BILL REQ. #: Z-0854.2
State of Washington | 62nd Legislature | 2011 2nd Special Session |
Read first time 12/12/11. Referred to Committee on Capital Budget.
AN ACT Relating to funding capital projects; amending 2011 1st sp.s. c 49 ss 1011, 1024, 1025, 1036, 2008, 2027, 3008, 3028, 5002, 5008, 5009, 5022, 5030, 5037, and 5082 (uncodified); amending 2011 1st sp.s. c 48 ss 1022, 2002, 2003, 3024, 3036, 3041, 5006, 5012, and 7011 (uncodified); adding new sections to 2011 1st sp.s. c 49 (uncodified); adding new sections to 2011 1st sp.s. c 48 (uncodified); creating a new section; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1 A supplemental capital budget is hereby
adopted and, subject to the provisions set forth in this act, the
several dollar amounts hereinafter specified, or so much thereof as
shall be sufficient to accomplish the purposes designated, are hereby
appropriated and authorized to be incurred for capital projects during
the period beginning with the effective date of this act and ending
June 30, 2013, out of the several funds specified in this act.
Sec. 1001 2011 1st sp.s. c 49 s 1011 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF COMMERCE
Local and Community Projects (20084001)
The reappropriation in this section is subject to the following
conditions and limitations:
(1) The projects must comply with RCW 43.63A.125 and other
requirements for community projects administered by the department.
(2) The reappropriation is subject to the provisions of section
1008, chapter 328, Laws of 2008 and section 1003, chapter 36, Laws of
2010 1st sp. sess.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . (($18,387,000))
$18,477,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $106,757,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($125,144,000))
$125,234,000
Sec. 1002 2011 1st sp.s. c 49 s 1024 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF COMMERCE
Temporary Public Works Grant Program (92000021)
The reappropriation in this section is subject to the provisions of
section 1050, chapter 497, Laws of 2009.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $17,106,000
State Taxable Building Construction
Account--State . . . . . . . . . . . . (($1,298,000))
$328,000
Subtotal Reappropriation . . . . . . . . . . . . (($18,404,000))
$17,434,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $23,936,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($42,340,000))
$41,370,000
Sec. 1003 2011 1st sp.s. c 49 s 1025 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF COMMERCE
Jobs Act for K-12 Public Schools & Higher Education Institutions
(91000085)
The reappropriation in this section is subject to the following
conditions and limitations: The reappropriation is subject to the
provisions of section 1016, chapter 36, Laws of 2010 1st sp. sess.
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . (($44,630,000))
$44,405,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $179,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($44,809,000))
$44,584,000
NEW SECTION. Sec. 1004 A new section is added to 2011 1st sp.s.
c 48 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Public Works Assistance Account Program (30000184)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the list of projects in LEAP capital document No. . . . dated . . . ..
Appropriation:
Public Works Assistance Account--State . . . . . . . . . . . . $185,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $185,000,000
NEW SECTION. Sec. 1005 A new section is added to 2011 1st sp.s.
c 48 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Community Economic Revitalization Board (30000183)
Appropriation:
Public Works Assistance Account--State . . . . . . . . . . . . $15,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $15,000,000
NEW SECTION. Sec. 1006 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Connell Klindworth Water Line Distribution (30000181)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $540,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $540,000
NEW SECTION. Sec. 1007 A new section is added to 2011 1st sp.s.
c 48 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Financing Energy/Water Efficiency (30000180)
Appropriation:
Public Works Assistance Account--State . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $5,000,000
Sec. 1008 2011 1st sp.s. c 49 s 1036 (uncodified) is amended to
read as follows:
FOR THE OFFICE OF FINANCIAL MANAGEMENT
Bid Savings Contingency Pool (92000002)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($6,500,000))
$0
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($6,500,000))
$0
NEW SECTION. Sec. 1009 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE OFFICE OF FINANCIAL MANAGEMENT
Transfer Capital Budget Staff to Capital Funds (30000028)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $728,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,912,000
Total . . . . . . . . . . . . $3,640,000
Sec. 1010 2011 1st sp.s. c 48 s 1022 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF ((GENERAL ADMINISTRATION)) ENTERPRISE SERVICES
Engineering and Architectural Services: Staffing (91000005)
Appropriation:
((Charitable, Educational, Penal and Reformatory)) State Building
Institutions Account--State
Construction Account--State . . . . . . . . . . . . $928,000
Capitol Building Construction Account--State . . . . . . . . . . . . $790,000
Subtotal Appropriation . . . . . . . . . . . . $1,718,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $1,718,000
NEW SECTION. Sec. 1011 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ENTERPRISE SERVICES
Earthquake Repair (20041015)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $106,380,442
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $107,480,442
NEW SECTION. Sec. 1012 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ENTERPRISE SERVICES
Capital Projects Advisory Review Board (30000001)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $246,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $984,000
Total . . . . . . . . . . . . $1,230,000
Sec. 2001 2011 1st sp.s. c 49 s 2008 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Capacity to Replace Maple Lane School (92000005)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $363,000
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,635,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $462,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($2,097,000))
$2,460,000
Sec. 2002 2011 1st sp.s. c 48 s 2002 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Frances Haddon Morgan Center (91000014)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the department of social and health services to develop a predesign
with options for the future use of the Frances Haddon Morgan Center
site, including the permanent use of the property to support housing or
other services for low-income, disabled, or vulnerable persons. The
predesign shall be delivered to the house of representatives fiscal
committees and the senate ways and means committee by December 31,
2011. This predesign shall not delay any activities associated with
ceasing to operate the facility as a residential habilitation center
after December 31, 2012. On and after January 1, 2013, the Frances
Haddon Morgan Center property must remain either in public ownership,
or may be sold or leased for a nominal amount to a nonprofit
organization for the permanent use of the property to support housing
or other services for low-income, disabled, or vulnerable persons.
Appropriation:
((Charitable, Educational, Penal and Reformatory)) State Building
Institutions Account--State
Construction Account--State . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $150,000
Sec. 2003 2011 1st sp.s. c 48 s 2003 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Yakima Valley School (91000016)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
the department of social and health services to develop a predesign
with options for the future use of the Yakima Valley School site,
including the permanent use of the property to support housing or other
services for low-income, disabled, or vulnerable persons. The
predesign shall be delivered to the house of representatives fiscal
committees and the senate ways and means committee by December 31,
2011. This predesign shall not delay any activities associated with
ceasing to operate the facility as a residential habilitation center
after December 31, 2012. On and after January 1, 2013, the Yakima
Valley School property must remain either in public ownership, or may
be sold or leased for a nominal amount to a nonprofit organization for
the permanent use of the property to support housing or other services
for low-income, disabled, or vulnerable persons.
Appropriation:
((Charitable, Educational, Penal and Reformatory)) State Building
Institutions Account--State
Construction Account--State . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $150,000
Sec. 2004 2011 1st sp.s. c 49 s 2027 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Housing Units, Kitchen and Site
Work (30000482)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $5,810,000
Public Safety Reimbursable Bond Account--State . . . . . . . . . . . . $546,000
Subtotal Reappropriation . . . . . . . . . . . . $6,356,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($42,453,000))
$40,753,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $463,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($49,272,000))
$47,572,000
NEW SECTION. Sec. 2005 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: Replace Fire Alarm Systems (30000715)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,223,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $3,223,000
NEW SECTION. Sec. 2006 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Replace Intensive Management Unit
Roofs (30000714)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,207,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $1,207,000
Sec. 3001 2011 1st sp.s. c 49 s 3008 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Columbia River Basin Water Supply Development Program (20062950)
The appropriation in this section is subject to the following
conditions and limitations:
(1) $1,000,000 of the appropriation is provided solely to the
Columbia basin ground water management area for the following projects:
(a) $600,000 of the appropriation is provided solely to construct
localized hydrologic models for municipal supply sources and aquifer
storage and recovery potential; and
(b) $400,000 of the appropriation is provided solely to develop and
implement methods to identify sustainable wells near the East Low
Canal.
(2) $6,000,000 of the appropriation is provided solely for the
Sunnyside Valley Irrigation District Water Conservation program.
(3) The department must reexamine its method of accounting for in-stream and out-of-stream benefits and develop a means of accounting for
the indirect but substantial and tangible out-of-stream benefits that
accrue from conservation, pump exchanges, and other projects. The
department must report the results of this reexamination to the
legislature by September 15, 2011.
Reappropriation:
Columbia River Basin Water Supply Development
Account--State . . . . . . . . . . . . $23,987,000
Appropriation:
Columbia River Basin Water Supply Development
Account--State . . . . . . . . . . . . (($47,000,000))
$36,596,000
Columbia River Basin Taxable Bond Water
Supply Development Account--State . . . . . . . . . . . . $10,404,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $20,513,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $128,700,000
TOTAL . . . . . . . . . . . . $220,200,000
Sec. 3002 2011 1st sp.s. c 49 s 3028 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Protect Communities from Flood and Drought (92000002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . (($6,475,000))
$8,172,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $8,500,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($14,975,000))
$16,672,000
Sec. 3003 2011 1st sp.s. c 48 s 3024 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (30000208)
The appropriations in this section are subject to the following
conditions and limitations:
(1) $3,500,000 of the appropriation is provided solely to the city
of Snohomish to implement the near-term wastewater treatment plant
improvement project required under agreed order No. 7973 between the
department of ecology and the city.
(2) $3,500,000 of the appropriation is provided solely for a grant
for the Freeland sewer project.
(3) (($540,000 of the appropriation is provided solely for the city
of Connell's Klindworth Campbell waterline distribution project.)) $600,000 of the appropriation is provided solely for a grant
for the town of Mabton's wastewater treatment project.
(4)
(((5))) (4) For projects involving repair, replacement, or
improvement of a wastewater treatment plant or other public works
facility for which an investment grade audit is obtainable, the
department of ecology must require as a contract condition that the
project sponsor undertake an investment grade audit. The project
sponsor may finance the costs of the audit as part of its centennial
clean water program grant.
Appropriation:
State Toxics Control Account--State . . . . . . . . . . . . $34,100,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . $34,100,000
Sec. 3004 2011 1st sp.s. c 48 s 3036 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Clean Up Toxics Sites - Puget Sound (30000265)
Appropriation:
((Local Toxics Control Account--State)) State
Toxics Control Account--State . . . . . . . . . . . . $16,400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $11,248,000
TOTAL . . . . . . . . . . . . $27,648,000
Sec. 3005 2011 1st sp.s. c 48 s 3041 (uncodified) is amended to
read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Statewide Storm Water Projects (30000294)
The appropriation in this section is subject to the following
conditions and limitations: The appropriation is provided solely for
construction projects or design/construction projects statewide that
result in the greatest improvements necessary to meet national
pollution discharge elimination system requirements for communities
least able to pay for those projects or for jurisdictions who are early
adopters of new regulations and effective new technology. The
department must develop specific evaluative criteria to award grants on
a competitive basis to projects that meet the policy objectives in this
section, demonstrate readiness to proceed and have a minimum cash match
of twenty-five percent.
Appropriation:
Local Toxics Control Account--State . . . . . . . . . . . . (($30,000,000))
$7,000,000
State Toxics Control Account--State . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($30,000,000))
$8,000,000
NEW SECTION. Sec. 3006 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program Contract Obligations
(30000007)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,277,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $1,277,000
NEW SECTION. Sec. 3007 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Minor Works - Infrastructure Preservation (30000470)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,050,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $1,050,000
NEW SECTION. Sec. 4001 A new section is added to 2011 1st sp.s.
c 48 (uncodified) to read as follows:
FOR THE WASHINGTON STATE PATROL
Fire Training Academy Self Contained Breathing Apparatus Building
(30000067)
Appropriation:
Fire Service Training Account--State . . . . . . . . . . . . $244,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $244,000
NEW SECTION. Sec. 4002 A new section is added to 2011 1st sp.s.
c 48 (uncodified) to read as follows:
FOR THE WASHINGTON STATE PATROL
Fire Training Academy Master Plan/Environmental Impact Study
(30000066)
Appropriation:
Fire Service Training Account--State . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $400,000
Sec. 5001 2011 1st sp.s. c 49 s 5002 (uncodified) is amended to
read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
Vocational Skills Centers (20084300)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . (($3,187,000))
$2,226,000
School Construction and Skills Centers Building
Account--State . . . . . . . . . . . . $119,000
Subtotal Reappropriation . . . . . . . . . . . . (($3,306,000))
$2,345,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $67,401,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($70,707,000))
$69,746,000
Sec. 5002 2011 1st sp.s. c 49 s 5008 (uncodified) is amended to
read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
Skills Centers Minor Works - Facility Preservation (30000111)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($3,000,000))
$2,942,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $12,000,000
TOTAL . . . . . . . . . . . . (($15,000,000))
$14,942,000
Sec. 5003 2011 1st sp.s. c 49 s 5009 (uncodified) is amended to
read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
Yakima Valley Technical Skills Center (30000076)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($28,461,000))
$25,443,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($28,461,000))
$25,443,000
Sec. 5004 2011 1st sp.s. c 48 s 5006 (uncodified) is amended to
read as follows:
FOR THE STATE SCHOOL FOR THE BLIND
General Campus Preservation (30000018)
Appropriation:
Charitable, Educational, Penal and Reformatory
Institutions Account--State . . . . . . . . . . . . (($550,000))
$60,000
State Building Construction Account--State . . . . . . . . . . . . $490,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $2,557,000
TOTAL . . . . . . . . . . . . $3,107,000
NEW SECTION. Sec. 5005 A new section is added to 2011 1st sp.s.
c 49 (uncodified) to read as follows:
FOR THE CENTER FOR CHILDHOOD DEAFNESS AND HEARING LOSS
Lloyd Auditorium Emergency Repairs (30000012)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,858,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
Total . . . . . . . . . . . . $1,858,000
Sec. 5006 2011 1st sp.s. c 49 s 5022 (uncodified) is amended to
read as follows:
FOR THE UNIVERSITY OF WASHINGTON
Anderson Hall Renovation (20091002)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($1,553,000))
$0
Prior Biennia (Expenditures) . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs) . . . . . . . . . . . . (($19,997,000))
$0
TOTAL . . . . . . . . . . . . (($21,750,000))
$200,000
Sec. 5007 2011 1st sp.s. c 48 s 5012 (uncodified) is amended to
read as follows:
FOR THE UNIVERSITY OF WASHINGTON
University of Washington - Minor Capital Repairs (30000372)
Appropriation:
University of Washington Building
Account--State . . . . . . . . . . . . (($27,801,000))
$31,820,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $30,000,000
TOTAL . . . . . . . . . . . . (($57,801,000))
$61,820,000
Sec. 5008 2011 1st sp.s. c 49 s 5030 (uncodified) is amended to
read as follows:
FOR THE EASTERN WASHINGTON UNIVERSITY
Minor Works: Health, Safety, and Code Compliance (20081002)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . (($286,000))
$129,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,871,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($4,157,000))
$4,000,000
Sec. 5009 2011 1st sp.s. c 49 s 5037 (uncodified) is amended to
read as follows:
FOR THE CENTRAL WASHINGTON UNIVERSITY
Combined Utilities (30000448)
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . $3,727,000
Central Washington University Capital Projects
Account--State . . . . . . . . . . . . $273,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $0
Future Biennia (Projected Costs) . . . . . . . . . . . . $19,600,000
TOTAL . . . . . . . . . . . . (($23,327,000))
$23,600,000
Sec. 5010 2011 1st sp.s. c 49 s 5082 (uncodified) is amended to
read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Everett Community College: Index Hall Replacement (20081221)
Reappropriation:
State Building Construction Account--State . . . . . . . . . . . . $1,468,000
Appropriation:
State Building Construction Account--State . . . . . . . . . . . . (($31,988,000))
$31,357,000
Prior Biennia (Expenditures) . . . . . . . . . . . . $3,489,000
Future Biennia (Projected Costs) . . . . . . . . . . . . $0
TOTAL . . . . . . . . . . . . (($36,945,000))
$36,314,000
Sec. 6001 2011 1st sp.s. c 48 s 7011 (uncodified) is amended to
read as follows:
The following agencies may enter into financial contracts, paid
from any funds of an agency, appropriated or nonappropriated, for the
purposes indicated and in not more than the principal amounts
indicated, plus financing expenses and required reserves pursuant to
chapter 39.94 RCW. When securing properties under this section,
agencies shall use the most economical financial contract option
available, including long-term leases, lease-purchase agreements,
lease-development with option to purchase agreements or financial
contracts using certificates of participation. Expenditures made by an
agency for one of the indicated purposes before the issue date of the
authorized financial contract and any certificates of participation
therein are intended to be reimbursed from proceeds of the financial
contract and any certificates of participation therein to the extent
provided in the agency's financing plan approved by the state finance
committee.
State agencies may enter into agreements with the department of
general administration and the state treasurer's office to develop
requests to the legislature for acquisition of properties and
facilities through financial contracts. The agreements may include
charges for services rendered.
Those noninstructional facilities of higher education institutions
authorized in this section to enter into financial contracts are not
eligible for state funded maintenance and operations. Instructional
space that is available for regularly scheduled classes for academic
transfer, basic skills, and workforce training programs may be eligible
for state funded maintenance and operations.
(1) Community and technical colleges:
(a) Enter into a financing contract on behalf of Columbia basin
college for up to $2,500,000 plus financing and required reserves
pursuant to chapter 39.94 RCW to add space to the delta high school for
the science technology engineering math program.
(b) Enter into a financing contract on behalf of Peninsula college
for up to $2,000,000 plus financing expenses and required reserves
pursuant to chapter 39.94 RCW to renovate the Forks Satellite building.
(c) Enter into a financing contract on behalf of Peninsula college
for up to $800,000 plus financing expenses and required reserves
pursuant to chapter 39.94 RCW to build a wellness center on the Port
Angeles campus.
(d) Enter into a financing contract on behalf of Walla Walla
Community College for up to $1,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to purchase up to 40
acres of land.
(e) Enter into a financing contract on behalf of Walla Walla
Community College for up to $1,000,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW for the water and
environment center.
(f) Enter into a financing contract on behalf of Wenatchee Valley
Community College for up to $2,700,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to construct a music
and art center.
(g) Enter into a financing contract on behalf of Whatcom community
college for up to $3,916,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW to build an auxiliary services
building.
(h) Enter into a financing contract on behalf of Everett Community
College for up to $4,000,000 plus financing expenses and required
reserves pursuant to chapter 39.94 RCW for the renovation of the
corporate and continuing education building.
(i) Enter into a financing contract on behalf of the state board
for community and technical colleges for up to $100,000,000 plus
financing expenses and required reserves pursuant to chapter 39.94 RCW
for the administrative system replacement project pursuant to RCW
28B.50.515(4).
(2) Central Washington University: Enter into a financing contract
for up to $2,500,000 plus financing and required reserves pursuant to
chapter 39.94 RCW to purchase the Albertsons's building.
(3) Department of general administration:
(a) Enter into a financing contract for up to $6,000,000 plus
financing expenses and required reserves pursuant to chapter 39.94 RCW
for the rehabilitation of the John L. O'Brien building.
(b) Enter into a financing contract for up to $250,000 plus
financing expenses and required reserves pursuant to chapter 39.94 RCW
for the "Perry Street child care site" land purchase.
(4) Department of social and health services: Enter into a
financing contract for up to $15,850,000 plus financing expenses and
required reserves pursuant to chapter 39.94 RCW to construct or
renovate specialized housing and treatment facilities for youth
committed to the juvenile rehabilitation administration. The debt
service is to be paid with the savings associated with closure of the
Maple Lane school.
NEW SECTION. Sec. 6002 If any provision of this act or its
application to any person or circumstance is held invalid, the
remainder of the act or the application of the provision to other
persons or circumstances is not affected.
NEW SECTION. Sec. 6003 This act is necessary for the immediate
preservation of the public peace, health, or safety, or support of the
state government and its existing public institutions, and takes effect
immediately.