2482-S.E AMS CLEV S5595.1
ESHB 2482 - S AMD 799
By Senator Cleveland
ADOPTED 03/01/2024
On page 2, line 32, after "((2024))" strike "2035" and insert "2034"
On page 6, line 37, after "(d)" strike "No application is necessary for the tax exemption." and insert "((No application is necessary for the tax exemption.)) Applications for the exemption under this section must be made at least 90 days before initiation of the construction of the significant semiconductor microchip manufacturing facility in a form and manner prescribed by the department."
EFFECT: Requires a qualifying semiconductor manufacturer to apply to the department for an exemption certificate at least 90 days prior to commencing construction. Makes a technical change of the date.