CERTIFICATION OF ENROLLMENT
SUBSTITUTE HOUSE BILL 1193
Chapter 299, Laws of 2021
67TH LEGISLATURE
2021 REGULAR SESSION
COLUMBIA RIVER FEDERAL NAVIGATION CHANNELS—SHORELINE MANAGEMENT ACT EXEMPTION
EFFECTIVE DATE: July 25, 2021
Passed by the House April 15, 2021
  Yeas 96  Nays 0
LAURIE JINKINS

Speaker of the House of Representatives
Passed by the Senate April 3, 2021
  Yeas 47  Nays 0
DENNY HECK

President of the Senate
CERTIFICATE
I, Bernard Dean, Chief Clerk of the House of Representatives of the State of Washington, do hereby certify that the attached is SUBSTITUTE HOUSE BILL 1193 as passed by the House of Representatives and the Senate on the dates hereon set forth.
BERNARD DEAN

Chief Clerk
Chief Clerk
Approved May 13, 2021 11:46 AM
FILED
May 13, 2021
JAY INSLEE

Governor of the State of Washington
Secretary of State
State of Washington

SUBSTITUTE HOUSE BILL 1193

AS AMENDED BY THE SENATE
Passed Legislature - 2021 Regular Session
State of Washington
67th Legislature
2021 Regular Session
ByHouse Environment & Energy (originally sponsored by Representative Hoff)
READ FIRST TIME 02/10/21.
AN ACT Relating to affirming the process for disposing of dredged materials for federal navigation channel maintenance and improvement; and amending RCW 90.58.355.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
Sec. 1. RCW 90.58.355 and 2020 c 20 s 1506 are each amended to read as follows:
Requirements to obtain a substantial development permit, conditional use permit, variance, letter of exemption, or other review conducted by a local government to implement this chapter do not apply to:
(1) Any person conducting a remedial action at a facility pursuant to a consent decree, order, or agreed order issued pursuant to chapter 70A.305 RCW, or to the department of ecology when it conducts a remedial action under chapter 70A.305 RCW. The department must ensure compliance with the substantive requirements of this chapter through the consent decree, order, or agreed order issued pursuant to chapter 70A.305 RCW, or during the department-conducted remedial action, through the procedures developed by the department pursuant to RCW 70A.305.090;
(2) Any person installing site improvements for stormwater treatment in an existing boatyard facility to meet requirements of a national pollutant discharge elimination system stormwater general permit. The department must ensure compliance with the substantive requirements of this chapter through the review of engineering reports, site plans, and other documents related to the installation of boatyard stormwater treatment facilities; ((or))
(3) The department of transportation projects and activities that meet the conditions of RCW 90.58.356; or
(4) Actions taken on the Columbia river by the United States army corps of engineers, under the authority of United States Code Titles 33 and 42 and 33 C.F.R. Sec. 335, to maintain and improve federal navigation channels in accordance with federally mandated dredged material management and improvement project plans, provided the project: (a) Has undergone environmental review under both the national environmental policy act, 42 U.S.C. Sec. 4321-4370h and the state environmental policy act, chapter 43.21C RCW; and (b) has applied for federal clean water act section 401 water quality certifications issued by the department.
Passed by the House April 15, 2021.
Passed by the Senate April 3, 2021.
Approved by the Governor May 13, 2021.
Filed in Office of Secretary of State May 13, 2021.