HOUSE BILL REPORT

HB 1095

This analysis was prepared by non-partisan legislative staff for the use of legislative members in their deliberations. This analysis is not a part of the legislation nor does it constitute a statement of legislative intent.

As Reported by House Committee On:

Technology & Economic Development

Title: An act relating to promoting thermal energy efficiency.

Brief Description: Promoting thermal energy efficiency.

Sponsors: Representatives Morris and Hudgins.

Brief History:

Committee Activity:

Technology & Economic Development: 1/20/15, 2/10/15 [DPS].

Brief Summary of Substitute Bill

  • Requires energy-consumption analyses for certain public facilities to include critical load analyses and combined heat and power feasibility assessments.

  • Incorporates certain valuation and assessment provisions for combined heat and power into Integrated Resource Plans.

  • Directs the Utilities and Transportation Commission to establish a voluntary emission reduction program for natural gas companies that encourages investment in thermal energy efficiency projects.

  • Directs the Department of Ecology to establish a general permit or permit by rule for stationary natural gas engines used in a combined heat and power system.

HOUSE COMMITTEE ON TECHNOLOGY & ECONOMIC DEVELOPMENT

Majority Report: The substitute bill be substituted therefor and the substitute bill do pass. Signed by 11 members: Representatives Morris, Chair; Tarleton, Vice Chair; Smith, Ranking Minority Member; DeBolt, Assistant Ranking Minority Member; Fey, Harmsworth, Hudgins, Magendanz, Ryu, Santos and Wylie.

Minority Report: Without recommendation. Signed by 1 member: Representative Young.

Staff: Nikkole Hughes (786-7156).

Background:

Energy Conservation in Design of Public Facilities.

Public agencies are directed by the Legislature to analyze the cost of energy consumption for each major facility to be planned and constructed or renovated after September 8, 1975.  A "major facility" is any publicly owned or leased building having 25,000 square feet or more of usable floor space.  A life-cycle cost analysis must be prepared during the design phase for each newly constructed or renovated major facility.  The life-cycle cost analysis includes an energy-consumption analysis of all energy systems of a major facility that must be prepared by a professional engineer or licensed architect.  The public agency must approve the major facility's life-cycle cost analysis before commencement of actual construction or renovation.

Electric Utility Resource Planning.

All investor-owned and consumer-owned electric utilities with more than 25,000 customers in the state must develop an Integrated Resource Plan (IRP). All other utilities in the state, including full requirements customers that receive all the power from the Bonneville Power Administration, must file either an IRP or a less detailed resource plan.

The minimum required components of an IRP include the following:

The Utilities and Transportation Commission.

The Utilities and Transportation Commission (UTC) regulates the rates, services, and practices of privately-owned utilities and transportation companies in Washington. Companies providing the following goods or services are regulated by the UTC: electricity, natural gas, certain telecommunications service, water, solid waste collection, commercial ferry service, transportation of household goods, certain auto transportation service, and transportation of petroleum through pipelines. The UTC is required to ensure that rates charged are "fair, just and reasonable."

District Thermal Energy Systems.

The UTC has limited regulatory authority over a district thermal energy system owned or operated by a thermal energy company. A "district thermal energy system" is any system that provides thermal energy for space heating, space cooling, or process uses from a central plant and distributes thermal energy to two or more buildings. A "thermal energy company" is any private person, company, association, partnership, joint venture, or corporation engaged in developing, producing, distributing, or selling to, or for the public, thermal energy services for any beneficial use other than electricity generation.

Air Operating Permits.

The Department of Ecology and seven local air quality agencies administer Washington's air operating permit standards under the Washington Clean Air Act.  An air operating permit specifies certain requirements for air pollution sources, including permissible emission levels.

Boiler Maximum Achievable Control Technology.

Federal major source boiler maximum achievable control technology (boiler MACT) rules (40 C.F.R. 63, Subpart DDDDD) apply to boilers and process heaters in major sources. A "major source" is an industrial, commercial, or institutional facility that emits 10 tons per year (tpy) or more of any single hazardous air pollutant or 25 tpy or more of total hazardous air pollutants.  The boiler MACT rules require affected boilers and process heaters to complete a one-time energy assessment that identifies energy savings opportunities.

–––––––––––––––––––––––––––––––––

Summary of Substitute Bill:

Energy Conservation in Design of Public Facilities.

The list of facilities for which analysis of the cost of energy consumption is required by the Legislature is expanded to include critical governmental facilities. A "critical governmental facility" is a publicly-owned building or district energy system that is expected to:

An energy-consumption analysis conducted as part of a life-cycle cost analysis for a major facility or critical governmental facility must include the identification and analysis of critical loads for each energy system and a combined heat and power system feasibility assessment.

Electric Utility Resource Planning.

By December 31, 2016, an electric utility with over 25,000 customers in the state must:

The Utilities and Transportation Commission (UTC) may authorize recovery of the actual cost of fuel incurred by an electrical company under a power purchase agreement for the electric output of a combined heat and power system. The governing body of a consumer-owned utility that offers a 15-year minimum power purchase agreement for the electric output of combined heat and power may, every five years after signing the agreement, initiate a fuel cost adjustment process.

An electric utility that is required to develop an integrated resource plan (IRP) may include combined heat and power systems among the measures in a conservation supply curve in the utility's assessment for demand side resources.

The Department of Commerce must submit any reports it receives of existing and potential combined heat and power facilities in IRPs to the Washington State University Extension Energy Program (WSU Energy Program) for analysis. The WSU Energy Program must submit an annual report electronically to the appropriate legislative committees on the planned and completed combined heat and power facilities in the state.

Thermal Energy Systems.

The UTC has limited regulatory authority over any thermal energy system owned or operated by a thermal energy company or by a combined heat and power facility engaged in thermal energy services. The UTC retains the authority to issue or enforce any order affecting combined heat and power facilities owned or operated by an electrical company that are subsidized by a regulated service.

References to "district" thermal energy systems are removed. A "thermal energy system" is any system that provides thermal energy for space heating, space cooling, or process uses from a central plant or combined heat and power facility, and that distributes the thermal energy to two or more buildings.

The Utilities and Transportation Commission.

The UTC is required to establish a voluntary emission reduction program for the purpose of encouraging natural gas companies to invest in projects that reduce emissions, improve thermal energy efficiency, and provide benefits to customers of natural gas companies. The UTC must adopt rules to implement a voluntary emission reduction program by December 31, 2016.

Air Operating Permits.

The Department of Ecology (Ecology) must establish a general air operating permit or permit by rule for stationary natural gas engines used in a combined heat and power system. The general permit or permit by rule must establish emission limits for air contaminants released by stationary natural gas engines, and is to be adopted and implemented as the permitting mechanism for the new construction of a combined heat and power system.

In establishing a general permit or permit by rule, Ecology may consider:

Boiler Maximum Achievable Control Technology.

An owner or operator of an industrial, commercial, or institutional boiler or process heater required to complete an energy assessment under federal major source boiler maximum achievable control technology (boiler MACT) rules (40 C.F.R. 63, Subpart DDDDD) must:

The reporting requirement does not apply if an owner or operator of a boiler or process heater is not required to complete an energy assessment under federal boiler MACT rules.

An owner or operator of a boiler or process heater who has not completed an energy assessment under federal boiler MACT rules must request a free combined heat and power site qualification screening from the U.S. Department of Energy.

Substitute Bill Compared to Original Bill:

The substitute bill:

–––––––––––––––––––––––––––––––––

Appropriation: None.

Fiscal Note: Available.

Effective Date of Substitute Bill: The bill takes effect 90 days after adjournment of the session in which the bill is passed.

Staff Summary of Public Testimony:

(In support) This bill looks past the 2020 target for Initiative 937. Combined heat and power will likely be a compliance pathway for federal clean power regulations in the years to come. Wasting heat energy and not taking advantage of it is a disservice to the state's economy.

(In support with concerns) Combined heat and power is a win-win-win technology for utility customers, utilities, and the environment. It's a way to capture waste heat and helps utilities by reducing load and costs associated with the distribution and transmission of electricity. Washington has the potential to expand combined heat and power in the state. The State Energy Strategy recommends encouraging and supporting both the retention and promotion of combined heat and power. It makes good sense to have state facilities look at incorporating combined heat and power, and the bill presents an ideal opportunity to look at critical governmental facilities.

Combined heat and power opportunities are not easy to identify. The bill's requirement that utilities conduct a combined heat and power feasibility assessment would be an extensive and expensive proposition. Feasibility assessments should be conducted at customer request, because combined heat and power requires a willing customer.

The bill might exempt thermal energy facilities owned by investor-owned utilities from regulation by the Utilities and Transportation Commission. The voluntary emissions reduction program proposed in the bill is a good idea, but implementation may be difficult, and concerns about cost-effectiveness and emissions reduction potential remain.

(With concerns) The language in the bill changes the way combined heat and power is treated in electric utilities' integrated resource plans. Natural gas prices are volatile, so a 15-year power purchase agreement for combined heat and power is concerning.

(Neutral) The Washington State University Energy Program has experts in combined heat and power who are engaged in conversations on the subject at the national level. The program is happy to do the work required of it in the bill.

(Opposed) None.

Persons Testifying: (In support) Representative Morris, prime sponsor; and Mary Moore, League of Women Voters.

(In support with concerns) Dave Danner, Utilities and Transportation Commission; Dave Warren, Washington Public Utilities District Association; John Rothlin, Avista; Joni Bosh, Northwest Energy Coalition; and Tony Usibelli, Department of Commerce.

(With concerns) Nancy Atwood, Puget Sound Energy.

(Neutral) Dave Sjoding and Sheila Riggs, Washington State University Energy Program.

Persons Signed In To Testify But Not Testifying: None.