ENGROSSED SUBSTITUTE SENATE BILL NO. 3654
_______________________________________________
AS AMENDED BY THE HOUSE
C 373 L 85
State of Washington 49th Legislature 1985 Regular Session
By Senate Committee on Ways and Means (originally sponsored by Senator McDermott)
Read first time 4/18/85.
AN ACT Adopting the capital budget; making appropriations and authorizing expenditures for capital improvements; authorizing certain projects; providing an effective date; and declaring an emergency.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:
NEW SECTION. Sec. 1. A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be disbursed for capital projects during the period ending June 30, 1987, out of the several funds specified in this act.
NEW SECTION. Sec. 2. (1) As used in this act, the following phrases have the following meanings:
"Common School Constr Fund" means Common School Construction Fund;
"GF, Cap Bldg Constr Acct" means General Fund‑-Capitol Building Construction Account;
"GF, St Bldg Constr Acct" means General Fund‑-State Building Construction Account;
"GF, St Fac Renew Acct" means State Facilities Renewal Account;
"GF, Fish Cap Proj Acct" means General Fund‑-Fisheries Capital Projects Account;
"GF, ORA" means General Fund‑-Outdoor Recreation Account;
"GF, Sal Enhmt Constr Acct" means General Fund‑-Salmon Enhancement Construction Account;
"GF, For Dev Acct" means General Fund‑-Forest Development Account;
"GF, Res Mgmt Cost Acct" means General Fund‑-Resource Management Cost Account;
"GF, LIRA, DSHS Fac" means General Fund‑-Local Improvements Revolving Account‑-Department of Social and Health Services Facilities;
"GF, DSHS Constr Acct" means General Fund‑-State Social and Health Services Construction Account;
"GF, CEP & RI Acct" means General Fund‑-Charitable, Educational, Penal, and Reformatory Institutions Account;
"GF, Fire Trng Constr Acct" means General Fund‑-Fire Training Construction Account;
"GF, WSU Bldg Acct" means General Fund‑-Washington State University Building Account;
"GF, St H Ed Constr Acct" means General Fund‑-State Higher Education Construction Account;
"GF, EWU Cap Proj Acct" means General Fund‑-Eastern Washington University Capital Projects Account;
"GF, TESC Cap Proj Acct" means General Fund‑-The Evergreen State College Capital Projects Account;
"GF, Com Col Cap Impvmt Acct" means General Fund‑-Community College Capital Improvement Account;
"GF, Com Col Cap Proj Acct" means General Fund‑-Community College Capital Projects Account;
"GF, Com Col Cap Constr Acct" means General Fund‑-1975 Community College Capital Construction Account;
"GF, CWU Cap Proj Acct" means General Fund‑-Central Washington University Capital Projects Account;
"GF, UW Bldg Acct" means General Fund‑-University of Washington Building Account;
"GF, St Bldg Auth Constr Acct" means General Fund‑-State Building Authority Construction Account;
"GF, WWU Cap Proj Acct" means General Fund‑-Western Washington University Capital Projects Account;
"GF, Cap Purch & Dev Acct" means General Fund‑-Capitol Purchase and Development Account;
"GF, Hndcp Fac Constr Acct" means General Fund‑-Handicapped Facilities Construction Account;
"GF, LIRA, Waste Disp Fac" means General Fund‑-State and Local Improvement Revolving Account‑-Waste Disposal Facilities;
"GF, State Emerg Water Proj Rev" means General Fund‑-Emergency Water Project Revolving Account‑-State;
"GF, LIRA, Waste Fac 1980" means General Fund‑-State and Local Improvement Revolving Account‑-Waste Disposal Facilities 1980;
"GF, LIRA, Water Sup Fac" means General Fund‑-State and Local Improvement Revolving Account‑-Water Supply Facilities;
"GF, LIRA" means General Fund‑-State and Local Improvement Revolving Account;
"GF, LIRA, Public Rec Fac" means General Fund State and Local Improvement Revolving Account‑-Public Recreation Facilities;
"GF, PNW Fest Fac Constr Acct" means General Fund‑-Pacific Northwest Festival Facility Construction Account;
"GF, Cultural Fac Constr Acct" means General Fund‑-Cultural Facilities Construction Account;
"GF, H Ed Constr Acct" means General Fund‑-Higher Education Construction Account 1979;
"GF, H Ed Reimb S/T Bonds Acct" means General Fund‑-Higher Education Reimbursable Short-Term Bonds Account;
"MV, St Patrol Hiwy Acct" means Motor Vehicle Fund‑-State Patrol Highway Account.
The words "capital improvements" or "capital projects" used in this act mean acquisition of sites, easements, rights of way, or improvements thereon and appurtenances thereto, construction and initial equipment, reconstruction, demolition, or major alterations of new or presently owned capital assets.
(2) Letters and numbers in parenthesis following each project description are the unique project identifiers used throughout a project's duration to identify it. INDEX
!ix@lbArts Commission, sec. 707
Central Washington University, secs. 398-413
Commerce and Economic Development Department, secs. 558-560
Community College Education Board, secs. 310-353
Community Development Department, sec. 257
Convention and Trade Center, sec. 663
Corrections Department, secs. 240-257
Eastern Washington State Historical Society, secs. 704-705
Eastern Washington University, secs. 389-397
Ecology Department, secs. 501-509
Education, State Board of, secs. 301-309
Emergency Management Department, secs. 134-135
Evergreen State College, secs. 414-424
Financial Management Office, sec. 133
Fisheries Department, secs. 561-598
Game Department, secs. 599-644
General Administration Department, secs. 102-131
Military Department, secs. 136-143
Natural Resources Department, secs. 645-662
Parks and Recreation Commission, secs. 510-557
Personnel Department, sec. 132
Secretary of State, sec. 101
Social and Health Services Department, secs. 201-233
Transportation Department, sec. 706
University of Washington, secs. 357-376
Veterans Affairs Department, secs. 234-239
Vocational Education Commission, secs. 354-356
Washington State Historical Society, secs. 701-703
Washington State University, secs. 377-388
Western Washington State University, secs. 425-428
@la
PART I
GENERAL GOVERNMENT
!af98,100@lb
NEW SECTION. Sec. 3. FOR THE SECRETARY OF STATE
Archives renovation: King county (CI-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc95,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc73,000!tj1!tc168,000
NEW SECTION. Sec. 4. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Nondeferrable repair projects (CR-83-1-R02)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Purch & Dev Acct!tj1!tc107,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc469,000!tj1!tc576,000
NEW SECTION. Sec. 5. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor improvements (CR-83-R-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj1!tc40,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc32,000!tj1!tc72,000
NEW SECTION. Sec. 6. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus conveyance system repair, phase II (CR-83-R-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj1!tc56,000
!ixGF, St Fac Renew Acct!tj2!tc852,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc137,000!tc1,381,000!tc2,426,000
NEW SECTION. Sec. 7. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus roof repairs (CR-83-R-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc198,000!tj1!tc298,000
NEW SECTION. Sec. 8. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol campus water distribution system repairs, phase II (CR-83-R-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj1!tc110,000
GF, St Bldg Constr Acct!tj2!tc544,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc65,000!tc450,000!tc1,169,000
NEW SECTION. Sec. 9. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
State library: Fire protection systems (CR-83-4-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj1!tc370,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc29,000!tj1!tc399,000
NEW SECTION. Sec. 10. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus accessibility improvements, phase II (CI-83-R-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj1!tc34,000
!ixGF, Cap Purch & Dev Acct!tj1!tc50,000
!ixGF, St Fac Renew Acct!tj2!tc31,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc502,000!tc709,000!tc1,326,000
NEW SECTION. Sec. 11. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Energy retrofit projects (CI-83-R-015)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj1!tc510,000!tc630,000
!ixGF, Cap Purch & Dev Acct!tj1!tc228,000
!ixGF, St Fac Renew Acct!tj2!tc50,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc140,000!tc878,000!tc2,436,000
NEW SECTION. Sec. 12. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Repairs to plaza garage (CR-83-1-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Purch & Dev Acct!tj1!tc225,000!tc308,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc137,000!tj1!tc670,000
NEW SECTION. Sec. 13. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Office Building No. 2 fire repairs and retrofit (CI-84-1-R11)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc1,980,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,502,000!tj1!tc3,482,000
NEW SECTION. Sec. 14. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Northern state multi-service center: Repairs, phase II (CR-84-R-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc385,000
!ixGF, St Bldg Constr Acct!tj1!tc600,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc465,000!tc2,200,000!tc3,650,000
NEW SECTION. Sec. 15. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Emergency repairs (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc200,000
NEW SECTION. Sec. 16. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Small repairs and improvements (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc500,000
NEW SECTION. Sec. 17. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Boiler plant structural evaluation (CR-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc67,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc67,000
NEW SECTION. Sec. 18. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
State facilities routine maintenance program: Inventory and standards (CR-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, State!tj2!tc400,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc400,000
NEW SECTION. Sec. 19. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Lake dam repair (CR-86-1-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc209,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc209,000
The appropriations in this section are subject to the following conditions and limitations: Each dollar of Referendum 39 moneys granted for the purposes of this section shall be substituted for the like amount of St Fac Renew Acct funds appropriated in this section. The total amount of Referendum 39 funds allotted for this project shall be determined prior to the allotment of St Fac Renew Acct funds.
NEW SECTION. Sec. 20. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol campus heating, ventilation, and air conditioning repairs (CR-86-1-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc250,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc250,000
NEW SECTION. Sec. 21. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Temple of Justice renovation (CR-86-1-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc600,000
!ixGF, St Fac Renew Acct!tj2!tc48,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc10,000,000!tc10,648,000
NEW SECTION. Sec. 22. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus sidewalk and street repairs (CR-86-1-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc45,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc875,000!tc920,000
NEW SECTION. Sec. 23. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Legislative Building renovation (CR-86-2-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc970,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,581,000!tc2,551,000
NEW SECTION. Sec. 24. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus roof repairs (CR-86-2-015)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc248,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc130,000!tc378,000
NEW SECTION. Sec. 25. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus building exterior repairs (CR-86-2-016)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc190,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,500,000!tc1,690,000
NEW SECTION. Sec. 26. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus building: Interior revisions (CI-86-1-017)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc284,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc284,000
NEW SECTION. Sec. 27. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus electrical system revisions (CI-86-2-019)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc390,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc390,000
NEW SECTION. Sec. 28. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Lake preservation (CR-86-2-024)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc1,294,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,294,000
The appropriations in this section are subject to the following conditions and limitations: Each dollar of Referendum 39 moneys granted for the purposes of this section shall be substituted for the like amount of St Fac Renew Acct funds appropriated in this section. The total amount of Referendum 39 funds allotted for this project shall be determined prior to the allotment of St Fac Renew Acct funds.
NEW SECTION. Sec. 29. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
House Office Building remodel (CR-86-2-025)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj1!tc150,000
!ixGF, St Bldg Constr Acct!tj2!tc2,764,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,302,000!tj1!tc4,216,000
NEW SECTION. Sec. 30. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Dawley property acquisition (CI-86-4-027)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc390,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc390,000
NEW SECTION. Sec. 31. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Campus irrigation repairs and landscaping (CR-86-2-030)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc398,000!tc498,000
NEW SECTION. Sec. 32. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Former Thurston County Courthouse renovation (CI-86-2-028)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc520,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc520,000
NEW SECTION. Sec. 33. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Archives Building renovation (CI-88-2-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Purch & Dev Acct!tj2!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc550,000!tc560,000
NEW SECTION. Sec. 34. FOR THE DEPARTMENT OF PERSONNEL
State employees pilot day care project
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Cap Bldg Constr Acct!tj2!tc90,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc90,000
NEW SECTION. Sec. 35. FOR THE OFFICE OF FINANCIAL MANAGEMENT
Restoration cost analysis: McNeil Island; long-term need and cost benefit study of constructing an intensive management unit at the Washington State Reformatory (CR-86-4-L50)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj2!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc150,000
NEW SECTION. Sec. 36. FOR THE DEPARTMENT OF EMERGENCY MANAGEMENT
Repairs to headquarters building roof and heating system (CR-86-1-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc30,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc30,000
NEW SECTION. Sec. 37. FOR THE DEPARTMENT OF EMERGENCY MANAGEMENT
Water retention structure: Green and Toutle rivers (CI-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc13,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc13,000,000
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section shall lapse if the federal government does not appropriate and authorize a single retention structure at the Green River site on the North Fork Toutle River; and
(2) Any moneys appropriated under this section for the acquisition of lands, easements, and rights of way may be transferred to the federal government in accordance with federal law if the federal government acts on behalf of the state to acquire the necessary lands, easements, and rights of way.
NEW SECTION. Sec. 38. FOR THE MILITARY DEPARTMENT
Unit training equipment site (CI-84-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, Federal!tj1!tc1,429,000!tc324,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc9,000!tj1!tc1,762,000
NEW SECTION. Sec. 39. FOR THE MILITARY DEPARTMENT
Organizational maintenance shop (CI-84-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, Federal!tj1!tc192,000!tc83,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,000!tj1!tc276,000
NEW SECTION. Sec. 40. FOR THE MILITARY DEPARTMENT
Tacoma Armory structural renovation (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc93,000!tc2,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc212,000!tj1!tc2,305,000
NEW SECTION. Sec. 41. FOR THE MILITARY DEPARTMENT
Watercraft support maintenance center (CI-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, Federal!tj2!tc3,024,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc90,000!tc2,477,000!tc5,591,000
NEW SECTION. Sec. 42. FOR THE MILITARY DEPARTMENT
Minor works (CI-86-1-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc1,040,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,174,000!tc3,931,000!tc6,145,000
NEW SECTION. Sec. 43. FOR THE MILITARY DEPARTMENT
Facility contingency (CR-86-2-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc475,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc600,000!tc1,210,000!tc2,285,000
NEW SECTION. Sec. 44. FOR THE MILITARY DEPARTMENT
South King County Armory (CI-86-3-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, Federal!tj1!tc1,260,000!tc207,000
!ixGF, St Bldg Constr Acct!tj1!tc489,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,956,000
NEW SECTION. Sec. 45. FOR THE MILITARY DEPARTMENT
Organizational maintenance shop (CI-88-1-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, Federal!tj2!tc22,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc303,000!tc325,000
PART II
HUMAN RESOURCES
!af98,200
NEW SECTION. Sec. 46. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Referendum 37 projects (CI-79-3-R01)
Approve, construct, and equip facilities for the care, training, and rehabilitation of persons with physical or mental handicaps involving eleven projects, of which two are reductions in scope from prior legislative approval. Moneys allocated to a project under this section shall revert for reallocation if the final application for the project has not been submitted by December 31, 1985, and approved by March 31, 1986.
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Hndcp Fac Constr Acct!tj1!tc4,242,000
!ixGF, LIRA, DSHS Fac!tj2!tc90,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc20,758,000!tj1!tc25,090,000
NEW SECTION. Sec. 47. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Referendum 29 projects (CR-79-3-R02)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, DSHS Fac!tj1!tc1,200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc100,000!tj1!tc1,300,000
NEW SECTION. Sec. 48. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Utilities and fire safety improvements, phase IV: Fircrest (CR-79-1-R21)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc425,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,431,000!tj1!tc2,856,000
NEW SECTION. Sec. 49. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Artwork for 225-bed addition, Western State Hospital (CI-79-4-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc75,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc21,111,000!tj1!tc21,186,000
NEW SECTION. Sec. 50. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Construct and equip habilitation center: Lakeland Village (CI-79-R-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc1,400,000!tc5,462,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc18,365,000!tj1!tc25,227,000
NEW SECTION. Sec. 51. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Evergreen Center renovation, phase IV: Rainier School (CR-79-R-017)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc2,094,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc26,586,000!tc10,113,000!tc38,793,000
NEW SECTION. Sec. 52. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Multi-purpose facility: Yakima Valley School (CI-79-R-039)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc5,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc9,061,000!tj1!tc14,061,000
NEW SECTION. Sec. 53. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Construct and equip new state public health laboratory (CI-81-3-R10)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc2,900,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc8,362,000!tj1!tc11,262,000
NEW SECTION. Sec. 54. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Energy conservation program (CR-81-2-R11)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc625,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,706,000!tj1!tc2,331,000
NEW SECTION. Sec. 55. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Health, safety, facility, utility, and roofing: Western State Hospital (CR-81-1-033)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc475,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,856,000!tj1!tc2,331,000
NEW SECTION. Sec. 56. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Renovation, repair, and construction related to small projects (CR-83-2-R01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc1,300,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,501,000!tj1!tc2,801,000
NEW SECTION. Sec. 57. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Emergency generator: Western State Hospital (CR-83-2-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc305,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc351,000!tj1!tc656,000
NEW SECTION. Sec. 58. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fire safety improvements: Western State Hospital (CR-83-1-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc225,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc64,000!tj1!tc289,000
NEW SECTION. Sec. 59. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Repair and upgrade utilities: Maple Lane School (CR-83-2-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc562,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc47,000!tj1!tc609,000
NEW SECTION. Sec. 60. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Repair and upgrade utilities: Green Hill School (CR-83-2-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc155,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc152,000!tj1!tc307,000
NEW SECTION. Sec. 61. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Preplanning (CI-83-4-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc4,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc298,000!tj1!tc302,000
NEW SECTION. Sec. 62. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Construct three living units: Child study and treatment center (CI-83-3-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc50,000!tc4,650,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc195,000!tj1!tc4,895,000
NEW SECTION. Sec. 63. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Convert dormitories for school and gym: Frances H. Morgan (CR-83-R-015)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc375,000!tc27,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,237,000!tc4,175,000!tc6,814,000
NEW SECTION. Sec. 64. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Renovate wards: Eastern State Hospital (CR-83-R-016)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc2,900,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc394,000!tj1!tc3,294,000
NEW SECTION. Sec. 65. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Renovate wards: Western State Hospital, phase II (CR-83-R-017)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc2,900,000!tc10,998,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,105,000!tj1!tc15,003,000
NEW SECTION. Sec. 66. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Artwork for education building: Green Hill School (CI-83-4-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,790,000!tj1!tc1,800,000
NEW SECTION. Sec. 67. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fire safety improvements: Safety (CR-84-1-017)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc850,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc650,000!tj1!tc1,500,000
NEW SECTION. Sec. 68. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Kitchen renovation and correct security safety hazards: Mission Creek (CR-84-1-033)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc24,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc36,000!tj1!tc60,000
NEW SECTION. Sec. 69. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Therapy pool: Interlake School (CI-84-R-034)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc5,000!tc1,281,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc25,000!tj1!tc1,311,000
NEW SECTION. Sec. 70. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Emergency and small repairs contingency (CR-86-1-010)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc977,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc2,000,000!tc2,977,000
NEW SECTION. Sec. 71. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor works request: Juvenile rehabilitation (CR-86-1-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc2,433,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,859,000!tc4,292,000
NEW SECTION. Sec. 72. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor works request: Mental health (CR-86-1-030)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc1,354,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,077,000!tc2,431,000
NEW SECTION. Sec. 73. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Minor works request: Developmental disabilities (CR-86-1-040)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc770,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,700,000!tc2,470,000
NEW SECTION. Sec. 74. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Renovate residential and training buildings: Mission Creek (CR-86-1-202)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc2,048,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,048,000
NEW SECTION. Sec. 75. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Construct and equip two new living units: Green Hill School: PROVIDED, That a study of future use of Green Hill School is completed prior to allotment of design funds (CR-86-1-203)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj2!tc2,600,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,600,000
NEW SECTION. Sec. 76. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Repair roads: Eastern State Hospital (CR-86-1-335)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc1,136,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,136,000
NEW SECTION. Sec. 77. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Construct and equip new building: Fircrest School (CI-86-1-403)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj2!tc4,098,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc4,098,000
NEW SECTION. Sec. 78. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Prepare a comprehensive programming study for the Interlake Program and various small repairs and improvements at Interlake School (CR-86-1-408)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, DSHS Fac!tj2!tc169,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc169,000
NEW SECTION. Sec. 79. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Repair and improve facilities: Omnibus (CR-81-1-R01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj1!tc55,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc279,000!tj1!tc334,000
NEW SECTION. Sec. 80. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Emergency repairs (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj2!tc75,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc75,000
NEW SECTION. Sec. 81. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Walla Walla Veterans Center (CI-86-3-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj1!tc170,500
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc33,000!tj1!tc203,500
NEW SECTION. Sec. 82. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Minor projects: Soldiers' home and veterans' home (CR-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj2!tc498,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc498,000
NEW SECTION. Sec. 83. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Veterans' and soldiers' homes small repairs and improvements (CR-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj2!tc42,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc42,000
NEW SECTION. Sec. 84. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Restroom renovation: Chilson Hall (CR-86-2-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj2!tc14,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc14,000
NEW SECTION. Sec. 85. FOR THE DEPARTMENT OF CORRECTIONS
Water system, Washington State Reformatory (CR-83-1-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc604,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc64,000!tj1!tc668,000
NEW SECTION. Sec. 86. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Enlarge and remodel 600 beds (CI-83-R-029)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc2,395,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc19,379,000!tj1!tc21,774,000
NEW SECTION. Sec. 87. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Reformatory: Facility improvements, install a boiler (CI-83-R-048)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc6,279,000!tc7,275,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc5,196,000!tc13,771,000!tc32,521,000
NEW SECTION. Sec. 88. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Reformatory: Construct intensive management unit (CI-86-R-L48)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj2!tc9,100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc9,100,000
The appropriation in this section is subject to the following conditions and limitations: Funds appropriated under this section shall not be allotted until completion and review of the long-term needs and cost benefit study of constructing the intensive management unit, to be done by the office of financial management.
NEW SECTION. Sec. 89. FOR THE DEPARTMENT OF CORRECTIONS
State-wide omnibus: Various projects (CI-83-R-049)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc595,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,083,000!tj1!tc1,678,000
NEW SECTION. Sec. 90. FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay: 500-person corrections center (CI-83-R-051)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc7,430,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc35,567,000!tj1!tc42,997,000
NEW SECTION. Sec. 91. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary facility renewal projects (CR-83-R-052)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc448,000!tc8,742,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc3,724,000!tj1!tc12,914,000
NEW SECTION. Sec. 92. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: 300 bed prototypical housing (CI-84-R-049)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc255,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc11,345,000!tj1!tc11,600,000
NEW SECTION. Sec. 93. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center: Ferry slip (CR-86-R-L13)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CEP & RI Acct!tj1!tc1,028,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc25,000!tj1!tc1,053,000
NEW SECTION. Sec. 94. FOR THE DEPARTMENT OF CORRECTIONS
Twin Rivers Corrections Center: Complete construction and claim defense costs (CI-81-R-01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, DSHS Constr Acct!tj1!tc757,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc33,105,300!tj1!tc33,862,300
The appropriation in this section is subject to the following conditions and limitations: A maximum of $661,500 may be spent for costs incurred in preparing the state's defense.
NEW SECTION. Sec. 95. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center: Renovation of utilities (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc3,219,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc4,361,000!tc7,580,000
NEW SECTION. Sec. 96. FOR THE DEPARTMENT OF CORRECTIONS
Repairs to McNeil Island transportation systems (CR-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc2,245,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc2,200,000!tc4,445,000
NEW SECTION. Sec. 97. FOR THE DEPARTMENT OF CORRECTIONS
State-wide minor projects (CI-86-2-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc2,096,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc508,000!tc2,604,000
NEW SECTION. Sec. 98. FOR THE DEPARTMENT OF CORRECTIONS
State-wide small repairs and improvements (CR-86-2-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc61,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc153,000!tc214,000
NEW SECTION. Sec. 99. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center building renovations (CR-86-1-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc2,229,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc3,426,000!tc5,655,000
The appropriation in this section is subject to the following conditions and limitations: Funds appropriated under this section shall not be allotted until completion and review of the facilities study to be done by the office of financial management.
NEW SECTION. Sec. 100. FOR THE DEPARTMENT OF CORRECTIONS
State-wide emergency repair projects (CR-86-1-010)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc400,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,250,000!tc1,650,000
NEW SECTION. Sec. 101. FOR THE DEPARTMENT OF CORRECTIONS
State-wide code compliance: Transformers (PCB) (CR-86-1-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc400,000!tc500,000
NEW SECTION. Sec. 102. FOR THE DEPARTMENT OF COMMUNITY DEVELOPMENT
Completion by the Seattle International District Chinatown Public Development Authority of the "Bush Annex" for the Wing Luke Museum.
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, State!tj2!tc200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc200,000
!af98,300 PART III
EDUCATION
NEW SECTION. Sec. 103. FOR THE STATE BOARD FOR EDUCATION
Public school building construction: 1975 (CI-75-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj1!tc40,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc15,000!tj1!tc55,000
NEW SECTION. Sec. 104. FOR THE STATE BOARD FOR EDUCATION
Public school building construction: 1977 (CI-77-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj1!tc110,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc80,000!tj1!tc190,000
NEW SECTION. Sec. 105. FOR THE STATE BOARD FOR EDUCATION
Public school building construction: 1979 (CI-79-3-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj1!tc763,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc370,000!tj1!tc1,133,000
NEW SECTION. Sec. 106. FOR THE STATE BOARD FOR EDUCATION
Public school building construction: 1981 (CI-81-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj1!tc1,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc41,000,000!tj1!tc42,000,000
NEW SECTION. Sec. 107. FOR THE STATE BOARD FOR EDUCATION
Public school building construction: 1983 (CI-83-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj1!tc38,100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc48,298,000!tj1!tc86,398,000
NEW SECTION. Sec. 108. FOR THE STATE BOARD FOR EDUCATION
Public school building construction: 1985-87 (CI-86-4-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj2!tc138,275,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc138,275,000
NEW SECTION. Sec. 109. FOR THE STATE BOARD FOR EDUCATION
Planning grants (CI-86-4-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj2!tc500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc500,000
NEW SECTION. Sec. 110. FOR THE STATE BOARD FOR EDUCATION
Artwork grants (CI-86-4-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj2!tc325,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc325,000
NEW SECTION. Sec. 111. FOR THE STATE BOARD FOR EDUCATION
Administrative costs (CI-86-4-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixCommon School Constr Fund!tj2!tc900,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc900,000
NEW SECTION. Sec. 112. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Design tech building and related remodeling: Skagit Valley (CI-86-3-021)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc4,217,000!tc4,417,000
NEW SECTION. Sec. 113. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Design of the Learning Resource Center instructional facility: South Puget Sound
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc375,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc6,043,000!tc6,418,000
NEW SECTION. Sec. 114. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Design of the heavy equipment building: Grays Harbor (CI-86-3-L04)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc60,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc755,000!tc755,000
NEW SECTION. Sec. 115. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Reappropriation for 1977-79 projects (CI-77-4-R01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Com Col Cap Proj Acct!tj1!tc68,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc118,000!tj1!tc186,000
NEW SECTION. Sec. 116. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Handicapped access improvements (CI-79-1-R21)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc21,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc131,000!tj1!tc152,000
NEW SECTION. Sec. 117. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Relocate parent education (CI-79-4-R26)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc123,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc80,000!tj1!tc203,000
NEW SECTION. Sec. 118. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Construct parking facility: Seattle Community College (CI-81-3-R01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, State!tj1!tc146,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc206,000!tj1!tc352,000
NEW SECTION. Sec. 119. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Nondeferrable repairs (CR-81-1-R02)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc31,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc100,000!tj1!tc131,000
NEW SECTION. Sec. 120. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Minor repair and improvement projects (CI-81-3-R05)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Com Col Cap Proj Acct!tj1!tc135,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc349,000!tj1!tc484,000
NEW SECTION. Sec. 121. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Minor improvements: State board for community college education allocation (CI-81-2-12)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Com Col Cap Proj Acct!tj1!tc50,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,450,000!tj1!tc2,500,000
NEW SECTION. Sec. 122. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Minor capital improvements (CI-83-2-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc560,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,350,000!tj1!tc2,910,000
NEW SECTION. Sec. 123. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Roof repairs (CR-83-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc300,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,751,000!tj1!tc2,051,000
NEW SECTION. Sec. 124. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Code compliance (CR-83-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc25,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc32,000!tj1!tc57,000
NEW SECTION. Sec. 125. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Electrical repairs (CR-83-1-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc55,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc653,000!tj1!tc708,000
NEW SECTION. Sec. 126. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
General repairs (CR-83-1-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc585,000!tj1!tc735,000
NEW SECTION. Sec. 127. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Heating, ventilation, and air conditioning repairs (CR-83-2-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc230,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc862,000!tj1!tc1,092,000
NEW SECTION. Sec. 128. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Clark College heating system (CI-83-1-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc2,150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,566,000!tj1!tc4,716,000
NEW SECTION. Sec. 129. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
The Evergreen State College and Clark College: Joint facility (CI-83-3-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc1,450,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc50,000!tj1!tc1,500,000
NEW SECTION. Sec. 130. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Emergency repair and repairs, maintenance, and improvements (CR-83-1-01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc346,000!tj1!tc446,000
NEW SECTION. Sec. 131. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Repairs: Various campuses (CR-84-1-10)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc747,000!tj1!tc1,247,000
NEW SECTION. Sec. 132. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Repairs: Various campuses (CI-84-3-11)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc120,000!tj1!tc220,000
NEW SECTION. Sec. 133. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Minor works request (repairs, maintenance, and improvements) (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Reimb S/T Bonds Acct!tj2!tc3,100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc3,100,000
NEW SECTION. Sec. 134. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
State Board for Community College Education emergency repair fund (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Reimb S/T Bonds Acct!tj2!tc500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc500,000
NEW SECTION. Sec. 135. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Critical repair projects (CR-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Reimb S/T Bonds Acct!tj2!tc6,556,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc6,556,000
NEW SECTION. Sec. 136. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
General repair projects (CR-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc9,324,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc9,324,000
NEW SECTION. Sec. 137. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Energy conservation projects (CR-86-1-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc2,497,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,497,000
NEW SECTION. Sec. 138. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Minor renovations (CR-86-2-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc8,094,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc8,094,000
NEW SECTION. Sec. 139. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Minor remodel projects (CR-86-2-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc2,050,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,050,000
NEW SECTION. Sec. 140. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Purchase Clarkston facility (CI-86-3-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc500,000
NEW SECTION. Sec. 141. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Design and construction of vocational-science facility: Wenatchee (CI-86-3-G09)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc2,420,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,420,000
NEW SECTION. Sec. 142. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Construct main storage building: Clark (CI-86-3-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc503,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc503,000
NEW SECTION. Sec. 143. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Construct science facility: Spokane (CI-86-3-010)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc506,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc506,000
NEW SECTION. Sec. 144. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Minor improvements: Various campuses (CI-86-3-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc6,007,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc6,007,000
NEW SECTION. Sec. 145. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Purchase Paine Field facility: Everett (CI-86-3-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc2,090,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,090,000
NEW SECTION. Sec. 146. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
District office and Edison North renovation: Seattle Central (CI-86-3-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc3,660,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc4,614,000!tc8,274,000
NEW SECTION. Sec. 147. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Purchase Wagstaff facility: Spokane (CI-86-3-014)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc900,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc900,000
NEW SECTION. Sec. 148. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Construct core facility and instructional space: Whatcom (CI-86-3-015)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc180,000!tc4,933,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc40,000!tj1!tc5,153,000
NEW SECTION. Sec. 149. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Science facility: Columbia Basin (CI-86-3-016)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc2,906,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,906,000
NEW SECTION. Sec. 150. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Replace relocatable buildings: Fort Steilacoom (CI-86-3-017)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc4,646,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc4,646,000
NEW SECTION. Sec. 151. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Design of Puyallup extension facility: Fort Steilacoom (CI-86-3-L50)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc275,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc2,930,000!tc3,205,000
NEW SECTION. Sec. 152. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Prior Hall renovation: Yakima Valley (CR-86-1-018)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc1,652,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,652,000
NEW SECTION. Sec. 153. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Design of the heavy equipment building: South Seattle
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc166,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc4,217,000!tc4,383,000
NEW SECTION. Sec. 154. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Food service building: Olympic (CI-86-3-019)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc4,167,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc4,167,000
NEW SECTION. Sec. 155. FOR THE STATE BOARD FOR COMMUNITY COLLEGE EDUCATION
Preplanning for 1987-89 major projects (CI-86-4-999)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc457,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc457,000
NEW SECTION. Sec. 156. FOR THE COMMISSION FOR VOCATIONAL EDUCATION
Design and construct fire training facility (CI-81-4-R01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fire Trng Constr Acct!tj1!tc440,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc6,131,000!tj1!tc6,571,000
NEW SECTION. Sec. 157. FOR THE COMMISSION FOR VOCATIONAL EDUCATION
Minor works request (CI-86-4-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc411,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc411,000
NEW SECTION. Sec. 158. FOR THE COMMISSION FOR VOCATIONAL EDUCATION
Preplanning for fire station (CI-88-4-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fire Trng Constr Acct!tj2!tc16,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,019,000!tc1,035,000
NEW SECTION. Sec. 159. FOR THE UNIVERSITY OF WASHINGTON
University Hospital expansion (CI-81-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj1!tc300,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc59,396,000!tj1!tc75,696,000
NEW SECTION. Sec. 160. FOR THE UNIVERSITY OF WASHINGTON
High rise fire safety (CR-83-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc1,040,000
GF, UW Bldg Acct!tj1!tc790,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc920,000!tj1!tc2,750,000
NEW SECTION. Sec. 161. FOR THE UNIVERSITY OF WASHINGTON
J Wing hazardous waste (CR-83-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj1!tc400,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc84,000!tj1!tc484,000
NEW SECTION. Sec. 162. FOR THE UNIVERSITY OF WASHINGTON
Emergency power extension (CR-83-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc295,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc60,000!tj1!tc355,000
NEW SECTION. Sec. 163. FOR THE UNIVERSITY OF WASHINGTON
Safety: General (CR-83-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj1!tc250,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc250,000!tj1!tc500,000
NEW SECTION. Sec. 164. FOR THE UNIVERSITY OF WASHINGTON
Energy conservation (CI-83-2-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc50,000!tj1!tc150,000
NEW SECTION. Sec. 165. FOR THE UNIVERSITY OF WASHINGTON
Roberts Hall renovation (CR-83-1-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj1!tc3,750,000
GF, H Ed Reimb S/T Bonds!tj2!tc6,325,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc250,000!tj1!tc10,325,000
NEW SECTION. Sec. 166. FOR THE UNIVERSITY OF WASHINGTON
Equipment (CI-83-3-999)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, UW Bldg Acct!tj1!tc1,177,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,732,000!tj1!tc3,909,000
NEW SECTION. Sec. 167. FOR THE UNIVERSITY OF WASHINGTON
Minor repairs (CR-81-1-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, UW Bldg Acct!tj1!tc265,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc288,000!tj1!tc553,000
NEW SECTION. Sec. 168. FOR THE UNIVERSITY OF WASHINGTON
Safety: Fire code (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc5,780,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc14,120,000!tc19,900,000
NEW SECTION. Sec. 169. FOR THE UNIVERSITY OF WASHINGTON
Safety: Asbestos (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc1,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc3,200,000!tc4,200,000
NEW SECTION. Sec. 170. FOR THE UNIVERSITY OF WASHINGTON
Safety: General (CR-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc1,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc2,000,000!tc3,000,000
NEW SECTION. Sec. 171. FOR THE UNIVERSITY OF WASHINGTON
Minor works: Capital renewal (CR-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc511,000
GF, UW Bldg Acct!tj2!tc3,907,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc26,200,000!tc36,170,000
NEW SECTION. Sec. 172. FOR THE UNIVERSITY OF WASHINGTON
Minor works: Program renewal (CI-86-3-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc7,230,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc26,100,000!tc35,780,000
NEW SECTION. Sec. 173. FOR THE UNIVERSITY OF WASHINGTON
SIEG computer science: Electrical (CR-86-1-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc1,120,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,120,000
NEW SECTION. Sec. 174. FOR THE UNIVERSITY OF WASHINGTON
Electrical engineering building: Electrical (CR-86-1-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc660,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc660,000
NEW SECTION. Sec. 175. FOR THE UNIVERSITY OF WASHINGTON
G wing renovation (CR-86-1-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Reimb S/T Bonds!tj2!tc6,297,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc6,297,000
NEW SECTION. Sec. 176. FOR THE UNIVERSITY OF WASHINGTON
Fisheries renovation (CR-86-1-014)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc6,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc6,000,000
NEW SECTION. Sec. 177. FOR THE UNIVERSITY OF WASHINGTON
State energy audit (CI-86-4-023)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc945,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,000,000!tc1,945,000
NEW SECTION. Sec. 178. FOR THE UNIVERSITY OF WASHINGTON
H wing addition (CR-88-1-021)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Reimb S/T Bonds!tj2!tc176,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc8,803,000!tc8,979,000
NEW SECTION. Sec. 179. FOR WASHINGTON STATE UNIVERSITY
Minor capital improvements (CI-83-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, WSU Bldg Acct!tj1!tc1,500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc3,029,000!tj1!tc5,389,000
NEW SECTION. Sec. 180. FOR WASHINGTON STATE UNIVERSITY
Electrical and mechanical engineering building (CI-83-3-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, WSU Bldg Acct!tj1!tc8,016,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc5,760,000!tj1!tc13,776,000
NEW SECTION. Sec. 181. FOR WASHINGTON STATE UNIVERSITY
McCoy Hall remodeling, phase I (CI-83-3-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, WSU Bldg Acct!tj1!tc160,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc160,000
NEW SECTION. Sec. 182. FOR WASHINGTON STATE UNIVERSITY
Minor capital improvements (CI-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, WSU Bldg Acct!tj2!tc4,300,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc17,040,000!tc24,667,000
NEW SECTION. Sec. 183. FOR WASHINGTON STATE UNIVERSITY
Minor capital renewal (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc3,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc8,000,000!tc11,000,000
NEW SECTION. Sec. 184. FOR WASHINGTON STATE UNIVERSITY
Construct chemistry building (CI-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj2!tc13,791,000
GF, WSU Bldg Acct!tj1!tc250,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc649,000!tc3,656,000!tc18,346,000
NEW SECTION. Sec. 185. FOR WASHINGTON STATE UNIVERSITY
Construct food and human nutrition facility (CI-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj2!tc4,454,000
GF, St H Ed Constr Acct!tj2!tc5,850,000
GF, WSU Bldg Acct!tj1!tc697,000!tc1,700,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc97,000!tc1,000,000!tc13,798,000
The appropriations in this section are subject to the following conditions and limitations: Funds appropriated under this section shall not be allotted for fiscal year 1986.
NEW SECTION. Sec. 186. FOR WASHINGTON STATE UNIVERSITY
McCoy Hall capital renewal and addition (CI-86-1-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj2!tc2,249,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc61,000!tc3,302,000!tc5,612,000
NEW SECTION. Sec. 187. FOR WASHINGTON STATE UNIVERSITY
Science hall renewal: Phase II and completion (CR-86-1-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, H Ed Constr Acct!tj2!tc11,646,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc63,000!tj1!tc11,709,000
NEW SECTION. Sec. 188. FOR WASHINGTON STATE UNIVERSITY
Feed preparation, mixing, and storage facility (CI-86-1-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc500,000
GF, WSU Bldg Acct!tj2!tc1,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,500,000
NEW SECTION. Sec. 189. FOR WASHINGTON STATE UNIVERSITY
Acquisition and renewal of Neil Residence Hall (CR-86-3-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc3,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc3,000,000
NEW SECTION. Sec. 190. FOR WASHINGTON STATE UNIVERSITY
Kalkus Lab fire: Reimbursement of emergency repair expenditures (CR-86-1-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc650,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc650,000
NEW SECTION. Sec. 191. FOR EASTERN WASHINGTON UNIVERSITY
Science building: Addition of laboratory space (CI-83-R-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, EWU Cap Proj Acct!tj1!tc387,000!tc1,677,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc13,000!tc3,072,000!tc5,149,000
NEW SECTION. Sec. 192. FOR EASTERN WASHINGTON UNIVERSITY
Minor capital reappropriations (CR-83-R-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, EWU Cap Proj Acct!tj1!tc800,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc966,000!tj1!tc1,766,000
NEW SECTION. Sec. 193. FOR EASTERN WASHINGTON UNIVERSITY
Electrical system renewal (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc1,513,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,513,000
NEW SECTION. Sec. 194. FOR EASTERN WASHINGTON UNIVERSITY
Roof replacement (CR-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc600,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc600,000!tc1,200,000
NEW SECTION. Sec. 195. FOR EASTERN WASHINGTON UNIVERSITY
Water storage and distribution (CI-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc1,170,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,170,000
NEW SECTION. Sec. 196. FOR EASTERN WASHINGTON UNIVERSITY
Energy conservation (CI-86-2-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,000,000!tc1,500,000
NEW SECTION. Sec. 197. FOR EASTERN WASHINGTON UNIVERSITY
Minor works projects (CR-86-1-010)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, EWU Cap Proj Acct!tj2!tc660,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc3,900,000!tc4,560,000
NEW SECTION. Sec. 198. FOR EASTERN WASHINGTON UNIVERSITY
Small repairs and improvements (CR-86-1-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, EWU Cap Proj Acct!tj2!tc76,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,300,000!tc1,376,000
NEW SECTION. Sec. 199. FOR EASTERN WASHINGTON UNIVERSITY
Fire suppression systems (CI-88-1-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc23,000
GF, EWU Cap Proj Acct!tj2!tc27,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc4,400,000!tc4,450,000
NEW SECTION. Sec. 200. FOR CENTRAL WASHINGTON UNIVERSITY
Utility extension (CI-79-R-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc83,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc801,000!tj1!tc884,000
NEW SECTION. Sec. 201. FOR CENTRAL WASHINGTON UNIVERSITY
Handicapped modifications (CI-79-R-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj1!tc66,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc466,000!tj1!tc532,000
NEW SECTION. Sec. 202. FOR CENTRAL WASHINGTON UNIVERSITY
Utilities improvement (CI-81-R-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc51,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc219,000!tj1!tc270,000
NEW SECTION. Sec. 203. FOR CENTRAL WASHINGTON UNIVERSITY
Energy savings: Boiler house (CI-81-R-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc123,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc412,000!tj1!tc535,000
NEW SECTION. Sec. 204. FOR CENTRAL WASHINGTON UNIVERSITY
Utilities improvement (CI-82-R-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc34,000!tj1!tc234,000
NEW SECTION. Sec. 205. FOR CENTRAL WASHINGTON UNIVERSITY
Minor capital improvements (CI-82-R-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc115,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc219,000!tj1!tc334,000
NEW SECTION. Sec. 206. FOR CENTRAL WASHINGTON UNIVERSITY
Minor capital improvements (CI-83-R-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc576,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc933,000!tj1!tc1,509,000
NEW SECTION. Sec. 207. FOR CENTRAL WASHINGTON UNIVERSITY
Bouillon Hall reroofing (CR-83-R-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc240,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc275,000!tj1!tc515,000
NEW SECTION. Sec. 208. FOR CENTRAL WASHINGTON UNIVERSITY
Hogue Technology and Hebler remodel (CI-83-R-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc750,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc196,000!tj1!tc946,000
NEW SECTION. Sec. 209. FOR CENTRAL WASHINGTON UNIVERSITY
Provide for additional staff space: Computer center (CI-83-3-063)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj1!tc182,800
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc182,800
NEW SECTION. Sec. 210. FOR CENTRAL WASHINGTON UNIVERSITY
Improvements to instructional and support space: Nicholson (CI-86-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc1,332,000
GF, CWU Cap Proj Acct!tj2!tc1,318,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc2,650,000
NEW SECTION. Sec. 211. FOR CENTRAL WASHINGTON UNIVERSITY
Energy savings projects (CR-86-2-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj2!tc300,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc412,000!tc712,000
NEW SECTION. Sec. 212. FOR CENTRAL WASHINGTON UNIVERSITY
Minor works request (CR-86-2-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj2!tc1,819,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc4,000,000!tc5,819,000
NEW SECTION. Sec. 213. FOR CENTRAL WASHINGTON UNIVERSITY
Emergency repairs (CR-86-1-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj2!tc22,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc56,000!tc78,000
NEW SECTION. Sec. 214. FOR CENTRAL WASHINGTON UNIVERSITY
Small repairs and improvements (CR-86-3-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj2!tc533,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc890,000!tc1,423,000
NEW SECTION. Sec. 215. FOR CENTRAL WASHINGTON UNIVERSITY
Renewal and utilization of campus buildings (CR-88-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, CWU Cap Proj Acct!tj2!tc86,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc10,374,000!tc10,460,000
NEW SECTION. Sec. 216. FOR THE EVERGREEN STATE COLLEGE
Renovate fire protection system (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc994,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc994,000
NEW SECTION. Sec. 217. FOR THE EVERGREEN STATE COLLEGE
Deferred maintenance and capital renewal program (CR-86-2-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc1,200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc4,095,000!tc5,295,000
NEW SECTION. Sec. 218. FOR THE EVERGREEN STATE COLLEGE
Replace roofing (three buildings) (CR-86-2-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc138,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc138,000
NEW SECTION. Sec. 219. FOR THE EVERGREEN STATE COLLEGE
Emergency repairs (CR-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, TESC Cap Proj Acct!tj2!tc60,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc60,000
NEW SECTION. Sec. 220. FOR THE EVERGREEN STATE COLLEGE
Minor works (group 1) (CI-86-3-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc309,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc309,000
NEW SECTION. Sec. 221. FOR THE EVERGREEN STATE COLLEGE
Small repairs and improvements (CR-86-2-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, TESC Cap Proj Acct!tj2!tc46,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc46,000
NEW SECTION. Sec. 222. FOR THE EVERGREEN STATE COLLEGE
Code compliance renovation (CR-86-1-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc105,000
GF, TESC Cap Proj Acct!tj1!tc132,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc237,000
NEW SECTION. Sec. 223. FOR THE EVERGREEN STATE COLLEGE
Energy conservation projects (CR-86-2-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc908,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc908,000
NEW SECTION. Sec. 224. FOR THE EVERGREEN STATE COLLEGE
Renovate roofing (four buildings) (CR-86-2-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc394,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc394,000
NEW SECTION. Sec. 225. FOR THE EVERGREEN STATE COLLEGE
Minor works (group 2) (CR-86-2-010)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc145,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc145,000
NEW SECTION. Sec. 226. FOR THE EVERGREEN STATE COLLEGE
Laboratory exhaust and ventilation repairs (CR-86-1-099)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc75,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc634,000!tc709,000
NEW SECTION. Sec. 227. FOR WESTERN WASHINGTON UNIVERSITY
Construct technology building and remodel art and technology building (CI-84-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc6,500,000
GF, WWU Cap Proj Acct!tj1!tc200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc372,000!tc2,905,000!tc9,977,000
NEW SECTION. Sec. 228. FOR WESTERN WASHINGTON UNIVERSITY
Programming science facility needs (CI-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St H Ed Constr Acct!tj2!tc50,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc50,000
NEW SECTION. Sec. 229. FOR WESTERN WASHINGTON UNIVERSITY
Minor works request (CI-86-2-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc1,902,000
GF, St H Ed Constr Acct!tj2!tc200,000
GF, WWU Cap Proj Acct!tj2!tc2,707,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,419,000!tc6,450,000!tc13,678,000
NEW SECTION. Sec. 230. FOR WESTERN WASHINGTON UNIVERSITY
Small repairs and improvements (CI-86-2-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, WWU Cap Proj Acct!tj1!tc204,000!tc900,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc663,000!tc1,800,000!tc3,567,000
PART IV
NATURAL RESOURCES
NEW SECTION. Sec. 231. FOR THE DEPARTMENT OF ECOLOGY
Riverside: Connection to municipal system (CI-77-R-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Waste Disp Fac!tj1!tc98,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc40,000!tj1!tc138,000
NEW SECTION. Sec. 232. FOR THE DEPARTMENT OF ECOLOGY
St. Edward water system (CI-81-R-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Water Sup Fac!tj1!tc220,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc220,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 233. FOR THE DEPARTMENT OF ECOLOGY
Organic sewage treatment (CI-81-R-04A)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Waste Fac 1980!tj1!tc36,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc91,000!tj1!tc127,000
NEW SECTION. Sec. 234. FOR THE DEPARTMENT OF ECOLOGY
Padilla Bay (CI-81-R-096)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, Federal!tj1!tc150,000
!ixGF, ORA‑-State!tj1!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,396,000!tj1!tc1,696,000
NEW SECTION. Sec. 235. FOR THE DEPARTMENT OF ECOLOGY
Blake Island water (CR-83-1-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Water Sup Fac!tj1!tc30,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc58,000!tj1!tc88,000
NEW SECTION. Sec. 236. FOR THE DEPARTMENT OF ECOLOGY
Moran sewage facilities modifications (CR-83-R-015)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Waste Fac 1980!tj1!tc20,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc58,000!tj1!tc78,000
NEW SECTION. Sec. 237. FOR THE DEPARTMENT OF ECOLOGY
Ocean city sewer system modifications (CR-83-R-016)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Waste Fac 1980!tj1!tc120,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc120,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 238. FOR THE DEPARTMENT OF ECOLOGY
Pacific Beach: Sewage system (CR-83-R-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Waste Fac 1980!tj1!tc6,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc20,000!tj1!tc26,000
NEW SECTION. Sec. 239. FOR THE DEPARTMENT OF ECOLOGY
Test observation wells (CI-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, State Emerg Water Proj Rev!tj2!tc120,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc120,000
NEW SECTION. Sec. 240. FOR THE STATE PARKS AND RECREATION COMMISSION
Ocean beach access, Copalis: Initial development (CI-79-R-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc50,000
!ixGF, ORA‑-Federal!tj1!tc50,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc118,000!tj1!tc218,000
NEW SECTION. Sec. 241. FOR THE STATE PARKS AND RECREATION COMMISSION
Squak Mountain: Staged acquisition (CI-79-R-022)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc5,000
!ixGF, ORA‑-Federal!tj1!tc5,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc70,000!tj1!tc80,000
NEW SECTION. Sec. 242. FOR THE STATE PARKS AND RECREATION COMMISSION
Clallam Bay Spit: Initial development (CI-79-R-033)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc80,000
!ixGF, ORA‑-Federal!tj1!tc80,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc20,000!tj1!tc180,000
NEW SECTION. Sec. 243. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden: Kitchen and small bathhouse (CI-81-R-023)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc80,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc99,000!tj1!tc179,000
NEW SECTION. Sec. 244. FOR THE STATE PARKS AND RECREATION COMMISSION
Millersylvania: CCC building restoration, phase I (CR-81-R-071)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc41,000
!ixGF, ORA‑-Federal!tj1!tc41,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc89,000!tj1!tc171,000
NEW SECTION. Sec. 245. FOR THE STATE PARKS AND RECREATION COMMISSION
Yakima Greenway: Acquisition (CI-81-3-098)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc110,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc40,000!tj1!tc150,000
NEW SECTION. Sec. 246. FOR THE STATE PARKS AND RECREATION COMMISSION
Jones Island, Squaxin Island, and Sucia Island (CR-81-R-099)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Waste Fac 1980!tj1!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc117,000!tj1!tc127,000
NEW SECTION. Sec. 247. FOR THE STATE PARKS AND RECREATION COMMISSION
All areas emergency account (CR-83-R-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Public Rec Fac!tj1!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc390,000!tj1!tc400,000
NEW SECTION. Sec. 248. FOR THE STATE PARKS AND RECREATION COMMISSION
Complete 1979-81 state-wide energy conservation program (CR-83-R-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Public Rec Fac!tj1!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc62,000!tj1!tc72,000
NEW SECTION. Sec. 249. FOR THE STATE PARKS AND RECREATION COMMISSION
Blake Island water (CR-83-1-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Water Sup Fac!tj1!tc30,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc58,000!tj1!tc88,000
NEW SECTION. Sec. 250. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sylvia: Dam inspection and compliance repair (CR-83-R-023)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc12,000!tj1!tc22,000
NEW SECTION. Sec. 251. FOR THE STATE PARKS AND RECREATION COMMISSION
St. Edward: Building repairs (CR-83-R-026)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc200,000!tj1!tc350,000
NEW SECTION. Sec. 252. FOR THE STATE PARKS AND RECREATION COMMISSION
Penrose Point (CI-83-R-027)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc45,000
!ixGF, ORA‑-Federal!tj1!tc45,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc260,000!tj1!tc350,000
NEW SECTION. Sec. 253. FOR THE STATE PARKS AND RECREATION COMMISSION
Energy conservation, Fort Worden (CR-83-2-106)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Public Rec Fac!tj1!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc105,000!tj1!tc255,000
NEW SECTION. Sec. 254. FOR THE STATE PARKS AND RECREATION COMMISSION
Little Spokane River: Appraise and acquire land (CI-84-R-088)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc100,000
GF, ORA‑-Federal!tj1!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc900,000!tj1!tc1,100,000
NEW SECTION. Sec. 255. FOR THE STATE PARKS AND RECREATION COMMISSION
Seaquest: Expansion and renovation (CR-84-R-090)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc185,000!tj1!tc285,000
NEW SECTION. Sec. 256. FOR THE STATE PARKS AND RECREATION COMMISSION
All areas: Emergencies (CI-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc450,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,150,000!tc1,600,000
NEW SECTION. Sec. 257. FOR THE STATE PARKS AND RECREATION COMMISSION
Water supply facilities: State-wide (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc604,000
!ixGF, ORA‑-State!tj2!tc27,000
!ixGF, ORA‑-Federal!tj2!tc3,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc414,000!tc1,048,000
NEW SECTION. Sec. 258. FOR THE STATE PARKS AND RECREATION COMMISSION
Sewage treatment facilities: State-wide (CR-86-1-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Waste Fac 1980!tj2!tc742,000
!ixGF, St Bldg Constr Acct!tj2!tc187,000
!ixGF, ORA‑-State!tj2!tc31,000
!ixGF, ORA‑-Federal!tj2!tc30,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc400,000!tc1,390,000
NEW SECTION. Sec. 259. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sammamish: Water ski float (CI-86-4-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc5,000
!ixGF, ORA‑-Federal!tj2!tc4,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc9,000
NEW SECTION. Sec. 260. FOR THE STATE PARKS AND RECREATION COMMISSION
Boating improvements: State-wide (CI-86-3-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc67,000
!ixGF, ORA‑-Federal!tj2!tc43,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc110,000
NEW SECTION. Sec. 261. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden pier repair: Add safety railing (CR-86-1-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc129,000
!ixGF, ORA‑-Federal!tj2!tc15,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc144,000
NEW SECTION. Sec. 262. FOR THE STATE PARKS AND RECREATION COMMISSION
Horsethief Lake electric power revision (CR-86-1-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc13,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc13,000
NEW SECTION. Sec. 263. FOR THE STATE PARKS AND RECREATION COMMISSION
Puget Sound and San Juan Island acquisition and development (CI-86-4-014)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc50,000
!ixGF, ORA‑-State!tj2!tc50,000
!ixGF, ORA‑-Federal!tj2!tc50,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc450,000!tc600,000
NEW SECTION. Sec. 264. FOR THE STATE PARKS AND RECREATION COMMISSION
Park renovation state-wide: Referendum 28 (CR-86-1-018)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, LIRA, Public Rec Fac!tj2!tc256,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc256,000
NEW SECTION. Sec. 265. FOR THE STATE PARKS AND RECREATION COMMISSION
Boating repairs: State-wide (CR-86-1-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc62,000
!ixGF, ORA‑-State!tj2!tc202,000
!ixGF, ORA‑-Federal!tj2!tc18,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc828,000!tc1,110,000
NEW SECTION. Sec. 266. FOR THE STATE PARKS AND RECREATION COMMISSION
Repairs and improvements to boating facilities: State-wide (CR-86-1-021)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc34,000
!ixGF, ORA‑-State!tj2!tc325,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc828,000!tc1,187,000
NEW SECTION. Sec. 267. FOR THE STATE PARKS AND RECREATION COMMISSION
Beacon Rock: Repair and replacement of water facilities (CR-86-1-022)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc140,000
!ixGF, ORA‑-Federal!tj2!tc16,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc156,000
NEW SECTION. Sec. 268. FOR THE STATE PARKS AND RECREATION COMMISSION
Deception Pass: Renovate marine work pier (CR-86-1-023)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc140,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc140,000
NEW SECTION. Sec. 269. FOR THE STATE PARKS AND RECREATION COMMISSION
Energy conservation, landscape repairs: State-wide (CR-86-1-026)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc541,000
!ixGF, ORA‑-State!tj2!tc40,000
!ixGF, ORA‑-Federal!tj2!tc40,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc2,382,000!tc3,003,000
NEW SECTION. Sec. 270. FOR THE STATE PARKS AND RECREATION COMMISSION
Energy conservation, landscape renovation: State-wide (CR-86-1-027)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc595,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc5,119,000!tc5,714,000
NEW SECTION. Sec. 271. FOR THE STATE PARKS AND RECREATION COMMISSION
West Hylebos acquisition and development (CI-86-4-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc296,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc296,000
NEW SECTION. Sec. 272. FOR THE STATE PARKS AND RECREATION COMMISSION
Milwaukee road trail: Trestle safety features, acquisition (CR-86-1-030)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc149,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc149,000
NEW SECTION. Sec. 273. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden: Point Wilson Bank protection (CR-86-1-032)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc114,000
!ixGF, ORA‑-Federal!tj2!tc113,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc227,000
NEW SECTION. Sec. 274. FOR THE STATE PARKS AND RECREATION COMMISSION
Mt. Spokane: Road improvements (CR-86-3-L34)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixMotor Vehicle Fund!tj2!tc900,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc900,000
NEW SECTION. Sec. 275. FOR THE STATE PARKS AND RECREATION COMMISSION
Construction at Brooks Memorial, Central Ferry, and Lake Easton (CR-87-2-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc141,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc750,000!tc891,000
NEW SECTION. Sec. 276. FOR THE STATE PARKS AND RECREATION COMMISSION
Green River Gorge: Staged acquisition (CI-87-3-010)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc300,000
!ixGF, ORA‑-State!tj2!tc100,000
!ixGF, ORA‑-Federal!tj2!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc2,000,000!tc2,500,000
NEW SECTION. Sec. 277. FOR THE STATE PARKS AND RECREATION COMMISSION
Auburn game farm: Consolidation and renovation (CR-87-3-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc80,000
!ixGF, ORA‑-State!tj2!tc18,000
!ixGF, ORA‑-Federal!tj2!tc18,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc116,000
NEW SECTION. Sec. 278. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden: Building weatherization and energy conservation (CR-87-2-016)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc511,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc500,000!tc1,011,000
NEW SECTION. Sec. 279. FOR THE STATE PARKS AND RECREATION COMMISSION
Replace breakwater, Illahee: Ramps, floats, and piling (CR-87-1-024)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc276,000
!ixGF, ORA‑-Federal!tj2!tc31,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc307,000
NEW SECTION. Sec. 280. FOR THE STATE PARKS AND RECREATION COMMISSION
Sacajawea: Boat launch reconstruction (CR-87-1-025)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc91,000
!ixGF, ORA‑-Federal!tj2!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc101,000
NEW SECTION. Sec. 281. FOR THE STATE PARKS AND RECREATION COMMISSION
Lake Sylvia: Renovate dam and seepage control (CR-87-1-028)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc132,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc132,000
NEW SECTION. Sec. 282. FOR THE STATE PARKS AND RECREATION COMMISSION
Flaming geyser and Kummer redevelopment and access (CR-87-1-029)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc183,000
!ixGF, ORA‑-Federal!tj2!tc183,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc366,000
NEW SECTION. Sec. 283. FOR THE STATE PARKS AND RECREATION COMMISSION
Kopachuck: Shoreline protection (CR-87-1-031)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc52,000
!ixGF, ORA‑-Federal!tj2!tc53,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc105,000
NEW SECTION. Sec. 284. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Columbia: Building dry rot repair (CR-87-2-045)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc164,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc164,000
NEW SECTION. Sec. 285. FOR THE STATE PARKS AND RECREATION COMMISSION
Moran: Mountain Lake CCC building renovation (CR-87-1-049)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc163,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc163,000
NEW SECTION. Sec. 286. FOR THE STATE PARKS AND RECREATION COMMISSION
Deception Pass: Renovate CCC buildings 2 and 3, Rosario (CR-87-1-050)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc218,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc218,000
NEW SECTION. Sec. 287. FOR THE STATE PARKS AND RECREATION COMMISSION
Lewis and Clark: Expand camping sites, parking and miscellaneous minor renovation
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc30,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc30,000
NEW SECTION. Sec. 288. FOR THE DEPARTMENT OF COMMERCE AND ECONOMIC DEVELOPMENT
Public facilities: Revolving construction loan (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc12,000,000!tc20,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc8,000,000!tc40,000,000!tc80,000,000
The appropriations in this section are subject to the following conditions and limitations: $5,000,000 of the appropriation shall be made available to the department of community development solely for the purpose of Substitute House Bill No. 855, the Washington state development loan fund.
NEW SECTION. Sec. 289. FOR THE DEPARTMENT OF COMMERCE AND ECONOMIC DEVELOPMENT
Washington State Ag-Trade Center, Spokane (CR-86-2-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc4,500,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc4,500,000
NEW SECTION. Sec. 290. FOR THE DEPARTMENT OF COMMERCE AND ECONOMIC DEVELOPMENT
Feasibility study for reconstruction, economic development, and expanded use of the state fairgrounds at Yakima
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj2!tc105,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc105,000
NEW SECTION. Sec. 291. FOR THE DEPARTMENT OF FISHERIES
Health and safety code (CR-77-R-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc20,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,766,000!tj1!tc1,786,000
NEW SECTION. Sec. 292. FOR THE DEPARTMENT OF FISHERIES
Water quality standard (CR-77-R-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc7,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc3,992,000!tj1!tc3,999,000
NEW SECTION. Sec. 293. FOR THE DEPARTMENT OF FISHERIES
Replacements and alterations (CR-77-R-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc99,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,390,000!tj1!tc2,489,000
NEW SECTION. Sec. 294. FOR THE DEPARTMENT OF FISHERIES
Salmon habitat enhancement program (CR-77-R-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Salmon Enhmt Constr Acct!tj1!tc1,500,000!tc1,700,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc3,500,000!tc3,300,000!tc10,000,000
NEW SECTION. Sec. 295. FOR THE DEPARTMENT OF FISHERIES
Puget Sound artificial reefs: Design and construct (CR-79-R-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc25,000!tc110,000
!ixGF, ORA‑-Federal!tj1!tc25,000!tc20,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc270,000!tc470,000!tc920,000
NEW SECTION. Sec. 296. FOR THE DEPARTMENT OF FISHERIES
Hood Canal Bridge: Design and construction (CR-79-R-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc280,000!tj1!tc380,000
NEW SECTION. Sec. 297. FOR THE DEPARTMENT OF FISHERIES
Snow Creek public access: Preplanning (CR-79-R-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc68,000!tc13,000
!ixGF, ORA‑-Federal!tj1!tc68,000!tc13,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc250,000!tc340,000!tc752,000
NEW SECTION. Sec. 298. FOR THE DEPARTMENT OF FISHERIES
Soleduck Sill (CI-81-1-R46)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc41,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc6,000!tj1!tc47,000
NEW SECTION. Sec. 299. FOR THE DEPARTMENT OF FISHERIES
Auxilliary fuel tank (CR-81-R-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc30,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc114,000!tj1!tc144,000
NEW SECTION. Sec. 300. FOR THE DEPARTMENT OF FISHERIES
Adult holding and spawning: Skagit (CR-81-R-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc257,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc84,000!tj1!tc341,000
NEW SECTION. Sec. 301. FOR THE DEPARTMENT OF FISHERIES
Sunset Falls fishway (CR-81-R-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc21,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc113,000!tj1!tc134,000
NEW SECTION. Sec. 302. FOR THE DEPARTMENT OF FISHERIES
Green River hatchery: Erosion control (CR-81-R-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc15,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc24,000!tj1!tc39,000
NEW SECTION. Sec. 303. FOR THE DEPARTMENT OF FISHERIES
Oakland Bay tideland access: Design and construction (CR-81-R-014)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc7,000!tc72,000
!ixGF, ORA‑-Federal!tj1!tc7,000!tc72,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc174,000!tj1!tc332,000
NEW SECTION. Sec. 304. FOR THE DEPARTMENT OF FISHERIES
Soleduck adult pond (CR-81-R-040)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc8,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc262,000!tj1!tc270,000
NEW SECTION. Sec. 305. FOR THE DEPARTMENT OF FISHERIES
Energy projects (CI-83-2-R01)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc20,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc95,000!tj1!tc115,000
NEW SECTION. Sec. 306. FOR THE DEPARTMENT OF FISHERIES
Combined replacement (CI-83-3-R04)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc40,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc60,000!tj1!tc100,000
NEW SECTION. Sec. 307. FOR THE DEPARTMENT OF FISHERIES
Green River incubation filter (CR-83-R-008)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc176,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc176,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 308. FOR THE DEPARTMENT OF FISHERIES
Puyallup filter and water supply (CR-83-R-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc112,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc50,000!tj1!tc162,000
NEW SECTION. Sec. 309. FOR THE DEPARTMENT OF FISHERIES
Hatchery security (CR-83-R-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc60,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc60,000!tj1!tc120,000
NEW SECTION. Sec. 310. FOR THE DEPARTMENT OF FISHERIES
Samish adult pond (CR-84-R-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj1!tc200,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc283,000!tj1!tc483,000
NEW SECTION. Sec. 311. FOR THE DEPARTMENT OF FISHERIES
Health, safety, and code compliance (CR-86-1-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc300,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc500,000!tc800,000
NEW SECTION. Sec. 312. FOR THE DEPARTMENT OF FISHERIES
Bird predation protection: Design and construction (CI-86-3-021)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc267,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc267,000
NEW SECTION. Sec. 313. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects: Salmon (CR-86-3-022)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc863,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc2,550,000!tc3,413,000
NEW SECTION. Sec. 314. FOR THE DEPARTMENT OF FISHERIES
Minor capital projects: Shellfish, design and construction (CR-86-3-023)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc269,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc200,000!tc469,000
NEW SECTION. Sec. 315. FOR THE DEPARTMENT OF FISHERIES
Paving and maintenance, asphalt ponds: Design and construction (CR-86-3-024)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc556,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc200,000!tc756,000
NEW SECTION. Sec. 316. FOR THE DEPARTMENT OF FISHERIES
Skykomish modifications: Design and construction (CR-86-3-025)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc217,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc217,000
NEW SECTION. Sec. 317. FOR THE DEPARTMENT OF FISHERIES
Bremerton public fishing pier: Design and construction (CI-86-3-027)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc410,000
!ixGF, ORA‑-Federal!tj2!tc410,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc820,000
NEW SECTION. Sec. 318. FOR THE DEPARTMENT OF FISHERIES
Langley public fishing pier: Design and construction (CI-86-3-L40)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc70,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc70,000
NEW SECTION. Sec. 319. FOR THE DEPARTMENT OF FISHERIES
Towhead Island public access: Renovation (CR-86-2-028)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc191,000
!ixGF, ORA‑-Federal!tj2!tc21,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc212,000
NEW SECTION. Sec. 320. FOR THE DEPARTMENT OF FISHERIES
Issaquah Hatchery Interpretive Center (CI-86-2-029)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc35,000
!ixGF, ORA‑-Federal!tj2!tc35,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc70,000
NEW SECTION. Sec. 321. FOR THE DEPARTMENT OF FISHERIES
Willapa Hatchery, new main pipeline: Design and construction (CI-86-3-030)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc426,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc426,000
NEW SECTION. Sec. 322. FOR THE DEPARTMENT OF FISHERIES
Energy conservation (CR-86-4-031)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc162,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc300,000!tc462,000
NEW SECTION. Sec. 323. FOR THE DEPARTMENT OF FISHERIES
Freezer remodel: Samish and Hood Canal (CR-86-3-032)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc103,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc103,000
NEW SECTION. Sec. 324. FOR THE DEPARTMENT OF FISHERIES
Patrol seized gear storage: Design and construction (CI-86-3-033)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Fish Cap Proj Acct!tj2!tc98,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc98,000
NEW SECTION. Sec. 325. FOR THE DEPARTMENT OF FISHERIES
Hood Canal: Boat access acquisition (CI-86-3-035)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc270,000
!ixGF, ORA‑-Federal!tj2!tc30,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc150,000!tc450,000
NEW SECTION. Sec. 326. FOR THE DEPARTMENT OF FISHERIES
Hood Canal beach access acquisition (CI-86-3-036)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc150,000
!ixGF, ORA‑-Federal!tj2!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc100,000!tc400,000
NEW SECTION. Sec. 327. FOR THE DEPARTMENT OF FISHERIES
Point Whitney tideland access acquisition (CI-86-3-037)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc128,000
!ixGF, ORA‑-Federal!tj2!tc128,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc150,000!tc406,000
NEW SECTION. Sec. 328. FOR THE DEPARTMENT OF FISHERIES
Knappton public access: Design and construction (CI-86-3-038)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc51,000
!ixGF, ORA‑-Federal!tj2!tc51,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc102,000
NEW SECTION. Sec. 329. FOR THE DEPARTMENT OF GAME
Relocate engineering shop and storage facilities (CI-81-R-033)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund!tj1!tc34,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tc962,700!tj1!tc996,700
NEW SECTION. Sec. 330. FOR THE DEPARTMENT OF GAME
Rebuild fishing dock and provide parking and sanitary facilities: Mercer Island, King County (CI-81-R-037)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc56,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tc3,000!tj1!tc59,000
NEW SECTION. Sec. 331. FOR THE DEPARTMENT OF GAME
Relocate or rebuild Bogachiel residence to avoid flooding: Clallam County (CI-83-R-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund!tj1!tc64,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tc4,000!tj1!tc68,000
NEW SECTION. Sec. 332. FOR THE DEPARTMENT OF GAME
Acquire access to stream bank: Mitigation for Wells dam, Okanogan County (CI-83-R-044)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-Game Special Wildlife Acct!tj1!tc62,900
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tj2!tc62,900
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 333. FOR THE DEPARTMENT OF GAME
Redevelop access areas: Amber Lake, Spokane County (CI-83-R-026)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc42,000
GF, ORA‑-Federal!tj1!tc42,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tj2!tc84,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 334. FOR THE DEPARTMENT OF GAME
Construct facilities on Big and Little Green Lakes: Okanogan County (CI-83-R-029)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc46,000
GF, ORA‑-Federal!tj1!tc46,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tj2!tc93,200
NEW SECTION. Sec. 335. FOR THE DEPARTMENT OF GAME
Construct public access: Stillaguamish River, Snohomish County (CI-83-R-030)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc32,000
GF, ORA‑-Federal!tj1!tc32,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tc3,000!tj1!tc67,000
NEW SECTION. Sec. 336. FOR THE DEPARTMENT OF GAME
Redevelop public access: Jamison Lake, Douglas County (CI-83-R-037)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc132,000
GF, ORA‑-Federal!tj1!tc132,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/85!sc ,1and!tcCosts
!tc6/30/83!tcThereafter
!tc9,200!tj1!tc282,400
NEW SECTION. Sec. 337. FOR THE DEPARTMENT OF GAME
Clear Lake (CI-81-R-041)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc20,000
!ixGF, ORA‑-Federal!tj1!tc9,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc29,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 338. FOR THE DEPARTMENT OF GAME
Snake River compensation (CI-83-R-009)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-Federal!tj1!tc11,223,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc11,223,000
NEW SECTION. Sec. 339. FOR THE DEPARTMENT OF GAME
I-82 development (CI-83-R-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc186,000
!ixGF, ORA‑-Federal!tj1!tc186,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc372,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 340. FOR THE DEPARTMENT OF GAME
Okanogan River natural area (McLaughlin Falls) (CI-83-R-016)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj1!tc350,000!tc18,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc368,000
NEW SECTION. Sec. 341. FOR THE DEPARTMENT OF GAME
Wenas inholdings: Acquisition (CI-83-R-018)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj1!tc132,000!tc72,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc204,000
NEW SECTION. Sec. 342. FOR THE DEPARTMENT OF GAME
Skagit habitat management area inholdings acquisition (CI-83-R-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj1!tc435,000!tc9,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc444,000
NEW SECTION. Sec. 343. FOR THE DEPARTMENT OF GAME
Chehalis Valley habitat management area acquisition (CI-83-R-021)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj1!tc510,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc510,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 344. FOR THE DEPARTMENT OF GAME
Aeneas Valley (CI-83-R-025)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc53,000
!ixGF, ORA‑-Federal!tj1!tc53,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc106,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 345. FOR THE DEPARTMENT OF GAME
Diamond Lake (CI-83-R-031)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc27,000
!ixGF, ORA‑-Federal!tj1!tc27,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc54,000
The appropriation in this section shall lapse on July 1, 1986, if substantial progress has not been made, as determined by the office of financial management, or contractual obligations have not been incurred.
NEW SECTION. Sec. 346. FOR THE DEPARTMENT OF GAME
Repairs and replacements (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc400,000!tc550,000
NEW SECTION. Sec. 347. FOR THE DEPARTMENT OF GAME
Facility maintenance and repair (CR-86-2-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc409,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,200,000!tc1,609,000
NEW SECTION. Sec. 348. FOR THE DEPARTMENT OF GAME
Access area toilet replacement (CR-86-1-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc400,000!tc550,000
NEW SECTION. Sec. 349. FOR THE DEPARTMENT OF GAME
State-wide fencing (CR-86-2-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc266,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,200,000!tc1,466,000
NEW SECTION. Sec. 350. FOR THE DEPARTMENT OF GAME
Administrative offices: Remodel (CR-86-3-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc160,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc160,000
NEW SECTION. Sec. 351. FOR THE DEPARTMENT OF GAME
Naches Hatchery water supply (CI-86-2-007)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc40,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc40,000
NEW SECTION. Sec. 352. FOR THE DEPARTMENT OF GAME
West Valley acquisition (CI-86-4-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc31,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc31,000
NEW SECTION. Sec. 353. FOR THE DEPARTMENT OF GAME
Hedt property: Acquisition (CI-86-4-014)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc383,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc383,000
NEW SECTION. Sec. 354. FOR THE DEPARTMENT OF GAME
E. N. Stone inholding: Klickitat habitat management area (CI-86-4-017)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc19,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc19,000
NEW SECTION. Sec. 355. FOR THE DEPARTMENT OF GAME
Lake Goodwin redevelopment (CR-86-2-021)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc81,000
!ixGF, ORA‑-Federal!tj2!tc9,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc90,000
NEW SECTION. Sec. 356. FOR THE DEPARTMENT OF GAME
Vancouver Lake: Access road improvements (CR-86-2-022)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc109,000
!ixGF, ORA‑-Federal!tj2!tc12,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc121,000
NEW SECTION. Sec. 357. FOR THE DEPARTMENT OF GAME
Oak Creek headquarters (CR-86-2-023)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc69,000
!ixGF, ORA‑-Federal!tj2!tc69,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc138,000
NEW SECTION. Sec. 358. FOR THE DEPARTMENT OF GAME
Newman Lake access area (CR-86-2-024)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc99,000
!ixGF, ORA‑-Federal!tj2!tc11,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc110,000
NEW SECTION. Sec. 359. FOR THE DEPARTMENT OF GAME
Wind River boat access (CI-86-3-025)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc83,000
!ixGF, ORA‑-Federal!tj2!tc9,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc92,000
NEW SECTION. Sec. 360. FOR THE DEPARTMENT OF GAME
Langlois Lake improvements (CR-86-2-026)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc56,000
!ixGF, ORA‑-Federal!tj2!tc6,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc62,000
NEW SECTION. Sec. 361. FOR THE DEPARTMENT OF GAME
Pipe Lake public fishing access (CI-86-4-027)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc85,000
!ixGF, ORA‑-Federal!tj2!tc10,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc95,000
NEW SECTION. Sec. 362. FOR THE DEPARTMENT OF GAME
Mineral Lake site improvements (CI-86-3-028)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc115,000
!ixGF, ORA‑-Federal!tj2!tc13,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc128,000
NEW SECTION. Sec. 363. FOR THE DEPARTMENT OF GAME
Satsop River redevelopment (CR-86-2-029)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc76,000
!ixGF, ORA‑-Federal!tj2!tc9,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc85,000
NEW SECTION. Sec. 364. FOR THE DEPARTMENT OF GAME
West Medical Lake redevelopment (CR-86-2-030)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc81,000
!ixGF, ORA‑-Federal!tj2!tc9,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc90,000
NEW SECTION. Sec. 365. FOR THE DEPARTMENT OF GAME
Lake Retreat public fishing access (CI-86-4-031)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc86,000
!ixGF, ORA‑-Federal!tj2!tc9,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc95,000
NEW SECTION. Sec. 366. FOR THE DEPARTMENT OF GAME
Engineering capital budget: Preplanning and design (CI-87-4-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc25,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc25,000
NEW SECTION. Sec. 367. FOR THE DEPARTMENT OF GAME
Whitestone irrigation district and Blue Lake inholding acquisition (CI-87-4-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc320,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc320,000
NEW SECTION. Sec. 368. FOR THE DEPARTMENT OF GAME
McConnell inholding Sinlahekin habitat management area (CI-87-4-013)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc112,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc112,000
NEW SECTION. Sec. 369. FOR THE DEPARTMENT OF GAME
Robinson Canyon acquisition (CI-87-4-016)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc204,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc204,000
NEW SECTION. Sec. 370. FOR THE DEPARTMENT OF GAME
Dalles Mountain land acquisition (CI-87-4-018)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc510,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc510,000
NEW SECTION. Sec. 371. FOR THE DEPARTMENT OF GAME
Samish River easement acquisition (CI-87-4-019)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc58,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc58,000
NEW SECTION. Sec. 372. FOR THE DEPARTMENT OF GAME
Klickitat habitat management area: G. Layman acquisition (CI-87-4-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGame Fund‑-State!tj2!tc444,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc444,000
NEW SECTION. Sec. 373. FOR THE DEPARTMENT OF GAME
Shady Lake improvements (CR-87-2-032)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc59,000
!ixGF, ORA‑-Federal!tj2!tc6,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc65,000
NEW SECTION. Sec. 374. FOR THE DEPARTMENT OF GAME
Methow River: Averill (CI-87-2-033)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj2!tc59,000
!ixGF, ORA‑-Federal!tj2!tc7,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc66,000
NEW SECTION. Sec. 375. FOR THE DEPARTMENT OF NATURAL RESOURCES
Construct and improve campsites, roads, trails, and other recreation projects (CI-77-4-R16)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund‑-ORV Account!tj1!tc210,400
!ixGF, ORA‑-State!tj1!tc97,800
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc4,183,800!tc1,379,000!tc5,871,000
NEW SECTION. Sec. 376. FOR THE DEPARTMENT OF NATURAL RESOURCES
Construct and improve campsites, roads, and trails: State-wide (CI-77-3-A16)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund‑-ORV Account!tj1!tc63,200
!ixGF, ORA‑-State!tj1!tc86,600
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc95,400!tj1!tc245,200
NEW SECTION. Sec. 377. FOR THE DEPARTMENT OF NATURAL RESOURCES
Acquire fragile and endangered natural lands for conservancy (CI-84-3-R92)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, ORA‑-State!tj1!tc965,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc35,000!tj1!tc1,000,000
NEW SECTION. Sec. 378. FOR THE DEPARTMENT OF NATURAL RESOURCES
Construct and improve roads and bridges: State-wide (CI-77-4-L16)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund‑-ORV Account!tj1!tc273,300
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc480,200!tj1!tc753,500
NEW SECTION. Sec. 379. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commercial land development (CI-77-R-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Res Mgmt Cost Acct!tj1!tc1,057,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc168,000!tj1!tc1,225,000
NEW SECTION. Sec. 380. FOR THE DEPARTMENT OF NATURAL RESOURCES
Irrigation development (CI-77-4-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Res Mgmt Cost Acct!tj1!tc765,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc765,000
NEW SECTION. Sec. 381. FOR THE DEPARTMENT OF NATURAL RESOURCES
Right of way acquisition (CI-86-3-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, For Dev Acct!tj2!tc265,000
!ixGF, Res Mgmt Cost Acct!tj2!tc887,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,152,000
NEW SECTION. Sec. 382. FOR THE DEPARTMENT OF NATURAL RESOURCES
Irrigation development (CI-86-3-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Res Mgmt Cost Acct!tj2!tc150,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc150,000
NEW SECTION. Sec. 383. FOR THE DEPARTMENT OF NATURAL RESOURCES
Forest land bank (CI-86-4-003)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, For Dev Acct!tj1!tc2,940,000!tc3,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc5,946,000
NEW SECTION. Sec. 384. FOR THE DEPARTMENT OF NATURAL RESOURCES
Commercial development and electronic sites (CI-86-3-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Res Mgmt Cost Acct!tj2!tc127,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc127,000
NEW SECTION. Sec. 385. FOR THE DEPARTMENT OF NATURAL RESOURCES
Transition land bank (CI-86-3-005)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, For Dev Acct!tj2!tc4,000,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc4,000,000
NEW SECTION. Sec. 386. FOR THE DEPARTMENT OF NATURAL RESOURCES
Tiger Mountain 4000 road betterment (CI-86-3-006)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund‑-ORV Account!tj2!tc100,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc100,000
NEW SECTION. Sec. 387. FOR THE DEPARTMENT OF NATURAL RESOURCES
Fire control projects (CR-86-1-010)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, State!tj2!tc77,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc77,000
NEW SECTION. Sec. 388. FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor works (CR-86-3-011)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, State!tj2!tc26,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc26,000
NEW SECTION. Sec. 389. FOR THE DEPARTMENT OF NATURAL RESOURCES
Bulk fuel facilities (CI-86-4-012)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, State!tj2!tc123,000
!ixGF, For Dev Acct!tj2!tc49,000
!ixGF, Res Mgmt Cost Acct!tj2!tc156,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc410,000
NEW SECTION. Sec. 390. FOR THE DEPARTMENT OF NATURAL RESOURCES
Capital Forest recreation storage building (CR-86-4-014)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund, State!tj2!tc17,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc17,000
NEW SECTION. Sec. 391. FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation projects (CR-86-3-018)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGeneral Fund‑-ORV Account!tj2!tc971,000
!ixGF, ORA‑-State!tj2!tc298,000
!ixGF, ORA‑-Federal!tj2!tc126,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc1,230,000!tc2,625,000
NEW SECTION. Sec. 392. FOR THE DEPARTMENT OF NATURAL RESOURCES
Aquatic land enhancement (CI-86-3-020)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Aquatic Lands Acct!tj2!tc1,470,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc1,470,000
NEW SECTION. Sec. 393. FOR THE STATE CONVENTION AND TRADE CENTER
Washington State Convention and Trade Center (CI-83-R-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, Convention Center Acct!tj1!tc85,418,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc10,832,000!tj1!tc96,250,000
PART V
MISCELLANEOUS
!af98,700
NEW SECTION. Sec. 394. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Minor works request (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc49,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc56,000
NEW SECTION. Sec. 395. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
New air conditioning (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc125,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj2!tc125,000
NEW SECTION. Sec. 396. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Museum interior remodeling (CI-88-3-004)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc26,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc2,000!tc3,250,000!tc3,317,000
NEW SECTION. Sec. 397. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Cheney Cowles Memorial Museum: Remodel (CR-86-1-001)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc633,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,068,000!tj1!tc1,701,000
NEW SECTION. Sec. 398. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Campbell House property: Restoration (CR-86-1-002)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Fac Renew Acct!tj2!tc342,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tj1!tc619,000!tc969,000
NEW SECTION. Sec. 399. FOR THE DEPARTMENT OF TRANSPORTATION
Acquisition of dredge spoil sites (chapter 1, Laws of 1983 1st ex. sess.)
!tm4,2,2!tj1!tcReappropriation!tcAppropriation
!ixGF, St Bldg Constr Acct!tj1!tc3,620,000
!tm1,1,1!tcProject!tcEstimated!tcEstimated
!tcCosts!tcCosts!tcTotal
!tcThrough!tc7/1/87!sc ,1and!tcCosts
!tc6/30/85!tcThereafter
!tc1,400,000!tj1!tc5,020,000
@la
NEW SECTION. Sec. 400. FOR THE ARTS COMMISSION
Artwork allowance pooling: Up to one-half of one percent of moneys appropriated in this act shall be spent as provided in RCW 28A.58.055, 28B.10.027, and 43.17.200.
NEW SECTION. Sec. 401. To carry out effectively the provisions of this act, the governor may assign responsibility for planning, engineering, construction, and other related activities to any appropriate agency.
NEW SECTION. Sec. 402. Reappropriations shall be limited to the unexpended balances remaining June 30, 1985, in the current appropriation for each project.
NEW SECTION. Sec. 403. As part of the annual six year update to the State Facilities and Capital Plan, agencies shall, beginning with the January 1986 update, provide lease development projects to the office of financial management.
NEW SECTION. Sec. 404. If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with any moneys available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the committees on ways and means of the senate and house of representatives.
NEW SECTION. Sec. 405. Notwithstanding any other provisions of law, for the 1985-87 biennium, state treasurer transfers of reimbursement to the general fund from the community college capital projects account for debt service payments made under the provisions of Title 28B RCW shall occur only after such debt service payment has been made and only to the extent that funds are actually available in the account. Any unpaid reimbursements shall be a continuing obligation against the community college capital projects account until paid. The state board for community college education need not accumulate any specific balance in the community college capital projects account in anticipation of transfers to reimburse the general fund.
NEW SECTION. Sec. 406. Any capital improvements or capital project involving construction or major expansion of a state office facility, including district headquarters, detachment offices, and off-campus faculty offices, shall be reviewed by the department of general administration for possible consolidation and compliance with state office standards prior to allotment of funds. The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.
NEW SECTION. Sec. 407. The governor, through the director of financial management, may authorize a transfer of appropriation authority provided for a capital project which is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer shall be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects which are funded from the same fund or account.
A report of any transfer effected under this section shall be filed with the legislative auditor by the director of financial management within thirty days of the date the transfer is effected. The legislative auditor shall review and compile these filings and periodically report thereon to the legislative budget committee and the appropriate standing committees of the senate and house of representatives.
NEW SECTION. Sec. 408. To carry out effectively, efficiently, and economically the provisions of this act, each agency shall establish a start date and completion date on each project which has an estimated total cost which exceeds five hundred thousand dollars and for which a start or completion date is not specified in this act. This information shall be furnished to the office of financial management and the legislative auditor no later than the date the allotment request is filed with the office of financial management. If a project cannot start on or before the indicated start date or be completed by the indicated completion date, the director of the agency shall document and file with the office of financial management and the legislative budget committee the reason for the delay and indicate the new start and/or completion date(s). The legislative auditor shall review these filings and report thereon to the legislative budget committee and the appropriate standing committees of the senate and house of representatives.
As a result of these filings, agency directors may be required to appear before the legislative budget committee for further explanation of a project delay.
NEW SECTION. Sec. 409. (1) A maximum of $121,800,000 of the appropriations and reappropriations provided in sections 301 through 309 of this act may be disbursed during the 1985-87 biennium.
(2) Reappropriations in sections 301 through 305 of this act are reauthorizations of appropriations from section 887, chapter 57, Laws of 1983 1st ex. sess. Proceeds of the sale of bonds authorized by chapter 266, Laws of 1984 may be used for the support of these projects.
NEW SECTION. Sec. 410. The appropriations of moneys and the designation of funds and accounts by this and other acts of the 1985 legislature shall be construed in a manner consistent with legislation enacted by the 1985 legislature to conform state funds and accounts with generally accepted accounting principles.
NEW SECTION. Sec. 411. (1) The legislature finds:
(a) Estimates of capital project costs are prepared in a manner to ensure sufficient funds are available for the completion of projects.
(b) Actual project costs are influenced by variations in cost factors, changing unit price levels, available inventories, inflation rates, gross construction volume at the time of project bid, and other factors that cannot be predicted at the time of estimating capital project costs.
(c) Due to funding limitations, necessary capital projects are deferred to ensuing biennia.
(d) The deferral of capital projects results in increased project costs due to the effects of inflation and increased deterioration of facilities.
(e) No statutory authority currently exists to allow project cost savings to be used to implement necessary capital projects that were deferred to ensuing biennia due to lack of funds.
(2) There is hereby authorized a capital projects cost control incentive program for the 1985-87 biennium.
(3) Appropriations not required by an agency to complete capital projects authorized in this act, may be expended to implement, in priority sequence, those capital renewal projects of the agency listed in the Governor's Six-Year Capital and Facility Plan for the 1987-89 Biennium, as that list exists in the Governor's final 1986 update of the six-year plan. Expenditures under this section are subject to the following conditions:
(a) No expenditure may be made without the prior allotment approval of the office of financial management.
(b) The office of financial management shall notify the senate and house ways and means committees prior to authorizing any project for implementation under this section.
(c) No project may be authorized under this section by the office of financial management unless sufficient funds are available to complete a project's design phase, construction phase, or both.
(d) Appropriations in this act for a capital project shall not be expended under this section unless:
(i) All contracts associated with the performance of the project have been completed and accepted by the state of Washington;
(ii) The statutory thirty-day lien period for each project has expired;
(iii) All claims of lien against project contracts have been satisfied;
(iv) There are no outstanding claims against the state of Washington by any contracted party to the project construction contract; and
(v) Any and all negotiated settlements or settlements arising from the findings of an arbitration board or court of jurisdiction have been satisfied.
NEW SECTION. Sec. 412. If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.
NEW SECTION. Sec. 413. This act is necessary for the immediate preservation of the public peace, health, and safety, the support of the state government and its existing public institutions, and shall take effect July 1, 1985.