Washington State University Energy Extension Program. The Washington State University Extension Energy Program (WSU Energy Program) provides program management, technical assistance, analytical tools, applied research, and training related to energy programs. This includes approving applications for programs that provide incentive payments funded by a public utility tax credit, such as the Community Solar Expansion Program, the Annual Production Incentive Certification, and the Renewable Energy System Cost Recovery Program.
Public Utility Tax. The public utility tax (PUT) is imposed on gross income derived from the operation of public and privately owned utilities, including businesses that engage in transportation, communications, and the supply of energy, natural gas, and water. The tax is in lieu of the business and occupation tax. This tax applies only on sales to consumers. There are also varying rates of the PUT, depending on the specific utility activity.
Light and Power Business. Light and power businesses operate plants or systems for the generation, production, or distribution of electrical energy for hire or sale, or for the wheeling of electricity for others, or both.
Battery Incentive Program. The WSU Energy Program must administer a Residential Battery Incentive Program (program) for qualified light and power businesses (electric utilities). Electric utilities with more than 100,000 retail electric customers must participate. Smaller electric utilities may choose to implement a program.
Under the program, an electric utility must:
A time-of-use rate means an electricity billing structure where the price of electricity varies based on the time of day it is used to encourage consumers to shift their energy use to less expensive times.
A virtual power plant is an aggregation of connected distributed energy resources that can balance electrical loads and are coordinated to work together to provide utility grid services like a traditional power plant.
To establish a program, electric utilities must submit an application to the WSU Energy Program to evaluate an application based on whether it meets program requirements. An electric utility may start a program if it is approved by the WSU Energy Program. The WSU Energy Program must audit the electric utility's program at least every two years.
Program requirements include:
An electric utility may establish residential installer partners and equipment specifications.
Qualified customers may apply to their electric utility for a one-time battery incentive payment between July 1, 2026, and June 30, 2036. Customers must be connected to the electric utility's Time-of-Use Rate Program or virtual power plant and provide certain information to receive an incentive payment. The electric utility must notify the applicant within 60 days of receipt of the incentive certification whether the incentive payment will be authorized or denied.
Incentives are for the kilowatt-hours (kWh) of an installed residential battery energy storage system, and may be for up to:
Before applying to the electric utility, qualified customers must apply to DOR and the WSU Energy Program for certification, which includes that the battery storage system has been approved for use by the electric utility. DOR must consult with the WSU Energy Program to determine the customer's eligibility and then must notify the customer within 30 days as to whether their system qualifies.
Customers receiving incentive payments must keep records of incentives applied for and received for five years. If it appears that an incentive was paid in excess of the correct amount, the electric utility may assess against the customer the excess incentive amount and must add interest on the amount. The environmental attributes of the renewable energy system belong to the applicant.
The Department of Commerce (Commerce) must produce nonbinding recommendations for electric utilities to help design virtual power plants for the program, and make the recommendations public on Commerce's website by December 1, 2025.
Electric Utility Tax Credit. An electric utility is allowed a PUT credit equal to:
This tax credit may not exceed 1.5 percent of the electric utility's taxable Washington power sales generated in calendar year 2022, and may not exceed the tax that is otherwise due. Expenditures not used to earn a credit in one year may be used in subsequent years. Tax credits may be earned from July 1, 2026, to June 30, 2036, and may not be claimed after June 30, 2038.
Tax Preference Performance Statement. The Legislature's public policy objective is to induce participating utilities to make incentive payments to utility customers who invest in battery energy storage on the customer-side of the meter, reduce the costs associated with installing and operating these storage systems, and create and retain jobs in the clean energy sector.
The Joint Legislative Audit and Review Committee (JLARC) must review this tax preference as part of its 2030 tax preference reviews. The battery incentive achieved its desired outcomes, if JLARC determines:
The WSU Energy Program must collect information from qualified customers and electric utilities under the program to be able to report on the number of participants, size of systems installed, dollars spent on incentives, and energy storage program load flexibility and demand response events.