On page 22, after line 21, insert the following:
"(6) The evaluation required under subsection (3) of this section must be conducted by an independent consultant whose services the department has contracted. The estimate or range in probable costs or cost savings from the independent consultant must be announced in a press release to the news media at the time that the report submitted under this section is posted to the department's web site, and must be simultaneously reported to the energy committees of the house of representatives and the senate."