5161-S.E AMH FEYJ MUNN 876

  

ESSB 5161 - H AMD TO H AMD (H-2091.1/25) 941

By Representative Fey

ADOPTED 04/02/2025

On page 50, line 36 of the striking amendment, after "(4)(a)" strike "$11,922,000" and insert "$6,369,000"

On page 54, line 6 of the striking amendment, increase the multimodal transportation account--state appropriation by $8,000,000

On page 54, line 11 of the striking amendment, correct the total.

On page 55, line 11 of the striking amendment, after "(5)" strike "$188,930,000" and insert "$188,900,000"

On page 62, line 28 of the striking amendment, reduce the multimodal transportation account--state appropriation by $8,000,000

On page 62, line 29 of the striking amendment, correct the total.

On page 63, line 15 of the striking amendment, after "(4)" strike "275,000" and insert "274,000"

On page 83, line 5 of the striking amendment, after "(Y)" strike "." and insert ", except that passenger rail equipment preservation (700010C) is renamed "Passenger rail equipment preservation and heavy maintenance", and grain train program (701210A) is renamed "Grain hopper car preservation and maintenance.""

On page 87, line 9 of the striking amendment, decrease the multimodal transportation account--state appropriation by $1,000,000

On page 87, line 10 of the striking amendment, correct the total.

On page 87, line 20 of the striking amendment, after "additional" strike "5,500,000" and insert "$4,500,000"

On page 216, line 2 of the striking amendment, after "subsection" strike "(15)" and insert "(((15)))"

On page 242, line 32 of the striking amendment, after "US-12/Walla" insert "Walla"

On page 274, line 28 of the striking amendment, strike "$560,000"
and insert "(($560,000)) $380,000

EFFECT: Makes the following technical changes:

Aligns the proviso amount with the appropriated amount for the I-5 Planning and Environmental Linkage Study and Statewide I-5 Master Plan.

Moves the transit mitigation funds connected to the Revive I-5 highway construction project from Program Z/Local Programs to Program V/Public Transportation.

Corrects the amount provided for transit support grants.

Corrects the amount provided for zero youth fares policies.

Renames two existing WSDOT rail program projects: "passenger rail equipment preservation and heavy maintenance" and "grain hopper car preservation and maintenance."

Corrects an error by reducing the amount needed for the Maple Valley Pedestrian Bridge over SR 169 project to $4,500,000 in 2025-27.

Removes an incorrect subsection reference.

Corrects an incorrect project name.

Reduces transfers for the SR 520 Civil Penalties Account-State Appropriation to reflect actual civil penalty collections

FISCAL IMPACT (2025-27):

Reduces Multimodal Transportation Account-State by $1,000,000.

FISCAL IMPACT (2025 Supplemental):

Reduces the transfer amount from the SR 520 Civil Penalties Account-State to the SR 520 Corridor Account-State by $180,000.