1147-S AMH SHMK BALL 205
SHB 1147 - H AMD 401
By Representative Schmick
NOT CONSIDERED 01/05/2018
On page 43, after line 35, insert the following:
"(14) During the course of any planned resurfacing or other preservation activity on state route 26 between Colfax and Othello in the 2017-2019 fiscal biennium, the department must add dug-in reflectors and shoulder rumble strips."
|
EFFECT: Requires the WSDOT to add dug-in reflectors and shoulder rumble strips on SR 26 between Colfax and Othello during the course of any planned resurfacing or other preservation activity.
FISCAL IMPACT: No net change to appropriated levels.
|
--- END ---