Z-0821.1

HOUSE BILL 2324

State of Washington
66th Legislature
2020 Regular Session
ByRepresentatives Tharinger and Wylie; by request of Office of Financial Management
Prefiled 01/08/20.Read first time 01/13/20.Referred to Committee on Capital Budget.
AN ACT Relating to capital budget; making appropriations and authorizing expenditures for capital improvements; amending RCW 43.19.501; amending 2019 c 413 ss 1009, 1015, 1029, 1030, 1035, 1041, 1042, 1043, 1051, 1059, 1060, 1073, 1078, 1093, 2001, 2002, 2010, 2030, 2037, 2038, 2039, 2041, 2072, 2075, 2080, 2086, 2091, 2093, 2094, 2096, 2098, 3007, 3008, 3009, 3010, 3011, 3016, 3022, 3023, 3026, 3028, 3030, 3031, 3032, 3034, 3036, 3038, 3052, 3056, 3062, 3064, 3081, 3096, 3097, 3115, 3119, 3120, 3123, 3129, 3131, 3132, 3135, 3137, 3141, 3143, 3144, 3145, 3149, 3150, 3151, 3152, 3153, 3156, 3160, 3204, 3223, 3230, 3232, 3236, 3242, 3247, 3252, 3253, 3254, 3255, 3274, 3275, 3294, 5012, 5032, 5033, 5034, 5035, 5060, 5072, 5079, 5093, 5098, 5101, 7001, and 7002 (uncodified); adding new sections to 2019 c 413 (uncodified); creating a new section; making appropriations; repealing 2019 c 413 ss 3099 and 3296 (uncodified); and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION.  Sec. 1. A supplemental capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2021, out of the several funds specified in this act.
PART 1
GENERAL GOVERNMENT
Sec. 1001. 2019 c 413 s 1009 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Building Communities Fund Program (30000803)
The reappropriation in this section is subject to the following conditions and limitations:
(1) $1,455,000 of the amount reappropriated in this section is provided solely for the Byrd Barr place, formerly known as Centerstone, building renovation project.
(2) $220,000 of the amount reappropriated in this section is provided solely for El Centro de la Raza boiler fan and master plan for rehabilitation. This amount is not subject to the match requirements, pursuant to RCW 43.63A.125.
State Building Construction AccountState
. . . .
$1,675,000
Prior Biennia (Expenditures)
. . . .
(($19,184,000))
     
$17,990,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($20,859,000))
     
$19,665,000
Sec. 1002. 2019 c 413 s 1015 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
2017-19 Housing Trust Fund Program (30000872)
The reappropriations in this section are subject to the following conditions and limitations: ((The))
(1) Except as provided in subsection (2) of this section, the reappropriations are subject to the provisions of section 6005 ((of this act)), chapter 413, Laws of 2019.
(2) $1,000,000 of the Washington housing trust accountstate reappropriation from section 6005(1)(e), chapter 413, Laws of 2019 and $1,500,000 of the state taxable building construction accountstate reappropriation from section 6005(1)(e), chapter 413, Laws of 2019 are instead provided solely for the purchase of the two south annex properties. The state board for community and technical colleges must transfer the two south annex properties located at 1534 Broadway and 909 East Pine street in Seattle to Capitol Hill Housing to provide services and housing for homeless youth or young adults for a minimum of fifty years. The transfer agreement between the state board for community and technical colleges and Capitol Hill Housing must specify a mutually agreed transfer date and require Capitol Hill Housing to cover any closing costs with a total purchase price of nine million dollars for the two properties. The contract between the department and Capitol Hill Housing must provide that Capitol Hill Housing will be responsible for maintaining and securing the property until it is developed. The contract must also specify that, if Capitol Hill Housing does not construct at least seventy affordable housing units on the site by 2028, this funding must be fully repaid to the state or the land must revert back to the state.
State Building Construction AccountState
. . . .
$17,165,000
State Taxable Building Construction AccountState
. . . .
$73,139,000
Washington Housing Trust AccountState
. . . .
$7,513,000
Subtotal Reappropriation
. . . .
$97,817,000
Prior Biennia (Expenditures)
. . . .
$13,972,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$111,789,000
Sec. 1003. 2019 c 413 s 1029 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
2019-21 Housing Trust Fund Program (40000036)
The appropriations in this section are subject to the following conditions and limitations:
(1) $129,050,000 of the state taxable building construction accountstate appropriation and (($45,950,000))$46,950,000 of the state building construction accountstate appropriation are provided solely for production and preservation of affordable housing. Of the amounts in this subsection:
(a) $35,000,000 of the appropriation is provided solely for housing projects that provide supportive housing and case-management services to persons with ((behavioral or)) chronic mental illness. When evaluating applications for this population, the department must prioritize low-income supportive housing unit proposals that show:
(i) Evidence that the application was developed in collaboration with one or more health care entities that provide behavioral health care services to individuals eligible for the housing provided under this subsection;
(ii) A commitment by the applicant to provide, directly or through a formal partnership, necessary treatment and supportive services to the tenants and maintain the beds or housing units for at least a forty-year period;
(iii) Readiness to begin structural modifications or construction resulting in a fast project completion;
(iv) Program requirements that adhere to the key elements of permanent supportive housing programs including choice in housing and living arrangements, functional separation of housing and services, community integration, rights of tenancy, and voluntary recovery-focused services; and
(v) To achieve geographic distribution, the department must prioritize projects in rural areas as defined by the department per RCW 43.185.050 and unserved communities with the goal of maximizing the investment and increasing the number of supportive housing units in rural, unserved communities.
(b) $10,000,000 of the appropriation in this section is provided solely for competitive grant awards for modular housing which includes high quality affordable housing projects that will quickly move people from homelessness into secure housing and are significantly less expensive to construct than traditional housing. These funds must be awarded to projects with a total project development cost per housing unit of less than $125,000, excluding the value of land, off-site infrastructure costs, and any capitalized reserves, compliant with the Americans with disabilities act, and with a commitment by the applicant to maintain the housing units for at least a fifty year period.
(c) $10,000,000 of the appropriation in this section is provided solely for a state match or state matches on private contributions that fund the production and preservation of affordable housing. Awards must be made using a competitive process. If any funding remains unallocated after the first fiscal year during the 2019-2021 fiscal biennium, the department may allocate the remaining funding through its annual competitive process for affordable housing projects that serve and benefit low-income and special needs populations in need of housing.
(d)(i) $10,000,000 of the appropriation in this section is provided solely for housing preservation grants or loans to be awarded competitively.
(ii) The funds may be provided for major building improvements, preservation, and system replacements, necessary for the existing housing trust fund portfolio to maintain long-term viability. The department must require a capital needs assessment to be provided prior to contract execution. Funds may not be used to add or expand the capacity of the property.
(iii) To allocate preservation funds, the department must review applications and evaluate projects based on the following criteria:
(A) The age of the property, with priority given to buildings that are more than fifteen years old;
(B) The population served, with priority given to projects with at least 50 percent of the housing units being occupied by families and individuals at or below 50 percent area median income;
(C) The degree to which the applicant demonstrates that the improvements will result in a reduction of operating or utilities costs, or both;
(D) The potential for additional years added to the affordability period of the property; and
(E) Other criteria that the department considers necessary to achieve the purpose of this program.
(e)(i) $7,000,000 of the appropriation in this section is provided solely for loans or grants to design and construct ultra-high energy efficient affordable housing projects.
(ii) To receive funding, a project must provide a life-cycle cost analysis report to the department and must demonstrate energy-saving and renewable energy systems either designed to reach net-zero energy use after housing is fully occupied or designed to achieve the most recent building standard of the passive house institute US as of the effective date of this section.
(iii) The department must consider, at a minimum and in any order, the following factors in assigning a numerical ranking to a project:
(A) Whether the proposed design has demonstrated that the project will achieve either net-zero energy use when fully occupied or will achieve the most recent building standard of the passive house institute US as of the effective date of this section;
(B) The life-cycle cost of the project;
(C) That the project demonstrates a design, use of materials, and construction process that can be replicated by the Washington building industry;
(D) The extent to which the project leverages nonstate funds;
(E) The extent to which the project is ready to proceed to construction;
(F) Whether the project promotes sustainable use of resources and environmental quality;
(G) Whether the project is being well managed to fund maintenance and capital depreciation;
(H) Reduction of housing and utilities carbon footprint; and
(I) Other criteria that the department considers necessary to achieve the purpose of this program.
(iv) The department must monitor and track the results of the housing projects that receive ultra-high energy efficiency funding under this section.
(f) (($45,950,000))$46,950,000 of the appropriation in this section is provided solely for the following list of housing projects:
Bellwether Housing (Seattle). . . .$6,000,000
Capitol Hill Housing Broadway (Seattle). . . .$6,000,000
Crosswalk Teen Shelter and Transitional Housing
Project (Spokane). . . .$1,000,000
Ethiopian Community Affordable Housing (Seattle). . . .$3,000,000
FUSION Emergency Housing for Homeless Families
(Federal Way). . . .$3,000,000
Highland Village (Airway Heights). . . .$5,500,000
Home At Last (Tacoma). . . .(($1,500,000))
$2,500,000
Interfaith Works Shelter (Olympia). . . .$3,000,000
NorthHaven Affordable Senior Housing Campus
(Seattle). . . .$1,000,000
Pateros Gardens (Pateros). . . .$1,400,000
Roslyn Housing Project (Roslyn). . . .$2,000,000
SCIDpda North Lot (Seattle). . . .$9,000,000
Seattle Indian Health Board - Low Income Housing
(Seattle). . . .$1,000,000
Tenny Creek Assisted Living (Vancouver). . . .$1,750,000
THA Arlington Drive (Tacoma). . . .$800,000
(g) $6,000,000 of the appropriation for Capitol Hill Housing Broadway (Seattle) in (f) of this subsection is provided solely for the purchase of the two south annex properties. The state board for community and technical colleges must transfer the two south annex properties located at 1534 Broadway and 909 East Pine street in Seattle to Capitol Hill Housing to provide services and housing for homeless youth or young adults for a minimum of fifty years. The transfer agreement between the state board for community and technical colleges and Capitol Hill Housing must specify a mutually agreed transfer date and require Capitol Hill Housing to cover any closing costs with a total purchase price of nine million dollars for the two properties. The contract between the department and Capitol Hill Housing must provide that Capitol Hill Housing will be responsible for maintaining and securing the property until it is developed. The contract must also specify that, if Capitol Hill Housing does not construct at least seventy affordable housing units on the site by 2028, this funding must be fully repaid to the state or the land must revert back to the state.
(h) $57,050,000 of the appropriation in this section is provided solely for affordable housing projects that serve and benefit low-income and special needs populations in need of housing. Of the amounts appropriated in this subsection, the department must allocate the funds as follows:
(i) $5,000,000 of the appropriation in this section is provided solely for housing for veterans;
(ii) $5,000,000 of the appropriation in this section is provided solely for housing that serves people with developmental disabilities;
(iii) $5,000,000 of the appropriation in this section is provided solely for housing that serves people who are employed as farmworkers; and
(iv)(A) $5,000,000 of the appropriation in this section is provided solely for housing projects that benefit homeownership.
(B) During the 2019-2021 fiscal biennium, the department must use a separate application form for applications to provide homeownership opportunities and evaluate homeownership project applications as allowed under chapter 43.185A RCW.
(C) In addition to the definition of "first-time home buyer" in RCW 43.185A.010, for the purposes of awarding homeownership projects during the 2019-2021 fiscal biennium "first time home buyer" also includes:
(I) A single parent who has only owned a home with a former spouse while married;
(II) An individual who is a displaced homemaker as defined in 24 C.F.R. Sec. 93.2 as it existed on the effective date of this section, or such subsequent date as may be provided by the department by rule, consistent with the purposes of this section, and has only owned a home with a spouse;
(III) An individual who has only owned a principal residence not permanently affixed to a permanent foundation in accordance with applicable regulations; or
(IV) An individual who has only owned a property that is discerned by a licensed building inspector as being uninhabitable.
(2) In evaluating projects in this section, the department must give preference for applications based on some or all of the criteria in RCW 43.185.070(5).
(3)(a) The department must strive to allocate all of the amounts appropriated in this section within the 2019-2021 fiscal biennium in the manner prescribed in subsection (1) of this section. However, if upon review of applications the department determines there are not adequate suitable projects in a category, the department may allocate funds to projects serving other low-income and special needs populations, provided those projects are located in an area with an identified need for the type of housing proposed.
(b) By June 30, 2021, the department must report on its web site the following for every previous funding cycle: The number of homeownership and multifamily rental projects funded by housing trust fund moneys; the percentage of housing trust fund investments made to homeownership and multifamily rental projects; and the total number of households being served at up to eighty percent of the area median income, up to fifty percent of the area median income, and up to thirty percent of the area median income, for both homeownership and multifamily rental projects.
(4)(a) The department, in cooperation with the housing finance commission, must develop and implement a process for the collection of certified final development cost data from each grant or loan recipient under this section. The department must use this data as part of its cost containment policy.
(b) Beginning December 1, 2019, and continuing annually, the department must provide the legislature with a report of its final cost data for each project under this section. Such cost data must, at a minimum, include total development cost per unit for each project completed within the past year, descriptive statistics such as average and median per unit costs, regional cost variation, and other costs that the department deems necessary to improve cost controls and enhance understanding of development costs. The department must coordinate with the housing finance commission to identify relevant development costs data and ensure that the measures are consistent across relevant agencies.
State Building Construction AccountState
. . . .
(($45,950,000))
     
$46,950,000
State Taxable Building Construction AccountState
. . . .
$129,050,000
Subtotal Appropriation
. . . .
(($175,000,000))
     
$176,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$480,000,000
TOTAL
. . . .
(($655,000,000))
     
$656,000,000
Sec. 1004. 2019 c 413 s 1030 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Pacific Tower Capital Improvements (40000037)
State Taxable Building Construction AccountState
. . . .
(($1,020,000))
     
$1,376,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$5,311,000
TOTAL
. . . .
(($6,331,000))
     
$6,687,000
Sec. 1005. 2019 c 413 s 1035 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Clean Energy Transition 4 (40000042)
The appropriations in this section are subject to the following conditions and limitations:
(1) The appropriations are provided solely for projects that provide a benefit to the public through development, demonstration, and deployment of clean energy technologies that save energy and reduce energy costs, reduce harmful air emissions, or increase energy independence for the state. Priority must be given to projects that benefit vulnerable populations, including tribes and communities with high environmental or energy burden.
(2) In soliciting and evaluating proposals, awarding contracts, and monitoring projects under this section, the department must:
(a) Ensure that competitive processes, rather than sole source contracting processes, are used to select all projects, except as otherwise noted in this section; and
(b) Conduct due diligence activities associated with the use of public funds including, but not limited to, oversight of the project selection process, project monitoring, and ensuring that all applications and contracts fully comply with all applicable laws including disclosure and conflict of interest statutes.
(3)(a) Pursuant to chapter 42.52 RCW, the ethics in public service act, the department must require a project applicant to identify in application materials any state of Washington employees or former state employees employed by the firm or on the firm's governing board during the past twenty-four months. Application materials must identify the individual by name, the agency previously or currently employing the individual, job title or position held, and separation date. If it is determined by the department that a conflict of interest exists, the applicant may be disqualified from further consideration for award of funding.
(b) If the department finds, after due notice and examination, that there is a violation of chapter 42.52 RCW, or any similar statute involving a grantee who received funding under this section, either in procuring or performing under the grant, the department in its sole discretion may terminate the funding grant by written notice. If the grant is terminated, the department must reserve its right to pursue all available remedies under law to address the violation.
(4) The requirements in subsections (2) and (3) of this section must be specified in funding agreements issued by the department.
(5) $6,107,000 of the state building construction accountstate appropriation is provided solely for grid modernization grants for projects that: Advance clean and renewable energy technologies and transmission and distribution control systems; support integration of renewable energy sources, deployment of distributed energy resources, and sustainable microgrids; and increase utility customer options for energy sources, energy efficiency, energy equipment, and utility services.
(a) Projects must be implemented by public and private electrical utilities that serve retail customers in the state. Priority must be given to: (i) Projects that benefit vulnerable populations, including tribes and communities with high environmental or energy burden; and (ii) projects that have a partner that is a tribe or nonprofit organization that serves community eligible entities. Utilities may partner with other public and private sector research organizations, businesses, tribes, and nonprofit organizations in applying for funding.
(b) The department shall develop a grant application process to competitively select projects for grant awards, to include scoring conducted by a group of qualified experts with application of criteria specified by the department. In development of the application criteria, the department shall, to the extent possible, allow smaller utilities or consortia of small utilities to apply for funding.
(c) Applications for grants must disclose all sources of public funds invested in a project.
(d) $4,400,000 of the state building construction accountstate appropriation is provided solely for providing shore power electrification at terminal five for the northwest seaport alliance. In order to receive this grant, the northwest seaport alliance must demonstrate that they applied to the VW settlement for this project and were denied.
(6)(a) $8,100,000 of the state building construction accountstate appropriation is provided solely for competitive grants for strategic research and development for new and emerging clean energy technologies. These grants will be used to match federal or other nonstate funds to research, develop, and demonstrate clean energy technologies.
(b) The department shall consult and coordinate with the University of Washington, Washington State University, the Pacific Northwest national laboratory and other clean energy organizations to design the grant program. Clean energy organizations who compete for grants from the program may not participate in the design of the grant program. Criteria for the grant program must include life cycle cost analysis for projects that are part of the competitive process.
(c) The program may include, but is not limited to: Solar technologies, advanced bioenergy and biofuels, development of new earth abundant materials or lightweight materials, advanced energy storage, battery components recycling, and new renewable energy and energy efficiency technologies.
(d) $1,000,000 of the state building construction accountstate appropriation is provided solely for grants that enhance the viability of dairy digester bioenergy projects, energy efficiency, and resource recovery to demonstrate advanced nutrient recovery systems that produce value added biofertilizers, reduce trucking of lagoon water, and improve soil health and air and water quality. Grants shall include at least one project east of the Cascades and one project west of the Cascades. State agencies must promote and demonstrate the use of such recovered biofertilizers through state procurement and contracts.
(7)(a) $3,000,000 of the state taxable building construction accountstate appropriation is provided solely as grants to nonprofit lenders to create a revolving loan fund to support the widespread use of proven energy efficiency and renewable energy technologies by households with high energy burden or environmental health risk now inhibited by lack of access to capital.
(b) The department shall provide grant funds to one or more competitively selected nonprofit lenders that will provide matching private capital and will administer the loan fund. The department must select the loan fund administrator or administrators through a competitive process, with scoring conducted by a group of qualified experts, applying criteria specified by the department.
(c) The department must establish guidelines that specify applicant eligibility, the screening process, and evaluation and selection criteria. The guidelines must be used by the nonprofit lenders.
(8) $5,000,000 of the state building construction accountstate appropriation is provided solely for the Washington Maritime Innovation Center. The center must be used to support technology acceleration and incubation, and act as a focal point for maritime sustainability, including, but not limited to, supporting technology development for maritime decarbonization and electrification.
(9) $8,300,000 of the state taxable construction accountstate appropriation is provided solely for scientific instruments to help accelerate research in grid-scale energy storage at the proposed grid-scale energy storage research, development, and testing facility at the Pacific Northwest national laboratory. The state funds are contingent on securing federal funds for the new facility, and are provided as a match to the federal funding. The instruments will support collaborations with the University of Washington and the Washington State University.
(10) $593,000 of the state building construction accountstate appropriation is provided solely to the port of Grays Harbor for an offshore ocean wave renewable energy demonstration project.
(11) $1,500,000 of the state building construction accountstate appropriation is provided solely to the ((Port of)) Skagit county public works department for the Guemes ferry dock shore power charging infrastructure.
State Building Construction AccountState
. . . .
$21,300,000
State Taxable Building Construction AccountState
. . . .
$11,300,000
Subtotal Appropriation
. . . .
$32,600,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$160,000,000
TOTAL
. . . .
$192,600,000
Sec. 1006. 2019 c 413 s 1041 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
2019-21 Behavioral Health Capacity Grants (40000114)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is provided solely for the department of commerce to issue grants to community hospitals or other community providers to expand and establish new capacity for behavioral health services in communities. The department of commerce must consult an advisory group consisting of representatives from the department of social and health services, the health care authority, one representative from a managed care organization, one representative from an accountable care organization, and one representative from the association of county human services. Amounts provided in this section may be used for construction and equipment costs associated with establishment of the facilities. The department of commerce may approve funding for the acquisition of a facility or land if the project results in increased capacity. Amounts provided in this section may not be used for operating costs associated with the treatment of patients using these services.
(2) The department must establish criteria for the issuance of the grants, which must include:
(a) Evidence that the application was developed in collaboration with one or more regional behavioral health entities that administer the purchasing of services;
(b) Evidence that the applicant has assessed and would meet gaps in geographical behavioral health services needs in their region;
(c) Evidence that the applicant is able to meet applicable licensing and certification requirements in the facility that will be used to provide services;
(d) A commitment by applicants to serve persons who are publicly funded and persons detained under the involuntary treatment act under chapter 71.05 RCW;
(e) A commitment by the applicant to maintain and operate the beds or facility for a time period commensurate to the state investment, but for at least a fifteen-year period;
(f) The date upon which structural modifications or construction would begin and the anticipated date of completion of the project;
(g) A detailed estimate of the costs associated with opening the beds;
(h) A financial plan demonstrating the ability to maintain and operate the facility; and
(i) The applicant's commitment to work with local courts and prosecutors to ensure that prosecutors and courts in the area served by the hospital or facility will be available to conduct involuntary commitment hearings and proceedings under chapter 71.05 RCW.
(3) In awarding funding for projects in subsection (5) of this section, the department, in consultation with the advisory group established in subsection (1) of this section, must strive for geographic distribution and allocate funding based on population and service needs of an area. The department must consider current services available, anticipated services available based on projects underway, and the service delivery needs of an area.
(4) The department must prioritize projects that increase capacity in unserved and underserved areas of the state.
(5) $47,000,000 is provided solely for a competitive process for each category listed and is subject to the criteria in subsections (1), (2), (3), and (4) of this section:
(a) $4,000,000 is provided solely for at least two enhanced service facilities for long-term placement of patients discharged or diverted from the state psychiatric hospitals and that are not subject to federal funding restrictions that apply to institutions of mental diseases;
(b) $10,000,000 is provided solely for enhanced adult residential care facilities for long-term placements of dementia discharged or diverted from the state psychiatric hospitals and are not subject to federal funding restrictions that apply to institutions of mental diseases;
(c) $4,000,000 is provided solely for at least two facilities with secure withdrawal management and stabilization treatment beds that are not subject to federal funding restrictions that apply to institutions of mental diseases;
(d) $2,000,000 is provided solely for one or more crisis diversion or stabilization facilities to add sixteen beds in the Spokane region that will address both urban and rural needs, consistent with the settlement agreement in A.B, by and through Trueblood, et al., v. DSHS, et al. and that are not subject to federal funding restrictions that apply to institutions of mental diseases;
(e) $5,000,000 is provided solely for at least four mental health peer respite centers that are not subject to federal funding restrictions that apply to institutions of mental diseases. No more than one mental health peer respite center should be funded in each of the nine regions;
(f) $8,000,000 is provided solely for the department to provide grants to community hospitals, freestanding evaluation and treatment providers, or freestanding psychiatric hospitals to develop capacity for beds to serve individuals on ninety-day or one hundred eighty-day civil commitments as an alternative to treatment in the state hospitals. In awarding this funding, the department must coordinate with the department of social and health services, the health care authority, and the department of health and must only select facilities that meet the following conditions:
(i) The funding must be used to increase capacity related to serving individuals who will be transitioned from or diverted from the state hospitals;
(ii) The facility is not subject to federal funding restrictions that apply to institutions of mental diseases;
(iii) The provider has submitted a proposal for operating the facility to the health care authority;
(iv) The provider has demonstrated to the department of health and the health care authority that it is able to meet the applicable licensing and certification requirements for the facility that will be used to provide services; and
(v) The health care authority has confirmed that it intends to contract with the facility for operating costs within funds provided in the omnibus operating appropriations act for these purposes.
(g) $4,000,000 is provided solely for competitive community behavioral health grants to address regional needs;
(h) $8,000,000 is provided solely for at least four intensive behavioral health treatment facilities for long-term placement of behavioral health patients with complex needs and that are not subject to federal funding restrictions that apply to institutions of mental diseases; and
(i) $2,000,000 is provided solely for grants to community providers to increase behavioral health services and capacity for children and minor youth including, but not limited to, services for substance use disorder treatment, sexual assault and traumatic stress, anxiety, or depression, and interventions for children exhibiting aggressive or depressive behaviors in facilities that are not subject to federal funding restrictions. Consideration must be given to programs that incorporate outreach and treatment for youth dealing with mental health or social isolation issues.
(6) $1,000,000 of the state taxable building construction accountstate is provided solely for deposit into the revolving fund established in Second Substitute House Bill No. 1528 (recovery support services) for capital improvements. ((If the bill is not enacted by June 30, 2019, the amount provided in this subsection shall lapse.))
(7) (($49,543,000))(a) $47,935,000 is provided solely for the following list of projects and is subject to the criteria in subsection (1) of this section:
CHAS Spokane Behavioral Health. . . .$400,000
((Chelan SUD Design. . . .$206,000
Columbia Valley Community Health Remodel. . . .$31,000))
Colville SUD Facility. . . .$4,523,000
((Community Health of Snohomish County Edmonds. . . .$1,000,000))
DESC Health Clinic. . . .$6,000,000
Detox/Inpatient SUD Building (Centralia). . . .$750,000
Evergreen RC Addiction Treatment Facility for
Mothers (Everett). . . .$2,000,000
HealthPoint Behavioral Health Expansion (Auburn). . . .$1,030,000
Issaquah Opportunity Center (Issaquah). . . .$3,000,000
Jamestown S'Klallam Behavioral Health. . . .$7,200,000
Lynnwood Sea Mar Behavioral Health Expansion. . . .$1,000,000
Nexus Youth and Families. . . .$535,000
North Sound SUD Treatment Facility (Everett). . . .$1,500,000
Oak Harbor Tri-County Behavioral Health. . . .$1,000,000
Peninsula Community Health Services Behavioral
Health Expansion (Bremerton). . . .$1,700,000
Providence Regional Medical Center. . . .$4,700,000
((Sea Mar Community Health Centers Seattle BH
(Seattle). . . .$371,000))
Sedro-Woolley North Sound E&T. . . .$6,600,000
Spokane Crisis Stabilization. . . .$2,000,000
Virginia Mason Acute Stabilization. . . .$2,200,000
Yakima Neighborhood Health Services. . . .$488,000
Yakima Valley Farm Workers Clinic. . . .$309,000
YVFWC Children's Village. . . .$1,000,000
(b) $3,577,000 is provided solely for the following list of projects and is subject to the criteria in subsection (1) of this section, except that the following projects are not required to establish new capacity:
Chelan SUD Design. . . .$206,000
Community Health of Snohomish County Edmonds. . . .$1,000,000
The Parkside Place Project (Wenatchee). . . .$2,000,000
Sea Mar Community Health Centers Seattle BH (Seattle). . . .$371,000
(8)(a) $20,000,000 of the appropriation in this section is provided solely for a contract with MultiCare to provide a mixed-use psychiatric care facility in Auburn. The facility must include twelve to eighteen crisis stabilization beds, sixty commitment beds for short-term stays, and sixty long-term involuntary commitment beds for persons on a ninety-day or one hundred eighty-day civil commitment.
(b) The funding in this subsection is subject to the recipient maintaining and operating the beds for at least thirty years to serve (i) persons who are publicly funded and (ii) persons who are detained under the involuntary treatment act under chapter 71.05 RCW.
(9) $408,000 is provided solely for the department for the purpose of providing technical assistance for the community behavioral health grants.
(10) The department of commerce must notify all applicants that they may be required to have a construction review performed by the department of health.
(11) To accommodate the emergent need for behavioral health services, the department of health and the department of commerce, in collaboration with the health care authority and the department of social and health services, must establish a concurrent and expedited process to assist grant applicants in meeting any applicable regulatory requirements necessary to operate inpatient psychiatric beds, freestanding evaluation and treatment facilities, enhanced services facilities, triage facilities, crisis stabilization facilities, or secure detoxification/secure withdrawal management and stabilization facilities.
(12) The department must strive to allocate all of the amounts appropriated within subsection (5) of this section in the manner prescribed. However, if upon review of applications, the department determines, in consultation with the advisory group established in subsection (1) of this section, that there are not adequate suitable projects in a category, the department may allocate funds to other behavioral health capacity project categories within subsection (5) of this section, prioritizing projects in unserved areas of the state.
(13) The department must provide a progress report by November 1, 2020. The report must include:
(a) The total number of applications and amount of funding requested;
(b) A list and description of the projects approved for funding including state funding, total project cost, services anticipated to be provided, bed capacity, and anticipated completion date; and
(c) A status report of projects that received funding in prior funding rounds, including details about the project completion and the date the facility began providing services.
State Building Construction AccountState
. . . .
(($117,951,000))
     
$118,920,000
State Taxable Building Construction AccountState
. . . .
$1,000,000
Subtotal Appropriation
. . . .
$119,920,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$360,000,000
TOTAL
. . . .
(($477,951,000))
     
$479,920,000
Sec. 1007. 2019 c 413 s 1042 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
2020 Local and Community Projects (40000116)
The appropriation in this section is subject to the following conditions and limitations:
(1) The department shall not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature. This requirement does not apply to projects where a share of the appropriation is for design costs only.
(2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations in which the sole purpose is to purchase real property that does not include a construction or renovation component.
(3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
(4) Project funds are available on a reimbursement basis only, and shall not be advanced under any circumstances.
(5) In contracts for grants authorized under this section the department shall include provisions which require that capital improvements be held by the grantee for a specified period of time appropriate to the amount of the grant and that facilities be used for the express purpose of the grant. If the grantee is found to be out of compliance with provisions of the contract, the grantee shall repay to the state general fund the principal amount of the grant plus interest calculated at the rate of interest on state of Washington general obligation bonds issued most closely to the date of authorization of the grant.
(6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
(7) The appropriation is provided solely for the following list of projects:
?al?al "Home" in Lushootseed (Seattle). . . .$947,000
4th Ave. Street Enhancement (White Center). . . .$670,000
Abigail Stuart House (Olympia). . . .$250,000
Aging in PACE Washington (AiPACE) (Seattle). . . .$1,500,000
Airport Utility Extension (Pullman). . . .$1,626,000
Aquatic and Recreation Center (King County). . . .$1,050,000
Arivva Community Center (Tacoma). . . .$1,000,000
Arlington B&G Club Parking Safety (Arlington). . . .$530,000
Asotin Masonic Lodge (Asotin). . . .$62,000
Auburn Arts & Culture Center (Auburn). . . .$500,000
Audubon Center (Sequim). . . .$1,000,000
B&GC of Olympic Peninsula (Port Angeles). . . .$500,000
B&GC of Thurston County (Lacey). . . .$98,000
Ballard Food Bank (Seattle). . . .$750,000
Battle Ground YMCA (Battle Ground). . . .$500,000
Beacon Center Renovation (Tacoma). . . .$1,000,000
Bellevue HERO House (Bellevue). . . .$46,000
Benton Co. Museum Building Improvements (Prosser). . . .$103,000
Big Brothers Big Sisters Learning Lab (Olympia). . . .$56,000
Blue Mountain Action Council Comm. Services Center
(Walla Walla). . . .$1,000,000
Bothell Downtown Revitalization (Bothell). . . .$1,500,000
Bowers Field Airport (Ellensburg). . . .$275,000
Boys & Girls Club of Thurston Co. Upgrades (Rochester). . . .$31,000
Boys & Girls Club Roof and Flooring Repairs (Federal Way). . . .$319,000
Brezee Creek Culvert Replacement/East 4th St. Widening
(La Center). . . .$1,500,000
Browns Park Project (Spokane Valley). . . .$536,000
Buffalo Soldiers' Museum (Seattle). . . .$200,000
Camas Washougal Nature Play Area (Washougal). . . .$103,000
Campus Towers (Longview). . . .$228,000
Carbonado Water Source Protection Acquisition
(Carbonado). . . .$1,500,000
Carl Maxey Center (Spokane). . . .$350,000
Carlisle Lake Park Improvements (Onalaska). . . .$213,000
Carlyle Housing Facility Upgrades (Spokane). . . .$400,000
Cathlamet Pioneer Center Restoration (Cathlamet). . . .$165,000
Centerville Fire Dept. (Centerville). . . .$216,000
Centerville Grange (Centerville). . . .$90,000
Centralia Fox Theater (Centralia). . . .$1,000,000
Chehalis River Bridge Ped Safety Lighting Ph2 (Aberdeen). . . .$323,000
Cheney Reclaimed Water Project (Cheney). . . .$2,000,000
Chief Kitsap Education and Community Resource Center
(Poulsbo). . . .$1,000,000
Chief Leschi Schools Facilities & Safety Project
(Puyallup). . . .$250,000
Chief Leschi Schools Safety & Security (Puyallup). . . .$250,000
Children's Center Design & Feasibility Study (Vancouver). . . .$400,000
Clymer Museum Remodel Ph2 (Ellensburg). . . .$258,000
Colfax Pantry Building (Colfax). . . .$247,000
Community Services of Moses Lake Food Bank Facility
(Moses Lake). . . .$2,000,000
Conconully Community Services Complex (Conconully). . . .$515,000
Cosmopolis Elem. Energy & Safety (Cosmopolis). . . .$206,000
Coulee City Medical Clinic (Coulee City). . . .$150,000
Curran House Museum (University Place). . . .$43,000
Dakota Homestead (Seattle). . . .$155,000
Dawson Park Improvements (Tacoma). . . .$258,000
Dayton Pump Station (Edmonds). . . .$515,000
((Dock and Marine Terminal (Seattle). . . .$750,000))
Downtown Park Gateway (Bellevue). . . .$1,030,000
Dungeness River Audubon Center Expansion (Sequim). . . .$500,000
East Blaine Infrastructure (Blaine). . . .$500,000
Ejido Community Farm (Whatcom). . . .$250,000
El Centro de la Raza Federal Way Office (Federal Way). . . .$1,000,000
Enumclaw Aquatic Center (Enumclaw). . . .$258,000
Enumclaw Expo Center Roof (Enumclaw). . . .$250,000
Everett TOD Study (Everett). . . .$200,000
Everett YMCA (Everett). . . .$1,000,000
Evergreen High School Health Center (Vancouver). . . .$388,000
Evergreen Speedway Capital Improvement (Monroe). . . .$150,000
Excelsior Integrated Care Ctr. Sports Court (Spokane). . . .$266,000
Excelsior Roof & Gym Repair (Spokane). . . .$263,000
Excelsior Vocational Education Space (Spokane). . . .$164,000
Expanding on Excellence Capital Campaign (White Salmon). . . .$500,000
Family Education and Support Services (Tumwater). . . .$500,000
Felts Field Gateway Improvement Phase 1 (Spokane). . . .$100,000
Fennel Creek Trailhead (Bonney Lake). . . .$258,000
Filipino Hall Renovation (Wapato). . . .$63,000
Fircrest Pool (Fircrest). . . .$1,000,000
FISH Food Bank (Ellensburg). . . .$772,000
Fishtrap Creek Habitat Improvement (Lynden). . . .$258,000
Flood Plain Stabilization, Habitat Enhancement (Kent). . . .$1,000,000
Food Lifeline (Seattle). . . .$1,004,000
Foothills Trail Extension (Wilkeson). . . .$500,000
Fort Steilacoom Park Artificial Turf Infields
(Lakewood). . . .$1,015,000
Fourth Plain Community Commons (Vancouver). . . .$800,000
Garfield Co. Hospital HVAC (Pomeroy). . . .$250,000
Gateway Center (Grays Harbor). . . .$500,000
Gene Coulon Memorial Beach Park Play Equipment
Upgrade (Renton). . . .$618,000
George Community Hall Roof (George). . . .$201,000
George Davis Creek Fish Passage Project (Sammamish). . . .$515,000
Gig Harbor Food Bank (Gig Harbor). . . .$180,000
Goldendale Airport (Goldendale). . . .$550,000
((Grand Connection Downtown Park Gateway (Bellevue). . . .$1,000,000))
Granger Historical Museum Construction (Granger). . . .$150,000
Granite Falls Police Dept. Renovation Project
(Granite Falls). . . .$412,000
Grays Harbor and Willapa Bay Sedimentation (Grays Harbor). . . .$464,000
Grays Harbor YMCA (Grays Harbor). . . .$293,000
Greater Maple Valley Veterans Memorial (Maple Valley). . . .$102,000
Green Bridges, Healthy Communities; Aurora Bridge I-5
(Seattle). . . .$1,500,000
Greenwood Cemetery Restoration (Centralia). . . .$402,000
Greenwood Cemetery Safety Upgrades (Centralia). . . .$91,000
HealthPoint (Tukwila). . . .$1,000,000
HealthPoint Dental Expansion (SeaTac). . . .$1,545,000
Heritage Senior Housing (Chelan). . . .$52,000
High Dune Trail & Conservation Project (Ocean Shores). . . .$140,000
Historic Downtown Chelan Revitalization (Chelan). . . .$52,000
Historic Olympic Stadium Preservation Project (Hoquiam). . . .$515,000
Historical Museum & Community Center Roof Replacement
(Washtucna). . . .$24,000
Historical Society Energy Upgrades (Anderson Island). . . .$14,000
Hoh Tribe Broadband (Grays Harbor). . . .$129,000
Horseshoe Lake ADA Upgrades (Woodland). . . .$82,000
Housing Needs Study (Statewide). . . .$200,000
Howard Bowen Event Complex (Sumas). . . .$1,712,000
Howe Farm Water Service (Port Orchard). . . .$52,000
ICHS Bellevue Clinic Renovation Project (Bellevue). . . .$1,600,000
Illahee Preserve's Lost Continent Acquisition (Bremerton). . . .$335,000
((Ilwaco Boatyard Modernization (Ilwaco). . . .$458,000))
Imagine Children's Museum Expansion and Renovation
(Everett). . . .$2,000,000
Index Water System Design (Index). . . .$23,000
Infrastructure for Economic Development (Port Townsend). . . .$675,000
Innovative Health Care Learning Center Phase 1 (Yakima). . . .$500,000
Interactive Educ. Enh./Friends Issaquah Hatchery
(Issaquah). . . .$113,000
Intersection Improvements Juanita Dr. (Kirkland). . . .$750,000
Japanese American Exclusion Memorial (Bainbridge Island). . . .$155,000
Japanese Gulch Daylight Project (Mukilteo). . . .$400,000
Keller House and Carriage House Paint Restoration
(Colville). . . .$45,000
Key Kirkland Sidewalk Repairs (Kirkland). . . .$537,000
Key Peninsula Elder Community (Gig Harbor). . . .$1,000,000
Ki-Be School Parking Lot Improvements (Benton City). . . .$268,000
Kitsap Conservation Study (Kitsap). . . .$51,000
Kittitas Valley Event Center (Ellensburg). . . .$206,000
Klickitat Co. Sheriff Office Training Bldg. (Goldendale). . . .$335,000
KNKX Radio Studio (Tacoma). . . .$824,000
Lacey Veterans Services Hub Facility Renovation (Lacey). . . .$2,000,000
Lake Chelan Community Center (Lake Chelan). . . .$250,000
Lake Chelan Water Supply (Wenatchee). . . .$464,000
Lake City Community Center Replacement (Seattle). . . .$2,000,000
Lake Stevens Civic Center Phase II (Lake Stevens). . . .$1,000,000
Lake Sylvia State Park Pavilion (Montesano). . . .$250,000
Lake Wilderness Park Improvements (Maple Valley). . . .$200,000
Land Use & Infrastructure Subarea Plan (Mill Creek). . . .$300,000
Larson Gallery Renovation (Yakima). . . .$875,000
Leffler Park (Manson). . . .$265,000
Legacy in Motion (Puyallup). . . .$1,750,000
Legacy Site Utility Infrastructure (Maple Valley). . . .$154,000
Lewis Co. CHS Pediatric Clinic (Centralia). . . .$84,000
Little Badger Mountain Trailhead (Richland). . . .$464,000
Little Mountain Road Pipeline and Booster Station
(Mount Vernon). . . .$1,300,000
Long Beach Police Department (Long Beach). . . .$705,000
Lopez Island Swim Center (Lopez Island). . . .$1,000,000
Lummi Hatchery Project (San Juan). . . .$1,000,000
Mabton City Park (Mabton). . . .$54,000
Main Street Redevelopment Project - Phase 2
(University Place). . . .$985,000
Mariner Community Campus (Everett). . . .$2,250,000
Mary's Place (Burien). . . .$2,050,000
Marymount Museum/Spana-Park Senior Center (Spanaway). . . .$1,000,000
McChord Airfield North Clear Zone (Lakewood). . . .$500,000
McCormick Woods Sewer Lift #2 Improvements (Port Orchard). . . .$800,000
Melanie Dressel Park (Tacoma). . . .$500,000
Mercer Is/Aubrey Davis Park Trail Upgrade (Mercer Island). . . .$500,000
Missing & Murdered Indigenous Women Memorial (Toppenish). . . .$49,000
Monroe B&G Club ADA Improvements (Monroe). . . .$464,000
Mountlake Terrace Main Street (Mountlake Terrace). . . .$750,000
Mt. Adams Comm. Forest, Klickitat Canyon Rim Purchase
(Glenwood). . . .$400,000
Mt. Adams School District Athletic Fields (Harrah). . . .$242,000
Mt. Peak Fire Lookout Tower (Enumclaw). . . .$381,000
Mt. Spokane SP Ski Lift (Mead). . . .$750,000
Mukilteo Promenade (Mukilteo). . . .$500,000
Museum Storage Building (Steilacoom). . . .$72,000
Naches Fire/Rescue, Yakima Co. #3 (Naches). . . .$200,000
Naselle HS Music/Vocational Wing (Naselle). . . .$258,000
Naselle Primary Care Clinic (Naselle). . . .$216,000
Naselle SD Flooring (Naselle). . . .$237,000
NCRA Maint. Bldg., Parking Lot, Event Space (Castle Rock). . . .$283,000
NEW Health Programs, Colville Dental Clinic (Colville). . . .$1,250,000
Newman Lake Flood Control Zone District (Newman Lake). . . .$415,000
North Elliott Bay Public Dock; Marine Transit Terminal
(Seattle). . . .(($1,000,000))
$1,750,000
Northshore Senior Center Rehabilitation Project (Bothell). . . .$500,000
Northwest African American Museum (Seattle). . . .$500,000
Northwest Native Canoe Center (Seattle). . . .$986,000
NW School of Wooden Boatbuilding (Port Hadlock). . . .$464,000
Oak Harbor Marina (Oak Harbor). . . .$400,000
Oakville SD Kitchen Renovation (Oakville). . . .$517,000
Oddfellows Ellensburg Bldg. Restoration (Ellensburg). . . .$267,000
Opening Doors - Permanent Supportive Housing Facility
(Bremerton). . . .$750,000
Orting City Hall and Police Station (Orting). . . .$600,000
Orting Ped Evac Crossing (Orting). . . .$103,000
Othello Regional Water (Othello). . . .$425,000
Outdoors for All (Seattle). . . .$1,000,000
Pacific Co. Fairgrounds Roof (Menlo). . . .$210,000
Packwood FEMA Floodplain Study (Packwood). . . .$637,000
Pasco Farmers Market & Park (Pasco). . . .$154,000
Pendergast Regional Park Phase II (Bremerton). . . .$50,000
Peninsula Community Health Service Dental Mobile
(Bremerton). . . .$340,000
PenMet - Cushman Trail Enhancements (Gig Harbor). . . .$52,000
PenMet Community Rec Center (Gig Harbor). . . .$173,000
Pet Overpopulation Prevention Vet Clinic Building
(West Richland). . . .$300,000
Pine Garden Apartment Roof (Shelton). . . .$46,000
Pioneer Park Fountain (Walla Walla). . . .$9,000
Pomeroy Booster Pumping Station (Pomeroy). . . .$96,000
Port of Everett (Everett). . . .$300,000
Port of Ilwaco Boatyard Modernization (Ilwaco). . . .$545,000
Port of Willapa Harbor Dredging Support Boat (Tokeland). . . .$180,000
Poulsbo Historical Society (Poulsbo). . . .$400,000
Prairie View Schoolhouse Community Center (Waverly). . . .$57,000
Protect Sewer Plant from Erosion (Ocean Shores). . . .$155,000
Puyallup Culvert Replacement (Puyallup). . . .$515,000
Puyallup Street Frontage Improvement (Puyallup). . . .$258,000
Puyallup VFW Kitchen Renovation (Puyallup). . . .$52,000
Quincy Hospital (Quincy). . . .$300,000
Quincy Square on 4th (Bremerton). . . .$206,000
Recreation Park Renovation (Chehalis). . . .$258,000
Redmond Pool (Redmond). . . .$1,000,000
Renton Trail Connector (Renton). . . .$500,000
Richmond Highland Recreation Center Repairs (Shoreline). . . .$500,000
Rise Together White Center Project (King County). . . .$1,000,000
Ritzville Business & Entrepreneurship Center (Ritzville). . . .$350,000
Rosalia Sewer Improvements (Rosalia). . . .$500,000
Roslyn Downtown Assoc. (Roslyn). . . .$480,000
Royal Park & Rec Ctr. (Royal City). . . .$250,000
Sargent Oyster House Maritime Museum (Allyn). . . .$218,000
Schmid Ballfields Ph3 (Washougal). . . .$584,000
Scott Hill Park & Sports Complex (Woodland). . . .$500,000
Sea Mar Community Health Centers Tumwater Dental
(Olympia). . . .$170,000
Seaport Landing (Aberdeen). . . .$349,000
Seattle Aquarium (Seattle). . . .$1,000,000
Seattle Goodwill (Seattle). . . .$2,000,000
Sewage Lagoon Decommissioning (Concrete). . . .$255,000
Shelton Civic Center Parking Lot (Shelton). . . .$283,000
Shoreline Maintenance Facility - Brightwater Site
(Shoreline). . . .$500,000
Skabob House Cultural Center (Shelton). . . .$350,000
Skagit County Sheriff Radios (Skagit). . . .$1,000,000
Skamania Courthouse Plaza (Stevenson). . . .$150,000
Snohomish Carnegie Project (Snohomish). . . .$500,000
Snohomish County Sheriff's Office South Precinct
(Snohomish). . . .$1,000,000
Snohomish Fire District #26 Communications Project
(Gold Bar). . . .$27,000
Snoqualmie Early Learning Center (Snoqualmie). . . .$500,000
Snoqualmie Valley Youth Activities Center (North Bend). . . .$412,000
South Fork Snoqualmie Levee Setback Project (North Bend). . . .$250,000
SOZO Sports Indoor Arena (Yakima). . . .$600,000
Spokane Sportsplex (Spokane). . . .$1,000,000
Springbrook Park Expansion & Clover Creek Restoration
(Lakewood). . . .$773,000
SR 503 Ped/Bike Ph1&2 (Woodland). . . .$235,000
SR 530 "Oso" Slide Memorial (Arlington). . . .$300,000
Stan and Joan Cross Park (Tacoma). . . .$500,000
Starfire Sports STEM (Tukwila). . . .$250,000
((Step by Step (Puyallup). . . .$500,000))
Stevens Co. Disaster Response Communications (Colville). . . .$500,000
Sultan Water Treatment Plant Design (Sultan). . . .$246,000
Sumas History Themed Playground and Water Park (Sumas). . . .$288,000
Sunnyside Airport Hangar Maintenance Facility
(Sunnyside). . . .(($500,000))
$750,000
Sunnyside Yakima Valley-TEC Welding Program (Yakima). . . .$26,000
Sunset Multi-Service & Career Development Center
(Renton). . . .$1,000,000
SW WA Dance Center (Chehalis). . . .$62,000
SW WA Fairgrounds (Chehalis). . . .$103,000
SW Washington Regional Agriculture & Innovation Park
(Tenino). . . .$1,500,000
Swede Hall Renovation (Rochester). . . .$196,000
((Tacoma Beacon Center Renovation (Tacoma). . . .$1,000,000))
Tacoma Community House (Tacoma). . . .$413,000
Tam O'Shanter Park Circulation & Parking Phase 2
(Kelso). . . .$1,030,000
Tehaleh Slopes Bike Trail (Bonney Lake). . . .$309,000
((Telford Helipad (Creston). . . .$52,000))
Tenino City Hall Renovation (Tenino). . . .$515,000
Terminal 1 Waterfront Development (Vancouver). . . .$4,700,000
The AMP: Aids Memorial Pathway (Seattle). . . .$600,000
The Morck Hotel (Aberdeen). . . .$500,000
Toledo Sewer & Water (Toledo). . . .$469,000
Tonasket Senior Citizen Ctr. (Tonasket). . . .$33,000
Town Center to Burke Gilman Trail Connector
(Lake Forest Park). . . .$500,000
Tukwila Village Food Hall (Tukwila). . . .$400,000
Twin Springs Park (Kenmore). . . .$155,000
Twisp Civic Building & EOC (Twisp). . . .$1,288,000
United Way of Pierce County HVAC (Tacoma). . . .$206,000
University Place Arts (University Place). . . .$34,000
Vertical Evacuation (Ocean Shores). . . .$500,000
Veterans Memorial Museum (Chehalis). . . .$123,000
Veterans Supportive Housing (Yakima). . . .$2,500,000
VOA Lynnwood Center (Lynnwood). . . .$1,000,000
Volunteer Park Amphitheater (Seattle). . . .$500,000
West Kelso Affordable Housing & Community Facility Study
(Kelso). . . .$258,000
WA Poison Control IT (Seattle). . . .$151,000
Waitsburg Taggart Road Waterline (Waitsburg). . . .$456,000
Wallula Dodd Water System Improvement (Walla Walla). . . .$1,000,000
Wapato Creek Restoration (Fife). . . .$258,000
Warren Ave. Playfield (Bremerton). . . .$206,000
Washington Park Boat Launch Storm Damage (Anacortes). . . .$200,000
Wesley Homes (Des Moines). . . .$2,000,000
Westport Dredge Material Use (Westport). . . .$250,000
Whidbey Is. B&G Coupeville (Coupeville). . . .$849,000
Whidbey Is. B&G Oak Harbor (Oak Harbor). . . .$743,000
((White Center Community HUB (Seattle). . . .$500,000))
Wilkeson Water Protection (Wilkeson). . . .$36,000
Willapa BH - Long Beach Safety Improvement Project
(Long Beach). . . .$225,000
William Shore Memorial Pool (Port Angeles). . . .$840,000
Wing Luke Museum Homestead Home (Seattle). . . .$500,000
Wisdom Ridge Business Park (Ridgefield). . . .$2,000,000
Yakima Co. Veterans Dental Facility (Yakima). . . .$469,000
Yakima Valley Fair & Rodeo Multi-Use Facility
(Grandview). . . .$200,000
Yelm Business Incubator Serving Thurston/Pierce
Counties (Yelm). . . .$200,000
Yelm Water Tower (Yelm). . . .$303,000
YMCA Childcare Center Tenant Improvements (Woodinville). . . .$1,000,000
(8) $400,000 of the appropriation in this section is provided solely to the city of Oak Harbor to enhance the fiscal sustainability and revenue generation of the city-owned marina through feasibility work, planning, development, and acquisition.
(9) $200,000 of the appropriation in this section is provided solely for the department to contract for a study regarding both available and needed affordable housing for farmworkers and Native Americans in Washington state. The study must include data to inform policies related to affordable housing for farmworkers and Native Americans and supplement the housing assessment conducted by the affordable housing advisory board created in chapter 43.185B RCW.
(10) $200,000 of the appropriation in this section is provided solely for a grant to the Tacoma buffalo soldiers' museum to conduct a feasibility study for the rehabilitation of building 734, the band barracks at Fort Lawton in Discovery park. The study will provide an assessment of general conditions of building 734 and cost estimates for a comprehensive rehabilitation of the building to meet current building codes including, but not limited to heating, ventilation, air conditioning, and mechanical systems, seismic retrofits, and compliance with the Americans with disabilities act.
(11) $1,300,000 of the appropriation in this section is provided solely for a grant to the Skagit public utility district for the Little Mountain Road pipeline and booster station. $1,000,000 of these funds are provided solely for the design phase of the project; $150,000 of these funds are provided solely for land acquisition; and $150,000 of these funds are provided solely to the district for a public outreach effort to solicit input on the project from residents and rate payers.
State Building Construction AccountState
. . . .
(($162,793,000))
     
$159,533,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($162,793,000))
     
$159,533,000
Sec. 1008. 2019 c 413 s 1043 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Washington Broadband Program (40000117)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is provided solely for implementation of Second Substitute Senate Bill No. 5511 (broadband service). ((If the bill is not enacted by June 30, 2019, the amounts provided in this section shall lapse.))
(2) The funding in this section is provided solely for grants, loans, and administrative expenses related to implementation of the broadband program. Of the total funds:
(a) (($14,440,000))$10,775,000 is provided solely for loans. Moneys attributable to appropriations of state bond proceeds may not be expended for loans to nongovernmental entities.
(b) (($7,110,000))$10,775,000 is provided solely for grants.
(((4)))(3) By January 1, 2021, in the first report to the legislature required under section 6 of Second Substitute Senate Bill No. 5511 (broadband service), the governor's statewide broadband office must include a list of potential regional projects that will accelerate broadband access by providing connections to local jurisdictions, with recommendations for how to fund such larger scale projects. This list must be developed within existing resources.
Statewide Broadband AccountState
. . . .
$21,550,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$80,000,000
TOTAL
. . . .
$101,550,000
NEW SECTION.  Sec. 1009. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMERCE
2021 Local and Community Projects (40000130)
The appropriation in this section is subject to the following conditions and limitations:
(1) The department may not expend the appropriation in this section unless and until the nonstate share of project costs have been either expended or firmly committed, or both, in an amount sufficient to complete the project or a distinct phase of the project that is useable to the public for the purpose intended by the legislature. This requirement does not apply to projects where a share of the appropriation is for design costs only.
(2) Prior to receiving funds, project recipients must demonstrate that the project site is under control for a minimum of ten years, either through ownership or a long-term lease. This requirement does not apply to appropriations for preconstruction activities or appropriations in which the sole purpose is to purchase real property that does not include a construction or renovation component.
(3) Projects funded in this section may be required to comply with Washington's high performance building standards as required by chapter 39.35D RCW.
(4) Project funds are available on a reimbursement basis only, and may not be advanced under any circumstances.
(5) In contracts for grants authorized under this section, the department must include provisions that require that capital improvements be held by the grantee for a specified period of time appropriate to the amount of the grant and that facilities be used for the express purpose of the grant. If the grantee is found to be out of compliance with provisions of the contract, the grantee shall repay to the state general fund the principal amount of the grant plus interest calculated at the rate of interest on state of Washington general obligation bonds issued most closely to the date of authorization of the grant.
(6) Projects funded in this section, including those that are owned and operated by nonprofit organizations, are generally required to pay state prevailing wages.
(7) The appropriation is provided solely for the following list of projects:
El Centro de la Raza (Seattle). . . .$2,000,000
Mount Zion Housing (Seattle). . . .$250,000
State Building Construction AccountState
. . . .
$2,250,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$2,250,000
NEW SECTION.  Sec. 1010. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Seattle Vocational Institute (40000136)
State Building Construction AccountState
. . . .
$10,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$10,000,000
NEW SECTION.  Sec. 1011. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF COMMERCE
New Shelter and Facility Improvements (40000138)
Washington Housing Trust AccountState
. . . .
$30,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$30,000,000
Sec. 1012. 2019 c 413 s 1051 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
2017-19 Stormwater Pilot Project (91001099)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1010, chapter 298, Laws of 2018.
State Building Construction AccountState
. . . .
$50,000
Prior Biennia (Expenditures)
. . . .
(($200,000))
     
$171,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($250,000))
     
$221,000
Sec. 1013. 2019 c 413 s 1059 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Projects that Strengthen Youth & Families (92000227)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 1079, chapter 19, Laws of 2013 2nd sp. sess.
State Building Construction AccountState
. . . .
$300,000
Prior Biennia (Expenditures)
. . . .
(($19,377,000))
     
$18,951,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($19,677,000))
     
$19,251,000
Sec. 1014. 2019 c 413 s 1060 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMERCE
Projects that Strengthen Communities & Quality of Life (92000230)
The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 6006, chapter 3, Laws of 2015 3rd sp. sess.
State Building Construction AccountState
. . . .
$1,400,000
Model Toxics Control Capital AccountState
. . . .
$40,000
Prior Biennia (Expenditures)
. . . .
(($30,688,000))
     
$29,194,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($32,128,000))
     
$30,634,000
Sec. 1015. 2019 c 413 s 1073 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ENTERPRISE SERVICES
Capitol Lake Long-Term Management Planning (30000740)
The ((reappropriation))appropriations in this section ((is))are subject to the following conditions and limitations: The ((reappropriation is))appropriations are subject to the provisions of section 1034, chapter 298, Laws of 2018.
State Building Construction AccountState
. . . .
$3,369,000
State Building Construction AccountState
. . . .
$2,165,000
General FundPrivate/Local
. . . .
$284,000
Subtotal Appropriation
. . . .
$2,449,000
Prior Biennia (Expenditures)
. . . .
$881,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($4,250,000))
     
$6,699,000
Sec. 1016. 2019 c 413 s 1078 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ENTERPRISE SERVICES
Statewide Minor Works - Preservation Projects (30000825)
((Enterprise Services AccountState
. . . .
$207,000))
State Building Construction AccountState
. . . .
$3,246,000
State Vehicle Parking AccountState
. . . .
$79,000
Subtotal Reappropriation
. . . .
(($3,532,000))
     
$3,325,000
Prior Biennia (Expenditures)
. . . .
(($368,000))
     
$261,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($3,900,000))
     
$3,586,000
Sec. 1017. 2019 c 413 s 1093 (uncodified) is amended to read as follows:
FOR THE MILITARY DEPARTMENT
King County Area Readiness Center (30000592)
The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely to acquire land in King county for a readiness center and to complete a predesign. If the department has not signed a purchase and sale agreement by June 30, 2021, the amounts provided in this section shall lapse. The department must work to secure federal funding to cover the majority of future costs for design and construction.
State Building Construction AccountState
. . . .
(($6,600,000))
     
$7,055,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
(($83,900,000))
     
$0
TOTAL
. . . .
(($90,500,000))
     
$7,055,000
(End of part)
PART 2
HUMAN SERVICES
Sec. 2001. 2019 c 413 s 2001 (uncodified) is amended to read as follows:
FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
Omnibus Minor Works (40000003)
State Building Construction AccountState
. . . .
(($470,000))
     
$1,888,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($470,000))
     
$1,888,000
Sec. 2002. 2019 c 413 s 2002 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF LABOR AND INDUSTRIES
L&I HQ Elevators (30000018)
Accident AccountState
. . . .
(($342,000))
     
$366,000
Medical Aid AccountState
. . . .
(($342,000))
     
$366,000
Subtotal Reappropriation
. . . .
(($684,000))
     
$732,000
Accident AccountState
. . . .
$1,450,000
Medical Aid AccountState
. . . .
$1,450,000
Subtotal Appropriation
. . . .
$2,900,000
Prior Biennia (Expenditures)
. . . .
(($350,000))
     
$302,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$3,934,000
Sec. 2003. 2019 c 413 s 2010 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor Works Program Projects: Statewide (30001859)
State Building Construction AccountState
. . . .
(($600,000))
     
$612,000
Prior Biennia (Expenditures)
. . . .
(($855,000))
     
$843,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,455,000
NEW SECTION.  Sec. 2004. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Rainier School - Multiple Buildings: Roofing Replacement & Repairs (30002752)
State Building Construction AccountState
. . . .
$4,200,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$4,200,000
NEW SECTION.  Sec. 2005. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fircrest School - Nursing Facilities: Replacement (30002755)
State Building Construction AccountState
. . . .
$6,650,000
Prior Biennia (Expenditures)
. . . .
$300,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$6,950,000
NEW SECTION.  Sec. 2006. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
DOC/DSHS McNeil Island - Main Dock: Float and Dolphin Replacement (30003234)
State Building Construction AccountState
. . . .
$3,085,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$3,085,000
Sec. 2007. 2019 c 413 s 2030 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fircrest School: Campus Master Plan & Rezone (30003601)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation is subject to the provisions of section 2012, chapter 298, Laws of 2018.
(2) The department shall work with the city of Shoreline on the future siting of a behavioral health facility and nursing facility.
(3) The department may enter into a lease with the city of Shoreline for open space and other uses to generate revenue for the benefit of the persons served by the Dan Thompson memorial trust account.
Charitable, Educational, Penal, and Reformatory
Institutions AccountState
. . . .
$143,000
Prior Biennia (Expenditures)
. . . .
$57,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$200,000
Sec. 2008. 2019 c 413 s 2037 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor Works Preservation Projects: Statewide 2019-21 (40000381)
Charitable, Educational, Penal, and Reformatory
Institutions AccountState
. . . .
$1,665,000
State Building Construction AccountState
. . . .
(($11,015,000))
     
$12,185,000
Subtotal Appropriation
. . . .
(($12,680,000))
     
$13,850,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$159,345,000
TOTAL
. . . .
(($172,025,000))
     
$173,195,000
Sec. 2009. 2019 c 413 s 2038 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor Works Program Projects: Statewide 2019-21 (40000382)
Charitable, Educational, Penal, and Reformatory
Institutions AccountState
. . . .
$955,000
State Building Construction AccountState
. . . .
(($965,000))
     
$1,800,000
Subtotal Appropriation
. . . .
(($1,920,000))
     
$2,755,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$24,000,000
TOTAL
. . . .
(($25,920,000))
     
$26,755,000
Sec. 2010. 2019 c 413 s 2039 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
DSHS & DCYF Fire Alarms (91000066)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is provided solely for projects installing fire alarms at the following locations: (a) Fircrest School; (b) Lakeland Village; (c) Western State Hospital; (d) Rainier School; and (e) Echo Glen. The Echo Glen project may include duress alarms. ((The projects listed in this section must be designed under one contract, and installed under one contract.)) The department must consult with the department of children, youth, and families to prioritize the projects.
(2) When the ((bid is))bids are received, the department must report to the appropriate legislative committees the overall ((bid))bids for the projects.
(3) The department must report to the appropriate legislative committees any best practices on the process by December 31, 2019.
State Building Construction AccountState
. . . .
$11,819,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$11,819,000
Sec. 2011. 2019 c 413 s 2041 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital Elevators (91000068)
Charitable, Educational, Penal, and Reformatory
Institutions AccountState
. . . .
(($2,700,000))
     
$2,000,000
State Building Construction AccountState
. . . .
$700,000
Subtotal Appropriation
. . . .
$2,700,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$2,700,000
Sec. 2012. 2019 c 413 s 2072 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF VETERANS AFFAIRS
Minor Works Facilities Preservation (30000094)
State Building Construction AccountState
. . . .
(($570,000))
     
$755,000
State Building Construction AccountState
. . . .
(($2,025,000))
     
$2,225,000
Prior Biennia (Expenditures)
. . . .
(($2,743,000))
     
$2,558,000
Future Biennia (Projected Costs)
. . . .
$11,445,000
TOTAL
. . . .
(($16,783,000))
     
$16,983,000
Sec. 2013. 2019 c 413 s 2075 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF VETERANS AFFAIRS
Retsil Building 10 (40000004)
State Building Construction AccountState
. . . .
$625,000
Prior Biennia (Expenditures)
. . . .
(($125,000))
     
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($750,000))
     
$625,000
NEW SECTION.  Sec. 2014. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF VETERANS AFFAIRS
WSH - Life Safety Grant (40000013)
General FundFederal
. . . .
$325,000
State Building Construction AccountState
. . . .
$175,000
Subtotal Appropriation
. . . .
$500,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$500,000
NEW SECTION.  Sec. 2015. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CHILDREN, YOUTH, & FAMILIES
Naselle Youth Camp - Eagle Lodge: Medical, Dental & Social Services (30002758)
State Building Construction AccountState
. . . .
$200,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$200,000
Sec. 2016. 2019 c 413 s 2080 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CHILDREN, YOUTH, AND FAMILIES
Green Hill School-Recreation Building: Replacement (30003237)
The appropriation in this section is subject to the following conditions and limitations: This project was formerly administered by the department of social and health services. Due to the transfer of the juvenile rehabilitation program from the department of social and health services to the department of children, youth, and families on July 1, 2019, the administration of this project shall also transfer to the department of children, youth, and families on that date.
State Building Construction AccountState
. . . .
(($800,000))
     
$2,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($800,000))
     
$2,000,000
NEW SECTION.  Sec. 2017. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CHILDREN, YOUTH, & FAMILIES
Naselle Youth Camp - Moolock Lodge: Remodel & Renovation (40000430)
State Building Construction AccountState
. . . .
$200,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$200,000
NEW SECTION.  Sec. 2018. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CHILDREN, YOUTH, & FAMILIES
Echo Glen Cottage 4 Remodel & Renovation (40000526)
State Building Construction AccountState
. . . .
$200,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$200,000
NEW SECTION.  Sec. 2019. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CHILDREN, YOUTH, & FAMILIES
Green Hill School: Baker Living Unit Renovation & Remodel (40000529)
State Building Construction AccountState
. . . .
$200,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$200,000
NEW SECTION.  Sec. 2020. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
MCC: WSR Perimeter Wall Renovation (30000117)
State Building Construction AccountState
. . . .
$1,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$10,135,000
TOTAL
. . . .
$11,135,000
Sec. 2021. 2019 c 413 s 2086 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
CBCC: Boiler Replacement (30000130)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 2025, chapter 298, Laws of 2018.
State Building Construction AccountState
. . . .
$830,000
State Building Construction AccountState
. . . .
(($9,718,000))
     
$10,207,000
Prior Biennia (Expenditures)
. . . .
$170,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($10,718,000))
     
$11,207,000
Sec. 2022. 2019 c 413 s 2091 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
WCCW: Bldg E Roof Replacement (30000810)
State Building Construction AccountState
. . . .
$1,674,000
Prior Biennia (Expenditures)
. . . .
(($1,022,000))
     
$586,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($2,696,000))
     
$2,260,000
Sec. 2023. 2019 c 413 s 2093 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
WSP: Program and Support Building (30001101)
State Building Construction AccountState
. . . .
$1,500,000
Prior Biennia (Expenditures)
. . . .
(($10,085,000))
     
$9,998,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($11,585,000))
     
$11,498,000
Sec. 2024. 2019 c 413 s 2094 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
Prison Capacity Expansion (30001105)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 2059, chapter 3, Laws of 2015 3rd sp. sess.
State Building Construction AccountState
. . . .
$400,000
Prior Biennia (Expenditures)
. . . .
(($4,400,000))
     
$1,958,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($4,800,000))
     
$2,358,000
Sec. 2025. 2019 c 413 s 2096 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
MCC ADA Compliance Retrofit (30001118)
State Building Construction AccountState
. . . .
$750,000
Prior Biennia (Expenditures)
. . . .
(($250,000))
     
$172,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($1,000,000))
     
$922,000
Sec. 2026. 2019 c 413 s 2098 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
CRCC Security Electronics Network Renovation (30001124)
State Building Construction AccountState
. . . .
$5,900,000
Prior Biennia (Expenditures)
. . . .
(($100,000))
     
$36,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($6,000,000))
     
$5,936,000
NEW SECTION.  Sec. 2027. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
MCC: WSR Clinic Roof Replacement (40000180)
State Building Construction AccountState
. . . .
$1,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$8,439,000
TOTAL
. . . .
$9,439,000
NEW SECTION.  Sec. 2028. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF CORRECTIONS
MCC: SOU and TRU - Domestic Water and HVAC Piping System (40000246)
The appropriation in this section is subject to the following conditions and limitations: The predesign must compare the benefits of addressing each system as part of a single project with the benefits of addressing each system as a separate project in design and construction phases.
State Building Construction AccountState
. . . .
$400,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$19,731,000
TOTAL
. . . .
$20,131,000
(End of part)
PART 3
NATURAL RESOURCES
Sec. 3001. 2019 c 413 s 3007 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Watershed Plan Implementation and Flow Achievement (30000028)
State Building Construction AccountState
. . . .
$275,000
Prior Biennia (Expenditures)
. . . .
(($5,721,000))
     
$5,718,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($5,996,000))
     
$5,993,000
Sec. 3002. 2019 c 413 s 3008 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Remedial Action Grant Program (30000039)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of section 3006, chapter 36, Laws of 2010 1st sp. sess.
Model Toxics Control Capital AccountState
. . . .
(($3,813,000))
     
$3,531,000
Prior Biennia (Expenditures)
. . . .
(($71,296,000))
     
$71,578,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$75,109,000
Sec. 3003. 2019 c 413 s 3009 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Clean Up Toxics Sites - Puget Sound (30000144)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of section 3021, chapter 48, Laws of 2011 1st sp. sess. and section 3002, chapter 35, Laws of 2016 sp. sess.
Model Toxics Control Capital AccountState
. . . .
(($324,000))
     
$318,000
Prior Biennia (Expenditures)
. . . .
(($38,710,000))
     
$38,716,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$39,034,000
Sec. 3004. 2019 c 413 s 3010 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Watershed Plan Implementation and Flow Achievement (30000213)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3030, chapter 49, Laws of 2011 1st sp. sess.
State Building Construction AccountState
. . . .
$432,000
Prior Biennia (Expenditures)
. . . .
(($7,568,000))
     
$7,534,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($8,000,000))
     
$7,966,000
Sec. 3005. 2019 c 413 s 3011 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Remedial Action Grant Program (30000216)
Model Toxics Control Capital AccountState
. . . .
(($19,152,000))
     
$18,603,000
Prior Biennia (Expenditures)
. . . .
(($43,712,000))
     
$44,261,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$62,864,000
Sec. 3006. 2019 c 413 s 3016 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (30000326)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of section 3066, chapter 19, Laws of 2013 2nd sp. sess.
Model Toxics Control Capital AccountState
. . . .
(($3,526,000))
     
$2,284,000
Prior Biennia (Expenditures)
. . . .
(($46,474,000))
     
$47,716,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$50,000,000
Sec. 3007. 2019 c 413 s 3022 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Clean Up Toxics Sites - Puget Sound (30000337)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of section 3007, chapter 35, Laws of 2016 sp. sess.
Model Toxics Control Capital AccountState
. . . .
(($1,940,000))
     
$1,843,000
Prior Biennia (Expenditures)
. . . .
(($23,115,000))
     
$23,212,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$25,055,000
Sec. 3008. 2019 c 413 s 3023 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Eastern Washington Clean Sites Initiative (30000351)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of section 3008, chapter 35, Laws of 2016 sp. sess.
Model Toxics Control Capital AccountState
. . . .
(($169,000))
     
$168,000
Prior Biennia (Expenditures)
. . . .
(($7,431,000))
     
$7,432,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$7,600,000
Sec. 3009. 2019 c 413 s 3026 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Remedial Action Grants (30000374)
Model Toxics Control Capital AccountState
. . . .
(($10,710,000))
     
$10,489,000
Prior Biennia (Expenditures)
. . . .
(($51,827,000))
     
$52,048,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$62,537,000
Sec. 3010. 2019 c 413 s 3028 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (30000427)
The reappropriations and appropriations in this section are subject to the following conditions and limitations: The reappropriations and appropriations are subject to the provisions of section 3009, chapter 35, Laws of 2016 sp. sess.
State Building Construction AccountState
. . . .
$1,171,000
Model Toxics Control Capital AccountState
. . . .
(($3,436,000))
     
$2,647,000
Prior Biennia (Expenditures)
. . . .
(($17,893,000))
     
$18,682,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$22,500,000
Sec. 3011. 2019 c 413 s 3030 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Eastern Washington Clean Sites Initiative (30000432)
Model Toxics Control Capital AccountState
. . . .
(($8,908,000))
     
$8,650,000
Prior Biennia (Expenditures)
. . . .
(($992,000))
     
$1,250,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$9,900,000
Sec. 3012. 2019 c 413 s 3031 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Remedial Action Grants (30000458)
The reappropriations and appropriations in this section are subject to the following conditions and limitations: The reappropriations and appropriations are subject to the provisions of section 3011, chapter 35, Laws of 2016 sp. sess.
State Building Construction AccountState
. . . .
$16,967,000
Model Toxics Control Capital AccountState
. . . .
(($15,786,000))
     
$12,927,000
Prior Biennia (Expenditures)
. . . .
(($19,994,000))
     
$22,853,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$52,747,000
Sec. 3013. 2019 c 413 s 3032 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Leaking Tank Model Remedies (30000490)
Model Toxics Control Capital AccountState
. . . .
(($672,000))
     
$519,000
Prior Biennia (Expenditures)
. . . .
(($1,328,000))
     
$1,481,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$2,000,000
Sec. 3014. 2019 c 413 s 3034 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Stormwater Financial Assistance Program (30000535)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of section 3012, chapter 35, Laws of 2016 sp. sess.
Model Toxics Control Stormwater AccountState
. . . .
(($27,816,000))
     
$26,950,000
Prior Biennia (Expenditures)
. . . .
(($3,384,000))
     
$4,250,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$31,200,000
Sec. 3015. 2019 c 413 s 3036 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Floodplains by Design (30000537)
State Building Construction AccountState
. . . .
(($19,149,000))
     
$19,369,000
Prior Biennia (Expenditures)
. . . .
(($16,411,000))
     
$16,191,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$35,560,000
Sec. 3016. 2019 c 413 s 3038 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Cleanup Toxics Sites - Puget Sound (30000542)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of section 3013, chapter 35, Laws of 2016 sp. sess.
Model Toxics Control Capital AccountState
. . . .
(($7,917,000))
     
$7,885,000
Prior Biennia (Expenditures)
. . . .
(($6,464,000))
     
$6,496,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$14,381,000
Sec. 3017. 2019 c 413 s 3052 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
2017-19 Remedial Action Grants (30000707)
Model Toxics Control Capital AccountState
. . . .
(($5,877,000))
     
$5,872,000
Prior Biennia (Expenditures)
. . . .
(($0))
     
$5,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$5,877,000
Sec. 3018. 2019 c 413 s 3056 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Columbia River Water Supply Development Program (30000712)
The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are subject to the provisions of section 3006, chapter 298, Laws of 2018.
Columbia River Basin Water Supply Development
AccountState
. . . .
(($12,203,000))
     
$12,250,000
Columbia River Basin Water Supply Revenue
Recovery AccountState
. . . .
$2,000,000
State Building Construction AccountState
. . . .
$19,541,000
Subtotal Reappropriation
. . . .
(($33,744,000))
     
$33,791,000
Prior Biennia (Expenditures)
. . . .
(($56,000))
     
$9,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$33,800,000
Sec. 3019. 2019 c 413 s 3062 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
2017-19 Clean Up Toxic Sites – Puget Sound (30000749)
Model Toxics Control Capital AccountState
. . . .
(($2,099,000))
     
$1,310,000
Prior Biennia (Expenditures)
. . . .
(($83,000))
     
$872,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$2,182,000
Sec. 3020. 2019 c 413 s 3064 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
2017-19 Stormwater Financial Assistance Program (30000796)
The reappropriations and appropriations in this section are subject to the following conditions and limitations: The reappropriation and appropriation are subject to the provisions of section 3005, chapter 298, Laws of 2018.
State Building Construction AccountState
. . . .
$25,000,000
Model Toxics Control Stormwater AccountState
. . . .
(($11,400,000))
     
$11,334,000
Prior Biennia (Expenditures)
. . . .
(($0))
     
$66,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$36,400,000
Sec. 3021. 2019 c 413 s 3081 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
2019-21 Stormwater Financial Assistance Program (40000144)
The appropriation in this section is subject to the following conditions and limitations:
(1) Appropriations in this section are provided solely for competitive grants to local governments implementing projects that reduce the impacts of stormwater on Washington state's waters.
(2) $29,750,000 of the appropriation is provided solely for grants directed to areas of Puget Sound that will benefit southern resident killer whales.
Model Toxics Control Stormwater AccountState
. . . .
(($44,000,000))
     
$47,400,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$160,000,000
TOTAL
. . . .
(($204,000,000))
     
$207,400,000
NEW SECTION.  Sec. 3022. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
2020 Eastern Washington Clean Sites Initiative (40000286)
Model Toxics Control Capital AccountState
. . . .
$1,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,000,000
NEW SECTION.  Sec. 3023. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
2020 Remedial Action Grants (40000288)
Model Toxics Control Capital AccountState
. . . .
$23,700,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$23,700,000
Sec. 3024. 2019 c 413 s 3096 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Habitat Mitigation (91000007)
State Building Construction AccountState
. . . .
$47,000
Prior Biennia (Expenditures)
. . . .
(($2,802,000))
     
$2,388,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($2,849,000))
     
$2,435,000
Sec. 3025. 2019 c 413 s 3097 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Clean Up Toxics Sites - Puget Sound (91000032)
Model Toxics Control Capital AccountState
. . . .
(($304,000))
     
$179,000
Prior Biennia (Expenditures)
. . . .
(($8,966,000))
     
$9,091,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$9,270,000
NEW SECTION.  Sec. 3026. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE POLLUTION LIABILITY INSURANCE PROGRAM
Heating Oil Capital Financing Assistance Program (30000704)
The appropriation in this section is subject to the following conditions and limitations: The appropriation in this section is provided solely for implementation of chapter . . . (House or Senate Bill No. . . . (Z-0676/20 (Concerning the heating oil insurance program)), Laws of 2020. If the bill is not enacted by June 30, 2020, the amount provided in this section shall lapse.
PLIA Underground Storage Tank Revolving AccountState
. . . .
$4,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$24,000,000
TOTAL
. . . .
$28,000,000
Sec. 3027. 2019 c 413 s 3115 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Flagler - WW1 Historic Facilities Preservation (30000100)
State Building Construction AccountState
. . . .
$1,091,000
Prior Biennia (Expenditures)
. . . .
(($2,295,000))
     
$1,856,000
Future Biennia (Projected Costs)
. . . .
$1,963,000
TOTAL
. . . .
(($5,349,000))
     
$4,910,000
Sec. 3028. 2019 c 413 s 3119 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Marine Facilities - Various Locations Moorage Float Replacement (30000496)
State Building Construction AccountState
. . . .
$111,000
Prior Biennia (Expenditures)
. . . .
(($458,000))
     
$349,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($569,000))
     
$460,000
Sec. 3029. 2019 c 413 s 3120 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Willapa Hills Trail Develop Safe Multi-Use Trail Crossing at SR 6 (30000519)
State Building Construction AccountState
. . . .
(($25,000))
     
$79,000
State Building Construction AccountState
. . . .
$4,961,000
Prior Biennia (Expenditures)
. . . .
(($397,000))
     
$343,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$5,383,000
Sec. 3030. 2019 c 413 s 3123 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Goldendale Observatory - Expansion (30000709)
State Building Construction AccountState
. . . .
(($551,000))
     
$583,000
Prior Biennia (Expenditures)
. . . .
(($4,793,000))
     
$4,761,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$5,344,000
Sec. 3031. 2019 c 413 s 3129 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden - Replace Failing Sewer Lines (30000860)
State Building Construction AccountState
. . . .
(($1,493,000))
     
$1,668,000
Prior Biennia (Expenditures)
. . . .
(($1,061,000))
     
$886,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$2,554,000
Sec. 3032. 2019 c 413 s 3131 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sammamish Dock Grant Match (30000872)
State Building Construction AccountState
. . . .
$959,000
Prior Biennia (Expenditures)
. . . .
(($141,000))
     
$121,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($1,100,000))
     
$1,080,000
Sec. 3033. 2019 c 413 s 3132 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Birch Bay - Replace Failing Bridge (30000876)
State Building Construction AccountState
. . . .
$100,000
Prior Biennia (Expenditures)
. . . .
(($237,000))
     
$148,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($337,000))
     
$248,000
Sec. 3034. 2019 c 413 s 3135 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Mount Spokane - Maintenance Facility Relocation from Harms Way (30000959)
State Building Construction AccountState
. . . .
$1,921,000
Prior Biennia (Expenditures)
. . . .
(($587,000))
     
$528,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($2,508,000))
     
$2,449,000
Sec. 3035. 2019 c 413 s 3137 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide - Depression Era Structures Restoration Assessment (30000966)
State Building Construction AccountState
. . . .
$186,000
Prior Biennia (Expenditures)
. . . .
(($1,086,000))
     
$1,057,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($1,272,000))
     
$1,243,000
Sec. 3036. 2019 c 413 s 3141 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Minor Works - Health and Safety (30000977)
State Building Construction AccountState
. . . .
(($402,000))
     
$537,000
Prior Biennia (Expenditures)
. . . .
(($647,000))
     
$512,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,049,000
Sec. 3037. 2019 c 413 s 3143 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Minor WorksProgram (30000979)
State Building Construction AccountState
. . . .
$646,000
Prior Biennia (Expenditures)
. . . .
(($845,000))
     
$620,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($1,491,000))
     
$1,266,000
Sec. 3038. 2019 c 413 s 3144 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Moran Summit Learning Center - Interpretive Facility (30000980)
State Building Construction AccountState
. . . .
(($903,000))
     
$955,000
Prior Biennia (Expenditures)
. . . .
(($112,000))
     
$60,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,015,000
Sec. 3039. 2019 c 413 s 3145 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Penrose Point Sewer Improvements (30000981)
State Building Construction AccountState
. . . .
(($320,000))
     
$367,000
State Building Construction AccountState
. . . .
$289,000
Prior Biennia (Expenditures)
. . . .
(($130,000))
     
$83,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($450,000))
     
$739,000
Sec. 3040. 2019 c 413 s 3149 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Septic System Renovation (30001017)
State Building Construction AccountState
. . . .
$65,000
Prior Biennia (Expenditures)
. . . .
(($185,000))
     
$177,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($250,000))
     
$242,000
Sec. 3041. 2019 c 413 s 3150 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Electrical System Renovation (30001018)
State Building Construction AccountState
. . . .
$462,000
Prior Biennia (Expenditures)
. . . .
(($288,000))
     
$267,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($750,000))
     
$729,000
Sec. 3042. 2019 c 413 s 3151 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide - ADA Compliance (30000985)
State Building Construction AccountState
. . . .
(($467,000))
     
$784,000
Prior Biennia (Expenditures)
. . . .
(($533,000))
     
$216,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,000,000
Sec. 3043. 2019 c 413 s 3152 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide New Park (30001019)
State Building Construction AccountState
. . . .
(($267,000))
     
$313,000
Prior Biennia (Expenditures)
. . . .
(($46,000))
     
$0
Future Biennia (Projected Costs)
. . . .
$20,006,000
TOTAL
. . . .
$20,319,000
Sec. 3044. 2019 c 413 s 3153 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden Replace Failing Water Lines (30001022)
State Building Construction AccountState
. . . .
(($214,000))
     
$339,000
Prior Biennia (Expenditures)
. . . .
(($163,000))
     
$38,000
Future Biennia (Projected Costs)
. . . .
$2,013,000
TOTAL
. . . .
$2,390,000
Sec. 3045. 2019 c 413 s 3156 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Fish Barrier Removal (40000010)
State Building Construction AccountState
. . . .
(($53,000))
     
$194,000
State Building Construction AccountState
. . . .
$1,605,000
Prior Biennia (Expenditures)
. . . .
(($247,000))
     
$106,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,905,000
Sec. 3046. 2019 c 413 s 3160 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Nisqually New Full Service Park (40000153)
State Building Construction AccountState
. . . .
(($2,994,000))
     
$3,857,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$17,700,000
TOTAL
. . . .
(($20,694,000))
     
$21,557,000
NEW SECTION.  Sec. 3047. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Palouse to Cascades Trail: Crab Creek Trestle Replacement (40000162)
State Building Construction AccountState
. . . .
$250,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$250,000
Sec. 3048. 2019 c 413 s 3204 (uncodified) is amended to read as follows:
FOR THE RECREATION AND CONSERVATION OFFICE
2019-21 - Youth Athletic Facilities (40000007)
The appropriation in this section is subject to the following conditions and limitations: Revisions to the recreation and conservation funding board approved list of projects for the 2019-2021 biennium, including the addition of projects and the transfer of funds between projects, are allowed but must be submitted to the office of financial management and the appropriate fiscal committees of the legislature for review and comment, and must include an explanation of variances from the proposed projects. Any project revisions must be approved by the office of financial management before funds may be expended from this appropriation.
State Building Construction AccountState
. . . .
$12,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$20,000,000
TOTAL
. . . .
$32,000,000
Sec. 3049. 2019 c 413 s 3223 (uncodified) is amended to read as follows:
FOR THE STATE CONSERVATION COMMISSION
2019-21 Match for Federal RCPP (40000006)
The appropriation in this section is subject to the following conditions and limitations:
(1) The state building construction account—state appropriation is provided solely for a state match to the United States department of agriculture regional conservation partnership.
(2) The commission must, to the greatest extent possible, leverage other state and local projects in funding the match and development of the regional conservation partnership program grant applications.
State Building Construction AccountState
. . . .
(($4,000,000))
     
$6,249,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$7,800,000
TOTAL
. . . .
(($11,800,000))
     
$14,049,000
Sec. 3050. 2019 c 413 s 3230 (uncodified) is amended to read as follows:
FOR THE STATE CONSERVATION COMMISSION
Conservation Commission Ranch & Farmland Preservation Projects (92000004)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3188, chapter 3, Laws of 2015 3rd sp. sess., with the exception of the following: The commission is authorized to reallocate the project funds of $4,913,000 from the Imrie ranches Rock creek agricultural easement to the purchase of the Simcoe unit.
State Building Construction AccountState
. . . .
$4,974,000
Prior Biennia (Expenditures)
. . . .
(($2,548,000))
     
$2,403,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($7,522,000))
     
$7,377,000
Sec. 3051. 2019 c 413 s 3232 (uncodified) is amended to read as follows:
FOR THE STATE CONSERVATION COMMISSION
Improve Shellfish Growing Areas 2017-19 (92000012)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 3052, chapter 298, Laws of 2018.
State Building Construction AccountState
. . . .
$800,000
Prior Biennia (Expenditures)
. . . .
(($3,200,000))
     
$3,199,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($4,000,000))
     
$3,999,000
NEW SECTION.  Sec. 3052. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE STATE CONSERVATION COMMISSION
CREP PIP Loan Program 2017-19 (92000014)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the provisions of section 6019, chapter 413, Laws of 2019.
Conservation Assistance Revolving AccountState
. . . .
$350,000
Prior Biennia (Expenditures)
. . . .
$50,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$400,000
Sec. 3053. 2019 c 413 s 3236 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Mitigation Projects and Dedicated Funding (20082048)
((The appropriations in this section are subject to the following conditions and limitations: $3,900,000 of the appropriation is provided solely for repair of the Wiley Slough dike.))
General FundFederal
. . . .
$10,000,000
General FundPrivate/Local
. . . .
$863,000
Special Wildlife AccountFederal
. . . .
$1,000,000
Special Wildlife AccountPrivate/Local
. . . .
$1,680,000
State Wildlife AccountState
. . . .
$400,000
Subtotal Reappropriation
. . . .
$13,943,000
General FundFederal
. . . .
$10,000,000
General FundPrivate/Local
. . . .
$1,000,000
Special Wildlife AccountFederal
. . . .
$1,000,000
Special Wildlife AccountPrivate/Local
. . . .
$1,000,000
State Wildlife AccountState
. . . .
$500,000
Subtotal Appropriation
. . . .
$13,500,000
Prior Biennia (Expenditures)
. . . .
$72,421,000
Future Biennia (Projected Costs)
. . . .
$58,500,000
TOTAL
. . . .
$158,364,000
Sec. 3054. 2019 c 413 s 3242 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Soos Creek Hatchery Renovation (30000661)
State Building Construction AccountState
. . . .
$5,555,000
State Building Construction AccountState
. . . .
(($1,710,000))
     
$4,646,000
Prior Biennia (Expenditures)
. . . .
$6,144,000
Future Biennia (Projected Costs)
. . . .
(($3,031,000))
     
$0
TOTAL
. . . .
(($16,440,000))
     
$16,345,000
NEW SECTION.  Sec. 3055. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Beaver Creek Hatchery - Renovation (30000680)
State Building Construction AccountState
. . . .
$150,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$11,355,000
TOTAL
. . . .
$11,505,000
Sec. 3056. 2019 c 413 s 3247 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Eells Springs Production Shift (30000723)
State Building Construction AccountState
. . . .
(($1,400,000))
     
$1,546,000
Prior Biennia (Expenditures)
. . . .
(($2,670,000))
     
$2,524,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$4,070,000
Sec. 3057. 2019 c 413 s 3252 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Snow Creek Reconstruct Facility (30000826)
The appropriation in this section is subject to the following conditions and limitations: In constructing the project, the department must consider the firelight toilet technology.
State Building Construction AccountState
. . . .
$25,000
State Building Construction AccountState
. . . .
$143,000
Prior Biennia (Expenditures)
. . . .
(($75,000))
     
$67,000
Future Biennia (Projected Costs)
. . . .
$4,794,000
TOTAL
. . . .
(($5,037,000))
     
$5,029,000
Sec. 3058. 2019 c 413 s 3253 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Forks Creek Hatchery - Renovate Intake and Diversion (30000827)
State Building Construction AccountState
. . . .
(($2,423,000))
     
$2,577,000
State Building Construction AccountState
. . . .
$3,086,000
Prior Biennia (Expenditures)
. . . .
(($2,000))
     
$198,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($5,511,000))
     
$5,861,000
Sec. 3059. 2019 c 413 s 3254 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Hurd Creek - Relocate Facilities out of Floodplain (30000830)
State Building Construction AccountState
. . . .
$600,000
Prior Biennia (Expenditures)
. . . .
(($200,000))
     
$177,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($800,000))
     
$777,000
Sec. 3060. 2019 c 413 s 3255 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Dungeness Hatchery - Replace Main Intake (30000844)
State Building Construction AccountState
. . . .
$300,000
State Building Construction AccountState
. . . .
$4,830,000
Prior Biennia (Expenditures)
. . . .
(($315,000))
     
$276,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($5,445,000))
     
$5,406,000
NEW SECTION.  Sec. 3061. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Wiley Slough Dike Raising (40000004)
State Building Construction AccountState
. . . .
$972,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$4,183,000
TOTAL
. . . .
$5,155,000
NEW SECTION.  Sec. 3062. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Infrastructure Master Plan for SRKW Recovery (40000085)
State Building Construction AccountState
. . . .
$1,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,000,000
Sec. 3063. 2019 c 413 s 3274 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Forestry Riparian Easement Program (FREP) (30000279)
State Building Construction AccountState
. . . .
(($400,000))
     
$520,000
Prior Biennia (Expenditures)
. . . .
(($3,100,000))
     
$2,980,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$3,500,000
Sec. 3064. 2019 c 413 s 3275 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Teanaway Working Forest (30000289)
State Building Construction AccountState
. . . .
(($600,000))
     
$675,000
Prior Biennia (Expenditures)
. . . .
(($881,000))
     
$663,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($1,481,000))
     
$1,338,000
Sec. 3065. 2019 c 413 s 3294 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Forest Riparian Easement Program (FREP) (40000052)
State Building Construction AccountState
. . . .
(($2,500,000))
     
$3,500,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$20,000,000
TOTAL
. . . .
(($22,500,000))
     
$23,500,000
NEW SECTION.  Sec. 3066. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Grouse Ridge Fish Barriers & RMAP Compliance (40000056)
State Building Construction AccountState
. . . .
$3,245,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$1,694,000
TOTAL
. . . .
$4,939,000
NEW SECTION.  Sec. 3067. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Emergent Environmental Mitigation Projects (40000058)
State Building Construction AccountState
. . . .
$320,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$320,000
NEW SECTION.  Sec. 3068. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor Works - Preservation: 2019-21 (40000061)
State Building Construction AccountState
. . . .
$1,550,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$1,550,000
NEW SECTION.  Sec. 3069. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Whitmarsh (March Point) Landfill Site Cleanup (40000069)
Model Toxics Control Capital AccountState
. . . .
$3,063,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$3,063,000
NEW SECTION.  Sec. 3070. The following acts or parts of acts are each repealed:
(1) 2019 c 413 s 3099 (uncodified); and
(2) 2019 c 413 s 3296 (uncodified).
(End of part)
PART 4
TRANSPORTATION
NEW SECTION.  Sec. 4001. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE DEPARTMENT OF TRANSPORTATION
Telford Helipad (40000001)
State Building Construction AccountState
. . . .
$75,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$75,000
(End of part)
PART 5
EDUCATION
Sec. 5001. 2019 c 413 s 5012 (uncodified) is amended to read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
2019-21 School Construction Assistance Program - Maintenance Level (40000013)
The appropriations in this section are subject to the following conditions and limitations: $1,005,000 of the common school construction accountstate appropriation is provided solely for study and survey grants and for completing inventory and building condition assessments for public school districts every six years.
State Building Construction AccountState
. . . .
$879,021,000
Common School Construction AccountState
. . . .
(($160,032,000))
     
$213,110,000
Common School Construction AccountFederal
. . . .
(($3,000,000))
     
$3,840,000
Subtotal Appropriation
. . . .
(($1,042,053,000))
     
$1,095,971,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$4,870,192,000
TOTAL
. . . .
(($5,912,245,000))
     
$5,966,163,000
NEW SECTION.  Sec. 5002. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
2019-21: School Seismic Safety Retrofit Program (40000033)
The appropriation in this section is subject to the following conditions and limitations:
(1) $9,500,000 of the appropriation is provided solely for school seismic safety retrofit grants to school districts for seismic retrofits and seismic safety related improvements of school buildings used for the instruction of students in kindergarten through twelfth grade. The superintendent of public instruction must prioritize school seismic safety retrofit grants for school districts with the most significant building deficiencies and the greatest seismic risks as determined by the most recent geological data and building engineering assessments.
(2) $500,000 of the appropriation is provided solely for grants to school districts to perform rapid visual screening assessments of school buildings constructed prior to 1997 and used for the instruction of students in kindergarten through twelfth grade. The collected assessment data must be entered into the office of the superintendent of public instruction's information and condition of schools data system.
(3) During the 2019-2021 fiscal biennium, if upon review of applications the superintendent of public instruction determines there are not adequate suitable projects under subsection (2) of this section, the superintendent of public instruction may use any remaining funds from subsection (2) of this section for seismic safety retrofit grants in subsection (1) of this section.
State Building Construction AccountState
. . . .
$10,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$200,000,000
TOTAL
. . . .
$210,000,000
Sec. 5003. 2019 c 413 s 5032 (uncodified) is amended to read as follows:
FOR THE STATE SCHOOL FOR THE BLIND
Independent Living Skills Center (30000107)
State Building Construction AccountState
. . . .
$143,000
State Building Construction AccountState
. . . .
$1,192,000
Prior Biennia (Expenditures)
. . . .
$27,000
Future Biennia (Projected Costs)
. . . .
(($0))
     
$8,076,000
TOTAL
. . . .
(($170,000))
     
$9,438,000
Sec. 5004. 2019 c 413 s 5033 (uncodified) is amended to read as follows:
FOR THE STATE SCHOOL FOR THE BLIND
2019-21 Campus Preservation (40000004)
State Building Construction AccountState
. . . .
(($580,000))
     
$655,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$2,320,000
TOTAL
. . . .
(($2,900,000))
     
$2,975,000
Sec. 5005. 2019 c 413 s 5034 (uncodified) is amended to read as follows:
FOR THE WASHINGTON ((STATE)) CENTER FOR ((CHILDHOOD DEAFNESS AND HEARING LOSS))DEAF AND HARD OF HEARING YOUTH
Academic and Physical Education Building (30000036)
The ((reappropriation))appropriations in this section ((is))are subject to the following conditions and limitations: The ((reappropriation is))appropriations are subject to the provisions of section 5009, chapter 298, Laws of 2018.
State Building Construction AccountState
. . . .
(($786,000))
     
$787,000
State Building Construction AccountState
. . . .
$4,637,000
Prior Biennia (Expenditures)
. . . .
(($214,000))
     
$213,000
Future Biennia (Projected Costs)
. . . .
(($0))
     
$50,511,000
TOTAL
. . . .
(($1,000,000))
     
$56,148,000
Sec. 5006. 2019 c 413 s 5035 (uncodified) is amended to read as follows:
FOR THE WASHINGTON ((STATE)) CENTER FOR ((CHILDHOOD DEAFNESS AND HEARING LOSS))DEAF AND HARD OF HEARING YOUTH
Minor Works: Preservation 2019-21 (30000045)
State Building Construction AccountState
. . . .
$500,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$4,000,000
TOTAL
. . . .
$4,500,000
NEW SECTION.  Sec. 5007. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE UNIVERSITY OF WASHINGTON
Magnuson Health Sciences Phase II - Renovation/Replacement (40000049)
State Building Construction AccountState
. . . .
$1,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$59,000,000
TOTAL
. . . .
$60,000,000
NEW SECTION.  Sec. 5008. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE WASHINGTON STATE UNIVERSITY
Washington State University Vancouver - Life Sciences Building (30000840)
State Building Construction AccountState
. . . .
$4,000,000
Prior Biennia (Expenditures)
. . . .
$500,000
Future Biennia (Projected Costs)
. . . .
$52,600,000
TOTAL
. . . .
$57,100,000
Sec. 5009. 2019 c 413 s 5060 (uncodified) is amended to read as follows:
FOR THE EASTERN WASHINGTON UNIVERSITY
Engineering Building (30000556)
Eastern Washington University Capital Projects
AccountState
. . . .
(($245,000))
     
$345,000
Prior Biennia (Expenditures)
. . . .
(($100,000))
     
$0
Future Biennia (Projected Costs)
. . . .
$56,695,000
TOTAL
. . . .
$57,040,000
Sec. 5010. 2019 c 413 s 5072 (uncodified) is amended to read as follows:
FOR THE CENTRAL WASHINGTON UNIVERSITY
Minor Works Preservation: 2019-21 (40000041)
State Building Construction AccountState
. . . .
$3,283,000
Central Washington University Capital Projects
AccountState
. . . .
(($7,000,000))
     
$3,717,000
Subtotal Appropriation
. . . .
$7,000,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$28,000,000
TOTAL
. . . .
$35,000,000
NEW SECTION.  Sec. 5011. A new section is added to 2019 c 413 (uncodified) to read as follows:
FOR THE CENTRAL WASHINGTON UNIVERSITY
Campus Security Enhancements (40000074)
Central Washington University Capital Projects
AccountState
. . . .
$3,283,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
$3,283,000
Sec. 5012. 2019 c 413 s 5079 (uncodified) is amended to read as follows:
FOR THE EVERGREEN STATE COLLEGE
Historic Lord Mansion (91000029)
The ((reappropriation))appropriations in this section ((is))are subject to the following conditions and limitations: The ((reappropriation is))appropriations are subject to the provisions of section 5016, chapter 298, Laws of 2018.
State Building Construction AccountState
. . . .
$100,000
State Building Construction AccountState
. . . .
$300,000
Prior Biennia (Expenditures)
. . . .
(($404,000))
     
$337,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($504,000))
     
$737,000
Sec. 5013. 2019 c 413 s 5093 (uncodified) is amended to read as follows:
FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Washington Heritage Grants (30000237)
State Building Construction AccountState
. . . .
$643,000
Prior Biennia (Expenditures)
. . . .
(($9,054,000))
     
$8,714,000
Future Biennia (Projected Costs)
. . . .
$0
TOTAL
. . . .
(($9,697,000))
     
$9,357,000
Sec. 5014. 2019 c 413 s 5098 (uncodified) is amended to read as follows:
FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Minor Works - Preservation: 2019-21 (40000086)
State Building Construction AccountState
. . . .
(($1,545,000))
     
$2,608,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$9,543,000
TOTAL
. . . .
(($11,088,000))
     
$12,151,000
Sec. 5015. 2019 c 413 s 5101 (uncodified) is amended to read as follows:
FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Minor Works - Preservation: 2019-21 (40000026)
State Building Construction AccountState
. . . .
(($800,000))
     
$1,559,000
Prior Biennia (Expenditures)
. . . .
$0
Future Biennia (Projected Costs)
. . . .
$3,200,000
TOTAL
. . . .
(($4,000,000))
     
$4,759,000
(End of part)
PART 6
RESERVED
(End of part)
PART 7
MISCELLANEOUS PROVISIONS
Sec. 7001. 2019 c 413 s 7001 (uncodified) is amended to read as follows:
RCW 43.88.031 requires the disclosure of the estimated debt service costs associated with new capital bond appropriations. The estimated debt service costs for the appropriations contained in this act are ((forty-eight million six hundred eighteen thousand two hundred eighteen dollars for the 2019-2021 biennium, three hundred six million nine hundred two thousand nine hundred ninety-six dollars for the 2021-2023 biennium, and four hundred thirty-three million two hundred fifty-nine thousand five hundred seventy-three dollars for the 2023-2025 biennium))forty-three million three hundred fourteen thousand six hundred forty-two dollars for the 2019-2021 biennium, three hundred million four hundred twenty-two thousand three hundred forty-three dollars for the 2021-2023 biennium, and four hundred seventeen million four hundred fifty-five thousand six hundred sixty dollars for the 2023-2025 biennium.
Sec. 7002. 2019 c 413 s 7002 (uncodified) is amended to read as follows:
ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS.
(1) The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
(2) Those noninstructional facilities of higher education institutions authorized in this section to enter into financial contracts are not eligible for state funded maintenance and operations. Instructional space that is available for regularly scheduled classes for academic transfer, basic skills, and workforce training programs may be eligible for state funded maintenance and operations.
(3) Secretary of state: Enter into a financing contract for up to $103,143,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a new library-archives building.
(4) Washington state patrol: Enter into a financing contract for up to $7,450,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a burn building for live fire training.
(5) Department of social and health services: Enter into a financing contract for up to $3,600,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase the King county secure community transition center.
(6) Department of social and health services: Enter into a financing contract for up to $118,000,000 plus costs and financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a nursing facility on the fircrest residential habilitation center campus. The department may contract to lease develop or lease purchase the facility. Before entering into a contract, the department must consult with the office of financial management and the office of the state treasurer. Should the department of social and health services choose to use a financing contract that does not provide for the issuance of certificates of participation, the financing contract shall be subject to approval by the state finance committee as required by RCW 39.94.010. In approving a financing contract not providing for the use of certificates of participation, the state finance committee should be reasonably certain that the contract is excluded from the computation of indebtedness, particularly that the contract is not backed by the full faith and credit of the state and the legislature is expressly not obligated to appropriate funds to make payments. For purposes of this subsection, "financing contract" includes but is not limited to a certificate of participation and tax exempt financing similar to that authorized in RCW 47.79.140.
(7) Department of fish and wildlife: Enter into a financing contract for up to $3,099,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase automated salmon marking trailers.
(((7)))(8) Department of natural resources: Enter into a financing contract for up to $1,800,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to remodel spaces within agency-owned commercial buildings that will benefit the common school trust.
(((8)))(9) Western Washington University: Enter into a financing contract for up to $9,950,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a consolidated academic support services facility. Debt service for this facility may not be paid from additional student fees.
(((9)))(10) Community and technical colleges:
(a) Enter into a financing contract on behalf of Columbia Basin Community College for up to $27,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student recreation center.
(b) Enter into a financing contract on behalf of Pierce College Puyallup for up to $2,831,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land and construct parking.
(c) Enter into a financing contract on behalf of Walla Walla Community College for up to $1,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to build a student activity center on the Clarkston campus.
(d) Enter into a financing contract on behalf of Walla Walla Community College for up to $6,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to build a student recreation center.
(e) Enter into a financing contract on behalf of Wenatchee Valley College for up to $4,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the Wells Hall replacement project.
(f) Enter into a financing contract on behalf of Yakima Valley Community College for up to $22,700,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to build additional instructional and lab classroom space.
(g) Enter into a financing contract on behalf of Everett Community College for up to $10,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase one or more properties adjacent to the campus.
(11) Eastern Washington University: Enter into a financing contract for up to $3,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for roof replacement projects.
Sec. 7003. RCW 43.19.501 and 2018 c 2 s 7027 are each amended to read as follows:
The Thurston county capital facilities account is created in the state treasury. The account is subject to the appropriation and allotment procedures under chapter 43.88 RCW. Moneys in the account may be expended for capital projects in facilities owned and managed by the department in Thurston county. ((For the 2015-2017 biennium, moneys in the account may be used for studies related to real estate.))
During the ((2017-2019))2019-2021 fiscal biennium, the Thurston county capital facilities account may be appropriated for costs associated with staffing to support capital budget and project activities and lease and facility oversight activities.
NEW SECTION.  Sec. 7004. A new section is added to 2019 c 413 (uncodified) to read as follows:
The department of social and health services may enter into a long-term, revenue generating lease for up to seven acres of the fircrest residential habilitation center bounded by 15th Ave NE and NE 150th Street and B Street to benefit the charitable, educational, penal, and reformatory trust and support capital investment at the residential habilitation center. The department of social and health services and the department of natural resources must amend their lease if necessary to conform with this section.
NEW SECTION.  Sec. 7005. A new section is added to 2019 c 413 (uncodified) to read as follows:
In order to accelerate the reduction of embodied carbon and improve the environmental performance of construction materials, agencies shall, whenever possible, review and consider embodied carbon reported in environmental product declarations when evaluating proposed structural materials for construction projects.
NEW SECTION.  Sec. 7006. If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.
NEW SECTION.  Sec. 7007. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.
--- END ---