2322-S AMH FEYJ MCPH 029

  

SHB 2322 - H AMD 1688

By Representative Fey

ADOPTED 02/28/2020

On page 43, beginning on line 10, after "impact" strike "the existing I-5 corridor from Mounts road to Tumwater analysis." and insert ": the existing I-5 corridor from Mounts road to Tumwater design and operations alternatives analysis; design studies related to HOV lanes or operations; or where it is necessary to continue design and operations analysis related to projects already under development."

EFFECT: Makes the following changes:

Adds details to the Mounts road to Tumwater analysis name.

Adds that this proviso is not intended to impact design studies related to HOV lanes or operations.

Adds that this proviso is not intended to impact design and operations analyses related to projects under development.   

FISCAL IMPACT: No net change to appropriated levels.

--- END ---