CERTIFICATION OF ENROLLMENT

SUBSTITUTE SENATE BILL 5400

Chapter 61, Laws of 2013

63rd Legislature
2013 Regular Session



UTILITIES--ELIGIBLE RENEWABLE RESOURCES



EFFECTIVE DATE: 07/28/13

Passed by the Senate March 11, 2013
  YEAS 25   NAYS 23

BRAD OWEN
________________________________________    
President of the Senate
Passed by the House April 9, 2013
  YEAS 92   NAYS 1

FRANK CHOPP
________________________________________    
Speaker of the House of Representatives


 
CERTIFICATE

I, Hunter G. Goodman, Secretary of the Senate of the State of Washington, do hereby certify that the attached is SUBSTITUTE SENATE BILL 5400 as passed by the Senate and the House of Representatives on the dates hereon set forth.

HUNTER G. GOODMAN
________________________________________    
Secretary
Approved April 23, 2013, 4:51 p.m.








JAY INSLEE
________________________________________    
Governor of the State of Washington
 
FILED
April 24, 2013







Secretary of State
State of Washington


_____________________________________________ 

SUBSTITUTE SENATE BILL 5400
_____________________________________________

Passed Legislature - 2013 Regular Session
State of Washington63rd Legislature2013 Regular Session

By Senate Energy, Environment & Telecommunications (originally sponsored by Senators Honeyford, Ericksen, and Hewitt)

READ FIRST TIME 02/21/13.   



     AN ACT Relating to allowing utilities serving customers in Washington and in other states to use eligible renewable resources in their other states to comply with chapter 19.285 RCW, the energy independence act; and reenacting and amending RCW 19.285.030.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:

Sec. 1   RCW 19.285.030 and 2012 c 22 s 2 are each reenacted and amended to read as follows:
     The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.
     (1) "Attorney general" means the Washington state office of the attorney general.
     (2) "Auditor" means: (a) The Washington state auditor's office or its designee for qualifying utilities under its jurisdiction that are not investor-owned utilities; or (b) an independent auditor selected by a qualifying utility that is not under the jurisdiction of the state auditor and is not an investor-owned utility.
     (3)(a) "Biomass energy" includes: (i) Organic by-products of pulping and the wood manufacturing process; (ii) animal manure; (iii) solid organic fuels from wood; (iv) forest or field residues; (v) untreated wooden demolition or construction debris; (vi) food waste and food processing residuals; (vii) liquors derived from algae; (viii) dedicated energy crops; and (ix) yard waste.
     (b) "Biomass energy" does not include: (i) Wood pieces that have been treated with chemical preservatives such as creosote, pentachlorophenol, or copper-chrome-arsenic; (ii) wood from old growth forests; or (iii) municipal solid waste.
     (4) "Commission" means the Washington state utilities and transportation commission.
     (5) "Conservation" means any reduction in electric power consumption resulting from increases in the efficiency of energy use, production, or distribution.
     (6) "Cost-effective" has the same meaning as defined in RCW 80.52.030.
     (7) "Council" means the Washington state apprenticeship and training council within the department of labor and industries.
     (8) "Customer" means a person or entity that purchases electricity for ultimate consumption and not for resale.
     (9) "Department" means the department of commerce or its successor.
     (10) "Distributed generation" means an eligible renewable resource where the generation facility or any integrated cluster of such facilities has a generating capacity of not more than five megawatts.
     (11) "Eligible renewable resource" means:
     (a) Electricity from a generation facility powered by a renewable resource other than freshwater that commences operation after March 31, 1999, where: (i) The facility is located in the Pacific Northwest; or (ii) the electricity from the facility is delivered into Washington state on a real-time basis without shaping, storage, or integration services;
     (b) Incremental electricity produced as a result of efficiency improvements completed after March 31, 1999, to hydroelectric generation projects owned by a qualifying utility and located in the Pacific Northwest or to hydroelectric generation in irrigation pipes and canals located in the Pacific Northwest, where the additional generation in either case does not result in new water diversions or impoundments; ((and))
     (c) Qualified biomass energy; or
     (d) For a qualifying utility that serves customers in other states, electricity from a generation facility powered by a renewable resource other than freshwater that commences operation after March 31, 1999, where: (i) The facility is located within a state in which the qualifying utility serves retail electrical customers; and (ii) the qualifying utility owns the facility in whole or in part or has a long-term contract with the facility of at least twelve months or more
.
     (12) "Investor-owned utility" has the same meaning as defined in RCW 19.29A.010.
     (13) "Load" means the amount of kilowatt-hours of electricity delivered in the most recently completed year by a qualifying utility to its Washington retail customers.
     (14) "Nonpower attributes" means all environmentally related characteristics, exclusive of energy, capacity reliability, and other electrical power service attributes, that are associated with the generation of electricity from a renewable resource, including but not limited to the facility's fuel type, geographic location, vintage, qualification as an eligible renewable resource, and avoided emissions of pollutants to the air, soil, or water, and avoided emissions of carbon dioxide and other greenhouse gases.
     (15) "Pacific Northwest" has the same meaning as defined for the Bonneville power administration in section 3 of the Pacific Northwest electric power planning and conservation act (94 Stat. 2698; 16 U.S.C. Sec. 839a).
     (16) "Public facility" has the same meaning as defined in RCW 39.35C.010.
     (17) "Qualified biomass energy" means electricity produced from a biomass energy facility that: (a) Commenced operation before March 31, 1999; (b) contributes to the qualifying utility's load; and (c) is owned either by: (i) A qualifying utility; or (ii) an industrial facility that is directly interconnected with electricity facilities that are owned by a qualifying utility and capable of carrying electricity at transmission voltage.
     (18) "Qualifying utility" means an electric utility, as the term "electric utility" is defined in RCW 19.29A.010, that serves more than twenty-five thousand customers in the state of Washington. The number of customers served may be based on data reported by a utility in form 861, "annual electric utility report," filed with the energy information administration, United States department of energy.
     (19) "Renewable energy credit" means a tradable certificate of proof of at least one megawatt-hour of an eligible renewable resource where the generation facility is not powered by freshwater. The certificate includes all of the nonpower attributes associated with that one megawatt-hour of electricity, and the certificate is verified by a renewable energy credit tracking system selected by the department.
     (20) "Renewable resource" means: (a) Water; (b) wind; (c) solar energy; (d) geothermal energy; (e) landfill gas; (f) wave, ocean, or tidal power; (g) gas from sewage treatment facilities; (h) biodiesel fuel as defined in RCW 82.29A.135 that is not derived from crops raised on land cleared from old growth or first-growth forests where the clearing occurred after December 7, 2006; or (i) biomass energy.
     (21) "Rule" means rules adopted by an agency or other entity of Washington state government to carry out the intent and purposes of this chapter.
     (22) "Year" means the twelve-month period commencing January 1st and ending December 31st.


         Passed by the Senate March 11, 2013.
         Passed by the House April 9, 2013.
         Approved by the Governor April 23, 2013.
         Filed in Office of Secretary of State April 24, 2013.