1466-S AMS WM SIMS 117

                

SHB 1466 - S COMM AMD to S COMM AMD S-2274.2

By Committee on Ways & Means

ADOPTED 04/16/2013

    On page 5, after line 24, insert the following:

 

"The Capital Projects Advisory Review Board is directed to review current statutes regarding life-cycle cost analysis and energy efficiency as related to the design-build procurement method performed under RCW 39.10.  CPARB shall report to the appropriate committees of the legislature by December 31, 2013, with recommendations for statutory changes that promote energy efficiency and reduce the total cost to construct, operate and maintain public buildings. Recommendation must include provisions for post-occupancy validation of estimated energy efficiency measures, and operating and maintenance cost estimates. Life-cycle estimates of energy use must include estimates of energy consumptions for materials used in construction."

 

 

 

    EFFECT: Adds a requirement that the Capital Projects Advisory Review Board make recommendations to the Legislature by December 31, 2013 regarding life-cycle cost analysis and energy efficiency as related to the design-build procurement method

 

 

--- END ---