AN ACT Relating to the management of water resources; amending RCW 90.03.255, 90.44.055, 90.44.050, 90.14.140, 90.14.160, 90.14.170, 90.14.180, 90.03.380, 90.03.380, 90.44.100, 90.44.100, 90.82.040, 90.82.043, 90.82.060, 90.82.060, and 90.03.470; reenacting and amending RCW 90.14.140; adding new sections to chapter 90.03 RCW; adding a new section to chapter 90.54 RCW; creating new sections; repealing RCW 90.14.240; prescribing penalties; providing an effective date; and providing an expiration date.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 101 (1) The legislature finds that continued
population growth will increase competition for water among municipal,
industrial, agricultural, and instream water interests in the state.
The competition for water will also be intensified by the coming
challenges of climate change that will reduce the capacity of the
state's natural snowpack and groundwater resources to recharge and
sustain stream base flows and lake levels. The legislature therefore
intends to promote active water management that protects and restores
sustainable water supplies for our communities, farms, and ecosystems.
Active water management means ensuring that current water supplies are
used efficiently, collecting data and assessing water availability,
investing in development of new water supplies, and working with local
partners to implement watershed plans and actions.
(2) The legislature finds that an adequate scientific foundation is
necessary to support sound water resources management by characterizing
how much water a water source has now and will have in the future, as
well as how much water is being used now and will be needed in the
future under projected climatic and development trends. The
legislature therefore intends to promote water supply assessments as a
foundational and science-based extension of current watershed planning
and implementation efforts to project future water supply needs and
availability, to develop surface and groundwater supply solutions, and
to inform coordinated water supply and land use decisions that serve
the economic and environmental water needs of present and future
generations.
(3) The legislature finds that certainty and clarity in water
rights administration is crucial for the economic and environmental
vitality of the state, but that current statutory authorities for
managing water create unnecessary administrative costs and
inefficiencies and impede effective conservation of scarce water
resources. The legislature therefore intends to reform current
statutory provisions to promote administrative efficiencies and active
water management that will be needed to help the state and its water
users prepare for coming water resource challenges due to population
growth and climate change.
(4) The legislature finds that processing water rights involves
conferring a significant private right to use a public resource upon
applicants and that applicants pay approximately two percent of state
water right application processing costs. The legislature therefore
intends to authorize new cost recovery mechanisms through which the
beneficiaries of this process pay for the costs of processing their
applications.
(5) The legislature finds that the state general fund pays for
approximately eighty-five percent of the department of ecology's costs
for water resource management services provided by the water resources
program as a whole. The legislature therefore intends to direct the
department of ecology to recommend ways to make the state's water
resource management program financially self-sufficient.
Sec. 201 RCW 90.03.255 and 1997 c 360 s 2 are each amended to
read as follows:
(1) The department shall, when evaluating an application for a
water right, transfer, or change filed pursuant to RCW 90.03.250 or
90.03.380 that includes provision for ((any water impoundment or other
resource management technique)) mitigation of impacts through new or
existing storage or other infrastructure, operations, or institutional
arrangements, take into consideration the benefits and costs, including
environmental effects, of any ((water impoundment or other resource
management)) mitigation technique that is included as a component of
the application. The department's consideration shall extend to any
increased water supply that results from ((the impoundment or other
resource management)) a mitigation technique, including but not limited
to any recharge of groundwater that may occur or water banking activity
under chapters 90.42 and 90.38 RCW, as a means of making water
available or otherwise offsetting the impact of the diversion of
surface water proposed in the application for the water right,
transfer, or change. Provision for ((an impoundment or other resource
management technique)) mitigation of impacts in an application shall be
made solely at the discretion of the applicant and shall not otherwise
be made by the department as a condition for approving an application
that does not include such provision, unless the department has first
adopted a rule closing the source to new appropriations or a rule
establishing instream flows that apply to the source. If the
department has adopted such closure or instream flow rules and it has
published guidance as provided in subsection (2) of this section, then
the department may reject an application for lack of completeness if it
is not accompanied by a mitigation plan.
(2) The department may publish guidance on its web site to inform
applicants of mitigation strategies, techniques, and institutional
arrangements that, where feasible, would ensure that, if the
application were granted, the effects of the new diversion or
withdrawal would not impair any senior water right or adopted instream
flow, or negatively affect any closed water source.
(3) This section does not lessen, enlarge, or modify the rights of
any riparian owner, or any existing water right acquired by
appropriation or otherwise.
Sec. 202 RCW 90.44.055 and 1997 c 360 s 3 are each amended to
read as follows:
(1) The department shall, when evaluating an application for a
water right or an amendment filed pursuant to RCW 90.44.050 or
90.44.100 that includes provision for ((any water impoundment or other
resource management technique)) mitigation of impacts through new or
existing storage or other infrastructure, operations, or institutional
arrangements, take into consideration the benefits and costs, including
environmental effects, of any ((water impoundment or other resource
management)) mitigation technique that is included as a component of
the application. The department's consideration shall extend to any
increased water supply that results from the impoundment or other
resource management technique, including but not limited to any
recharge of groundwater that may occur or water banking activity under
chapters 90.42 and 90.38 RCW, as a means of making water available or
otherwise offsetting the impact of the withdrawal of groundwater
proposed in the application for the water right or amendment in the
same water resource inventory area. Provision for ((an impoundment or
other resource management technique)) mitigation of impacts in an
application shall be made solely at the discretion of the applicant and
shall not be made by the department as a condition for approving an
application that does not include such provision, unless the department
has first adopted a rule closing the source to new appropriations or
has first adopted rules establishing instream flows that apply to the
source. If the department has adopted such closure or instream flow
rules and it has published guidance as provided in subsection (2) of
this section, then the department may reject an application for lack of
completeness if it is not accompanied by a mitigation plan.
(2) The department may publish guidance on its web site to inform
applicants of mitigation strategies, techniques, and institutional
arrangements that, where feasible, would ensure that, if the
application were granted, the effects of the new diversion or
withdrawal would not impair any senior water right or adopted instream
flow, or negatively affect any closed water source.
(3) This section does not lessen, enlarge, or modify the rights of
any riparian owner, or any existing water right acquired by
appropriation or otherwise.
Sec. 203 RCW 90.44.050 and 2003 c 307 s 1 are each amended to
read as follows:
(1) After June 6, 1945, no withdrawal of public groundwaters of the
state shall be begun, nor shall any well or other works for such
withdrawal be constructed, unless an application to appropriate such
waters has been made to the department and a permit has been granted by
it as herein provided: EXCEPT, HOWEVER, That any withdrawal of public
groundwaters for stock-watering purposes, or for the watering of a lawn
or of a noncommercial garden not exceeding one-half acre in area, or
for single or group domestic uses in an amount not exceeding five
thousand gallons a day, or as provided in RCW 90.44.052, or for an
industrial purpose in an amount not exceeding five thousand gallons a
day, is and shall be exempt from the provisions of this section, but,
to the extent that it is regularly used beneficially, shall be entitled
to a right equal to that established by a permit issued under the
provisions of this chapter: PROVIDED, HOWEVER, That the department
from time to time may require the person or agency making any such
small withdrawal to furnish information as to the means for and the
quantity of that withdrawal: PROVIDED, FURTHER, That at the option of
the party making withdrawals of groundwaters of the state not exceeding
five thousand gallons per day, applications under this section or
declarations under RCW 90.44.090 may be filed and permits and
certificates obtained in the same manner and under the same
requirements as is in this chapter provided in the case of withdrawals
in excess of five thousand gallons a day.
(2) The department may by rule establish quantity and acreage
limits for new uses of water that are lower than those provided in
subsection (1) of this section. The rules, which may include rules
adopted under RCW 90.54.050, must be specific to a watershed or aquifer
that the department believes is at or close to being fully appropriated
and that lower limits on new uses of groundwater are needed in the
interest of conservation and stretching the beneficial use of remaining
waters as far as possible.
NEW SECTION. Sec. 301 A new section is added to chapter 90.03
RCW to read as follows:
(1) The department may tentatively determine the extent, validity,
and priority of respective rights to the use of water for purposes of
protecting senior water rights from impairment by junior water rights,
or when necessary for effective water management, or when a question
arises among competing water users whether any of them is using water
in excess of the amount to which the user of the water is lawfully
entitled.
(2) Except as provided in subsection (3) of this section, such a
tentative determination is binding among the water users whose rights
are determined until such time as a partial or final decree is entered
in a general adjudication, which includes rights to the uses determined
by the department pursuant to this section, but is not binding on any
water user whose rights were not determined by the department. A water
master may rely on such a determination in dividing, regulating, and
controlling the use of water pursuant to RCW 90.03.070.
(3) Any person aggrieved by department actions under this section
may appeal the decision to the pollution control hearings board under
chapter 43.21B RCW.
NEW SECTION. Sec. 302 A new section is added to chapter 90.03
RCW to read as follows:
(1) In making a determination of the extent and validity of a water
right under this chapter and chapters 90.14, 90.38, 90.42, and 90.44
RCW, the department shall only evaluate the exercise of the water right
during the most recent thirty-year period prior to the commencement of
the department's determination at issue.
(2) For the purposes of appeal, department determinations under
this section do not alone constitute an agency action. Aggrieved
parties must appeal the primary action of the department under which
the evaluation under this section applies.
(3) Notwithstanding subsection (1) of this section, water right
determinations during a general adjudication, under RCW 90.03.110
through 90.03.245 and 90.03.620 through 90.03.645, are not limited to
a thirty-year period of review.
(4) Nothing in this section limits a superior court's authority in
determining the extent and validity of a water right.
Sec. 401 RCW 90.14.140 and 2009 c 183 s 14 are each amended to
read as follows:
(1) ((For the purposes of RCW 90.14.130 through 90.14.180,
"sufficient cause" shall be defined as the nonuse of all or a portion
of the water by the owner of a water right for a period of five or more
consecutive years where such nonuse occurs as a result of)) Beneficial
use is the basis, the measure, and the limit of all rights to the use
of water in this state. Notwithstanding any other provisions of RCW
90.14.130 through 90.14.180, there shall be no relinquishment of any
water right as a result of nonuse when the nonuse occurs due to the
following:
(a) Drought, or other unavailability of water;
(b) Active service in the armed forces of the United States during
military crisis;
(c) Nonvoluntary service in the armed forces of the United States;
(d) The operation of legal proceedings;
(e) Federal or state agency leases of or options to purchase lands
or water rights which preclude or reduce the use of the right by the
owner of the water right;
(f) Federal laws imposing land or water use restrictions either
directly or through the voluntary enrollment of a landowner in a
federal program implementing those laws, or acreage limitations, or
production quotas;
(g) Temporarily reduced water need for irrigation use where such
reduction is due to varying weather conditions, including but not
limited to precipitation and temperature, that warranted the reduction
in water use, so long as the water user's diversion and delivery
facilities are maintained in good operating condition consistent with
beneficial use of the full amount of the water right;
(h) Temporarily reduced diversions or withdrawals of irrigation
water directly resulting from the provisions of a contract or similar
agreement in which a supplier of electricity buys back electricity from
the water right holder and the electricity is needed for the diversion
or withdrawal or for the use of the water diverted or withdrawn for
irrigation purposes;
(i) Water conservation measures implemented under the Yakima river
basin water enhancement project, so long as the conserved water is
reallocated in accordance with the provisions of P.L. 103-434;
(j) Reliance by an irrigation water user on the transitory presence
of return flows in lieu of diversion or withdrawal of water from the
primary source of supply, if such return flows are measured or reliably
estimated using a scientific methodology generally accepted as reliable
within the scientific community; ((or))
(k) The reduced use of irrigation water resulting from crop
rotation. For purposes of this subsection, crop rotation means the
temporary change in the type of crops grown resulting from the exercise
of generally recognized sound farming practices. Unused water
resulting from crop rotation will not be relinquished if the remaining
portion of the water continues to be beneficially used((.));
(2) Notwithstanding any other provisions of RCW 90.14.130 through
90.14.180, there shall be no relinquishment of any water right:
(a) If such
(l) The right is claimed for power development purposes under
chapter 90.16 RCW and annual license fees are paid in accordance with
chapter 90.16 RCW;
(((b) If such)) (m) The right is used for a standby or reserve
water supply to be used in time of drought or other low flow period so
long as withdrawal or diversion facilities are maintained in good
operating condition for the use of such reserve or standby water
supply;
(((c) If such)) (n) The right is claimed for a determined future
development to take place either within fifteen years of July 1, 1967,
or the most recent beneficial use of the water right, whichever date is
later;
(((d) If such)) (o) The right is claimed for municipal water supply
purposes under chapter 90.03 RCW;
(((e) If such waters are)) (p) A water source is not subject to
appropriation under the applicable provisions of RCW 90.40.030;
(((f) If such)) (q) The right or portion of the right is leased to
another person for use on land other than the land to which the right
is appurtenant as long as the lessee makes beneficial use of the right
in accordance with this chapter and a transfer or change of the right
has been approved by the department in accordance with RCW 90.03.380,
90.03.383, 90.03.390, or 90.44.100;
(((g) If such a)) (r) The right or portion of the right is
authorized for a purpose that is satisfied by the use of agricultural
industrial process water as authorized under RCW 90.46.150;
(((h) If such)) (s) The right is a trust water right under chapter
90.38 or 90.42 RCW;
(((i) If such a)) (t) The right is involved in an approved local
water plan created under RCW 90.92.090, provided the right is subject
to an agreement not to divert under RCW 90.92.050, or provided the
right is banked under RCW 90.92.070; or
(u) If such a right is a perfected and developed water right used
for an agricultural irrigation purpose and as long as:
(i) The water user's diversion and delivery facilities are
maintained in good operating condition consistent with the full
beneficial use of the right;
(ii) Each part of the authorized acreage is irrigated for
beneficial use at least once every five years and is nonwasteful; and
(iii) The actual use of water on a unit basis is less than one
hundred ten percent the annual crop requirement for the most water
intensive crop normally grown in the area.
(((3))) (2) In adding provisions to this section by chapter 237,
Laws of 2001, the legislature does not intend to imply legislative
approval or disapproval of any existing administrative policy
regarding, or any existing administrative or judicial interpretation
of, the provisions of this section not expressly added or revised.
Sec. 402 RCW 90.14.140 and 2001 c 240 s 1, 2001 c 237 s 27, and
2001 c 69 s 5 are each reenacted and amended to read as follows:
(1) ((For the purposes of RCW 90.14.130 through 90.14.180,
"sufficient cause" shall be defined as the nonuse of all or a portion
of the water by the owner of a water right for a period of five or more
consecutive years where such nonuse occurs as a result of)) Beneficial
use is the basis, the measure, and the limit of all rights to the use
of water in this state. Notwithstanding any other provisions of RCW
90.14.130 through 90.14.180, there shall be no relinquishment of any
water right as a result of nonuse when the nonuse occurs due to any of
the following:
(a) Drought, or other unavailability of water;
(b) Active service in the armed forces of the United States during
military crisis;
(c) Nonvoluntary service in the armed forces of the United States;
(d) The operation of legal proceedings;
(e) Federal or state agency leases of or options to purchase lands
or water rights which preclude or reduce the use of the right by the
owner of the water right;
(f) Federal laws imposing land or water use restrictions either
directly or through the voluntary enrollment of a landowner in a
federal program implementing those laws, or acreage limitations, or
production quotas;
(g) Temporarily reduced water need for irrigation use where such
reduction is due to varying weather conditions, including but not
limited to precipitation and temperature, that warranted the reduction
in water use, so long as the water user's diversion and delivery
facilities are maintained in good operating condition consistent with
beneficial use of the full amount of the water right;
(h) Temporarily reduced diversions or withdrawals of irrigation
water directly resulting from the provisions of a contract or similar
agreement in which a supplier of electricity buys back electricity from
the water right holder and the electricity is needed for the diversion
or withdrawal or for the use of the water diverted or withdrawn for
irrigation purposes;
(i) Water conservation measures implemented under the Yakima river
basin water enhancement project, so long as the conserved water is
reallocated in accordance with the provisions of P.L. 103-434;
(j) Reliance by an irrigation water user on the transitory presence
of return flows in lieu of diversion or withdrawal of water from the
primary source of supply, if such return flows are measured or reliably
estimated using a scientific methodology generally accepted as reliable
within the scientific community; ((or))
(k) The reduced use of irrigation water resulting from crop
rotation. For purposes of this subsection, crop rotation means the
temporary change in the type of crops grown resulting from the exercise
of generally recognized sound farming practices. Unused water
resulting from crop rotation will not be relinquished if the remaining
portion of the water continues to be beneficially used((.));
(2) Notwithstanding any other provisions of RCW 90.14.130 through
90.14.180, there shall be no relinquishment of any water right:
(a) If such
(l) The right is claimed for power development purposes under
chapter 90.16 RCW and annual license fees are paid in accordance with
chapter 90.16 RCW;
(((b) If such)) (m) The right is used for a standby or reserve
water supply to be used in time of drought or other low flow period so
long as withdrawal or diversion facilities are maintained in good
operating condition for the use of such reserve or standby water
supply;
(((c) If such)) (n) The right is claimed for a determined future
development to take place either within fifteen years of July 1, 1967,
or the most recent beneficial use of the water right, whichever date is
later;
(((d) If such)) (o) The right is claimed for municipal water supply
purposes under chapter 90.03 RCW;
(((e) If such waters are)) (p) A water source is not subject to
appropriation under the applicable provisions of RCW 90.40.030;
(((f) If such)) (q) The right or portion of the right is leased to
another person for use on land other than the land to which the right
is appurtenant as long as the lessee makes beneficial use of the right
in accordance with this chapter and a transfer or change of the right
has been approved by the department in accordance with RCW 90.03.380,
90.03.383, 90.03.390, or 90.44.100;
(((g) If such a)) (r) The right or portion of the right is
authorized for a purpose that is satisfied by the use of agricultural
industrial process water as authorized under RCW 90.46.150; ((or)) (s) The right is a trust water right under chapter
90.38 or 90.42 RCW; or
(h) If such
(t) The right is a perfected and developed water right used for an
agricultural irrigation purpose and as long as:
(i) The water user's diversion and delivery facilities are
maintained in good operating condition consistent with the full
beneficial use of the right;
(ii) Each part of the authorized acreage is irrigated for
beneficial use at least once every five years and is nonwasteful; and
(iii) The actual use of water on a unit basis is less than one
hundred ten percent the annual crop requirement for the most water
intensive crop normally grown in the area.
(((3))) (2) In adding provisions to this section by chapter 237,
Laws of 2001, the legislature does not intend to imply legislative
approval or disapproval of any existing administrative policy
regarding, or any existing administrative or judicial interpretation
of, the provisions of this section not expressly added or revised.
Sec. 403 RCW 90.14.160 and 1981 c 291 s 1 are each amended to
read as follows:
Any person entitled to divert or withdraw waters of the state
through any appropriation authorized by enactments of the legislature
prior to enactment of chapter 117, Laws of 1917, or by custom, or by
general adjudication, who abandons the same, or who voluntarily fails,
without sufficient ((cause)) exception under RCW 90.14.140, to
beneficially use all or any part of said right to divert or withdraw
for any period of five successive years after July 1, 1967, shall
relinquish such right or portion thereof, and said right or portion
thereof shall revert to the state, and the waters affected by said
right shall become available for appropriation in accordance with RCW
90.03.250.
Sec. 404 RCW 90.14.170 and 1967 c 233 s 17 are each amended to
read as follows:
Any person entitled to divert or withdraw waters of the state by
virtue of his ownership of land abutting a stream, lake, or
watercourse, who abandons the same, or who voluntarily fails, without
sufficient ((cause)) exception under RCW 90.14.140, to beneficially use
all or any part of said right to withdraw or divert said water for any
period of five successive years after July 1, 1967, shall relinquish
such right or portion thereof, and such right or portion thereof shall
revert to the state, and the waters affected by said right shall become
available for appropriation in accordance with the provisions of RCW
90.03.250.
Sec. 405 RCW 90.14.180 and 1987 c 109 s 101 are each amended to
read as follows:
Any person hereafter entitled to divert or withdraw waters of the
state through an appropriation authorized under RCW 90.03.330,
90.44.080, or 90.44.090 who abandons the same, or who voluntarily
fails, without sufficient ((cause)) exception under RCW 90.14.140, to
beneficially use all or any part of said right to withdraw for any
period of five successive years shall relinquish such right or portion
thereof, and such right or portion thereof shall revert to the state,
and the waters affected by said right shall become available for
appropriation in accordance with RCW 90.03.250. All certificates
hereafter issued by the department of ecology pursuant to RCW 90.03.330
shall expressly incorporate this section by reference.
Sec. 406 RCW 90.03.380 and 2009 c 183 s 15 are each amended to
read as follows:
(1) The right to the use of water which has been applied to a
beneficial use in the state shall be and remain appurtenant to the land
or place upon which the same is used: PROVIDED, HOWEVER, That the
right may be transferred to another or to others and become appurtenant
to any other land or place of use without loss of priority of right
theretofore established if such change can be made without detriment or
injury to existing rights. The point of diversion of water for
beneficial use or the purpose of use may be changed, if such change can
be made without detriment or injury to existing rights. A change in
the place of use, point of diversion, and/or purpose of use of a water
right to enable irrigation of additional acreage or the addition of new
uses may be permitted if such change results in no increase in the
annual consumptive quantity of water used under the water right. For
purposes of this section, "annual consumptive quantity" means the
estimated or actual annual amount of water diverted pursuant to the
water right, reduced by the estimated annual amount of return flows,
averaged over the two years of greatest use within the most recent
five-year period of continuous beneficial use of the water right.
Before any transfer of such right to use water or change of the point
of diversion of water or change of purpose of use can be made, any
person having an interest in the transfer or change, shall file a
written application therefor with the department, and the application
shall not be granted until notice of the application is published as
provided in RCW 90.03.280. If it shall appear that such transfer or
such change may be made without injury or detriment to existing rights,
the department shall issue to the applicant an authorization to
implement the change together with any conditions that may be required
to avoid injury or detriment to another water right. Upon the
applicant's showing that the change or transfer has been implemented,
the department shall issue a certificate in duplicate granting the
right for such transfer or for such change of point of diversion or of
use. The certificate so issued shall be filed and be made a record
with the department and the duplicate certificate issued to the
applicant may be filed with the county auditor in like manner and with
the same effect as provided in the original certificate or permit to
divert water. The time period that the water right was banked under
RCW 90.92.070, in an approved local water plan created under RCW
90.92.090, or the water right was subject to an agreement to not divert
under RCW 90.92.050 will not be included in the most recent five-year
period of continuous beneficial use for the purpose of determining the
annual consumptive quantity under this section. If the water right has
not been used during the previous five years but the nonuse of which
qualifies for one or more of the statutory ((good causes or))
exceptions to relinquishment in RCW 90.14.140 and 90.44.520, the period
of nonuse is not included in the most recent five-year period of
continuous beneficial use for purposes of determining the annual
consumptive quantity of water under this section.
(2) The department's determination of the extent and validity of
water rights under this section shall be consistent with section 302 of
this act.
(3) The department may establish a reasonable schedule for
completion of necessary work to effect a change in the purpose, place,
or manner of use or for the construction of works to effect an
authorized change of point of diversion or withdrawal. Nonuse during
such a reasonable schedule is not subject to relinquishment provided
the project is pursued in accordance with RCW 90.03.320. Failure to
complete all or a portion of the change results in relinquishment of
the right unless otherwise excused under RCW 90.14.140.
(4) If an application for change proposes to transfer water rights
from one irrigation district to another, the department shall, before
publication of notice, receive concurrence from each of the irrigation
districts that such transfer or change will not adversely affect the
ability to deliver water to other landowners or impair the financial
integrity of either of the districts.
(((3))) (5) A change in place of use by an individual water user or
users of water provided by an irrigation district need only receive
approval for the change from the board of directors of the district if
the use of water continues within the irrigation district, and when
water is provided by an irrigation entity that is a member of a board
of joint control created under chapter 87.80 RCW, approval need only be
received from the board of joint control if the use of water continues
within the area of jurisdiction of the joint board and the change can
be made without detriment or injury to existing rights.
(((4))) (6) This section shall not apply to trust water rights
acquired by the state through the funding of water conservation
projects under chapter 90.38 RCW or RCW 90.42.010 through 90.42.070.
(((5))) (7)(a) Pending applications for new water rights are not
entitled to protection from impairment, injury, or detriment when an
application relating to an existing surface or ground water right is
considered.
(b) Applications relating to existing surface or ground water
rights may be processed and decisions on them rendered independently of
processing and rendering decisions on pending applications for new
water rights within the same source of supply without regard to the
date of filing of the pending applications for new water rights.
(c) Notwithstanding any other existing authority to process
applications, including but not limited to the authority to process
applications under WAC 173-152-050 as it existed on January 1, 2001, an
application relating to an existing surface or ground water right may
be processed ahead of a previously filed application relating to an
existing right when sufficient information for a decision on the
previously filed application is not available and the applicant for the
previously filed application is sent written notice that explains what
information is not available and informs the applicant that processing
of the next application will begin. The previously filed application
does not lose its priority date and if the information is provided by
the applicant within sixty days, the previously filed application shall
be processed at that time. This subsection (((5))) (7)(c) does not
affect any other existing authority to process applications.
(d) Nothing in this subsection (((5))) (7) is intended to stop the
processing of applications for new water rights.
(((6))) (8) No applicant for a change, transfer, or amendment of a
water right may be required to give up any part of the applicant's
valid water right or claim to a state agency, the trust water rights
program, or to other persons as a condition of processing the
application.
(((7))) (9) In revising the provisions of this section and adding
provisions to this section by chapter 237, Laws of 2001, the
legislature does not intend to imply legislative approval or
disapproval of any existing administrative policy regarding, or any
existing administrative or judicial interpretation of, the provisions
of this section not expressly added or revised.
(((8))) (10) The development and use of a small irrigation
impoundment, as defined in RCW 90.03.370(8), does not constitute a
change or amendment for the purposes of this section. The exemption
expressly provided by this subsection shall not be construed as
requiring a change or transfer of any existing water right to enable
the holder of the right to store water governed by the right.
(((9))) (11) This section does not apply to a water right involved
in an approved local water plan created under RCW 90.92.090, a water
right that is subject to an agreement not to divert under RCW
90.92.050, or a banked water right under RCW 90.92.070.
Sec. 407 RCW 90.03.380 and 2003 c 329 s 2 are each amended to
read as follows:
(1) The right to the use of water which has been applied to a
beneficial use in the state shall be and remain appurtenant to the land
or place upon which the same is used: PROVIDED, HOWEVER, That the
right may be transferred to another or to others and become appurtenant
to any other land or place of use without loss of priority of right
theretofore established if such change can be made without detriment or
injury to existing rights. The point of diversion of water for
beneficial use or the purpose of use may be changed, if such change can
be made without detriment or injury to existing rights. A change in
the place of use, point of diversion, and/or purpose of use of a water
right to enable irrigation of additional acreage or the addition of new
uses may be permitted if such change results in no increase in the
annual consumptive quantity of water used under the water right. For
purposes of this section, "annual consumptive quantity" means the
estimated or actual annual amount of water diverted pursuant to the
water right, reduced by the estimated annual amount of return flows,
averaged over the two years of greatest use within the most recent
five-year period of continuous beneficial use of the water right.
Before any transfer of such right to use water or change of the point
of diversion of water or change of purpose of use can be made, any
person having an interest in the transfer or change, shall file a
written application therefor with the department, and the application
shall not be granted until notice of the application is published as
provided in RCW 90.03.280. If it shall appear that such transfer or
such change may be made without injury or detriment to existing rights,
the department shall issue to the applicant an authorization to
implement the change together with any conditions that may be required
to avoid injury or detriment to another water right. Upon the
applicant's showing that the change or transfer has been implemented,
the department shall issue a certificate in duplicate granting the
right for such transfer or for such change of point of diversion or of
use. The certificate so issued shall be filed and be made a record
with the department and the duplicate certificate issued to the
applicant may be filed with the county auditor in like manner and with
the same effect as provided in the original certificate or permit to
divert water. If the water right has not been used during the previous
five years but the nonuse of which qualifies for one or more of the
statutory exceptions to relinquishment in RCW 90.14.140 and 90.44.520,
the period of nonuse is not included in the most recent five-year
period of continuous beneficial use for purposes of determining the
annual consumptive quantity of water under this section.
(2) The department's determination of the extent and validity of
water rights under this section shall be consistent with section 302 of
this act.
(3) The department may establish a reasonable schedule for
completion of necessary work to effect a change in the purpose, place,
or manner of use or for the construction of works to effect an
authorized change of point of diversion or withdrawal. Nonuse during
such a reasonable schedule is not subject to relinquishment provided
the project is pursued in accordance with RCW 90.03.320. Failure to
complete all or a portion of the change results in relinquishment of
the right unless otherwise excused under RCW 90.14.140.
(4) If an application for change proposes to transfer water rights
from one irrigation district to another, the department shall, before
publication of notice, receive concurrence from each of the irrigation
districts that such transfer or change will not adversely affect the
ability to deliver water to other landowners or impair the financial
integrity of either of the districts.
(((3))) (5) A change in place of use by an individual water user or
users of water provided by an irrigation district need only receive
approval for the change from the board of directors of the district if
the use of water continues within the irrigation district, and when
water is provided by an irrigation entity that is a member of a board
of joint control created under chapter 87.80 RCW, approval need only be
received from the board of joint control if the use of water continues
within the area of jurisdiction of the joint board and the change can
be made without detriment or injury to existing rights.
(((4))) (6) This section shall not apply to trust water rights
acquired by the state through the funding of water conservation
projects under chapter 90.38 RCW or RCW 90.42.010 through 90.42.070.
(((5))) (7)(a) Pending applications for new water rights are not
entitled to protection from impairment, injury, or detriment when an
application relating to an existing surface or ground water right is
considered.
(b) Applications relating to existing surface or ground water
rights may be processed and decisions on them rendered independently of
processing and rendering decisions on pending applications for new
water rights within the same source of supply without regard to the
date of filing of the pending applications for new water rights.
(c) Notwithstanding any other existing authority to process
applications, including but not limited to the authority to process
applications under WAC 173-152-050 as it existed on January 1, 2001, an
application relating to an existing surface or ground water right may
be processed ahead of a previously filed application relating to an
existing right when sufficient information for a decision on the
previously filed application is not available and the applicant for the
previously filed application is sent written notice that explains what
information is not available and informs the applicant that processing
of the next application will begin. The previously filed application
does not lose its priority date and if the information is provided by
the applicant within sixty days, the previously filed application shall
be processed at that time. This subsection (((5))) (7)(c) does not
affect any other existing authority to process applications.
(d) Nothing in this subsection (((5))) (7) is intended to stop the
processing of applications for new water rights.
(((6))) (8) No applicant for a change, transfer, or amendment of a
water right may be required to give up any part of the applicant's
valid water right or claim to a state agency, the trust water rights
program, or to other persons as a condition of processing the
application.
(((7))) (9) In revising the provisions of this section and adding
provisions to this section by chapter 237, Laws of 2001, the
legislature does not intend to imply legislative approval or
disapproval of any existing administrative policy regarding, or any
existing administrative or judicial interpretation of, the provisions
of this section not expressly added or revised.
(((8))) (10) The development and use of a small irrigation
impoundment, as defined in RCW 90.03.370(8), does not constitute a
change or amendment for the purposes of this section. The exemption
expressly provided by this subsection shall not be construed as
requiring a change or transfer of any existing water right to enable
the holder of the right to store water governed by the right.
Sec. 408 RCW 90.44.100 and 2009 c 183 s 16 are each amended to
read as follows:
(1) After an application to, and upon the issuance by the
department of an amendment to the appropriate permit or certificate of
groundwater right, the holder of a valid right to withdraw public
groundwaters may, without losing the holder's priority of right,
construct wells or other means of withdrawal at a new location in
substitution for or in addition to those at the original location, or
the holder may change the manner or the place of use of the water.
(2) An amendment to construct replacement or a new additional well
or wells at a location outside of the location of the original well or
wells or to change the manner or place of use of the water shall be
issued only after publication of notice of the application and findings
as prescribed in the case of an original application. Such amendment
shall be issued by the department only on the conditions that: (a) The
additional or replacement well or wells shall tap the same body of
public groundwater as the original well or wells; (b) where a
replacement well or wells is approved, the use of the original well or
wells shall be discontinued and the original well or wells shall be
properly decommissioned as required under chapter 18.104 RCW; (c) where
an additional well or wells is constructed, the original well or wells
may continue to be used, but the combined total withdrawal from the
original and additional well or wells shall not enlarge the right
conveyed by the original permit or certificate; and (d) other existing
rights shall not be impaired. The department may specify an approved
manner of construction and shall require a showing of compliance with
the terms of the amendment, as provided in RCW 90.44.080 in the case of
an original permit.
(3) The construction of a replacement or new additional well or
wells at the location of the original well or wells shall be allowed
without application to the department for an amendment. However, the
following apply to such a replacement or new additional well: (a) The
well shall tap the same body of public groundwater as the original well
or wells; (b) if a replacement well is constructed, the use of the
original well or wells shall be discontinued and the original well or
wells shall be properly decommissioned as required under chapter 18.104
RCW; (c) if a new additional well is constructed, the original well or
wells may continue to be used, but the combined total withdrawal from
the original and additional well or wells shall not enlarge the right
conveyed by the original water use permit or certificate; (d) the
construction and use of the well shall not interfere with or impair
water rights with an earlier date of priority than the water right or
rights for the original well or wells; (e) the replacement or
additional well shall be located no closer than the original well to a
well it might interfere with; (f) the department may specify an
approved manner of construction of the well; and (g) the department
shall require a showing of compliance with the conditions of this
subsection (3).
(4) As used in this section, the "location of the original well or
wells" is the area described as the point of withdrawal in the original
public notice published for the application for the water right for the
well.
(5) The development and use of a small irrigation impoundment, as
defined in RCW 90.03.370(8), does not constitute a change or amendment
for the purposes of this section. The exemption expressly provided by
this subsection shall not be construed as requiring an amendment of any
existing water right to enable the holder of the right to store water
governed by the right.
(6) This section does not apply to a water right involved in an
approved local water plan created under RCW 90.92.090 or a banked water
right under RCW 90.92.070.
(7) The department's determination of the extent and validity of
water rights under this section must be consistent with section 302 of
this act.
Sec. 409 RCW 90.44.100 and 2003 c 329 s 3 are each amended to
read as follows:
(1) After an application to, and upon the issuance by the
department of an amendment to the appropriate permit or certificate of
groundwater right, the holder of a valid right to withdraw public
groundwaters may, without losing the holder's priority of right,
construct wells or other means of withdrawal at a new location in
substitution for or in addition to those at the original location, or
the holder may change the manner or the place of use of the water.
(2) An amendment to construct replacement or a new additional well
or wells at a location outside of the location of the original well or
wells or to change the manner or place of use of the water shall be
issued only after publication of notice of the application and findings
as prescribed in the case of an original application. Such amendment
shall be issued by the department only on the conditions that: (a) The
additional or replacement well or wells shall tap the same body of
public groundwater as the original well or wells; (b) where a
replacement well or wells is approved, the use of the original well or
wells shall be discontinued and the original well or wells shall be
properly decommissioned as required under chapter 18.104 RCW; (c) where
an additional well or wells is constructed, the original well or wells
may continue to be used, but the combined total withdrawal from the
original and additional well or wells shall not enlarge the right
conveyed by the original permit or certificate; and (d) other existing
rights shall not be impaired. The department may specify an approved
manner of construction and shall require a showing of compliance with
the terms of the amendment, as provided in RCW 90.44.080 in the case of
an original permit.
(3) The construction of a replacement or new additional well or
wells at the location of the original well or wells shall be allowed
without application to the department for an amendment. However, the
following apply to such a replacement or new additional well: (a) The
well shall tap the same body of public groundwater as the original well
or wells; (b) if a replacement well is constructed, the use of the
original well or wells shall be discontinued and the original well or
wells shall be properly decommissioned as required under chapter 18.104
RCW; (c) if a new additional well is constructed, the original well or
wells may continue to be used, but the combined total withdrawal from
the original and additional well or wells shall not enlarge the right
conveyed by the original water use permit or certificate; (d) the
construction and use of the well shall not interfere with or impair
water rights with an earlier date of priority than the water right or
rights for the original well or wells; (e) the replacement or
additional well shall be located no closer than the original well to a
well it might interfere with; (f) the department may specify an
approved manner of construction of the well; and (g) the department
shall require a showing of compliance with the conditions of this
subsection (3).
(4) As used in this section, the "location of the original well or
wells" is the area described as the point of withdrawal in the original
public notice published for the application for the water right for the
well.
(5) The development and use of a small irrigation impoundment, as
defined in RCW 90.03.370(8), does not constitute a change or amendment
for the purposes of this section. The exemption expressly provided by
this subsection shall not be construed as requiring an amendment of any
existing water right to enable the holder of the right to store water
governed by the right.
(6) The department's determination of the extent and validity of
water rights under this section must be consistent with section 302 of
this act.
NEW SECTION. Sec. 501 A new section is added to chapter 90.54
RCW to read as follows:
After consulting with potentially affected tribal governments,
local governments, and stakeholders, the department may set, either by
order or rule, nonbinding achievable stream flow restoration benchmarks
and state the preferred, though not exclusive, means by which the
department and other parties may seek to achieve the benchmarks.
Sec. 601 RCW 90.82.040 and 2003 1st sp.s. c 4 s 2 are each
amended to read as follows:
(1) Once a WRIA planning unit has been initiated under RCW
90.82.060 and a lead agency has been designated, it shall notify the
department and may apply to the department for funding assistance for
conducting the planning and implementation. Funds shall be provided
from and to the extent of appropriations made by the legislature to the
department expressly for this purpose.
(2)(a) Each planning unit that has complied with subsection (1) of
this section is eligible to receive watershed planning grants in the
following amounts for the first three phases of watershed planning and
phase four watershed plan implementation:
(i) Initiating governments may apply for an initial organizing
grant of up to fifty thousand dollars for a single WRIA or up to
seventy-five thousand dollars for a multi-WRIA management area in
accordance with RCW 90.82.060(4);
(ii)(A) A planning unit may apply for up to two hundred thousand
dollars for each WRIA in the management area for conducting watershed
assessments in accordance with RCW 90.82.070, except that a planning
unit that chooses to conduct a detailed assessment or studies under
(a)(ii)(B) of this subsection or whose initiating governments choose or
have chosen to include an instream flow or water quality component in
accordance with RCW 90.82.080 or 90.82.090 may apply for up to one
hundred thousand additional dollars for each instream flow and up to
one hundred thousand additional dollars for each water quality
component included for each WRIA to conduct an assessment on that
optional component and for each WRIA in which the assessments or
studies under (a)(ii)(B) of this subsection are conducted.
(B) A planning unit may elect to apply for up to one hundred
thousand additional dollars to conduct a detailed assessment of
multipurpose water storage opportunities or for studies of specific
multipurpose storage projects which opportunities or projects are
consistent with and support the other elements of the planning unit's
watershed plan developed under this chapter; and
(iii) A planning unit may apply for up to two hundred fifty
thousand dollars for each WRIA in the management area for developing a
watershed plan and making recommendations for actions by local, state,
and federal agencies, tribes, private property owners, private
organizations, and individual citizens, including a recommended list of
strategies and projects that would further the purpose of the plan in
accordance with RCW 90.82.060 through 90.82.100.
(b) A planning unit may request a different amount for phase two or
phase three of watershed planning than is specified in (a) of this
subsection, provided that the total amount of funds awarded do not
exceed the maximum amount the planning unit is eligible for under (a)
of this subsection. The department shall approve such an alternative
allocation of funds if the planning unit identifies how the proposed
alternative will meet the goals of this chapter and provides a proposed
timeline for the completion of planning. However, the up to one
hundred thousand additional dollars in funding for instream flow and
water quality components and for water storage assessments or studies
that a planning unit may apply for under (a)(ii)(A) and (B) of this
subsection may be used only for those instream flow, water quality, and
water storage purposes.
(c) ((By December 1, 2001, or)) Within one year of initiating phase
one of watershed planning, ((whichever occurs later,)) the initiating
governments for each planning unit must inform the department whether
they intend to have the planning unit establish or amend instream flows
as part of its planning process. If they elect to have the planning
unit establish or amend instream flows, the planning unit is eligible
to receive one hundred thousand dollars for that purpose in accordance
with (a)(ii)(A) of this subsection. If the initiating governments for
a planning unit elect not to establish or amend instream flows as part
of the unit's planning process, the department shall retain one hundred
thousand dollars to carry out an assessment to support establishment of
instream flows and to establish such flows in accordance with RCW
90.54.020(3)(a) and chapter 90.22 RCW. The department shall not use
these funds to amend an existing instream flow unless requested to do
so by the initiating governments for a planning unit.
(d) In administering funds appropriated for supplemental funding
for optional plan components under (a)(ii) of this subsection, the
department shall give priority in granting the available funds to
proposals for setting or amending instream flows.
(e) A planning unit may apply for a matching grant for phase four
watershed plan implementation following approval under the provisions
of RCW 90.82.130. ((A match of ten percent is required and)) For years
one, two, three, four, and five of phase four, a match of ten percent
is required. For years six, seven, eight, and nine of phase four, a
match of fifty percent is required. For all years in phase four, the
match may include financial contributions or in-kind goods and services
directly related to coordination, plan, or project implementation, and
oversight functions. The match can be provided by the planning unit or
by the combined commitments from federal agencies, tribal governments,
local governments, special districts, or other local organizations.
The phase four grant may be up to one hundred thousand dollars for each
planning unit for each of the first three years of implementation. At
the end of the three-year period, a two-year extension may be available
for up to fifty thousand dollars each year. Subject to the
availability of amounts appropriated for this specific purpose, at the
end of five years and for years six and seven, a two-year matching
grant extension may be applied for with funding up to fifty thousand
dollars each year. For years eight and nine, planning units may apply
for another two-year matching grant extension with funding up to fifty
thousand dollars each year. For planning units that cover more than
one WRIA, additional matching funds of up to twenty-five thousand
dollars may be available for each additional WRIA per year for the
first three years of implementation, and up to twelve thousand five
hundred dollars per WRIA per year for each of the fourth ((and fifth
years)), fifth, sixth, seventh, eight, and ninth years.
(f) When evaluating requests from watershed planning units and lead
agencies to implement an adopted watershed plan and a completed
detailed implementation plan for funding consistent with (e) of this
subsection and for phase four years two through nine, the department
must give priority consideration to grant proposals that directly
support activities or implement projects that:
(i) Integrate watershed plan implementation with the goals,
objectives, or work plans of other local, regional, or statewide water
resource, water quality, or fish recovery programs and plans;
(ii) Develop new, or improve existing assessment of water supply as
required under RCW 90.82.070. To implement this subsection (2)(f)(ii),
the planning unit must work with the department to identify any areas
of substantive water management data gaps or technical gaps based on
current information. The planning unit must coordinate with the
department to prioritize future actions necessary to address any
substantive data gaps or technical gaps in new or existing assessments.
Planning units may list the improvement of its phase two watershed
assessment as its highest priority when making any future decisions
about watershed plan implementation;
(iii) Develop or implement strategies and priorities to enhance,
restore, or augment stream flows; and
(iv) Include in phase four, year six, a review of the adopted
watershed plan and the detailed implementation plan to affirm that the
highest priority water resource management issue or issues in the
watershed or watersheds are being addressed by the planning unit,
initiating governments, or other applicable local and tribal
governments in the basin. A detailed implementation plan update is
required at the end of year six and year nine. This plan update must
include a ranked ordering of water quantity, water quality, and habitat
projects or needs to address the highest priority issues.
(g) Throughout phase four, planning units with a detailed
implementation plan are eligible to apply for special grants from the
state's operating or capital budgets. These funds must be used to
carry out locally managed projects to the extent funds are appropriated
by the legislature for the purposes of implementing this act. In
addition to the eligibility requirements and priority considerations of
this subsection and subsection (3) of this section, the department must
consider the following to make grant award decisions for phase four:
(i) The existence, or reasonably anticipated emergence, of critical
water supply and demand issues that may create consistent, adverse
impacts on annual or seasonal water availability for people, farms, or
fish;
(ii) The existence, or reasonably anticipated emergence, of
critical water quality issues that may create adverse impacts to public
or environmental health or local economies;
(iii) The extent to which the adopted watershed plan, the detailed
implementation plan, and related implementation project proposals are
integrated with or will support other statewide or regional water
quantity or quality initiatives;
(iv) The department's work plan for review of existing or
development of new instream flow or basin water management rules to be
adopted by the department;
(v) The capacity of the planning unit and the lead agency for grant
administration and project management under this chapter.
(h) Nothing in this chapter precludes counties, cities,
conservation districts, public utility districts, or other legally
recognized special purpose districts of the state that physically or
financially support a watershed planning unit and lead agency to
exercise their legislated powers to raise local revenue to fund long-term watershed plan implementation needs or projects.
(3)(a) The department shall use the eligibility and priority
criteria in this subsection (3) instead of rules, policies, or
guidelines when evaluating grant applications ((at each stage of the
grants program)) during phases one, two, three, and four as identified
in this section.
(b) ((In)) When reviewing the eligibility of grant applications
under this subsection (3), the department shall evaluate whether:
(i) The planning unit meets all of the requirements of this
chapter;
(ii) The application demonstrates a need for state planning funds
to accomplish the objectives of the planning process((; and)) and shows a need for development and implementation grant
funds to accomplish the objectives of this section; and
(iii) The application and supporting information evidences a
readiness
(iii) The application and supporting information shows the grantee
is ready to proceed.
(c) ((In ranking grant applications submitted at each stage of the
grants program, the department shall give preference to applications in
the following order of priority:)) When
making decisions on the priority of funding grant applications
submitted during phases one, two, and three as identified in this
section, and in addition to priority considerations for funding phase
four grants in subsection (2) of this section, the department shall
give preference to applications that will:
(i) Applications from existing planning groups that have been in
existence for at least one year;
(ii) Applications that address protection and enhancement of
(i) Protect and enhance fish habitat in watersheds that have
aquatic fish species listed or proposed to be listed as endangered or
threatened under the federal endangered species act, 16 U.S.C. Sec.
1531 et seq. and for which there is evidence of an inability to supply
adequate water for the existing population, or for projected population
growth and economic growth ((from:));
(A) First, multi-WRIA planning; and
(B) Second, single WRIA planning;
(iii) Applications that address protection and enhancement of
(ii) Protect and enhance fish habitat and flows in watersheds or
for which there is evidence of an inability to supply adequate water
((for)) to support existing population or projected population growth
and economic growth ((from:)).
(A) First, multi-WRIA planning; and
(B) Second, single WRIA planning
(d) Except for phase four watershed plan implementation, the
department may not impose any local matching fund requirement as a
condition for grant eligibility or as a preference for receiving a
grant.
(4) ((The department may retain up to one percent of funds
allocated under this section to defray administrative costs.)) Planning and implementation under this chapter ((
(5)should))
must be completed as expeditiously as possible, with the focus being on
local stakeholders cooperating to meet local needs and partnering with
other regional, state, or federal entities and initiatives to address
water management problems, issues, and challenges.
(((6) Funding provided under this section shall be considered a
contractual obligation against the moneys appropriated for this
purpose.))
Sec. 602 RCW 90.82.043 and 2007 c 445 s 6 are each amended to
read as follows:
(1) Within one year of accepting funding under RCW 90.82.040(2)(e),
the planning unit must complete a detailed implementation plan.
Submittal of a detailed implementation plan to the department is a
condition of receiving grants for the second and all subsequent years
of the phase four grant.
(2) Each implementation plan must contain strategies to provide
sufficient water for: (a) Production agriculture; (b) commercial,
industrial, and residential use; and (c) instream flows. Each
implementation plan must contain timelines to achieve these strategies
and interim milestones to measure progress.
(3) The implementation plan must clearly define coordination and
oversight responsibilities; any needed interlocal agreements, rules, or
ordinances; any needed state or local administrative approvals and
permits that must be secured; and specific funding mechanisms.
(4) In developing the implementation plan, the planning unit must
consult with other entities planning in the watershed management area
and identify and seek to eliminate any activities or policies that are
duplicative or inconsistent.
(5)(((a))) By ((December 1, 2003, and by)) December 1st of each
((subsequent)) odd-numbered year, the director of the department shall
report to the appropriate legislative standing committees regarding
statutory changes necessary to enable state agency approval or permit
decision making needed to implement a plan approved under this chapter.
(((b) Beginning with the December 1, 2007, report, and then every
two years thereafter, the director shall include in each report the
extent to which reclaimed water has been identified in the watershed
plans as potential sources or strategies to meet future water needs,
and provisions in any watershed implementation plans that discuss
barriers to implementation of the water reuse elements of those plans.
The department's report shall include an estimate of the potential cost
of reclaimed water facilities and identification of potential sources
of funding for them.))
Sec. 603 RCW 90.82.060 and 2009 c 183 s 18 are each amended to
read as follows:
(1) Planning conducted under this chapter must provide for a
process to allow the local citizens within a WRIA or multi-WRIA area to
join together in an effort to: (a) Assess the status of the water
resources of their WRIA or multi-WRIA area; and (b) determine how best
to manage the water resources of the WRIA or multi-WRIA area to balance
the competing resource demands for that area within the parameters
under RCW 90.82.120.
(2)(a) Watershed planning under this chapter may be initiated for
a WRIA only with the concurrence of: (i) All counties within the WRIA;
(ii) the largest city or town within the WRIA unless the WRIA does not
contain a city or town; and (iii) the water supply utility obtaining
the largest quantity of water from the WRIA or, for a WRIA with lands
within the Columbia Basin project, the water supply utility obtaining
from the Columbia Basin project the largest quantity of water for the
WRIA. To apply for a grant for organizing the planning unit as
provided for under RCW 90.82.040(2)(a), these entities shall designate
the entity that will serve as the lead agency for the planning effort
and indicate how the planning unit will be staffed.
(b) For purposes of this chapter, WRIA 40 shall be divided such
that the portion of the WRIA located entirely within the Stemilt and
Squilchuck subbasins shall be considered WRIA 40a and the remaining
portion shall be considered WRIA 40b. Planning may be conducted
separately for WRIA 40a and 40b. WRIA 40a shall be eligible for one-
fourth of the funding available for a single WRIA, and WRIA 40b shall
be eligible for three-fourths of the funding available for a single
WRIA, for phases one, two, and three. Both WRIAs 40a and 40b are
eligible for the full amounts of funding allotted to a whole WRIA for
planning units in phase four.
(c) For purposes of this chapter, WRIA 29 shall be divided such
that the portion of the WRIA located entirely within the White Salmon
subbasin and the subbasins east thereof shall be considered WRIA 29b
and the remaining portion shall be considered WRIA 29a. Planning may
be conducted separately for WRIA 29a and 29b. WRIA 29a shall be
eligible for one-half of the funding available for a single WRIA and
WRIA 29b shall be eligible for one-half of the funding available for a
single WRIA, for phases one, two, and three. Both WRIAs 29a and 29b
are eligible for the full amounts of funding allotted to a whole WRIA
for planning units in phase four.
(d) For purposes of this chapter, WRIA 14 shall be divided such
that the portion of the WRIA where surface waters drain into Hood Canal
shall be considered WRIA 14b, and the remaining portion shall be
considered WRIA 14a. Planning for WRIA 14b under this chapter shall be
conducted by the WRIA 16 planning unit. WRIA 14b shall be eligible for
one-half of the funding available for a single WRIA, and WRIA 14a shall
be eligible for one-half of the funding available for a single WRIA,
for phases one, two, and three. Both WRIAs 14a and 14b are eligible
for the full amounts of funding allotted to a whole WRIA for planning
units in phase four.
(3) Watershed planning under this chapter may be initiated for a
multi-WRIA area only with the concurrence of: (a) All counties within
the multi-WRIA area; (b) the largest city or town in each WRIA unless
the WRIA does not contain a city or town; and (c) the water supply
utility obtaining the largest quantity of water in each WRIA.
(4) If entities in subsection (2) or (3) of this section decide
jointly and unanimously to proceed, they shall invite all tribes with
reservation lands within the management area.
(5) The entities in subsection (2) or (3) of this section,
including the tribes if they affirmatively accept the invitation,
constitute the initiating governments for the purposes of this section.
(6) The organizing grant shall be used to organize the planning
unit and to determine the scope of the planning to be conducted. In
determining the scope of the planning activities, consideration shall
be given to all existing plans and related planning activities. The
scope of planning must include water quantity elements as provided in
RCW 90.82.070, and may include water quality elements as contained in
RCW 90.82.090, habitat elements as contained in RCW 90.82.100, and
instream flow elements as contained in RCW 90.82.080. The initiating
governments shall work with state government, other local governments
within the management area, and affected tribal governments, in
developing a planning process. The initiating governments may hold
public meetings as deemed necessary to develop a proposed scope of work
and a proposed composition of the planning unit. In developing a
proposed composition of the planning unit, the initiating governments
shall provide for representation of a wide range of water resource
interests.
(7) Each state agency with regulatory or other interests in the
WRIA or multi-WRIA area to be planned shall assist the local citizens
in the planning effort to the greatest extent practicable, recognizing
any fiscal limitations. In providing such technical assistance and to
facilitate representation on the planning unit, state agencies may
organize and agree upon their representation on the planning unit.
Such technical assistance must only be at the request of and to the
extent desired by the planning unit conducting such planning. The
number of state agency representatives on the planning unit shall be
determined by the initiating governments in consultation with the
governor's office.
(8) As used in this section, "lead agency" means the entity that
coordinates staff support of its own or of other local governments and
receives grants for developing a watershed plan.
(9) A planning unit is dissolved when the department approves a
water management board, as authorized in RCW 90.92.030, and all assets,
funds, files, planning documents, pending plans and grant applications,
and other current activities of the planning unit are transferred to
the approved water management board. The approved water management
board must assume the duties, responsibilities, and activities of the
planning unit and the initiating governments, as required in this
chapter.
Sec. 604 RCW 90.82.060 and 2008 c 210 s 1 are each amended to
read as follows:
(1) Planning conducted under this chapter must provide for a
process to allow the local citizens within a WRIA or multi-WRIA area to
join together in an effort to: (a) Assess the status of the water
resources of their WRIA or multi-WRIA area; and (b) determine how best
to manage the water resources of the WRIA or multi-WRIA area to balance
the competing resource demands for that area within the parameters
under RCW 90.82.120.
(2)(a) Watershed planning under this chapter may be initiated for
a WRIA only with the concurrence of: (i) All counties within the WRIA;
(ii) the largest city or town within the WRIA unless the WRIA does not
contain a city or town; and (iii) the water supply utility obtaining
the largest quantity of water from the WRIA or, for a WRIA with lands
within the Columbia Basin project, the water supply utility obtaining
from the Columbia Basin project the largest quantity of water for the
WRIA. To apply for a grant for organizing the planning unit as
provided for under RCW 90.82.040(2)(a), these entities shall designate
the entity that will serve as the lead agency for the planning effort
and indicate how the planning unit will be staffed.
(b) For purposes of this chapter, WRIA 40 shall be divided such
that the portion of the WRIA located entirely within the Stemilt and
Squilchuck subbasins shall be considered WRIA 40a and the remaining
portion shall be considered WRIA 40b. Planning may be conducted
separately for WRIA 40a and 40b. WRIA 40a shall be eligible for one-fourth of the funding available for a single WRIA, and WRIA 40b shall
be eligible for three-fourths of the funding available for a single
WRIA, for phases one, two, and three. Both WRIAs 40a and 40b are
eligible for the full amounts of funding allotted to a whole WRIA for
planning units in phase four.
(c) For purposes of this chapter, WRIA 29 shall be divided such
that the portion of the WRIA located entirely within the White Salmon
subbasin and the subbasins east thereof shall be considered WRIA 29b
and the remaining portion shall be considered WRIA 29a. Planning may
be conducted separately for WRIA 29a and 29b. WRIA 29a shall be
eligible for one-half of the funding available for a single WRIA and
WRIA 29b shall be eligible for one-half of the funding available for a
single WRIA, for phases one, two, and three. Both WRIAs 29a and 29b
are eligible for the full amounts of funding allotted to a whole WRIA
for planning units in phase four.
(d) For purposes of this chapter, WRIA 14 shall be divided such
that the portion of the WRIA where surface waters drain into Hood Canal
shall be considered WRIA 14b, and the remaining portion shall be
considered WRIA 14a. Planning for WRIA 14b under this chapter shall be
conducted by the WRIA 16 planning unit. WRIA 14b shall be eligible for
one-half of the funding available for a single WRIA, and WRIA 14a shall
be eligible for one-half of the funding available for a single WRIA,
for phases one, two, and three. Both WRIAs 14a and 14b are eligible
for the full amounts of funding allotted to a whole WRIA for planning
units in phase four.
(3) Watershed planning under this chapter may be initiated for a
multi-WRIA area only with the concurrence of: (a) All counties within
the multi-WRIA area; (b) the largest city or town in each WRIA unless
the WRIA does not contain a city or town; and (c) the water supply
utility obtaining the largest quantity of water in each WRIA.
(4) If entities in subsection (2) or (3) of this section decide
jointly and unanimously to proceed, they shall invite all tribes with
reservation lands within the management area.
(5) The entities in subsection (2) or (3) of this section,
including the tribes if they affirmatively accept the invitation,
constitute the initiating governments for the purposes of this section.
(6) The organizing grant shall be used to organize the planning
unit and to determine the scope of the planning to be conducted. In
determining the scope of the planning activities, consideration shall
be given to all existing plans and related planning activities. The
scope of planning must include water quantity elements as provided in
RCW 90.82.070, and may include water quality elements as contained in
RCW 90.82.090, habitat elements as contained in RCW 90.82.100, and
instream flow elements as contained in RCW 90.82.080. The initiating
governments shall work with state government, other local governments
within the management area, and affected tribal governments, in
developing a planning process. The initiating governments may hold
public meetings as deemed necessary to develop a proposed scope of work
and a proposed composition of the planning unit. In developing a
proposed composition of the planning unit, the initiating governments
shall provide for representation of a wide range of water resource
interests.
(7) Each state agency with regulatory or other interests in the
WRIA or multi-WRIA area to be planned shall assist the local citizens
in the planning effort to the greatest extent practicable, recognizing
any fiscal limitations. In providing such technical assistance and to
facilitate representation on the planning unit, state agencies may
organize and agree upon their representation on the planning unit.
Such technical assistance must only be at the request of and to the
extent desired by the planning unit conducting such planning. The
number of state agency representatives on the planning unit shall be
determined by the initiating governments in consultation with the
governor's office.
(8) As used in this section, "lead agency" means the entity that
coordinates staff support of its own or of other local governments and
receives grants for developing a watershed plan.
Sec. 701 RCW 90.03.470 and 2005 c 412 s 2 are each amended to
read as follows:
Except as provided in subsection (16) of this section, the fees
specified in this section shall be collected by the department in
advance of the requested action.
(1) For the examination of an application for a permit to
appropriate water, a minimum fee of fifty dollars must be remitted with
the application. For an amount of water exceeding one-half cubic foot
per second, the examination fee shall be assessed at the rate of one
dollar per one hundredth cubic foot per second. In no case will the
examination fee be less than fifty dollars or more than twenty-five
thousand dollars. No fee is required under this subsection (1) for an
application filed by a party to a cost-reimbursement agreement made
under RCW 90.03.265.
(2) For the examination of an application to store water, a fee of
two dollars for each acre foot of storage proposed shall be charged,
but a minimum fee of fifty dollars must be remitted with the
application. In no case will the examination fee for a storage project
be less than fifty dollars or more than twenty-five thousand dollars.
No fee is required under this subsection (2) for an application filed
by a party to a cost-reimbursement agreement made under RCW 90.03.265.
(3)(a) For the examination of an application to transfer, change,
or amend a water right certificate, permit, or claim as authorized by
RCW 90.44.100, 90.44.105, or 90.03.380, a minimum fee of fifty dollars
must be remitted with the application. For an application for change
involving an amount of water exceeding one cubic foot per second, the
total examination fee shall be assessed at the rate of fifty cents per
one hundredth cubic foot per second. For an application for change of
a storage water right, the total examination fee shall be assessed at
the rate of one dollar for each acre foot of water involved in the
change. The fee shall be based on the amount of water subject to
change as proposed in the application, not on the total amount of water
reflected in the water right certificate, permit, or claim. In no case
will the examination fee charged for a change application be less than
fifty dollars or more than twelve thousand five hundred dollars.
(b) The examination fee for a temporary or seasonal change under
RCW 90.03.390 is fifty dollars and must be remitted with the
application.
(c) No fee is required under this subsection (3) for:
(i) An application to process a change relating to donation of a
trust water right to the state;
(ii) An application to process a change when the department
otherwise acquires a trust water right for purposes of improving
instream flows or for other public purposes;
(iii) An application filed with a water conservancy board according
to chapter 90.80 RCW or for the review of a water conservancy board's
record of decision submitted to the department according to chapter
90.80 RCW; or
(iv) An application filed by a party to a cost-reimbursement
agreement made under RCW 90.03.265.
(d) For a change, transfer, or amendment involving a single project
operating under more than one water right, including related secondary
diversion rights, or involving the consolidation of multiple water
rights, only one examination fee and one certificate fee are required
to be paid.
(4) The fifty-dollar minimum fee payable with the application shall
be a credit to the total amount whenever the examination fee totals
more than fifty dollars under the schedule specified in subsections (1)
through (3) of this section and in such case the further fee due shall
be the total computed amount, less the amount previously paid. Within
five working days from receipt of an application, the department shall
notify the applicant by registered mail of any additional fees due
under subsections (1) through (3) of this section.
(5) The fees specified in subsections (1) through (3) of this
section do not apply to any filings for emergency withdrawal
authorizations or temporary drought-related water right changes
authorized under RCW 43.83B.410 that are received by the department
while a drought condition order issued under RCW 43.83B.405 is in
effect.
(6) For applying for each extension of time for beginning
construction work under a permit to appropriate water, for completion
of construction work, or for completing application of water to a
beneficial use, a fee of fifty dollars is required. These fees also
apply to similar extensions of time requested under a change or
transfer authorization.
(7) For the inspection of any hydraulic works to ((insure)) ensure
safety to life and property, a fee based on the actual cost of the
inspection, including the expense incident thereto, is required except
as follows: (a) For any hydraulic works less than ten years old, that
the department examined and approved the construction plans and
specifications as to its safety when required under RCW 90.03.350,
there shall be no fee charged; or (b) for any hydraulic works more than
ten years old, but less than twenty years old, that the department
examined and approved the construction plans and specifications as to
its safety when required under RCW 90.03.350, the fee charged shall not
exceed the fee for a significant hazard dam.
(8) For the examination of plans and specifications as to safety of
controlling works for storage of ten acre feet or more of water, a
minimum fee of ten dollars, or a fee equal to the actual cost, is
required.
(9) For recording an assignment either of a permit to appropriate
water or of an application for such a permit, a fee of fifty dollars is
required.
(10) For preparing and issuing all water right certificates, a fee
of fifty dollars is required.
(11) For filing and recording a formal protest against granting any
application, a fee of fifty dollars is required. No fee is required to
submit a comment, by mail or otherwise, regarding an application.
(12) For filing an application to amend a water right claim filed
under chapter 90.14 RCW, a fee of fifty dollars is required.
(13) An application or request for an action as provided for under
this section is incomplete unless accompanied by the fee or the minimum
fee. If no fee or an amount less than the minimum fee accompanies an
application or other request for an action as provided under this
section, the department shall return the application or request to the
applicant with advice as to the fee that must be remitted with the
application or request for it to be accepted for processing. If
additional fees are due, the department shall provide timely
notification by certified mail with return receipt requested to the
applicant. No action may be taken by the department until the fee is
paid in full. Failure to remit fees within sixty days of the
department's notification is grounds for rejecting the application or
request or canceling the permit. Cash shall not be accepted. Except
as provided in subsection (16)(d) of this section, fees must be paid by
check or money order and are nonrefundable.
(14) For purposes of calculating fees for groundwater filings, one
cubic foot per second shall be regarded as equivalent to four hundred
fifty gallons per minute.
(15) ((Eighty percent of the fees collected by the department under
this section shall be deposited in the state general fund. Twenty
percent of the fees collected by the department under this section
shall be deposited in the water rights tracking system account
established in RCW 90.14.240)) Fees collected by the department under
this section must be deposited in the water rights processing account
established in RCW 90.03.650.
(16) ((Except for the fees relating to the inspection of hydraulic
works and the examination of plans and specifications of controlling
works provided for in subsections (7) and (8) of this section, nothing
in this section is intended to grant authority to the department to
amend the fees in this section by adoption of rules or otherwise)) (a)
In addition to the application, examination, and extension fees in this
section, the department must recover from applicants the full cost of
processing all the applications received after or awaiting the
initiation of application processing as of the effective date of this
section. In processing the applications the department must continue
to improve efficiency, including fully utilizing technology to
streamline processes.
(b) The department must calculate a processing fee for each
application based primarily on the department's projected workload and
cost to process the applications to a decision and the proportionate
quantity of water requested by each applicant. For the purposes of
assessing the full cost of water right processing under this section,
the department must ensure that applicants are charged only for
services necessarily related to the processing of their applications.
The department may adjust the fee if it appears that an application
will require a disproportionately greater amount of time and effort to
process due to its complexity. Any application fees that were paid by
the applicant under other requirements of this section must be credited
against the applicant's share of the cost of processing applications
under this subsection.
(c) The processing fee must be collected by the department prior to
the processing of an application. However, prior to collecting the
processing fee under (a) of this subsection, the department shall
provide in writing an initial assessment that estimates the cost and
scope of issues likely involved in processing the applications from a
water source. The purpose of this initial assessment is to assist the
applicants by providing them with information that could support their
decision whether to proceed with having the department make a formal
determination on their water right application. Such an assessment
must be made with the department's best professional judgment based on
the information available to the department at that time. If
additional information will need to be collected or studies will have
to be conducted to answer the applicable tests for issuing a permit or
change approval, the department shall, to the extent possible, disclose
to the applicant the time and cost that the department estimates will
be incurred. The department's initial assessment under this subsection
does not constitute an appealable action or a final decision by the
department. The department must recover the department's cost of
performing an initial water right processing assessment from those
applicants who elect to proceed with having a formal determination made
on their application. In the event of voluntary withdrawal of an
application prior to issuance of the initial assessment under this
section, the department shall refund any application fees that accrued
to the applicant.
(d) An applicant may choose to withdraw their application from
further consideration based on the initial assessment provided by the
department and no further costs will accrue to the applicant.
(e) An applicant for municipal supply or community domestic supply
may request that processing of an application be deferred due to the
applicant not being ready to proceed with development of the proposed
water use at that time. A request to defer an application must be
accompanied by a statement of the reason that deferral is necessary,
including the projected timing for development of the water under the
application. A deferred application retains its priority date if an
annual fee is paid that is equal to ten percent of the estimated cost
to process the application under this section.
(f) Revenue collected from these fees must be deposited into the
water rights processing account created in RCW 90.03.650. The
applicant must transmit the processing fee within sixty days of the
written request.
(g) If the department does not have sufficient technical staff
resources or specialized expertise needed to make its determinations on
applications, it may elect to utilize a contractor from its cost-reimbursement consultant list established under RCW 90.03.265. The
cost of the consultant must be included in the processing fees.
(h) The department must fully recover its costs related to
providing water users mitigation credits, issued as a result of water
banking under chapters 90.42 and 90.38 RCW.
(i) The goal of the department is to process all pending
applications by July 30, 2017, such that the average waiting period to
receive a decision is no longer than one year for new applications
received after that date.
NEW SECTION. Sec. 702 A new section is added to chapter 90.03
RCW to read as follows:
The department may adopt a new fee schedule by rule to implement
the requirements of RCW 90.03.470. The fees must be based on the
department's actual cost to carry out the actions for which fees are
charged in RCW 90.03.470.
NEW SECTION. Sec. 703 A new section is added to chapter 90.03
RCW to read as follows:
(1) The department must submit a report to the governor and the
legislature on the status of water rights processing by November 30,
2012, and by November 30th of every even-numbered year thereafter
through 2020. The report must include the numbers of applications
received, decisions rendered, applications pending, decisions appealed,
decisions rendered by conservancy boards, decisions made through use of
cost-reimbursement contractors, decisions made under expedited
processing provisions, number of staff assigned to processing water
rights, and efficiency measures implemented. The department shall also
develop and report on performance measures for water rights processing.
(2) By September 1, 2011, the department shall explore ways to make
the state's water resource management program financially self-sufficient and shall submit a report to the office of financial
management and appropriate committees of the legislature regarding
recommended actions and legislation needed to implement a preferred
approach.
NEW SECTION. Sec. 801 Sections 401, 406, 408, and 603 of this
act expire June 30, 2019.
NEW SECTION. Sec. 802 Sections 402, 407, 409, and 604 of this
act take effect June 30, 2019.
NEW SECTION. Sec. 803 RCW 90.14.240 (Water rights tracking
system account) and 2005 c 412 s 3 are each repealed.
NEW SECTION. Sec. 804 Nothing in this act may be interpreted or
administered in a manner that impairs or diminishes a valid water
right, including rights established under state law and rights
established under federal law.
NEW SECTION. Sec. 805 If any provision of this act or its
application to any person or circumstance is held invalid, the
remainder of the act or the application of the provision to other