2586-S AMH BOEH H4997.1
SHB 2586 - H AMD TO H AMD (H-4987.1/20) 1451
By Representative Boehnke
On page 3, after line 20, insert the following:
"(7) An electric utility formed under this chapter may not implement a beneficial electrification plan under this section if the loss of load probability, as determined by the Northwest power and conservation council, exceeds five percent."
On page 5, after line 14, insert the following:
"(7) A public utility district may not implement a beneficial electrification plan under this section if the loss of load probability, as determined by the Northwest power and conservation council, exceeds five percent."
EFFECT: Prohibits a municipal electric utility or public utility district from implementing a beneficial electrification plan if the loss of load probability, as determined by the Northwest power and conservation council, exceeds five percent.
--- END ---