completed by the joint legislative audit and review committee in January 2007 and in consultation with legislative fiscal committees;
     (2) Deploy the life-cycle cost model for use by state agencies once completed and tested;
     (3) Update the life-cycle cost model periodically in consultation with legislative fiscal committees;
     (4) Establish clear policies, standards, and procedures regarding the use of life-cycle cost analysis by state agencies including:
     (a) When state agencies must use the life-cycle cost analysis, including the types of proposed capital projects and leased facilities to which it must be applied;
     (b) Procedures state agencies must use to document the results of required life-cycle cost analyses;
     (c) Standards regarding the discount rate and other key model assumptions; ((and))
     (d) A process to document and justify any deviation from the standard assumptions;
     (e) Establish a requirement that agencies conduct the analysis comparing a thirty-year and fifty-year building life when using the life-cycle cost model; and
     (f) Establish a requirement that agencies include renovation, system replacement, and remodel costs in maintenance costs for use in the life-cycle cost model
.

NEW SECTION.  Sec. 7006   (1) It is expected that projects be ready to proceed in a timely manner depending on the type or phase of the project or program that is the subject of the appropriation in this act. Except for major projects that customarily may take more than two biennia to complete from predesign to the end of construction, or large infrastructure grant or loan programs supporting projects that often take more than two biennia to complete, the legislature generally does not intend to reappropriate funds more than once, particularly for smaller grant programs, local/community projects, and minor works.
     (2) Agencies shall expedite the expenditure of reappropriations and appropriations in this act in order to: (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.
     (3) To the extent feasible, agencies are directed to accelerate expenditure rates at their current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section.

NEW SECTION.  Sec. 7007   State agencies, including institutions of higher education, shall allot and report full-time equivalent staff for capital projects in a manner comparable to staff reporting for operating expenditures.

NEW SECTION.  Sec. 7008   The department of general administration shall not charge the facility depreciation component of lease charges for nonprofit tenants in the building adjoining Capitol Way and 11th avenue during the 2011-2013 biennium.

NEW SECTION.  Sec. 7009   It is the intent of the legislature to meet the narrow banding requirements set forth by the federal communication commission. The department of general administration and the Washington state patrol must report the results of the preengineering study with cost estimates and schedule requirements as required in section 106, chapter ..., Laws of 2011 (PSHB 1175), to the house of representatives capital budget committee and the senate ways and means committee by December 31, 2011, for possible inclusion in the 2012 supplemental capital budget.

NEW SECTION.  Sec. 7010   Executive Order No. 05-05, archaeological and cultural resources, was issued effective November 10, 2005. Agencies and higher education institutions shall comply with the requirements set forth in this executive order.

NEW SECTION.  Sec. 7011   The capital projects advisory review board and the department of general administration, in consultation with the office of superintendent of public instruction, shall develop a performance-based school construction pilot program. The pilot program must consist of a minimum of two new K-12 school construction projects and two K-12 modernization projects, for consideration under the school construction assistance grant program. Performance-based contracting as allowed in chapter 39.35A RCW shall be the means of project delivery for all applicable systems or structural improvements. The program shall at a minimum include the following: (1) Guidelines for developing a prequalified list of energy services contractors eligible for selection to lead or participate on a team to design and construct a new building, or renovate a building; (2) a process for evaluating the projects submitted by school districts to determine if they are candidates for the pilot; (3) a model contract that requires a guarantee of system performance by way of ongoing monitoring and verification of energy measures to be used in the building; and (4) any rule making or oversight that the department of general administration considers necessary for the success of the pilot program. The pilot program recommendations shall be delivered to the house capital budget committee and the senate ways and means committee by January 1, 2012.

NEW SECTION.  Sec. 7012   ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS
     The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
     State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
     Those noninstructional facilities of higher education institutions authorized in this section to enter into financial contracts are not eligible for state funded maintenance and operations. Instructional space that is available for regularly scheduled classes for academic transfer, basic skills, and workforce training programs may be eligible for state funded maintenance and operations.
     (1) Community and technical colleges:
     (a) Enter into a financing contract on behalf of Columbia basin college for up to $2,500,000 plus financing and required reserves pursuant to chapter 39.94 RCW to add space to the delta high school for the science technology engineering math program.
     (b) Enter into a financing contract on behalf of Peninsula college for up to $2,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate the Forks Satellite building.
     (c) Enter into a financing contract on behalf of Peninsula college for up to $800,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to build a wellness center on the Port Angeles campus.
     (d) Enter into a financing contract on behalf of Walla Walla Community College for up to $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase up to 40 acres of land.
     (e) Enter into a financing contract on behalf of Walla Walla Community College for up to $1,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the water and environment center.
     (f) Enter into a financing contract on behalf of Wenatchee Valley Community College for up to $2,700,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a music and art center.
     (g) Enter into a financing contract on behalf of Whatcom community college for up to $3,916,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to build an auxiliary services building.
     (2) Central Washington University: Enter into a financing contract for up to $2,500,000 plus financing and required reserves pursuant to chapter 39.94 RCW to purchase the Albertsons's building.
     (3) Department of general administration:
     (a) Enter into a financing contract for up to $6,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the rehabilitation of the John L. O'Brien building.
     (b) Enter into a financing contract for up to $250,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the "Perry street child care site" land purchase.
     (4) Department of social and health services: Enter into a financing contract for up to $15,850,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct or renovate specialized housing and treatment facilities for youth committed to the juvenile rehabilitation administration. The debt service is to be paid with the savings associated with closure of the Maple Lane school.

NEW SECTION.  Sec. 7013   PUGET SOUND PROTECTION AND RESTORATION
     Consistent with RCW 90.71.340, when expending appropriations under this act that contribute to Puget Sound protection and recovery, agencies shall consult with the Puget Sound partnership to ensure that projects and expenditures are either in, or consistent with the 2020 action agenda. These consultations shall include the exchange of information on specific actions, projects, associated funding, performance measures, and other information necessary to track project implementation and ensure alignment with the action agenda. In situations where the Puget Sound partnership finds that a project is not in, or is not consistent with the action agenda Puget Sound partnership shall document this finding and report back to the governor and legislative fiscal committees.

NEW SECTION.  Sec. 7014   FOR THE ARTS COMMISSION--ART WORK ALLOWANCE POOLING
     (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities may be expended for the purposes of RCW 28A.335.210. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.
     (2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities may be expended for the purposes of RCW 28B.10.027. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.
     (3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 may be expended for the purposes of RCW 43.17.200. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.
     (4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 2011-2013 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended solely for direct acquisition of works of art. The commission may use up to $100,000 of this amount to conserve or maintain existing pieces in the state art collection pursuant to chapter 36, Laws of 2005.

NEW SECTION.  Sec. 7015   To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.

NEW SECTION.  Sec. 7016   If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate ways and means committee and the house of representatives capital budget committee.

NEW SECTION.  Sec. 7017   (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply: Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.
     (2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.

NEW SECTION.  Sec. 7018   NONTAXABLE AND TAXABLE BOND PROCEEDS
     Portions of the appropriation authority granted by this act from the state building construction account, or any other account receiving bond proceeds, may be transferred to the state taxable building construction account as deemed necessary by the state finance committee to comply with the federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds. Portions of the general obligation bond proceeds authorized by chapter . . ., Laws of 2011 (HB 1348) for deposit into the state taxable building construction account that are in excess of amounts required to comply with the federal internal revenue service rules and regulations shall be deposited into the state building construction account. The state treasurer shall submit written notification to the director of financial management if it is determined that a shift of appropriation authority between the state building construction account, or any other account receiving bond proceeds, and the state taxable building construction account is necessary, or that a shift of appropriation authority from the state taxable building construction account to the state building construction account may be made.

NEW SECTION.  Sec. 7019   A new section is added to 2009 c 497 (uncodified) to read as follows:
     The office of financial management, in consultation with the fiscal committees of the legislature, may select capital projects that have completed predesign to undergo a budget evaluation study. The budget evaluation study team approach using value engineering techniques must be utilized by the office of financial management in conducting the studies. The office of financial management shall select the budget evaluation team members, contract for the study, and report the results to the legislature and agencies in a timely manner following the study. Funds from the project appropriation must be used by the office of financial management through an interagency agreement with the affected agencies to cover the cost of the study.

NEW SECTION.  Sec. 7020   FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
     The superintendent of public instruction shall work with the department of general administration to help raise school district awareness of the department's services related to standard construction contract language, consultant agreement language, and the consultant selection process. The superintendent of public instruction shall use their web site, or other means, to post access to this information.

Sec. 7021   RCW 28B.20.725 and 2010 1st sp.s. c 36 s 6008 are each amended to read as follows:
     The board is hereby empowered:
     (1) To reserve the right to issue bonds later on a parity with any bonds being issued;
     (2) To authorize the investing of moneys in the bond retirement fund and any reserve account therein;
     (3) To authorize the transfer of money from the University of Washington building account to the bond retirement fund when necessary to prevent a default in the payments required to be made out of such fund;
     (4) To create a reserve account or accounts in the bond retirement fund to secure the payment of the principal of and interest on any bonds;
     (5) To authorize the transfer to the University of Washington building account of any money on deposit in the bond retirement fund in excess of debt service for a period of three years from the date of such transfer on all outstanding bonds payable out of such fund. However, during the 2009-2011 fiscal biennium, the legislature may transfer to the University of Washington building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund. However, during the 2011-2013 fiscal biennium, the legislature may transfer to the University of Washington building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund.

Sec. 7022   RCW 28B.30.750 and 2010 1st sp.s. c 36 s 6009 are each amended to read as follows:
     The board is hereby empowered:
     (1) To reserve the right to issue bonds later on a parity with any bonds being issued;
     (2) To authorize the investing of moneys in the bond retirement fund and any reserve account therein;
     (3) To authorize the transfer of money from the Washington State University building account to the bond retirement fund when necessary to prevent a default in the payments required to be made out of such fund;
     (4) To create a reserve account or accounts in the bond retirement fund to secure the payment of the principal of and interest on any bonds;
     (5) To authorize the transfer to the Washington State University building account of any money on deposit in the bond retirement fund in excess of debt service for a period of three years from the date of such transfer on all outstanding bonds payable out of such fund. However, during the 2009-2011 fiscal biennium, the legislature may transfer to the Washington State University building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund. However, during the 2011-2013 fiscal biennium, the legislature may transfer to the Washington State University building account moneys that are in excess of the debt service due within one year of the date of transfer on all outstanding bonds payable out of the bond retirement fund.

Sec. 7023   RCW 28B.15.210 and 2009 c 499 s 1 and 2009 c 497 s 6019 are each reenacted and amended to read as follows:
     Within thirty-five days from the date of collection thereof, all building fees at the University of Washington, including building fees to be charged students registering in the schools of medicine and dentistry, shall be paid into the state treasury and credited as follows:
     One-half or such larger portion as may be necessary to prevent a default in the payments required to be made out of the bond retirement fund to the "University of Washington bond retirement fund" and the remainder thereof to the "University of Washington building account." The sum so credited to the University of Washington building account shall be used exclusively for the purpose of erecting, altering, maintaining, equipping, or furnishing buildings, and for certificates of participation under chapter 39.94 RCW, except for any sums transferred as authorized in RCW 28B.20.725(3). The sum so credited to the University of Washington bond retirement fund shall be used for the payment of principal of and interest on bonds outstanding as provided by chapter 28B.20 RCW except for any sums transferred as authorized in RCW 28B.20.725(5). During the ((2009-2011)) 2011-2013 biennium, sums credited to the University of Washington building account shall also be used for routine facility maintenance and utility costs.

Sec. 7024   RCW 28B.15.310 and 2009 c 499 s 2 and 2009 c 497 s 6020 are each reenacted and amended to read as follows:
     Within thirty-five days from the date of collection thereof, all building fees shall be paid and credited as follows: To the Washington State University bond retirement fund, one-half or such larger portion as may be necessary to prevent a default in the payments required to be made out of such bond retirement fund; and the remainder thereof to the Washington State University building account.
     The sum so credited to the Washington State University building account shall be expended by the board of regents for buildings, equipment, or maintenance on the campus of Washington State University as may be deemed most advisable and for the best interests of the university, and for certificates of participation under chapter 39.94 RCW, except for any sums transferred as authorized by law. During the ((2009-2011)) 2011-2013 biennium, sums credited to the Washington State University building account shall also be used for routine facility maintenance and utility costs. Expenditures so made shall be accounted for in accordance with existing law and shall not be expended until appropriated by the legislature.
     The sum so credited to the Washington State University bond retirement fund shall be used to pay and secure the payment of the principal of and interest on building bonds issued by the university, except for any sums which may be transferred out of such fund as authorized by law.

Sec. 7025   RCW 28B.35.370 and 2009 c 499 s 5 and 2009 c 497 s 6021 are each reenacted and amended to read as follows:
     Within thirty-five days from the date of collection thereof all building fees of each regional university and The Evergreen State College shall be paid into the state treasury and these together with such normal school fund revenues as provided in RCW 28B.35.751 as are received by the state treasury shall be credited as follows:
     (1) On or before June 30th of each year the board of trustees of each regional university and The Evergreen State College, if issuing bonds payable out of its building fees and above described normal school fund revenues, shall certify to the state treasurer the amounts required in the ensuing twelve months to pay and secure the payment of the principal of and interest on such bonds. The amounts so certified by each regional university and The Evergreen State College shall be a prior lien and charge against all building fees and above described normal school fund revenues of such institution. The state treasurer shall thereupon deposit the amounts so certified in the Eastern Washington University capital projects account, the Central Washington University capital projects account, the Western Washington University capital projects account, or The Evergreen State College capital projects account respectively, which accounts are hereby created in the state treasury. The amounts deposited in the respective capital projects accounts shall be used to pay and secure the payment of the principal of and interest on the building bonds issued by such regional universities and The Evergreen State College as authorized by law. If in any twelve month period it shall appear that the amount certified by any such board of trustees is insufficient to pay and secure the payment of the principal of and interest on the outstanding building and above described normal school fund revenue bonds of its institution, the state treasurer shall notify the board of trustees and such board shall adjust its certificate so that all requirements of moneys to pay and secure the payment of the principal of and interest on all such bonds then outstanding shall be fully met at all times.
     (2) All normal school fund revenue pursuant to RCW 28B.35.751 shall be deposited in the Eastern Washington University capital projects account, the Central Washington University capital projects account, the Western Washington University capital projects account, or The Evergreen State College capital projects account respectively, which accounts are hereby created in the state treasury. The sums deposited in the respective capital projects accounts shall be appropriated and expended to pay and secure the payment of the principal of and interest on bonds payable out of the building fees and normal school revenue and for the construction, reconstruction, erection, equipping, maintenance, demolition and major alteration of buildings and other capital assets, and the acquisition of sites, rights-of-way, easements, improvements or appurtenances in relation thereto except for any sums transferred therefrom as authorized by law. During the ((2009-2011)) 2011-2013 biennium, sums in the respective capital accounts shall also be used for routine facility maintenance and utility costs.
     (3) Funds available in the respective capital projects accounts may also be used for certificates of participation under chapter 39.94 RCW.

Sec. 7026   RCW 28B.50.360 and 2009 c 499 s 6 are each amended to read as follows:
     Within thirty-five days from the date of start of each quarter all collected building fees of each such community and technical college shall be paid into the state treasury, and shall be credited as follows:
     (1) On or before June 30th of each year the college board if issuing bonds payable out of building fees shall certify to the state treasurer the amounts required in the ensuing twelve-month period to pay and secure the payment of the principal of and interest on such bonds. The state treasurer shall thereupon deposit the amounts so certified in the community and technical college capital projects account. Such amounts of the funds deposited in the community and technical college capital projects account as are necessary to pay and secure the payment of the principal of and interest on the building bonds issued by the college board as authorized by this chapter shall be devoted to that purpose. If in any twelve-month period it shall appear that the amount certified by the college board is insufficient to pay and secure the payment of the principal of and interest on the outstanding building bonds, the state treasurer shall notify the college board and such board shall adjust its certificate so that all requirements of moneys to pay and secure the payment of the principal and interest on all such bonds then outstanding shall be fully met at all times.
     (2) The community and technical college capital projects account is hereby created in the state treasury. The sums deposited in the capital projects account shall be appropriated and expended to pay and secure the payment of the principal of and interest on bonds payable out of the building fees and for the construction, reconstruction, erection, equipping, maintenance, demolition and major alteration of buildings and other capital assets owned by the state board for community and technical colleges in the name of the state of Washington, and the acquisition of sites, rights-of-way, easements, improvements or appurtenances in relation thereto, engineering and architectural services provided by the department of general administration, and for the payment of principal of and interest on any bonds issued for such purposes. During the 2011-2013 biennium, sums in the capital projects account shall also be used for routine facility maintenance and utility costs.
     (3) Funds available in the community and technical college capital projects account may also be used for certificates of participation under chapter 39.94 RCW.

Sec. 7027   RCW 43.43.944 and 2010 1st sp.s. c 37 s 923 are each amended to read as follows:
     (1) The fire service training account is hereby established in the state treasury. The fund shall consist of:
     (a) All fees received by the Washington state patrol for fire service training;
     (b) All grants and bequests accepted by the Washington state patrol under RCW 43.43.940;
     (c) Twenty percent of all moneys received by the state on fire insurance premiums; and
     (d) General fund -- state moneys appropriated into the account by the legislature.
     (2) Moneys in the account may be appropriated only for fire service training. The state patrol may use amounts appropriated from the fire service training account under this section to contract with the Washington state firefighters apprenticeship trust for the operation of the firefighter joint apprenticeship training program. The contract may call for payments on a monthly basis. During the 2009-2011 fiscal biennium, the legislature may appropriate funds from this account for school fire prevention activities within the Washington state patrol and for repairs of the burn building. During the 2011-2013 fiscal biennium, the legislature may appropriate funds from this account for school fire prevention activities within the Washington state patrol, and for predesign and repairs of the burn building.
     (3) Any general fund -- state moneys appropriated into the account shall be allocated solely to the firefighter joint apprenticeship training program. The Washington state patrol may contract with outside entities for the administration and delivery of the firefighter joint apprenticeship training program.

NEW SECTION.  Sec. 7028   FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
     The department of general administration shall provide the office of the superintendent of public instruction with existing standard construction contract and consultant agreement standardized language and selection process, for publication on office of the superintendent of public instruction's web site, which can be used at no charge by school districts. In addition, the department of general administration shall provide an option to school districts to modify existing standard construction contract or consultant agreement language and assist districts with the consultant selection process an hourly rate for these services.

NEW SECTION.  Sec. 7029   FOR THE EASTERN WASHINGTON UNIVERSITY
     Riverpoint Center Property Sale (30000061)

     Eastern Washington University is authorized to sell its center at 701 West First Avenue in downtown Spokane, and directed to deposit the proceeds of the sale into the Eastern Washington University capital projects account. The university shall report to the office of financial management and to the appropriate committees of the legislature upon the sale of the downtown center and completion of the updated appraisal.

Sec. 7030   RCW 43.155.060 and 1988 c 93 s 2 are each amended to read as follows:
     In order to aid the financing of public works projects, the board may:
     (1) Make low-interest or interest-free loans to local governments from the public works assistance account or other funds and accounts for the purpose of assisting local governments in financing public works projects. The board may require such terms and conditions and may charge such rates of interest on its loans as it deems necessary or convenient to carry out the purposes of this chapter. Money received from local governments in repayment of loans made under this section shall be paid into the public works assistance account for uses consistent with this chapter: PROVIDED, That during the fiscal year 2011, moneys received from local governments in repayment of loans made under this section must be deposited in the general fund for general purpose expenditures.
     (2) Pledge money in the public works assistance account, or money to be received by the public works assistance account, to the repayment of all or a portion of the principal of or interest on obligations issued by local governments to finance public works projects. The board shall not pledge any amount greater than the sum of money in the public works assistance account plus money to be received from the payment of the debt service on loans made from that account, nor shall the board pledge the faith and credit or the taxing power of the state or any agency or subdivision thereof to the repayment of obligations issued by any local government.
     (3) Create such subaccounts in the public works assistance account as the board deems necessary to carry out the purposes of this chapter.
     (4) Provide a method for the allocation of loans and financing guarantees and the provision of technical assistance under this chapter.
     All local public works projects aided in whole or in part under the provisions of this chapter shall be put out for competitive bids, except for emergency public works under RCW 43.155.065 for which the recipient jurisdiction shall comply with this requirement to the extent feasible and practicable. The competitive bids called for shall be administered in the same manner as all other public works projects put out for competitive bidding by the local governmental entity aided under this chapter.

Sec. 7031   RCW 82.16.020 and 2009 c 469 s 702 are each amended to read as follows:
     (1) There is levied and there shall be collected from every person a tax for the act or privilege of engaging within this state in any one or more of the businesses herein mentioned. The tax shall be equal to the gross income of the business, multiplied by the rate set out after the business, as follows:
     (a) Express, sewerage collection, and telegraph businesses: Three and six-tenths percent;
     (b) Light and power business: Three and sixty-two one-hundredths percent;
     (c) Gas distribution business: Three and six-tenths percent;
     (d) Urban transportation business: Six-tenths of one percent;
     (e) Vessels under sixty-five feet in length, except tugboats, operating upon the waters within the state: Six-tenths of one percent;
     (f) Motor transportation, railroad, railroad car, and tugboat businesses, and all public service businesses other than ones mentioned above: One and eight-tenths of one percent;
     (g) Water distribution business: Four and seven-tenths percent;
     (h) Log transportation business: One and twenty-eight one-hundredths percent.
     (2) An additional tax is imposed equal to the rate specified in RCW 82.02.030 multiplied by the tax payable under subsection (1) of this section.
     (3) Twenty percent of the moneys collected under subsection (1) of this section on water distribution businesses and sixty percent of the moneys collected under subsection (1) of this section on sewerage collection businesses shall be deposited in the public works assistance account created in RCW 43.155.050: PROVIDED, That during the fiscal year 2011, twenty percent of the moneys collected under subsection (1) of this section on water distribution businesses and sixty percent of the moneys collected under subsection (1) of this section on sewerage collection businesses must be deposited in the general fund for general purpose expenditures.

Sec. 7032   RCW 82.16.020 and 1996 c 150 s 2 are each amended to read as follows:
     (1) There is levied and there shall be collected from every person a tax for the act or privilege of engaging within this state in any one or more of the businesses herein mentioned. The tax shall be equal to the gross income of the business, multiplied by the rate set out after the business, as follows:
     (a) Express, sewerage collection, and telegraph businesses: Three and six-tenths percent;
     (b) Light and power business: Three and sixty-two one-hundredths percent;
     (c) Gas distribution business: Three and six-tenths percent;
     (d) Urban transportation business: Six-tenths of one percent;
     (e) Vessels under sixty-five feet in length, except tugboats, operating upon the waters within the state: Six-tenths of one percent;
     (f) Motor transportation, railroad, railroad car, and tugboat businesses, and all public service businesses other than ones mentioned above: One and eight-tenths of one percent;
     (g) Water distribution business: Four and seven-tenths percent.
     (2) An additional tax is imposed equal to the rate specified in RCW 82.02.030 multiplied by the tax payable under subsection (1) of this section.
     (3) Twenty percent of the moneys collected under subsection (1) of this section on water distribution businesses and sixty percent of the moneys collected under subsection (1) of this section on sewerage collection businesses shall be deposited in the public works assistance account created in RCW 43.155.050: PROVIDED, That during the fiscal year 2011, twenty percent of the moneys collected under subsection (1) of this section on water distribution businesses and sixty percent of the moneys collected under subsection (1) of this section on sewerage collection businesses must be deposited in the general fund for general purpose expenditures.

Sec. 7033   RCW 82.18.040 and 2000 c 103 s 11 are each amended to read as follows:
     Taxes collected under this chapter shall be held in trust until paid to the state. Taxes received by the state shall be deposited in the public works assistance account created in RCW 43.155.050: PROVIDED, That during the fiscal year 2011, taxes received by the state under this chapter must be deposited in the general fund for general purpose expenditures. Any person collecting the tax who appropriates or converts the tax collected shall be guilty of a gross misdemeanor if the money required to be collected is not available for payment on the date payment is due. If a taxpayer fails to pay the tax imposed by this chapter to the person charged with collection of the tax and the person charged with collection fails to pay the tax to the department, the department may, in its discretion, proceed directly against the taxpayer for collection of the tax.
     The tax shall be due from the taxpayer within twenty-five days from the date the taxpayer is billed by the person collecting the tax.
     The tax shall be due from the person collecting the tax at the end of the tax period in which the tax is received from the taxpayer. If the taxpayer remits only a portion of the total amount billed for taxes, consideration, and related charges, the amount remitted shall be applied first to payment of the solid waste collection tax and this tax shall have priority over all other claims to the amount remitted.

Sec. 7034   RCW 82.45.060 and 2005 c 450 s 1 are each amended to read as follows:
     There is imposed an excise tax upon each sale of real property at the rate of one and twenty-eight one-hundredths percent of the selling price. An amount equal to six and one-tenth percent of the proceeds of this tax to the state treasurer shall be deposited in the public works assistance account created in RCW 43.155.050: PROVIDED, That during the fiscal year 2011, six and one-tenth percent of the proceeds of this tax must be deposited in the general fund for general purpose expenditures. An amount equal to one and six-tenths percent of the proceeds of this tax to the state treasurer shall be deposited in the city-county assistance account created in RCW 43.08.290.

Sec. 7035   RCW 43.155.050 and 2010 1st sp.s. c 37 s 932 are each amended to read as follows:
     The public works assistance account is hereby established in the state treasury. Money may be placed in the public works assistance account from the proceeds of bonds when authorized by the legislature or from any other lawful source. Money in the public works assistance account shall be used to make loans and to give financial guarantees to local governments for public works projects. Moneys in the account may also be appropriated to provide for state match requirements under federal law for projects and activities conducted and financed by the board under the drinking water assistance account. Not more than fifteen percent of the biennial capital budget appropriation to the public works board from this account may be expended or obligated for preconstruction loans, emergency loans, or loans for capital facility planning under this chapter; of this amount, not more than ten percent of the biennial capital budget appropriation may be expended for emergency loans and not more than one percent of the biennial capital budget appropriation may be expended for capital facility planning loans. For the 2007-2009 biennium, moneys in the account may be used for grants for projects identified in section 138, chapter 488, Laws of 2005 and section 1033, chapter 520, Laws of 2007. During the 2009-2011 fiscal biennium, sums in the public works assistance account may be used for the water pollution control revolving fund program match in section 3013, chapter 36, Laws of 2010 1st sp. sess. During the 2009-2011 fiscal biennium, the legislature may transfer from the job development fund to the general fund such amounts as reflect the excess fund balance of the fund. During the 2011-2013 fiscal biennium, sums in the public works assistance account may be used for grants for public works projects funded under section 2021 of this act.

NEW SECTION.  Sec. 7036   SALARY ADJUSTMENT
     The appropriations in this act shall be expended solely for the purposes designated in this act and are subject to the following conditions and limitations:
     (1) Appropriations in this act are provided solely for a 3.0 percent salary reduction effective July 1, 2011, through June 29, 2013, for all employees of the executive, legislative, and judicial branches, including those employees in the Washington management service, and including employees exempt from merit system rules, except for:
     (a) Elected officials whose salaries are set by the commission on salaries for elected officials;
     (b) Student employees at state institutions of higher education;
     (c) Faculty employees at state institutions of higher education: PROVIDED, HOWEVER, That appropriations to higher education institutions are reduced in an amount reflecting a 3.0 percent reduction in faculty salary expenditures;
     (d) Certificated employees of the state school for the blind and the center for childhood deafness and hearing loss;
     (e) Commissioned officers of the Washington state patrol represented by the state patrol troopers' association and the Washington state patrol lieutenants' association;
     (f) Represented ferry workers of the Washington state department of transportation, provided, however, that other reductions are included in section 504 of the 2011-2013 transportation appropriations act;
     (g) Employees whose salary is less than $2,500 per month; and
     (h) Employees as specified in subsection (2) of this section.
     (2) For employees subject to the 3.0 percent reduction in salary under subsection (1) of this section employees will receive temporary salary reduction leave of up to 5.2 hours per month. The director of personnel shall adopt rules governing the accrual and use of temporary salary reduction leave.
     (3) The department of retirement systems shall include any forgone salary or lost work hours under subsections (1) and (3) of this section in the final average compensation of employees affected for purposes of calculating retirement benefits, as specified in executive request legislation Z-0211.1/11.
     (4) The appropriation from dedicated funds and accounts shall be made in the amounts specified and from the dedicated funds and accounts specified in office of financial management document 2011-01, which is hereby incorporated by reference. The office of financial management shall allocate the moneys appropriated in this section in the amounts specified and to the state agencies specified in office of financial management document 2011-01 and adjust appropriation schedules accordingly.

NEW SECTION.  Sec. 7037   If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.

NEW SECTION.  Sec. 7038   Sections 7005 and 7031 of this act expire June 30, 2013.

NEW SECTION.  Sec. 7039   Section 7032 of this act takes effect June 30, 2013.

NEW SECTION.  Sec. 7040   Section 7035 of this act takes effect June 30, 2011.

NEW SECTION.  Sec. 7041   This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately, except for sections 7023 through 7026 of this act which take effect July 1, 2011.

(End of bill)



     INDEX       PAGE #


CENTRAL WASHINGTON UNIVERSITY . . . . . . . . . . . . 123, 200
COMMUNITY AND TECHNICAL COLLEGE SYSTEM . . . . . . . . . . . . 138, 201
CRIMINAL JUSTICE TRAINING COMMISSION . . . . . . . . . . . . 33
DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION . . . . . . . . . . . . 31
DEPARTMENT OF COMMERCE . . . . . . . . . . . . 3, 151
DEPARTMENT OF CORRECTIONS . . . . . . . . . . . . 40, 177
DEPARTMENT OF ECOLOGY . . . . . . . . . . . . 47, 184
DEPARTMENT OF FISH AND WILDLIFE . . . . . . . . . . . . 88, 192
DEPARTMENT OF GENERAL ADMINISTRATION . . . . . . . . . . . . 25, 173
DEPARTMENT OF HEALTH . . . . . . . . . . . . 38
DEPARTMENT OF LABOR AND INDUSTRIES . . . . . . . . . . . . 45
DEPARTMENT OF NATURAL RESOURCES . . . . . . . . . . . . 97, 195
DEPARTMENT OF SOCIAL AND HEALTH SERVICES . . . . . . . . . . . . 33, 174
DEPARTMENT OF VETERANS AFFAIRS . . . . . . . . . . . . 39
EASTERN WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 137
EASTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 122, 220
MILITARY DEPARTMENT . . . . . . . . . . . . 30
OFFICE OF FINANCIAL MANAGEMENT . . . . . . . . . . . . 22, 172
PUGET SOUND PARTNERSHIP . . . . . . . . . . . . 97, 197
RECREATION AND CONSERVATION FUNDING BOARD . . . . . . . . . . . . 74, 191
STATE CONSERVATION COMMISSION . . . . . . . . . . . . 87
STATE PARKS AND RECREATION COMMISSION . . . . . . . . . . . . 67, 190
STATE SCHOOL FOR THE BLIND . . . . . . . . . . . . 115
SUPERINTENDENT OF PUBLIC INSTRUCTION . . . . . . . . . . . . 108, 198
THE EVERGREEN STATE COLLEGE . . . . . . . . . . . . 126
UNIVERSITY OF WASHINGTON . . . . . . . . . . . . 116, 200
WASHINGTON STATE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS . . . . . . . . . . . . 116, 199
WASHINGTON STATE HISTORICAL SOCIETY . . . . . . . . . . . . 133
WASHINGTON STATE PATROL . . . . . . . . . . . . 106, 174
WASHINGTON STATE UNIVERSITY . . . . . . . . . . . . 119
WESTERN WASHINGTON UNIVERSITY . . . . . . . . . . . . 129

--- END ---