Toll Authorization and Rate Setting. The Legislature is the only entity with the authority to authorize tolls on an eligible toll facility. An eligible toll facility is portions of the state highway system specifically identified by the Legislature, including transportation corridors, bridges, crossings, interchanges, on-ramps, off-ramps, approaches, bistate facilities, and interconnections between highways. The Legislature has authorized collection of tolls on the following facilities:
The Legislature has designated the Washington State Transportation Commission (Commission) as the state tolling authority with responsibility for setting toll rates, including variable pricing, and reviewing toll operations. Before each regular session of the Legislature, the Commission must report to the transportation committees of the Legislature on any increase or decrease in toll rates approved by the Commission.
Interstate 5 Bridge Replacement Project. The Interstate 5 (I-5) Bridge crosses the Columbia River and connects Vancouver, Washington and Portland, Oregon with two parallel bridge structures. One bridge structure carries traffic northbound to Vancouver, and the other bridge structure carries traffic southbound to Portland. The northbound bridge was built in 1917, and the southbound bridge was built in 1958.
In 2012, the Legislature provided tolling authorization for replacement of the I-5 bridge crossing the Columbia river as part of the Columbia River Crossing Project. Although a bistate agreement regarding toll rate setting was entered into by the Commission and Oregon State Transportation Commission, the project was never fully funded and was suspended indefinitely in 2013.
In 2017, the Legislature established a joint Oregon-Washington legislative action committee (JLAC) regarding the construction of a new I-5 bridge. The committee is comprised of 16 members, eight from each state, tasked with, among other purposes:
In 2017, the Oregon State Legislature authorized the collection of tolls on the Oregon portion of I-5 and Interstate 205 as part of its toll program, the Regional Mobility Pricing Project. The Oregon State Legislature also authorized the Oregon State Transportation Commission to enter into agreements with the state of Washington, or its tollway operator, to establish, review, adjust, and collect tolls for the project.
Planning for the I-5 Bridge Replacement (IBR) Project was restarted in 2018, and the IBR Project was expanded in 2020. The IBR Project will reportedly replace the I-5 bridges, extend light rail to Vancouver, improve closely-spaced interchanges, and enhance the pedestrian and bicycle paths. The estimated project costs range from $5 billion to $7.5 billion.
In March 2022, the Secretary of the Washington State Department of Transportation (WSDOT) and Director of the Oregon State Department of Transportation (ODOT) signed a memorandum of understanding (MOU) regarding how tolls for the IBR Project could be designed, implemented, and administered. The MOU provides that ODOT should be the entity responsible for IBR Project toll operations. While acknowledging the respective state transportation commissions entering into a future bistate tolling agreement, the MOU also provides that future agreements between the states will address toll operations implementation and cost allocation processes and toll revenue uses and financial arrangements.
The IBR Project is defined as a bistate, multimodal corridor improvement program between the state route number 500 interchange in Vancouver, Washington and the Victory Boulevard interchange in Portland, Oregon. The IBR Project is designated as an eligible toll facility, and tolls may be imposed on the IBR Project. Tolls may be charged for travel only on the existing and replacement I-5 Columbia River bridges. Tolls may not be charged for travel on any portion of Interstate 205 within Washington State.
The Commission as tolling authority may enter into a bistate agreement with the Oregon State Transportation Commission regarding the mutual or joint setting, adjustment, and review of toll rates and exemptions. Toll rates established pursuant to the bistate agreement may not:
The IBR Project Account is created in the state treasury and the types of revenue and moneys that must be deposited into the account are specified, including all net tolls and other revenues received from operation of the IBR Pproject as a toll facility. Toll revenue generated on the IBR Project must only be expended to construct, improve, preserve, maintain, manage, or operate the IBR Project. Expenditures of toll revenues are subject to appropriation and must only be made:
Tolls may not be collected on the IBR Project until (1) certification of the Secretary of Transportation to the Governor that WSDOT has received satisfactory evidence that a sufficient federal funding plan is in place and that sufficient state and local funds are available to complete the IBR Project, and (2) and the bistate agreement between the Commission and the Oregon Transportation Commission has taken effect.
Provisions addressing bistate agreements related to the former Columbia River Crossing project are repealed.
Senate | 32 | 16 | |
House | 57 | 40 | (House amended) |
Senate | 31 | 18 | (Senate concurred) |
The bill contains several effective dates. Please refer to the bill.July 23, 2023
July 1, 2024 (Section 7)
Contingent (Sections 1-3, 5, 9-10)