Passed by the Senate January 24, 2020 Yeas 31 Nays 16
President of the Senate Passed by the House March 5, 2020 Yeas 97 Nays 0
Speaker of the House of Representatives | CERTIFICATE I, Brad Hendrickson, Secretary of the Senate of the State of Washington, do hereby certify that the attached is ENGROSSED SENATE BILL 5457 as passed by the Senate and the House of Representatives on the dates hereon set forth.
Secretary Secretary |
Approved | FILED |
| Secretary of State State of Washington |
ENGROSSED SENATE BILL 5457
Passed Legislature - 2020 Regular Session
State of Washington | 66th Legislature | 2019 Regular Session |
BySenators Keiser, Saldaña, Conway, Hasegawa, Hunt, and Nguyen
Read first time 01/21/19.Referred to Committee on State Government, Tribal Relations & Elections.
AN ACT Relating to the naming of subcontractors by prime contract bidders on public works contracts; and amending RCW
39.30.060.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
Sec. 1. RCW
39.30.060 and 2003 c 301 s 5 are each amended to read as follows:
(1) Every invitation to bid on a prime contract that is expected to cost one million dollars or more for the construction, alteration, or repair of any public building or public work of the state or a state agency or municipality as defined under RCW
39.04.010 or an institution of higher education as defined under RCW
28B.10.016 shall require each prime contract bidder to submit ((
as part of the bid, or within))
:(a) Within one hour after the published bid submittal time, the names of the subcontractors with whom the bidder, if awarded the contract, will subcontract for performance of the work of: HVAC (heating, ventilation, and air conditioning); plumbing as described in chapter
18.106 RCW; and electrical as described in chapter
19.28 RCW, or to name itself for the work
; or (b) Within forty-eight hours after the published bid submittal time, the names of the subcontractors with whom the bidder, if awarded the contract, will subcontract for performance of the work of structural steel installation and rebar installation.
(2) The prime contract bidder shall not list more than one subcontractor for each category of work identified, unless subcontractors vary with bid alternates, in which case the prime contract bidder must indicate which subcontractor will be used for which alternate. Failure of the prime contract bidder to submit as part of the bid the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the prime contract bidder's bid nonresponsive and, therefore, void.
(((2)))(3) Substitution of a listed subcontractor in furtherance of bid shopping or bid peddling before or after the award of the prime contract is prohibited and the originally listed subcontractor is entitled to recover monetary damages from the prime contract bidder who executed a contract with the public entity and the substituted subcontractor but not from the public entity inviting the bid. It is the original subcontractor's burden to prove by a preponderance of the evidence that bid shopping or bid peddling occurred. Substitution of a listed subcontractor may be made by the prime contractor for the following reasons:
(a) Refusal of the listed subcontractor to sign a contract with the prime contractor;
(b) Bankruptcy or insolvency of the listed subcontractor;
(c) Inability of the listed subcontractor to perform the requirements of the proposed contract or the project;
(d) Inability of the listed subcontractor to obtain the necessary license, bonding, insurance, or other statutory requirements to perform the work detailed in the contract; ((or))
(e) Refusal or inability to provide a letter of bondability from a surety company; or
(f) The listed subcontractor is barred from participating in the project as a result of a court order or summary judgment.
(((3)))(4) The requirement of this section to name the prime contract bidder's proposed ((HVAC, plumbing, and electrical)) subcontractors applies only to proposed HVAC, plumbing, ((and)) electrical, structural steel installation, and rebar installation subcontractors who will contract directly with the prime contract bidder submitting the bid to the public entity.
(((4)))(5) This section does not apply to job order contract requests for proposals under RCW ((39.10.130))39.10.420.
(6) The legislature finds that there are hundreds of capital construction projects completed each year which include complex contracting and bidding requirements. It is the intent of the legislature to review current subcontractor listing requirements to allow fair, transparent, and competitive bidding while prohibiting bid shopping. The capital projects advisory review board must submit a report to the governor and the appropriate committees of the legislature by November 1, 2020. The report must:
(a) Evaluate current subcontractor listing policies and practices;
(b) Recommend appropriate expansion of the number of subcontractors that may be listed in order to improve transparency and fairness without reducing competitive bidding and access to public works by minority and women-owned businesses; and
(c) Recommend possible project threshold and time frames for purposes of subcontractor listings for all scopes of work that are not required to list under law, including: The timing of subcontractor listing, bond requirements for subcontractors, general contractors standard contract request, and general contractor/construction manager and design-build applications.
--- END ---