BILL REQ. #:  S-4463.1 



_____________________________________________ 

SUBSTITUTE SENATE BILL 6336
_____________________________________________
State of Washington62nd Legislature2012 Regular Session

By Senate Environment (originally sponsored by Senator Pridemore)

READ FIRST TIME 02/03/12.   



     AN ACT Relating to electronic product recycling; and amending RCW 70.95N.050.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

Sec. 1   RCW 70.95N.050 and 2006 c 183 s 5 are each amended to read as follows:
     (1) A manufacturer must participate in the standard plan administered by the authority, unless the manufacturer obtains department approval for an independent plan for the collection, transportation, and recycling of unwanted electronic products.
     (2) An independent plan may be submitted by an individual manufacturer or by a group of manufacturers, provided that:
     (a) For program years 2009 through 2012, each independent plan represents at least a five percent return share of covered electronic products and for program year 2013 and all subsequent program years, each independent plan represents at least a three percent market share of covered electronic products; and
     (b) No manufacturer may participate in an independent plan if it is a new entrant or a white box manufacturer.
     (3) An individual manufacturer submitting an independent plan to the department is responsible for collecting, transporting, and recycling its equivalent share of covered electronic products.
     (4)(a) Manufacturers collectively submitting an independent plan are responsible for collecting, transporting, and recycling the sum of the equivalent shares of each participating manufacturer.
     (b) Each group of manufacturers submitting an independent plan must designate a party authorized to file the plan with the department on their behalf. A letter of certification from each of the manufacturers designating the authorized party must be submitted to the department together with the plan.
     (5) Each manufacturer in the standard plan or in an independent plan retains responsibility and liability under this chapter in the event that the plan fails to meet the manufacturer's obligations under this chapter.

--- END ---