5096 AMS FORT BRAM 057
SB 5096 - S AMD TO S AMD (S-2543.4/17) 206
By Senator Fortunato
ADOPTED 04/06/2017
On page 37, after line 3 of the amendment, insert the following:
"(29) Among the options studied as part of the SR 410 Corridor Study project (L1000174), the department shall examine the mobility and safety benefits of replacing or expanding the White River bridge between Enumclaw and Buckley to four lanes and removing the trestle."
|
EFFECT: Directs the department to study the White River bridge as part of the SR 410 Corridor Study project. |
--- END ---