AN ACT Relating to clarifying the contracting procedures for cities; and amending RCW
35.23.352.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
Sec. 1. RCW
35.23.352 and 2018 c 74 s 2 are each amended to read as follows:
(1) Any second-class city or any town may construct any public works, as defined in RCW
39.04.010, by contract or day labor without calling for bids therefor whenever the estimated cost of the work or improvement, including cost of materials, supplies and equipment will not exceed the sum of sixty-five thousand dollars if more than one craft or trade is involved with the public works, or forty thousand dollars if a single craft or trade is involved with the public works or the public works project is street signalization or street lighting. A public works project means a complete project. The restrictions in this subsection do not permit the division of the project into units of work or classes of work to avoid the restriction on work that may be performed by day labor on a single project.
Whenever the cost of the public work or improvement, including materials, supplies and equipment, will exceed these figures, the same shall be done by contract. All such contracts shall be let at public bidding upon publication of notice calling for sealed bids upon the work. The notice shall be published in the official newspaper, or a newspaper of general circulation most likely to bring responsive bids, at least thirteen days prior to the last date upon which bids will be received. The notice shall generally state the nature of the work to be done that plans and specifications therefor shall then be on file in the city or town hall for public inspections, and require that bids be sealed and filed with the council or commission within the time specified therein. Each bid shall be accompanied by a bid proposal deposit in the form of a cashier's check, postal money order, or surety bond to the council or commission for a sum of not less than five percent of the amount of the bid, and no bid shall be considered unless accompanied by such bid proposal deposit. The council or commission of the city or town shall let the contract to the lowest responsible bidder or shall have power by resolution to reject any or all bids and to make further calls for bids in the same manner as the original call.
When the contract is let then all bid proposal deposits shall be returned to the bidders except that of the successful bidder which shall be retained until a contract is entered into and a bond to perform the work furnished, with surety satisfactory to the council or commission, in accordance with RCW
39.08.030. If the bidder fails to enter into the contract in accordance with his or her bid and furnish a bond within ten days from the date at which he or she is notified that he or she is the successful bidder, the check or postal money order and the amount thereof shall be forfeited to the council or commission or the council or commission shall recover the amount of the surety bond. A low bidder who claims error and fails to enter into a contract is prohibited from bidding on the same project if a second or subsequent call for bids is made for the project.
If no bid is received on the first call the council or commission may readvertise and make a second call, or may enter into a contract without any further call or may purchase the supplies, material or equipment and perform the work or improvement by day labor.
(2)
For the purposes of this section, "lowest responsible bidder" means a bid that meets the criteria under RCW 39.04.350; and has the lowest bid, or has a bid that is within five percent of the lowest bid and meets the following supplemental criteria:(a) The bidder has delivered at least one project of similar size and scope within the last five years for the city on time, within budget, and according to required specifications; and
(b) The bidder has not delivered a project to the city within the last five years that was late, over budget, or did not meet specifications.
(3) The allocation of public works projects to be performed by city or town employees shall not be subject to a collective bargaining agreement.
((
(3)))
(4) In lieu of the procedures of subsection (1) of this section, a second-class city or a town may let contracts using the small works roster process provided in RCW
39.04.155.
Whenever possible, the city or town shall invite at least one proposal from a minority or woman contractor who shall otherwise qualify under this section.
((
(4)))
(5) The form required by RCW
43.09.205 shall be to account and record costs of public works in excess of five thousand dollars that are not let by contract.
(((5)))(6) The cost of a separate public works project shall be the costs of the materials, equipment, supplies, and labor on that construction project.
(((6)))(7) Any purchase of supplies, material, or equipment, except for public work or improvement, where the cost thereof exceeds seven thousand five hundred dollars shall be made upon call for bids.
(((7)))(8) Bids shall be called annually and at a time and in the manner prescribed by ordinance for the publication in a newspaper of general circulation in the city or town of all notices or newspaper publications required by law. The contract shall be awarded to the lowest responsible bidder.
((
(8)))
(9) For advertisement and formal sealed bidding to be dispensed with as to purchases with an estimated value of fifteen thousand dollars or less, the council or commission must authorize by resolution, use of the uniform procedure provided in RCW
39.04.190.
((
(9)))
(10) The city or town legislative authority may waive the competitive bidding requirements of this section pursuant to RCW
39.04.280 if an exemption contained within that section applies to the purchase or public work.
((
(10)))
(11) This section does not apply to performance-based contracts, as defined in RCW
39.35A.020(4), that are negotiated under chapter
39.35A RCW.
(((11)))(12) Nothing in this section shall prohibit any second class city or any town from allowing for preferential purchase of products made from recycled materials or products that may be recycled or reused.
(((12)))(13)(a) Any second-class city or any town may procure public works with a unit priced contract under this section for the purpose of completing anticipated types of work based on hourly rates or unit pricing for one or more categories of work or trades.
(b) For the purposes of this section, "unit priced contract" means a competitively bid contract in which public works are anticipated on a recurring basis to meet the business or operational needs of the city or town, under which the contractor agrees to a fixed period indefinite quantity delivery of work, at a defined unit price for each category of work.
(c) Unit priced contracts must be executed for an initial contract term not to exceed three years, with the city or town having the option of extending or renewing the unit priced contract for one additional year.
(d) Invitations for unit price bids shall include, for purposes of the bid evaluation, estimated quantities of the anticipated types of work or trades, and specify how the city or town will issue or release work assignments, work orders, or task authorizations pursuant to a unit priced contract for projects, tasks, or other work based on the hourly rates or unit prices bid by the contractor. Contracts must be awarded to the lowest responsible bidder as per RCW
39.04.010. Whenever possible, the city or town must invite at least one proposal from a minority or woman contractor who otherwise qualifies under this section.
(e) Unit price contractors shall pay prevailing wages for all work that would otherwise be subject to the requirements of chapter
39.12 RCW. Prevailing wages for all work performed pursuant to each work order must be the prevailing wage rates in effect at the beginning date for each contract year. Unit priced contracts must have prevailing wage rates updated annually. Intents and affidavits for prevailing wages paid must be submitted annually for all work completed within the previous twelve-month period of the unit priced contract.