HB 2555 -
By Committee on Governmental Operations
ADOPTED 02/26/2014
Strike everything after the enacting clause and insert the following:
"Sec. 1 RCW 39.10.330 and 2013 c 222 s 11 are each amended to
read as follows:
(1) Contracts for design-build services shall be awarded through a
competitive process using public solicitation of proposals for design-build services. The public body shall publish at least once in a legal
newspaper of general circulation published in, or as near as possible
to, that part of the county in which the public work will be done, a
notice of its request for qualifications from proposers for design-build services, and the availability and location of the request for
proposal documents. The request for qualifications documents shall
include:
(a) A general description of the project that provides sufficient
information for proposers to submit qualifications;
(b) The reasons for using the design-build procedure;
(c) A description of the qualifications to be required of the
proposer including, but not limited to, submission of the proposer's
accident prevention program;
(d) A description of the process the public body will use to
evaluate qualifications and finalists' proposals, including evaluation
factors and the relative weight of factors and any specific forms to be
used by the proposers;
(i) Evaluation factors for request for qualifications shall
include, but not be limited to, technical qualifications, such as
specialized experience and technical competence; capability to perform;
past performance of the proposers' team, including the architect-engineer and construction members; and other appropriate factors.
Evaluation factors may also include: (A) The proposer's past
performance in utilization of small business entities; and (B)
disadvantaged business enterprises. Cost or price-related factors are
not permitted in the request for qualifications phase;
(ii) Evaluation factors for finalists' proposals shall include, but
not be limited to, the factors listed in (d)(i) of this subsection, as
well as technical approach design concept; ability of professional
personnel; past performance on similar projects; ability to meet time
and budget requirements; ability to provide a performance and payment
bond for the project; recent, current, and projected workloads of the
firm; location; and cost or price-related factors that may include
operating costs. The public body may also consider a proposer's
outreach plan to include small business entities and disadvantaged
business enterprises as subcontractor and suppliers for the project.
Alternatively, if the public body determines that all finalists will be
capable of producing a design that adequately meets project
requirements, the public body may award the contract to the firm that
submits the responsive proposal with the lowest price;
(e) Protest procedures including time limits for filing a protest,
which in no event may limit the time to file a protest to fewer than
four business days from the date the proposer was notified of the
selection decision;
(f) The form of the contract to be awarded;
(g) The honorarium to be paid to finalists submitting responsive
proposals and who are not awarded a design-build contract;
(h) The schedule for the procurement process and the project; and
(i) Other information relevant to the project.
(2) The public body shall establish an evaluation committee to
evaluate the responses to the request for qualifications based solely
on the factors, weighting, and process identified in the request for
qualifications and any addenda issued by the public body. Based on the
evaluation committee's findings, the public body shall select not more
than five responsive and responsible finalists to submit proposals.
The public body may, in its sole discretion, reject all proposals and
shall provide its reasons for rejection in writing to all proposers.
(3) The public body must notify all proposers of the finalists
selected to move to the next phase of the selection process. The
process may not proceed to the next phase until two business days after
all proposers are notified of the committee's selection decision. At
the request of a proposer not selected as a finalist, the public body
must provide the requesting proposer with a scoring summary of the
evaluation factors for its proposal. Proposers filing a protest on the
selection of the finalists must file the protest in accordance with the
published protest procedures. The selection process may not advance to
the next phase of selection until two business days after the final
protest decision is transmitted to the protestor.
(4) Upon selection of the finalists, the public body shall issue a
request for proposals to the finalists, which shall provide the
following information:
(a) A detailed description of the project including programmatic,
performance, and technical requirements and specifications; functional
and operational elements; building performance goals and validation
requirements; minimum and maximum net and gross areas of any building;
and, at the discretion of the public body, preliminary engineering and
architectural drawings; and
(b) The target budget for the design-build portion of the project.
(5) The public body shall establish an evaluation committee to
evaluate the proposals submitted by the finalists. Design-build
contracts shall be awarded using the procedures in (a) or (b) of this
subsection. The public body must identify in the request for
qualifications which procedure will be used.
(a) The finalists' proposals shall be evaluated and scored based
solely on the factors, weighting, and process identified in the initial
request for qualifications and in any addenda published by the public
body. Public bodies may request best and final proposals from
finalists. The public body may initiate negotiations with the firm
submitting the highest scored proposal. If the public body is unable
to execute a contract with the firm submitting the highest scored
proposal, negotiations with that firm may be suspended or terminated
and the public body may proceed to negotiate with the next highest
scored firm. Public bodies shall continue in accordance with this
procedure until a contract agreement is reached or the selection
process is terminated.
(b) If the public body determines that all finalists are capable of
producing a design that adequately meets project requirements, the
public body may award the contract to the firm that submits the
responsive proposal with the lowest price.
(6) The public body shall notify all finalists of the selection
decision and make a selection summary of the final proposals available
to all proposers within two business days of such notification. If the
public body receives a timely written protest from a finalist firm, the
public body may not execute a contract until two business days after
the final protest decision is transmitted to the protestor. The
protestor must submit its protest in accordance with the published
protest procedures.
(7) The firm awarded the contract shall provide a performance and
payment bond for the contracted amount.
(8) The public body shall provide appropriate honorarium payments
to finalists submitting responsive proposals that are not awarded a
design-build contract. Honorarium payments shall be sufficient to
generate meaningful competition among potential proposers on design-build projects. In determining the amount of the honorarium, the
public body shall consider the level of effort required to meet the
selection criteria.
Sec. 2 RCW 39.10.470 and 2005 c 274 s 275 are each amended to
read as follows:
(1) Except as provided in subsections (2) and (3) of this section,
all proceedings, records, contracts, and other public records relating
to alternative public works transactions under this chapter shall be
open to the inspection of any interested person, firm, or corporation
in accordance with chapter 42.56 RCW.
(2) Trade secrets, as defined in RCW 19.108.010, or other
proprietary information submitted by a bidder, offeror, or contractor
in connection with an alternative public works transaction under this
chapter shall not be subject to chapter 42.56 RCW if the bidder,
offeror, or contractor specifically states in writing the reasons why
protection is necessary, and identifies the data or materials to be
protected.
(3) Proposals submitted by design-build finalists are exempt from
disclosure until the notification of the highest scoring finalist is
made in accordance with RCW 39.10.330(5) or the selection process is
terminated.
Sec. 3 RCW 43.131.408 and 2013 c 222 s 22 and 2013 c 186 s 2 are
each reenacted and amended to read as follows:
The following acts or parts of acts, as now existing or hereafter
amended, are each repealed, effective June 30, 2022:
(1) RCW 39.10.200 and 2010 1st sp.s. c 21 s 2, 2007 c 494 s 1, &
1994 c 132 s 1;
(2) RCW 39.10.210 and 2013 c 222 s 1, 2010 1st sp.s. c 36 s 6014,
2007 c 494 s 101, & 2005 c 469 s 3;
(3) RCW 39.10.220 and 2013 c 222 s 2, 2007 c 494 s 102, & 2005 c
377 s 1;
(4) RCW 39.10.230 and 2013 c 222 s 3, 2010 1st sp.s. c 21 s 3, 2009
c 75 s 1, 2007 c 494 s 103, & 2005 c 377 s 2;
(5) RCW 39.10.240 and 2013 c 222 s 4 & 2007 c 494 s 104;
(6) RCW 39.10.250 and 2013 c 222 s 5, 2009 c 75 s 2, & 2007 c 494
s 105;
(7) RCW 39.10.260 and 2013 c 222 s 6 & 2007 c 494 s 106;
(8) RCW 39.10.270 and 2013 c 222 s 7, 2009 c 75 s 3, & 2007 c 494
s 107;
(9) RCW 39.10.280 and 2013 c 222 s 8 & 2007 c 494 s 108;
(10) RCW 39.10.290 and 2007 c 494 s 109;
(11) RCW 39.10.300 and 2013 c 222 s 9, 2009 c 75 s 4, & 2007 c 494
s 201;
(12) RCW 39.10.320 and 2013 c 222 s 10, 2007 c 494 s 203, & 1994 c
132 s 7;
(13) RCW 39.10.330 and 2014 c ... s 1 (section 1 of this act), 2013
c 222 s 11, 2009 c 75 s 5, & 2007 c 494 s 204;
(14) RCW 39.10.340 and 2013 c 222 s 12 & 2007 c 494 s 301;
(15) RCW 39.10.350 and 2007 c 494 s 302;
(16) RCW 39.10.360 and 2013 c 222 s 13, 2009 c 75 s 6, & 2007 c 494
s 303;
(17) RCW 39.10.370 and 2007 c 494 s 304;
(18) RCW 39.10.380 and 2013 c 222 s 14 & 2007 c 494 s 305;
(19) RCW 39.10.385 and 2013 c 222 s 15 & 2010 c 163 s 1;
(20) RCW 39.10.390 and 2013 c 222 s 16 & 2007 c 494 s 306;
(21) RCW 39.10.400 and 2013 c 222 s 17 & 2007 c 494 s 307;
(22) RCW 39.10.410 and 2007 c 494 s 308;
(23) RCW 39.10.420 and 2013 c 222 s 18, 2013 c 186 s 1, 2012 c 102
s 1, 2009 c 75 s 7, 2007 c 494 s 401, & 2003 c 301 s 1;
(24) RCW 39.10.430 and 2007 c 494 s 402;
(25) RCW 39.10.440 and 2013 c 222 s 19 & 2007 c 494 s 403;
(26) RCW 39.10.450 and 2012 c 102 s 2 & 2007 c 494 s 404;
(27) RCW 39.10.460 and 2012 c 102 s 3 & 2007 c 494 s 405;
(28) RCW 39.10.470 and 2014 c ... s 2 (section 2 of this act), 2005
c 274 s 275, & 1994 c 132 s 10;
(29) RCW 39.10.480 and 1994 c 132 s 9;
(30) RCW 39.10.490 and 2013 c 222 s 20, 2007 c 494 s 501, & 2001 c
328 s 5;
(31) RCW 39.10.900 and 1994 c 132 s 13;
(32) RCW 39.10.901 and 1994 c 132 s 14;
(33) RCW 39.10.903 and 2007 c 494 s 510;
(34) RCW 39.10.904 and 2007 c 494 s 512; and
(35) RCW 39.10.905 and 2007 c 494 s 513."
HB 2555 -
By Committee on Governmental Operations
ADOPTED 02/26/2014
On page 1, line 1 of the title, after "Relating to" strike the remainder of the title and insert "finalists for design-build contracts; amending RCW 39.10.330 and 39.10.470; and reenacting and amending RCW 43.131.408."
EFFECT: Exempts proposals of finalists for design-build contracts from public disclosure until the highest scoring finalist is notified or until the selection process is terminated.