FIFTY NINTH LEGISLATURE - REGULAR SESSION
NINETY FOURTH DAY
House Chamber, Olympia, Wednesday, April 13, 2005
The House was called to order at 10:00 a.m. by the Speaker (Representative Lovick presiding). The Clerk called the roll and a quorum was present.
The flag was escorted to the rostrum by a Sergeant at Arms Color Guard, Pages Whitney McCoy and Jose Fernandez. The Speaker (Representative Lovick presiding) led the Chamber in the Pledge of Allegiance. Prayer was offered by Reverend Mary Olney-Loyd, First Christian Church, Olympia.
Reading of the Journal of the previous day was dispensed with and it was ordered to stand approved.
MESSAGES FROM THE SENATE
April 12, 2005
Mr. Speaker:
The Senate has passed:
SUBSTITUTE HOUSE BILL NO. 1113,
SUBSTITUTE HOUSE BILL NO. 1208,
SUBSTITUTE HOUSE BILL NO. 1337,
SUBSTITUTE HOUSE BILL NO. 1661,
SUBSTITUTE HOUSE BILL NO. 1719,
ENGROSSED HOUSE BILL NO. 1917,
SUBSTITUTE HOUSE BILL NO. 2061,
ENGROSSED HOUSE BILL NO. 2254,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The Senate has passed:
SUBSTITUTE HOUSE BILL NO. 1460,
ENGROSSED SUBSTITUTE HOUSE BILL NO. 1607,
ENGROSSED HOUSE BILL NO. 2241,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The President has signed:
SUBSTITUTE SENATE BILL NO. 5463,
SUBSTITUTE SENATE BILL NO. 5552,
SUBSTITUTE SENATE BILL NO. 5644,
SUBSTITUTE SENATE BILL NO. 5953,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The President has signed HOUSE BILL NO. 1405, and the same is herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The President has signed SENATE JOINT MEMORIAL NO. 8014, and the same is herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The President has signed:
SECOND SUBSTITUTE SENATE BILL NO. 5056,
ENGROSSED SUBSTITUTE SENATE BILL NO. 5285,
SUBSTITUTE SENATE BILL NO. 5729,
SUBSTITUTE SENATE BILL NO. 6043,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The President has signed:
ENGROSSED SUBSTITUTE HOUSE BILL NO. 1079,
SUBSTITUTE HOUSE BILL NO. 1117,
SUBSTITUTE HOUSE BILL NO. 1196,
SUBSTITUTE HOUSE BILL NO. 1491,
SUBSTITUTE HOUSE BILL NO. 1747,
SUBSTITUTE HOUSE BILL NO. 1918,
SUBSTITUTE HOUSE BILL NO. 1945,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The President has signed:
ENGROSSED SUBSTITUTE HOUSE BILL NO. 1401,
SECOND SUBSTITUTE HOUSE BILL NO. 1542,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
April 12, 2005
Mr. Speaker:
The President has signed:
SUBSTITUTE HOUSE BILL NO. 1806,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
There being no objection, the House advanced to the sixth order of business.
SECOND READING
SUBSTITUTE SENATE BILL NO. 5101, By Senate Committee on Water, Energy & Environment (originally sponsored by Senators Poulsen, Morton, Fraser, Rockefeller, Pridemore, Regala, Hewitt, Kline, Kohl-Welles, Brown and Oke)
Providing incentives to support renewable energy.
The bill was read the second time.
On motion of Representative McIntire, the committee amendment by the Committee on Finance was before the House for purpose of amendments. (For committee amendment, see Journal, 85th Day, April 4, 2005.)
Representative Morris moved the adoption of amendment (487) to the committee amendment:
On page 2, line 30, after "property" insert "that is not interconnected to the electric distribution system"
On page 2, after line 31, insert the following:
"(2) When light and power businesses serving eighty percent of the total customer load in the state adopt uniform standards for interconnection to the electric distribution system, any individual, business, or local governmental entity, not in the light and power business or in the gas distribution business, may apply to the light and power business serving the situs of the system, each fiscal year, for an investment cost recovery incentive for each kilowatt-hour from a customer-generated electricity renewable energy system installed on its property that is not interconnected to the electric distribution system and from a customer-generated electricity renewable energy system installed on its property that is interconnected to the electric distribution system. Uniform standards for interconnection to the electric distribution system means those standards established by light and power businesses that have ninety percent of total requirements the same. No incentive may be paid for kilowatt-hours generated before July 1, 2005, or after June 30, 2014."
Renumber the remaining subsections consecutively and correct internal references accordingly.
On page 5, line 18, strike all of section 4.
Renumber the remaining sections consecutively and correct internal references accordingly.
Representatives Morris and Crouse spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
Representative McIntire moved the adoption of amendment (430) to the committee amendment:
On page 2 of the amendment, line 31, after "June 30," strike "2012" and insert "2014"
On page 6 of the amendment, line 11, beginning with "2013." strike all material through "2014" on line 11 and insert "2015. Credits may not be claimed after June 30, 2016"
Representatives McIntire and Crouse spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
Representative McIntire moved the adoption of amendment (478) to the committee amendment:
On page 2 of the amendment, line 32, after "submitting" insert "for the first time"
On page 6 of the amendment, line 3, after "section" insert "for the fiscal year"
Representatives McIntire and Crouse spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
Representative McIntire moved the adoption of amendment (479) to the committee amendment:
On page 4 of the amendment, line 20, after "amount." insert "Interest shall be assessed in the manner that the department assesses interest upon delinquent tax under RCW 82.32.050."
On page 6 of the amendment, line 10, after "(2)" insert "For any business that has claimed credit for amounts that exceed the correct amount of the incentive payable under section 3 of this act, the amount of tax against which credit was claimed for the excess payments shall be immediately due and payable. The department shall assess interest but not penalties on the taxes against which the credit was claimed. Interest shall be assessed at the rate provided for delinquent excise taxes under Chapter 82.32 RCW, retroactively to the date the credit was claimed, and shall accrue until the taxes against which the credit was claimed are repaid.
(3)"
Correct internal references accordingly
Representatives McIntire and Crouse spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
The committee amendment as amended was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives McIntire, Crouse and Morris spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 5101, as amended by the House.
MOTION
On motion of Representative Clements, Representatives Alexander and Condotta were excused.
ROLL CALL
The Clerk called the roll on the final passage of Substitute Senate Bill No. 5101, as amended by the House, and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Tom, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Alexander and Condotta - 2.
SUBSTITUTE SENATE BILL NO. 5101, as amended by the House, having received the necessary constitutional majority, was declared passed.
ENGROSSED SECOND SUBSTITUTE SENATE BILL NO. 5111, By Senate Committee on Ways & Means (originally sponsored by Senators Morton, Poulsen, Parlette, Roach, Schmidt, Oke, Hewitt, Zarelli, Finkbeiner, Stevens, Swecker, Deccio, Honeyford, Mulliken, Kline and Sheldon)
Providing tax incentives for solar energy systems.
The bill was read the second time.
On motion of Representative McIntire, the committee amendment by the Committee on Finance was before the House for purpose of amendments. (For committee amendment, see Journal, 85th Day, April 4, 2005.)
Representative Crouse moved the adoption of amendment (439) to the committee amendment:
On page 1, line 28, after "modules" insert ", or silicon components of such systems"
On page 2, line 6, after "modules" insert ", or silicon components of such systems,"
Representatives Crouse and McIntire spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
Representative Orcutt moved the adoption of amendment (438) to the committee amendment:
On page 2 of the amendment, line 3, after "rate of" strike "0.2904" and insert "0.138"
On page 2 of the amendment, line 9, after "rate of" strike "0.2904" and insert "0.138"
Representatives Orcutt and Orcutt (again) spoke in favor of the adoption of the amendment to the committee amendment.
Representatives McIntire and Morris spoke against the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was not adopted.
Representative McIntire moved the adoption of amendment (429) to the committee amendment:
On page 2 of the amendment, line 20, after "June 30," strike "2010" and insert "2014"
On page 5 of the amendment, line 7, after "December 1," strike "2009" and insert "2013"
Representatives McIntire and Crouse spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
The committee amendment as amended was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives McIntire, Orcutt and Morris spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Second Substitute Senate Bill No. 5111, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Second Substitute Senate Bill No. 5111, as amended by the House, and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Tom, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Alexander and Condotta - 2.
ENGROSSED SECOND SUBSTITUTE SENATE BILL NO. 5111, as amended by the House, having received the necessary constitutional majority, was declared passed.
ENGROSSED SECOND SUBSTITUTE SENATE BILL NO. 5454, By Senate Committee on Ways & Means (originally sponsored by Senators Hargrove, Kline, Delvin, Thibaudeau, Johnson, Shin, Stevens, Rockefeller and Kohl-Welles; by request of Board For Judicial Administration)
Revising trial court funding provisions.
The bill was read the second time.
On motion of Representative Lantz, the committee amendment by the Committee on Judiciary was adopted. (For committee amendment, see Journal, 85th Day, April 4, 2005.)
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Lantz, Priest and Kagi spoke in favor of passage of the bill.
Representative Ahern spoke against the passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Second Substitute Senate Bill No. 5454, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Second Substitute Senate Bill No. 5454, as amended by the House, and the bill passed the House by the following vote: Yeas - 87, Nays - 9, Absent - 0, Excused - 2.
Voting yea: Representatives Anderson, Appleton, Bailey, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Talcott, Tom, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 87.
Voting nay: Representatives Ahern, Armstrong, Blake, Dunn, Holmquist, Kretz, Moeller, Sump and Takko - 9.
Excused: Representatives Alexander and Condotta - 2.
ENGROSSED SECOND SUBSTITUTE SENATE BILL NO. 5454, as amended by the House, having received the necessary constitutional majority, was declared passed.
MESSAGE FROM THE SENATE
April 13, 2005
Mr. Speaker:
The Senate has passed:
SUBSTITUTE HOUSE BILL NO. 1197,
SUBSTITUTE HOUSE BILL NO. 1406,
ENGROSSED SUBSTITUTE HOUSE BILL NO. 1703,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
SECOND READING
SUBSTITUTE SENATE BILL NO. 5042, By Senate Committee on Judiciary (originally sponsored by Senator McCaslin)
Tolling the statute of limitations for felony sex offenses.
The bill was read the second time.
On motion of Representative O'Brien, the committee amendment by the Committee on Criminal Justice & Correction was adopted. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives O'Brien and Ahern spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 5042, as amended by the House.
MOTION
On motion of Representative Clements, Representatives Dunn and Tom were excused.
ROLL CALL
The Clerk called the roll on the final passage of Substitute Senate Bill No. 5042, as amended by the House, and the bill passed the House by the following vote: Yeas - 94, Nays - 1, Absent - 0, Excused - 3.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunshee, Eickmeyer, Ericks, Ericksen, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 94.
Voting nay: Representative Flannigan - 1.
Excused: Representatives Condotta, Dunn and Tom - 3.
SUBSTITUTE SENATE BILL NO. 5042, as amended by the House, having received the necessary constitutional majority, was declared passed.
SUBSTITUTE SENATE BILL NO. 5058, By Senate Committee on Transportation (originally sponsored by Senators Haugen, Swecker, Prentice, Jacobsen and Weinstein)
Modifying fuel tax payment requirements.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives Wallace and Woods spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 5058.
ROLL CALL
The Clerk called the roll on the final passage of Substitute Senate Bill No. 5058 and the bill passed the House by the following vote: Yeas - 95, Nays - 0, Absent - 0, Excused - 3.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 95.
Excused: Representatives Condotta, Dunn and Tom - 3.
SUBSTITUTE SENATE BILL NO. 5058, having received the necessary constitutional majority, was declared passed.
SENATE BILL NO. 5127, By Senators Kohl-Welles, Benton, Hargrove, Roach, Prentice, Thibaudeau, Stevens, Fraser and Keiser
Improving services to victims of human trafficking.
The bill was read the second time.
On motion of Representative O'Brien, the committee amendment by the Committee on Criminal Justice & Correction was adopted. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives O'Brien and Pearson spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5127, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5127, as amended by the House, and the bill passed the House by the following vote: Yeas - 95, Nays - 0, Absent - 0, Excused - 3.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 95.
Excused: Representatives Condotta, Dunn and Tom - 3.
SENATE BILL NO. 5127, as amended by the House, having received the necessary constitutional majority, was declared passed.
SUBSTITUTE SENATE BILL NO. 5242, By Senate Committee on Human Services & Corrections (originally sponsored by Senators Doumit, Brandland, Hargrove, Pridemore, Kohl-Welles and Rasmussen)
Changing penalties for possession of weapons by inmates.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives O'Brien and Pearson spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 5242.
ROLL CALL
The Clerk called the roll on the final passage of Substitute Senate Bill No. 5242 and the bill passed the House by the following vote: Yeas - 95, Nays - 0, Absent - 0, Excused - 3.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 95.
Excused: Representatives Condotta, Dunn and Tom - 3.
SUBSTITUTE SENATE BILL NO. 5242, having received the necessary constitutional majority, was declared passed.
SECOND SUBSTITUTE SENATE BILL NO. 5370, By Senate Committee on Ways & Means (originally sponsored by Senators Brown, Benson, Shin, Sheldon, Eide, Kohl-Welles and McAuliffe)
Creating the economic development strategic reserve account.
The bill was read the second time.
On motion of Representative Dunshee, the committee amendment by the Committee on Capital Budget was before the House for purpose of amendments. (For committee amendment, see Journal, 85th Day, April 4, 2005.)
With the consent of the House, amendment (424) was withdrawn.
Representative Jarrett moved the adoption of amendment (497) to the committee amendment:
On page 1, line 7 of the amendment, after "with the" strike "consent" and insert "approval"
On page 1, line 7 of the amendment, after "board" insert "and the Washington economic development finance authority"
On page 1, line 9 of the amendment, after "legislature." strike all material through "subject." on line 12
On page 1, line 13 of the amendment, after "board" insert "or the Washington economic development finance authority"
On page 2, after line 18 of the amendment, insert the following:
"(6) No more than three million dollars per year may be expended from the account for the purpose of assisting an individual business or facility pursuant to the authority specified in this section."
Representatives Jarrett and Dunshee spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representative Dunshee spoke in favor of passage of the bill.
Representatives Kristiansen, Orcutt, Kristiansen (again) and Shabro spoke against the passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Second Substitute Senate Bill No. 5370, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Second Substitute Senate Bill No. 5370, as amended by the House, and the bill passed the House by the following vote: Yeas - 60, Nays - 36, Absent - 0, Excused - 2.
Voting yea: Representatives Appleton, Blake, Campbell, Chase, Clements, Clibborn, Cody, Conway, Darneille, Dickerson, Dunshee, Eickmeyer, Ericks, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hudgins, Hunt, Hunter, Kagi, Kenney, Kessler, Kilmer, Kirby, Lantz, Linville, Lovick, McCoy, McDermott, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, O'Brien, Ormsby, Pettigrew, Quall, Roberts, Santos, Schual-Berke, Sells, Simpson, Skinner, Sommers, Springer, B. Sullivan, P. Sullivan, Takko, Upthegrove, Wallace, Williams, Wood and Mr. Speaker - 60.
Voting nay: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Buck, Buri, Chandler, Cox, Crouse, Curtis, DeBolt, Dunn, Ericksen, Hinkle, Holmquist, Jarrett, Kretz, Kristiansen, McCune, McDonald, Newhouse, Nixon, Orcutt, Pearson, Priest, Roach, Rodne, Schindler, Serben, Shabro, Strow, Sump, Talcott, Walsh and Woods - 36.
Excused: Representatives Condotta and Tom - 2.
SECOND SUBSTITUTE SENATE BILL NO. 5370, as amended by the House, having received the necessary constitutional majority, was declared passed.
SENATE BILL NO. 5254, By Senators Jacobsen, Rasmussen, Franklin, McAuliffe and Kohl-Welles
Creating the legislative youth advisory council.
The bill was read the second time.
With the consent of the House, amendments (420) and (476) were withdrawn.
Representative Green moved the adoption of the following amendment (518):
Strike everything after the enacting clause and insert the following:
"NEW SECTION. Sec. 1. A new section is added to chapter 28A.300 RCW to read as follows:
(1) The legislative youth advisory council is established to examine issues of importance to youth, including but not limited to education, employment, strategies to increase youth participation in state and municipal government, safe environments for youth, substance abuse, emotional and physical health, foster care, poverty, homelessness, and youth access to services on a statewide and municipal basis.
(2) The council consists of twenty-two members as provided in this subsection who, at the time of appointment, are aged fourteen to eighteen. The council shall select a chair from among its members.
(a) Five members shall be selected by each of the two major caucuses in the senate, appointed by the secretary of the senate.
(b) Five members shall be selected by each of the two major caucuses in the house of representatives, appointed by the chief clerk of the house of representatives.
(c) The governor shall appoint two members.
(3) Except for initial members, members shall serve two-year terms, and if eligible, may be reappointed for subsequent two-year terms. One-half of the initial members shall be appointed to one-year terms, and these appointments shall be made in such a way as to preserve overall representation on the committee.
(4) The council shall have the following duties:
(a) Advising the legislature on proposed and pending legislation, including state budget expenditures and policy matters relating to youth;
(b) Advising the standing committees of the legislature and study commissions, committees, and task forces regarding issues relating to youth;
(c) Conducting periodic seminars for its members regarding leadership, government, and the legislature; and
(d) Reporting annually by December 1 to the legislature on its activities, including proposed legislation that implements recommendations of the council.
(5) In carrying out its duties under subsection (4) of this section, the council may meet at least three times but not more than six times per year, including not more than two public hearings on issues of importance to youth.
(6) Members shall be reimbursed as provided in RCW 43.03.050 and 43.03.060.
(7) The office of superintendent of public instruction shall provide administration, coordination, and facilitation assistance to the council. The senate and house of representatives may provide policy and fiscal briefings and assistance with drafting proposed legislation. The senate and the house of representatives shall each develop internal policies relating to staff assistance provided to the council. Such policies may include applicable internal personnel and practices guidelines, resource use and expense reimbursement guidelines, and applicable ethics mandates. Provision of funds, resources, and staff, as well as the assignment and direction of staff, remains at all times within the sole discretion of the chamber making the provision.
(8) The office of superintendent of public instruction, the legislature, any agency of the legislature, and any official or employee of such office or agency are immune from liability for any injury that is incurred by or caused by a member of the youth advisory council and that occurs while the member of the council is performing duties of the council or is otherwise engaged in activities or receiving services for which reimbursement is allowed under subsection (6) of this section. The immunity provided by this subsection does not apply to an injury intentionally caused by the act or omission of an employee or official of the superintendent of public instruction or the legislature or any agency of the legislature.
(9) This section expires June 30, 2007."
Correct the title.
Representatives Green and Nixon spoke in favor of adoption of the amendment.
The amendment was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representative Green spoke in favor of passage of the bill.
Representative Nixon spoke against the passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5254, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5254, as amended by the House, and the bill passed the House by the following vote: Yeas - 53, Nays - 43, Absent - 0, Excused - 2.
Voting yea: Representatives Appleton, Blake, Campbell, Chase, Clibborn, Cody, Conway, Darneille, Dickerson, Dunshee, Eickmeyer, Ericks, Flannigan, Fromhold, Grant, Green, Haigh, Hasegawa, Hunt, Kagi, Kenney, Kessler, Kirby, Lantz, Linville, Lovick, McCoy, McDermott, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, O'Brien, Ormsby, Pettigrew, Quall, Roberts, Santos, Schual-Berke, Sells, Simpson, Sommers, Springer, B. Sullivan, P. Sullivan, Takko, Upthegrove, Wallace, Williams, Wood and Mr. Speaker - 53.
Voting nay: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Buck, Buri, Chandler, Clements, Cox, Crouse, Curtis, DeBolt, Dunn, Ericksen, Haler, Hankins, Hinkle, Holmquist, Hudgins, Hunter, Jarrett, Kilmer, Kretz, Kristiansen, McCune, McDonald, Newhouse, Nixon, Orcutt, Pearson, Priest, Roach, Rodne, Schindler, Serben, Shabro, Skinner, Strow, Sump, Talcott, Walsh and Woods - 43.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 5254, as amended by the House, having received the necessary constitutional majority, was declared passed.
SENATE BILL NO. 5340, By Senators Rasmussen, Roach, Shin, Jacobsen, Delvin, Carrell, Rockefeller, Fraser, Franklin, Kastama, Regala and Pridemore; by request of Military Department
Creating the military department capital account and rental and lease account.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives Dunshee and Jarrett spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5340.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5340 and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 5340, having received the necessary constitutional majority, was declared passed.
SENATE BILL NO. 5347, By Senators Keiser and Brandland; by request of Department of Social and Health Services
Requiring the department of social and health services to defend temporary managers in nursing homes.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives Lantz and Priest spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5347.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5347 and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 5347, having received the necessary constitutional majority, was declared passed.
SENATE BILL NO. 5461, By Senator Fairley
Changing limits on costs of incarceration charged to offenders.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives O'Brien and Pearson spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5461.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5461 and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 5461, having received the necessary constitutional majority, was declared passed.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5620, By Senate Committee on Government Operations & Elections (originally sponsored by Senators Kline, Mulliken, Pridemore, Kastama, Poulsen, Rockefeller, Fairley and Kohl-Welles)
Providing for priority consideration for lands used as buffers in planning.
The bill was read the second time.
On motion of Representative Simpson, the committee amendment by the Committee on Local Government was adopted. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Simpson and Schindler spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5620, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5620, as amended by the House, and the bill passed the House by the following vote: Yeas - 91, Nays - 5, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 91.
Voting nay: Representatives Chandler, Dunn, Hinkle, Holmquist and Newhouse - 5.
Excused: Representatives Condotta and Tom - 2.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5620, as amended by the House, having received the necessary constitutional majority, was declared passed.
ENGROSSED SENATE BILL NO. 6010, By Senator Fairley
Granting a right of return to employment to state employees who leave employment to serve in the Peace Corps. (REVISED FOR ENGROSSED: Granting a right of return to employment to state employees who leave employment to serve as Peace Corps or humanitarian organization volunteers or on faith-based missions.)
The bill was read the second time.
On motion of Representative Green, the committee amendment by the Committee on State Government Operations & Accountability was adopted. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representative Green spoke in favor of passage of the bill.
Representatives Cox, Nixon and Hinkle spoke against the passage of the bill.
There being no objection, the House deferred action on ENGROSSED SENATE BILL NO. 6010, and the bill held its place on the Third Reading.
SENATE BILL NO. 6012, By Senators Spanel, Oke, Weinstein, Esser and Rasmussen
Making transportation services an authorized purpose for parking and business improvement areas.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives Wallace, Woods, Murray and Wallace (again) spoke in favor of passage of the bill.
Representative Nixon spoke against the passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 6012.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 6012 and the bill passed the House by the following vote: Yeas - 64, Nays - 32, Absent - 0, Excused - 2.
Voting yea: Representatives Appleton, Blake, Buri, Campbell, Chase, Clibborn, Cody, Conway, Curtis, Darneille, Dickerson, Dunshee, Eickmeyer, Ericks, Flannigan, Fromhold, Grant, Green, Haigh, Hasegawa, Hinkle, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, O'Brien, Ormsby, Pettigrew, Priest, Quall, Roberts, Santos, Schual-Berke, Sells, Simpson, Sommers, Springer, B. Sullivan, P. Sullivan, Takko, Upthegrove, Wallace, Williams, Wood, Woods and Mr. Speaker - 64.
Voting nay: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Buck, Chandler, Clements, Cox, Crouse, DeBolt, Dunn, Ericksen, Haler, Hankins, Holmquist, Kretz, Kristiansen, McDonald, Nixon, Orcutt, Pearson, Roach, Rodne, Schindler, Serben, Shabro, Skinner, Strow, Sump, Talcott and Walsh - 32.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 6012, having received the necessary constitutional majority, was declared passed.
MESSAGES FROM THE SENATE
April 13, 2005
Mr. Speaker:
The Senate has passed:
SECOND SUBSTITUTE HOUSE BILL NO. 1050,
ENGROSSED SUBSTITUTE HOUSE BILL NO. 1475,
SUBSTITUTE HOUSE BILL NO. 1732,
SUBSTITUTE HOUSE BILL NO. 2225,
and the same are herewith transmitted.
Thomas Hoemann, Secretary
April 13, 2005
Mr. Speaker:
The Senate has passed SUBSTITUTE SENATE BILL NO. 5615, and the same is herewith transmitted.
Thomas Hoemann, Secretary
There being no objection, the House reverted to the fourth order of business.
INTRODUCTION & FIRST READING
HB 2316 by Representatives McIntire and Kenney
AN ACT Relating to generating revenue for higher education funding.
Referred to Committee on Finance.
HB 2317 by Representative McIntire
AN ACT Relating to revenue and taxation.
Referred to Committee on Finance.
HB 2318 by Representatives Hasegawa, Moeller, Ormsby, Dickerson, Sells, Pettigrew and Roberts
AN ACT Relating to taxation of unearned income; amending RCW 82.03.130 and 82.03.140; adding a new title to the Revised Code of Washington to be codified as Title 82A RCW; prescribing penalties; and providing an effective date.
Referred to Committee on Finance.
HB 2319 by Representative Darneille
AN ACT Relating to court operations; amending RCW 2.56.030, 43.08.250, 3.62.060, 4.12.090, 10.46.190, 12.12.030, 12.40.020, 26.12.240, 27.24.070, 36.18.012, 36.18.016, and 36.18.020; adding a new section to chapter 2.56 RCW; and adding a new section to chapter 3.62 RCW.
Referred to Committee on Rules.
HB 2320 by Representative Sommers
AN ACT Relating to transfers from certain treasury accounts; and amending RCW 43.72.900 and 69.50.520.
Referred to Committee on Appropriations.
There being no objection, the bills listed on the day's introduction sheet under the fourth order of business were referred to the committees so designated.
REPORTS OF STANDING COMMITTEES
April 12, 2005
HB 1027 Prime Sponsor, Representative Murray: Making 2005-07 transportation appropriations. Reported by Committee on Transportation
MAJORITY recommendation: The substitute bill be substituted therefor and the substitute bill do pass. Signed by Representatives Murray, Chairman; Woods, Ranking Minority Member; Skinner, Assistant Ranking Minority Member; Campbell; Curtis; Dickerson; Flannigan; Hankins; Hudgins; Jarrett; Lovick; Morris; Sells; Shabro; Simpson; B. Sullivan; Upthegrove and Wood.
MINORITY recommendation: Do not pass. Signed by Representatives Wallace, Vice Chairman; Appleton; Buck; Ericksen; Kilmer; Nixon; Rodne; Schindler and Takko.
Passed to Committee on Rules for second reading.
April 12, 2005
HB 2311 Prime Sponsor, Representative Murray: Authorizing bonds for transportation funding. Reported by Committee on Transportation
MAJORITY recommendation: The substitute bill be substituted therefor and the substitute bill do pass. Signed by Representatives Murray, Chairman; Woods, Ranking Minority Member; Skinner, Assistant Ranking Minority Member; Campbell; Curtis; Dickerson; Ericksen; Flannigan; Hankins; Hudgins; Jarrett; Lovick; Morris; Nixon; Sells; Shabro; Simpson; B. Sullivan; Upthegrove and Wood.
MINORITY recommendation: Do not pass. Signed by Representatives Wallace, Vice Chairman; Appleton; Buck; Kilmer; Rodne; Schindler and Takko.
Passed to Committee on Rules for second reading.
April 13, 2005
HB 2299 Prime Sponsor, Representative Dunshee: Issuing general obligation bonds. Reported by Committee on Capital Budget
MAJORITY recommendation: The substitute bill be substituted therefor and the substitute bill do pass. Signed by Representatives Dunshee, Chairman; Ormsby, Vice Chairman; Jarrett, Ranking Minority Member; Hankins, Assistant Ranking Minority Member; Blake; Chase; Cox; DeBolt; Eickmeyer; Ericks; Ericksen; Flannigan; Green; Hasegawa; Kretz; Lantz; McCune; Moeller; Morrell; Newhouse; O'Brien; Roach; Schual-Berke; Serben; Springer; Strow and Upthegrove.
MINORITY recommendation: Do not pass. Signed by Representatives Holmquist and Kristiansen.
Passed to Committee on Rules for second reading.
April 12, 2005
HB 2312 Prime Sponsor, Representative Murray: Providing funding and funding options for transportation projects. Reported by Committee on Transportation
MAJORITY recommendation: The substitute bill be substituted therefor and the substitute bill do pass. Signed by Representatives Murray, Chairman; Woods, Ranking Minority Member; Skinner, Assistant Ranking Minority Member; Campbell; Curtis; Dickerson; Flannigan; Hankins; Hudgins; Jarrett; Lovick; Morris; Sells; Shabro; Simpson; B. Sullivan; Upthegrove and Wood.
MINORITY recommendation: Do not pass. Signed by Representatives Wallace, Vice Chairman; Appleton; Buck; Ericksen; Kilmer; Nixon; Rodne; Schindler and Takko.
Passed to Committee on Rules for second reading.
April 12, 2005
ESB 6003 Prime Sponsor, Senator Jacobsen: Modifying the commute trip reduction tax credit. Reported by Committee on Transportation
MAJORITY recommendation: Do pass as amended.
Strike everything after the enacting clause and insert the following:
"Sec. 1. RCW 82.70.010 and 2003 c 364 s 1 are each amended to read as follows:
The definitions in this section apply throughout this chapter and RCW 70.94.996 unless the context clearly requires otherwise.
(1) "Public agency" means any county, city, or other local government agency or any state government agency, board, or commission.
(2) "Public transportation" means the same as "public transportation service" as defined in RCW 36.57A.010 and includes passenger services of the Washington state ferries.
(3) "Nonmotorized commuting" means commuting to and from the workplace by an employee by walking or running or by riding a bicycle or other device not powered by a motor.
(4) "Ride sharing" means the same as "flexible commuter ride sharing" as defined in RCW 46.74.010, including ride sharing on Washington state ferries.
(5) "Car sharing" means a membership program intended to offer an alternative to car ownership under which persons or entities that become members are permitted to use vehicles from a fleet on an hourly basis.
(6) "Telework" means a program where work functions that are normally performed at a traditional workplace are instead performed by an employee at his or her home at least one day a week for the purpose of reducing the number of trips to the employee's workplace.
(7) "Applicant" means a person applying for a tax credit under this chapter.
NEW SECTION. Sec. 2. A new section is added to chapter 82.70 RCW to read as follows:
(1) Application for tax credits under this chapter must be received by the department between the first day of January and the 31st day of January, following the calendar year in which the applicant made payments to or on behalf of employees for ride sharing in vehicles carrying two or more persons, for using public transportation, for using car sharing, or for using nonmotorized commuting. The application shall be made to the department in a form and manner prescribed by the department. The application shall contain information regarding the number of employees for which incentives are paid during the calendar year, the amounts paid to or on behalf of employees for ride sharing in vehicles carrying two or more persons, for using public transportation, for using car sharing, or for using nonmotorized commuting, the amount of credit deferred under RCW 82.70.040(2)(b)(i) to be used, and other information required by the department. For applications due by January 31, 2006, the application shall not include amounts paid from January 1, 2005, through June 30, 2005, to or on behalf of employees for ride sharing in vehicles carrying two or more persons, for using public transportation, for using car sharing, or for using nonmotorized commuting.
(2) The department shall rule on the application within sixty days of the deadline provided in subsection (1) of this section.
(3) The department shall disapprove any application not received by the deadline provided in subsection (1) of this section regardless of the reason that the application was received after the deadline.
(4) After an application is approved and tax credit granted, no increase in the credit shall be allowed.
Sec. 3. RCW 82.70.020 and 2003 c 364 s 2 are each amended to read as follows:
(1) Employers in this state who are taxable under chapter 82.04 or 82.16 RCW and provide financial incentives to their own or other employees for ride sharing, for using public transportation, for using car sharing, or for using nonmotorized commuting before July 1, 2013, are allowed a credit against taxes payable under chapters 82.04 and 82.16 RCW for amounts paid to or on behalf of employees for ride sharing in vehicles carrying two or more persons, for using public transportation, for using car sharing, or for using nonmotorized commuting, not to exceed sixty dollars per employee per fiscal year.
(2) Property managers who are taxable under chapter 82.04 or 82.16 RCW and provide financial incentives to persons employed at a worksite in this state managed by the property manager for ride sharing, for using public transportation, for using car sharing, or for using nonmotorized commuting before July 1, 2013, are allowed a credit against taxes payable under chapters 82.04 and 82.16 RCW for amounts paid to or on behalf of these persons for ride sharing in vehicles carrying two or more persons, for using public transportation, for using car sharing, or for using nonmotorized commuting, not to exceed sixty dollars per person per fiscal year.
(3) The credit under this section is equal to the amount paid to or on behalf of each employee multiplied by fifty percent, but may not exceed sixty dollars per employee per fiscal year. ((The credit may not exceed the amount of tax that would otherwise be due under chapters 82.04 and 82.16 RCW.)) No refunds may be granted for credits under this section.
(4) A person may not receive credit under this section for amounts paid to or on behalf of the same employee under both chapters 82.04 and 82.16 RCW.
(5) A person may not take a credit under this section for amounts claimed for credit by other persons.
Sec. 4. RCW 82.70.030 and 2003 c 364 s 3 are each amended to read as follows:
(((1) Application for tax credit under RCW 82.70.020 may only be made in the form and manner prescribed in rules adopted by the department.
(2) The credit under this section must be taken or deferred under RCW 82.70.040 against taxes due for the same fiscal year in which the amounts for which credit is claimed were paid to or on behalf of employees for ride sharing, for using public transportation, for using car sharing, or for using nonmotorized commuting and must be claimed by the due date of the last tax return for the fiscal year in which the payment is made.
(3))) Any person who knowingly makes a false statement of a material fact in the application required under section 2 of this act for a credit under RCW 82.70.020 is guilty of a gross misdemeanor.
Sec. 5. RCW 82.70.040 and 2003 c 364 s 4 are each amended to read as follows:
(1)(a) The department shall keep a running total of all credits ((accrued)) allowed under RCW 82.70.020 during each fiscal year. ((No person is eligible for tax credits under RCW 82.70.020 if the credits would cause the tabulation for the total amount of credits taken in any fiscal year)) The department shall not allow any credits that would cause the total amount allowed to exceed two million ((two)) seven hundred fifty thousand dollars in any fiscal year. This limitation includes any deferred credits carried forward under subsection (2)(b)(i) of this section from prior years.
(b) If the total amount of credit applied for by all applicants in any year exceeds the limit in this subsection, the department shall ratably reduce the amount of credit allowed for all applicants so that the limit in this subsection is not exceeded. If a credit is reduced under this subsection, the amount of the reduction may not be carried forward and claimed in subsequent fiscal years.
(2)(a) ((No person is eligible for)) Tax credits under RCW 82.70.020 may not be claimed in excess of the amount of tax ((that would)) otherwise ((be)) due under chapter 82.04 or 82.16 RCW.
(b)(i) Through June 30, 2005, a person with taxes equal to or in excess of the credit under RCW 82.70.020, and therefore not subject to the limitation in (a) of this subsection, may elect to defer tax credits for a period of not more than three years after the year in which the credits accrue. No credits deferred under this subsection (2)(b)(i) may be used after June 30, 2008. A person deferring tax credits under this subsection (2)(b)(i) must submit an application as provided in section 2 of this act in the year in which the deferred tax credits will be ((applied)) used. This application is subject to ((eligibility under)) the provisions of subsection (1) of this section for the ((fiscal)) year in which the tax credits will be applied. If a deferred credit is reduced under subsection (1)(b) of this section, the amount of deferred credit disallowed because of the reduction may be carried forward as long as the period of deferral does not exceed three years after the year in which the credit was earned.
(ii) For credits approved by the department after June 30, 2005, the approved credit may be carried forward to subsequent years until used. Credits carried forward as authorized by this subsection are subject to the limitation in subsection (1)(a) of this section for the fiscal year for which the credits were originally approved.
(3) No person ((is eligible)) shall be approved for tax credits under RCW 82.70.020 in excess of two hundred thousand dollars in any fiscal year. This limitation does not apply to credits ((deferred in)) carried forward from prior years under subsection (2)(b) of this section.
(4) No person ((is eligible for)) may claim tax credits((, including deferred credits authorized under subsection (2)(b) of this section,)) after June 30, 2013.
(5) Credits may not be carried forward ((or carried backward)) other than as authorized in subsection (2)(b) of this section.
(6) No person is eligible for tax credits under RCW 82.70.020 if the additional revenues for the multimodal transportation account created by Engrossed Substitute House Bill No. 2231 are terminated.
NEW SECTION. Sec. 6. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect July 1, 2005.
NEW SECTION. Sec. 7. If Senate Bill No. 6103, or substantially similar legislation, is not enacted by June 30, 2005, this act is null and void."
Signed by Representatives Murray, Chairman; Wallace, Vice Chairman; Woods, Ranking Minority Member; Skinner, Assistant Ranking Minority Member; Appleton; Buck; Campbell; Curtis; Dickerson; Ericksen; Flannigan; Hankins; Hudgins; Jarrett; Kilmer; Lovick; Morris; Nixon; Rodne; Schindler; Sells; Shabro; Simpson; B. Sullivan; Takko; Upthegrove and Wood.
Passed to Committee on Rules for second reading.
April 13, 2005
ESSB 6094 Prime Sponsor, Senate Committee On Ways & Means: Making appropriations and authorizing expenditures for capital improvements. Reported by Committee on Capital Budget
MAJORITY recommendation: Do pass as amended.
Strike everything after the enacting clause and insert the following:
"NEW SECTION. Sec. 1. A capital budget is hereby adopted and, subject to the provisions set forth in this act, the several dollar amounts hereinafter specified, or so much thereof as shall be sufficient to accomplish the purposes designated, are hereby appropriated and authorized to be incurred for capital projects during the period beginning with the effective date of this act and ending June 30, 2007, out of the several funds specified in this act.
PART 1
GENERAL GOVERNMENT
NEW SECTION. Sec. 101. FOR THE JOINT LEGISLATIVE AUDIT AND REVIEW COMMITTEE
Capital Budget Studies (04-1-950)
The appropriations in this section are subject to the following conditions and limitations: The appropriations in this section are provided solely to refresh preservation information that resides in the state's comparable framework for higher education buildings (report 03-1) including any necessary revisions and/or adjustments that will enable more direct translation of information, updates for last renewal or replacement of major systems, and quality assurance field sampling. In executing this continued capital study, the joint legislative audit and review committee shall consult the office of financial management and the higher education coordinating board about its workplan to ensure timely delivery of assembled facilities information and related capital models in an easy to understand format. As a general condition upon appropriations provided to higher education agencies in this act, the state board for community and technical colleges and each state baccalaureate institution shall provide requested facilities information in a timely manner to enable the joint legislative audit and review committee to complete the above task and oversight so assigned.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120,000
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $320,000
NEW SECTION. Sec. 102. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Rural Washington Loan Fund (88-2-002)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $558,000
Rural Washington Loan Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,522,235
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,080,235
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,570,132
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,650,367
NEW SECTION. Sec. 103. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Rural Washington Loan Fund (06-4-010)
Appropriation:
Rural Washington Loan Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,126,905
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,096,207
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,223,112
NEW SECTION. Sec. 104. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Program (00-2-007)
Reappropriation:
Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,792,784
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,907,216
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,700,000
NEW SECTION. Sec. 105. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Program (02-4-008)
Reappropriation:
Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,475,621
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,224,379
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,700,000
NEW SECTION. Sec. 106. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Account (04-4-002)
The reappropriations in this section are subject to the following conditions and limitations:
(1) Expenditures of the reappropriation must comply with RCW 70.119A.170.
(2)(a) The state building construction account reappropriation is provided solely to provide assistance to counties, cities, and special purpose districts to identify, acquire, and rehabilitate public water systems that have water quality problems or have been allowed to deteriorate to a point where public health is an issue. Eligibility is confined to applicants that already own at least one group A public water system and that demonstrate a track record of sound drinking water utility management. Funds may be used for: Planning, design, and other preconstruction activities; system acquisition; and capital construction costs.
(b) The state building construction account reappropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this reappropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to the appropriation in section 201, chapter 277, Laws of 2004.
Reappropriation:
Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,500,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,749,753
Drinking Water Assistance Repayment Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,200,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,449,753
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,247
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,700,000
NEW SECTION. Sec. 107. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water SRF - Authorization to Use Loan Repayments (04-4-010)
Reappropriation:
Drinking Water Assistance Repayment Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,200,000
NEW SECTION. Sec. 108. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Program (06-4-003)
Appropriation:
Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,100,000
Drinking Water Assistance Repayment Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $11,500,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $19,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$78,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$98,000,000
NEW SECTION. Sec. 109. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Water System Acquisition and Rehabilitation Program (06-4-850)
The appropriation in this section is subject to the following conditions and limitations: The appropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this appropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to this appropriation.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 110. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Building for the Arts (04-4-007)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation is subject to the provisions of RCW 43.63A.750.
(2) The reappropriation is subject to the project list in section 104, chapter 277, Laws of 2004.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,750,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,718,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,468,000
NEW SECTION. Sec. 111. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Building for the Arts (06-4-005)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of RCW 43.63A.750.
The following projects are eligible for funding:
Projects |
Location |
Recommendation |
African-American museum |
Seattle |
$700,000 |
McIntyre hall |
Mount Vernon |
$350,000 |
Northwest film forum |
Seattle |
$100,000 |
Historic Cooper school |
Seattle |
$500,000 |
Merc playhouse |
Twisp |
$6,000 |
Masquers theatre |
Soap Lake |
$145,000 |
Cornish College of the Arts |
Seattle |
$700,000 |
Dahmen barn workshop |
Uniontown |
$79,000 |
Roxy theatre |
Morton |
$75,000 |
Duwamish longhouse |
Seattle |
$65,000 |
Everett symphony |
Everett |
$215,000 |
Admiral theatre |
Bremerton |
$180,000 |
Pratt fine arts center |
Seattle |
$300,000 |
Arlington performing arts |
Arlington |
$375,000 |
Seattle Academy of Fine Art |
Seattle |
$35,000 |
Academy of children's theatre |
Richland |
$150,000 |
Empire theatre |
Tekoa |
$25,000 |
Children's museum |
Spokane |
$75,000 |
World kite museum |
Long Beach |
$115,000 |
McCaw hall |
Seattle |
$1,000,000 |
KidsQuest children's museum |
Bellevue |
$200,000 |
Total |
|
$4,690,000 |
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,390,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,390,000
NEW SECTION. Sec. 112. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Cancer Research Facility Grant (01-S-005)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation is provided as a grant for equipment and facilities improvements for a prostate cancer research project at the University of Washington medical center and must be matched by an equal amount from nonstate sources.
(2) The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $668,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,332,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 113. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Fox Theatre Project (01-S-006)
The reappropriation in this section is subject to the following conditions and limitations: The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,093,031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,406,969
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 114. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
West Central Community Center (01-S-016)
The reappropriation in this section is subject to the following conditions and limitations: The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $493,750
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $106,250
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
NEW SECTION. Sec. 115. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (04-4-001)
Reappropriation:
Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$66,200,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $416,200,000
NEW SECTION. Sec. 116. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (06-4-004)
Appropriation:
Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $288,900,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,400,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,688,900,000
NEW SECTION. Sec. 117. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Highline School District Aircraft Noise Mitigation (03-H-001)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section is subject to the Highline school district, the port of Seattle, and the federal aviation administration each matching the appropriation in section 150, chapter 26, Laws of 2003 1st sp. sess.
(2) This reappropriation does not commit the state to make future appropriations for this program.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,517,598
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,482,402
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,000,000
NEW SECTION. Sec. 118. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
City of Woodland Infrastructure Development (04-4-959)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
(2) The reappropriation is provided for allocation by the department to the city of Woodland for infrastructure development, including drainage improvements and a dike access road.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $262,451
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $37,549
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000
NEW SECTION. Sec. 119. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Economic Revitalization Board (04-4-008)
The reappropriation in this section is subject to the following conditions and limitations: A maximum of twenty-five percent of the appropriation in section 105, chapter 277, Laws of 2004 may be used for grants.
Reappropriation:
Public Facility Construction Loan Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $11,437,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $54,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,491,000
NEW SECTION. Sec. 120. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Economic Revitalization Board (CERB) (06-4-011)
The appropriation in this section is subject to the following conditions and limitations: A maximum of twenty-five percent of the appropriation may be used for grants.
Appropriation:
Public Facility Construction Loan Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $20,448,657
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$54,990,055
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$75,438,712
NEW SECTION. Sec. 121. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Services Facilities Program (04-4-006)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation is subject to the provisions of RCW 43.63A.125.
(2) The reappropriation is subject to the project list in section 128, chapter 26, Laws of 2003 1st sp. sess.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,131,280
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,931,280
NEW SECTION. Sec. 122. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Community Services Facilities Program (06-4-006)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of RCW 43.63A.125.
The following projects are eligible for funding:
Projects |
Location |
Recommendation |
Abused deaf women's advocacy services |
Seattle |
$400,000 |
YouthCare |
Seattle |
$350,000 |
Pike market senior center |
Seattle |
$310,000 |
Friends of gladish |
Pullman |
$25,000 |
FareStart |
Seattle |
$400,000 |
Denise Louie education center |
Seattle |
$400,000 |
Rural resources community action |
Newport |
$170,000 |
Jumping mouse children's center |
Port Townsend |
$45,000 |
Compass center |
Seattle |
$400,000 |
Neighborhood house |
Seattle |
$550,000 |
Behavioral health resources |
Olympia |
$400,000 |
Salvation Army Renton corp |
Renton |
$350,000 |
Metropolitan development council |
Tacoma |
$110,000 |
Lutheran community services |
SeaTac |
$200,000 |
Olympia childcare center |
Olympia |
$90,000 |
Kitsap Community Resources |
Bremerton |
$735,000 |
Northwest Youth Services |
Bellingham |
$200,000 |
Total |
|
$5,135,000 |
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,135,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,135,000
NEW SECTION. Sec. 123. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Greenbank Farm (04-4-950)
The reappropriation in this section is subject to the following conditions and limitations: The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $550,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $950,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 124. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing (04-4-003)
The reappropriation in this section is subject to the following conditions and limitations:
(1) $1,700,000 of the reappropriation is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.
(2) $700,000 of the reappropriation is provided solely for grants to nonprofit organizations and public housing authorities for revolving loan, self-help housing programs for low and moderate income families.
(3) $84,500 of the reappropriation is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.
(4) $600,000 of the reappropriation is provided solely for facilities housing low-income migrant, seasonal, or temporary farmworkers. It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342. The department shall work with the farmworker housing advisory committee to prioritize funding of projects to the areas of highest need. Funding may also be provided, to the extent qualified projects are submitted, for health and safety projects.
(5) $1,400,000 of the reappropriation is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children.
(6) Up to $1,000,000 of the reappropriation is provided solely to help capitalize a self-insurance risk pool for nonprofit corporations in Washington that develop housing units for low-income persons and families. The self-insurance risk pool shall be approved by the state risk manager. The self-insurance risk pool shall repay to the state the amount of the reappropriation provided to the risk pool under this section whenever the capitalization exceeds the minimum requirements established by the office of the risk manager. Any reappropriation authority not expended by June 30, 2007, shall lapse.
Reappropriation:
State Taxable Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $25,780,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$55,220,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$81,000,000
NEW SECTION. Sec. 125. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Housing Assistance, Weatherization, and Affordable Housing (06-4-001)
The appropriation in this section is subject to the following conditions and limitations:
(1) At least $9,000,000 of the appropriation is provided solely for weatherization administered through the energy matchmakers program.
(2) $5,000,000 of the appropriation is provided solely to promote development of safe and affordable housing units for persons eligible for services from the division of developmental disabilities within the department of social and health services.
(3) $2,500,000 of the appropriation is provided solely for grants to nonprofit organizations and public housing authorities for revolving loan, self-help housing programs for low and moderate income families.
(4) $1,000,000 of the appropriation is provided solely for shelters, transitional housing, or other housing facilities for victims of domestic violence.
(5) $5,000,000 of the appropriation is provided solely for the development of emergency shelters and transitional housing opportunities for homeless families with children.
(6) $8,000,000 of the appropriation is provided solely for facilities housing low-income migrant, seasonal, or temporary farmworkers. It is the intent of the legislature that operation of the facilities built under this section be in compliance with 8 U.S.C. Sec. 1342. The department shall work with the farmworker housing advisory committee to identify sufficient farmworker housing projects to support a goal of providing $16,000,000 for farmworker housing, and to prioritize funding of projects to the areas of highest need. Funding may also be provided, to the extent qualified projects are submitted, for health and safety projects.
(7) The appropriation in this section shall not be used for the administrative costs of the department. The amount of the appropriation shall be included in the calculation of annual funds available for determining the administrative costs authorized under RCW 43.185.050.
Appropriation:
State Taxable Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $320,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $420,000,000
NEW SECTION. Sec. 126. $2,500,000 of the state taxable building construction account--state appropriation in section 125 of this act is provided solely for on-farm infrastructure improvements that directly support the creation or preservation of housing for low-income migrant, seasonal, or temporary farmworkers. Future loan repayments shall be used for the same purpose as specified in this section.
NEW SECTION. Sec. 127. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Japanese-American Memorial (04-4-951)
The reappropriation in this section is subject to the following conditions and limitations: The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $475,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,025,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 128. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Lewis and Clark Confluence Project (04-2-954)
The reappropriation in this section is subject to the following conditions and limitations: The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,337,500
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $662,500
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 129. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Local/Community Projects (04-4-011)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department, except that the Highline historical society project is land acquisition.
(2) The reappropriation is subject to the project list in section 204, chapter 277, Laws of 2004.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,228,345
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,086,155
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,314,500
NEW SECTION. Sec. 130. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Local/Community Projects (06-4-008)
The appropriation in this section is subject to the following conditions and limitations:
(1) The projects must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
(2) Funding for the Inland Northwest Science and Technology Center shall be held in reserve until the balance of phase I funding has been secured or committed from local government and community sources.
(3) The Washington state arts commission shall design a plaque that shall be affixed to buildings or displayed as part of a project receiving any appropriation from this section. The plaque shall provide information to the public that the building or project has been made possible by the tax dollars of Washington citizens. The commission may contact the secretary of state to obtain approval for use of the Washington seal in the design of the plaque. The final design shall be approved by the chairs and ranking members of the house of representatives capital budget committee and the senate ways and means committee.
(4) The following projects are eligible for funding:
Projects |
|
Recommendation |
7th street theatre |
|
$600,000 |
Alder creek pioneer association carousel museum |
|
$450,000 |
Asian counseling and referral service |
|
$2,000,000 |
Bailey Gatzert children's play area |
|
$75,000 |
Bi-state habitat conservation funding plan |
|
$150,000 |
Bridge for kids |
|
$850,000 |
Brookside school ADA playground equipment |
|
$25,000 |
Buena library |
|
$50,000 |
Cannon house |
|
$250,000 |
Central area motivation program (CAMP) |
|
$250,000 |
Cesar Chavez park |
|
$150,000 |
Childhaven |
|
$150,000 |
Colman school |
|
$500,000 |
Columbia breaks fire interpretive center |
|
$150,000 |
Covington aquatics center phase 1 |
|
$350,000 |
Crossroads community center and park |
|
$250,000 |
Cutter theater |
|
$71,000 |
Des Moines beach park historic buildings |
|
$300,000 |
Discovery park |
|
$1,500,000 |
East Whatcom regional resource center |
|
$2,000,000 |
El Centro de la Raza |
|
$900,000 |
Filipino community center |
|
$200,000 |
Filipino cultural center of Kitsap county |
|
$250,000 |
Foster creek |
|
$150,000 |
Fox theater |
|
$1,325,000 |
Granite Falls museum expansion |
|
$50,000 |
Habitat park south hill |
|
$400,000 |
Hidden river environmental education center |
|
$50,000 |
HOP initiative |
|
$500,000 |
ICL education center |
|
$200,000 |
Japanese cultural and community center |
|
$200,000 |
Joe's creek project |
|
$856,000 |
Juanita creek channel and riparian restoration |
|
$500,000 |
Julia Butler Hansen home restoration |
|
$10,000 |
LeMay museum |
|
$1,000,000 |
LeRoi smelter smokestack monument |
|
$3,000 |
Lewis and Clark confluence project |
|
$1,500,000 |
McCaw hall |
|
$1,500,000 |
MOBIUS/Inland Northwest science and technology center |
|
$1,325,000 |
Mt. Vernon Jasper Gates Statue |
|
$12,000 |
Nathaniel Orr home site museum interpretive center |
|
$29,000 |
New Lakewood clinic |
|
$350,000 |
Northeast community center expansion |
|
$250,000 |
Northshore performing arts center |
|
$1,000,000 |
Northwest communities education center |
|
$1,000,000 |
Oak Harbor multi-purpose community and sports facility |
|
$50,000 |
Omak stampede |
|
$200,000 |
Pacific Northwest salmon center |
|
$1,000,000 |
Pacific science center |
|
$900,000 |
Performing arts center (PACE) |
|
$500,000 |
Puget Sound freight building warehouse--Thea Foss waterway |
|
$1,500,000 |
Relocation of Sieke Japanese gardens |
|
$250,000 |
River walk and Sammamish river restoration |
|
$200,000 |
Roslyn city hall |
|
$150,000 |
Ruth Dykeman children's center |
|
$27,000 |
Sandman historical tug restoration |
|
$10,000 |
Seward park environmental and audubon center |
|
$400,000 |
Snohomish senior center |
|
$150,000 |
Sno-Valley senior activity center kitchen |
|
$50,000 |
Sound way property preservation |
|
$500,000 |
Spokane river whitewater course |
|
$400,000 |
Synthetic sportsfield partnership at Robinswood park |
|
$400,000 |
Tall ships moorage |
|
$300,000 |
Tukwila kayak and canoe launching facility |
|
$20,000 |
Undeveloped woodlands linked to interurban nature trail |
|
$150,000 |
Vancouver museum |
|
$125,000 |
Vancouver national historical reserve west barracks |
|
$1,000,000 |
Veterans memorial museum |
|
$100,000 |
West Seattle community resource center |
|
$500,000 |
West central community center |
|
$500,000 |
West Hylebos wetlands boardwalk |
|
$100,000 |
Wilson playfield land acquisition |
|
$200,000 |
Wing Luke Asian art museum |
|
$1,500,000 |
Youth housing/drop-in center |
|
$400,000 |
Total |
|
$35,263,000 |
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,263,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,263,000
NEW SECTION. Sec. 131. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
PBS Digital Upgrade (04-4-958)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
(2) $345,625 is provided to public television station KYVE for the costs to convert to digital transmission capability and the upgrading and replacement of equipment, studio facilities, and contents.
(3) The remaining reappropriation is available for public television stations based outside central Puget Sound metropolitan areas.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $363,548
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $336,452
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
NEW SECTION. Sec. 132. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Washington State Games (04-4-850)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $97,597
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $102,403
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
NEW SECTION. Sec. 133. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Wing Luke Asian Art Museum (04-4-952)
The reappropriation in this section is subject to the following conditions and limitations: The project must comply with RCW 43.63A.125(2)(c) and other requirements for community projects administered by the department.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $316,202
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,183,798
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 134. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Yakima Ball Fields (04-2-952)
The reappropriation in this section is subject to the following conditions and limitations: $119,990 of the reappropriation is provided solely to Yakima Valley Community College for the purchase of Noel field from the city of Yakima, and $230,000 is provided solely to the city of Yakima to replace and relocate ballfields. It is intended that no funds be distributed to the city of Yakima until the transfer of the Noel field property is complete.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $346,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
NEW SECTION. Sec. 135. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Youth Recreational Facilities Program (06-4-007)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is subject to the provisions of RCW 43.63A.135.
The following projects are eligible for funding:
Projects |
Location |
Recommendation |
Clinton and Gloria John clubhouse |
Vancouver |
$300,000 |
Greenbridge youth and family center |
Seattle |
$300,000 |
Mount Angeles clubhouse remodel |
Port Angeles |
$40,000 |
Mukilteo family YMCA skate park |
Mukilteo |
$200,000 |
Girl scouts program center |
Spokane |
$300,000 |
Federal Way Ex3 teen center |
Federal Way |
$300,000 |
Granite Falls clubhouse renovation |
Granite Falls |
$120,000 |
Monroe teen center |
Monroe |
$100,000 |
Springwood youth center |
Kent |
$300,000 |
Lummi youth recreation |
Bellingham |
$40,000 |
H.O.P.E. center |
Gig Harbor |
$200,000 |
South Whidbey commons |
Langley |
$200,000 |
H.O.P.E. center |
Lakewood |
$500,000 |
Tumwater boys and girls club |
Tumwater |
$400,000 |
Total |
|
$3,300,000 |
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,300,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,300,000
NEW SECTION. Sec. 136. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Historic Courthouse Rehabilitation (06-4-009)
The appropriation in this section is subject to the following conditions and limitations:
(1) $9,550,000 of the appropriation is provided solely for courthouse protection and preservation, including character defining architectural features, general repairs, system upgrades, payments for renovations completed since January 1, 2003, and improvements to access and accommodations for persons with disabilities. The office of archaeology and historic preservation within the department of community, trade, and economic development shall administer the historic county courthouse grant program. By October 1, 2005, the department shall establish eligibility criteria and a grant application process. A historic courthouse advisory committee shall be established to review grant applications and make funding recommendations to the state historic preservation officer. All rehabilitation work shall comply with the secretary of interior's standards for rehabilitation. Grants shall not be used for expenditures for courthouse maintenance. Only counties with historic courthouses that continue to maintain county functions are eligible for grants. Counties receiving grants shall provide an equal amount of matching funds from public or private sources. The department shall minimize the amount of these funds that are utilized for program administration.
(2) $450,000 of the appropriation is provided solely for rehabilitation of the Jefferson county clock tower.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
NEW SECTION. Sec. 137. FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Job/Economic Development Grants (06-4-950)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is provided for job and community development projects under the provisions of chapter . . . (Engrossed Substitute House Bill No. 1903), Laws of 2005. If the bill is not enacted by June 30, 2005, the appropriation shall lapse.
(2) $1,000,000 of the public works assistance account--state appropriation for the Pacific Northwest national labs campus infrastructure project is provided solely for giga-pop infrastructure.
Projects |
|
Recommendation |
Agriculture innovation center |
|
$1,000,000 |
Bellingham waterfront restoration/farmers market |
|
$2,300,000 |
Bremerton Harborside |
|
$5,500,000 |
Burien town square |
|
$3,000,000 |
Carnation sewer |
|
$2,000,000 |
City of Covington |
|
$1,000,000 |
Infrastructure for Renton Boeing property |
|
$5,000,000 |
Pacific Northwest national labs campus infrastructure project |
|
$6,500,000 |
Port of Walla Walla wine incubator |
|
$1,000,000 |
Rainier court |
|
$1,900,000 |
Redevelop Snohomish riverfront |
|
$3,000,000 |
Ridgefield employment center project |
|
$1,500,000 |
Wine and culinary arts center in Prosser |
|
$3,000,000 |
Yakima town center restoration |
|
$4,000,000 |
Total |
|
$40,700,000 |
Appropriation:
Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $40,700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,700,000
NEW SECTION. Sec. 138. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
East Plaza Repairs (96-1-002)
Reappropriation:
State Vehicle Parking Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,567,200
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$41,567,200
NEW SECTION. Sec. 139. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Legislative Building: Rehabilitation and Capital Addition (01-1-008)
Reappropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$106,280,442
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $106,380,442
NEW SECTION. Sec. 140. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Cherberg Building: Rehabilitation (02-1-005)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is for the purpose of furthering the John A. Cherberg building rehabilitation project, including but not limited to the following: Project final design and initial phase of reconstruction; purchase and remodel of the two modular buildings currently owned by the Legislative building rehabilitation project; and remodel of a portion of the Joel M. Pritchard building for use as swing space during reconstruction.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,100,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,940,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,540,000
NEW SECTION. Sec. 141. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor Works - Infrastructure Preservation: Capital Campus (04-1-003)
The reappropriation in this section is subject to the following conditions and limitations: This reappropriation shall not be used for studies.
Reappropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,350,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,100,000
NEW SECTION. Sec. 142. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Minor Works - Facility Preservation: Statewide (04-1-004)
Reappropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,345,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,545,000
NEW SECTION. Sec. 143. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Historic Buildings - Exterior Preservation (04-1-012)
The reappropriation in this section is subject to the following conditions and limitations: This reappropriation is for the sole purpose of capital projects on the capitol campus that correct immediate restoration deficiencies. It does not include survey, planning, or interior work.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,225,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,475,000
NEW SECTION. Sec. 144. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Transportation Building Preservation (02-1-008)
Appropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,190,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,939,116
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,818,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,947,116
NEW SECTION. Sec. 145. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Legislative Building Security (04-2-950)
Reappropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $60,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,119,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,179,000
NEW SECTION. Sec. 146. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Emergency Repairs (06-1-001)
The appropriation in this section is subject to the following conditions and limitations: The appropriation shall only be used for unanticipated building or infrastructure repairs necessary for the protection of capital assets and protection of health or safety.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000
General Administration Service Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,400,000
NEW SECTION. Sec. 147. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Infrastructure Projects - Savings (06-1-008)
The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
NEW SECTION. Sec. 148. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Engineering and Architectural Services (06-2-012)
The appropriations in this section are subject to the following conditions and limitations:
(1) The appropriations shall be used to provide project management services to state agencies as required by RCW 43.19.450 that are essential and mandated activities defined as core services and are included in the engineering and architectural services' responsibilities and task list for general public works projects of normal complexity. The general public works projects included are all those financed by the state capital budget for the biennium ending June 30, 2007, with individual total project values up to $20,000,000.
(2) The community and technical capital projects account shall be used to provide services to six community and technical colleges projects that require separate reimbursable project management agreements.
(3) The department may negotiate agreements with agencies for additional fees to manage projects financed by financial contracts, other alternative financing, projects with a total value greater than $20,000,000, or for the nonstate funded portion of projects with mixed funding sources.
(4) The department shall review each community and technical college request and the requests of other client agencies for funding any project over $2,500,000 for inclusion in the 2006 supplemental capital budget and the 2007-09 capital budget to ensure that the amount requested by the agency is appropriate for predesign, design, and construction, depending on the phase of the project being requested. The department shall pay particular attention: (a) That the budgeted amount requested is at an appropriate level for the various components that make up the cost of the project such as project management; and (b) that standard measurements such as cost per square foot are reasonable. The department shall also assist the office of financial management with review of other agency projects as requested.
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$145,000
State Vehicle Parking Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $132,815
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,216,771
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,723,892
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $461,307
General Administration Service Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $103,839
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $11,783,624
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$43,464,100
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$55,247,724
NEW SECTION. Sec. 149. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
General Administration Building Rehabilitation (06-1-002)
Appropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$65,500,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$65,900,000
NEW SECTION. Sec. 150. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Highway-License Building Repair and Renewal (06-1-013)
Appropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $925,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,600,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,525,000
NEW SECTION. Sec. 151. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Natural Resources Building Repairs and Renewal (06-1-014)
Appropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $502,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,950,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,452,000
NEW SECTION. Sec. 152. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Statewide Infrastructure: Preservation Minor Works (06-1-004)
Appropriation:
State Vehicle Parking Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $34,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,463,000
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,033,600
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,530,600
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,585,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,115,600
NEW SECTION. Sec. 153. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Statewide Office Facilities: Preservation Minor Works (06-1-003)
Appropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,965,000
General Administration Service Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,850,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,815,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,239,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,054,000
NEW SECTION. Sec. 154. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Statewide Parking Facilities: Preservation Minor Works (06-1-007)
Appropriation:
State Vehicle Parking Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $880,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,585,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,465,000
NEW SECTION. Sec. 155. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Capitol Public/Historic Facilities: Preservation Minor Works (06-1-006)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,204,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,270,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,474,000
NEW SECTION. Sec. 156. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Heritage Park Complete Development (01-H-004)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,535,774
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,135,774
NEW SECTION. Sec. 157. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
State Capitol Campus Master Plan and Campus Predesigns (06-2-850)
The appropriations in this section are subject to the following conditions and limitations:
(1) The appropriations in this section are contingent upon the enactment of chapter . . . (Engrossed Substitute House Bill No. 1301), Laws of 2005. If the bill is not enacted by June 30, 2005, the entire appropriation in this section shall lapse.
(2) $200,000 of the general administration services account--state appropriation is provided solely for completion of the capitol campus master plan. The department shall develop the master plan in consultation with the state capitol committee and the legislative buildings committee created in chapter . . . (Engrossed Substitute House Bill No. 1301), Laws of 2005.
(3) $140,000 of the archives and records account--state appropriation is provided solely for the secretary of state to conduct a predesign that explores alternatives for the Washington state library and the state archives in Thurston county. The predesign shall include a full range of alternatives for the state library and the state archives, including the feasibility and cost implications of relocating the state library back into the Pritchard building.
(4) $350,000 of the general administration services account--state appropriation is provided solely for a predesign and associated studies for a new executive office building on the capitol campus.
(5) The predesigns in this section are subject to review and approval by the office of financial management in accordance with section 903 of this act.
(6) The predesigns in this section shall be consistent with the master plan developed under subsection (2) of this section.
Appropriation:
Archives and Records Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $140,000
General Administration Services Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$550,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$690,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $690,000
NEW SECTION. Sec. 158. FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Legislative Building Omnibus (06-1-005)
The appropriations in this section are subject to the following conditions and limitations: The department will assist in the relocation of the statute law committee offices from the legislative building to the Pritchard building. The vacated space is intended for additional offices for the house of representatives.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,317,000
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $878,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,195,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,195,000
NEW SECTION. Sec. 159. FOR THE MILITARY DEPARTMENT
Bremerton Readiness Center (02-2-004)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the conditions and limitations in section 183, chapter 8, Laws of 2001 2nd sp. sess.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,023,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,823,000
NEW SECTION. Sec. 160. FOR THE MILITARY DEPARTMENT
Construct Spokane Readiness Center (04-2-003)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,800,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,300,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,468,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,568,000
NEW SECTION. Sec. 161. FOR THE MILITARY DEPARTMENT
Omnibus Support to Federal Preservation Projects (04-1-003)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,300,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,100,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,548,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,948,000
NEW SECTION. Sec. 162. FOR THE MILITARY DEPARTMENT
Preservation Projects - Statewide (04-1-001)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is to correct deficiencies to state-owned facilities and does not include parking lot repairs or paving.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $513,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,113,000
NEW SECTION. Sec. 163. FOR THE MILITARY DEPARTMENT
Alteration of Building No. 2, Camp Murray (05-1-001)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $140,000
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,260,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,400,000
NEW SECTION. Sec. 164. FOR THE MILITARY DEPARTMENT
Courseware Development Support Facility (05-2-002)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $138,000
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,237,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,375,000
NEW SECTION. Sec. 165. FOR THE MILITARY DEPARTMENT
Design and Construct Olympia Area Readiness Center (06-2-002)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is for a predesign to develop alternatives for the consolidation of the Olympia and Centralia readiness centers.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,062,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,312,000
NEW SECTION. Sec. 166. FOR THE MILITARY DEPARTMENT
Auditorium and Instructor Support Facility (06-2-003)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,390,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,390,000
NEW SECTION. Sec. 167. FOR THE MILITARY DEPARTMENT
Infrastructure Projects-Savings (06-1-022)
The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
NEW SECTION. Sec. 168. FOR THE MILITARY DEPARTMENT
Kent Readiness Center Preservation (06-1-001)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $386,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,136,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,136,000
NEW SECTION. Sec. 169. FOR THE MILITARY DEPARTMENT
National Guard Headquarter's Building Preservation (06-1-002)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $643,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $643,000
NEW SECTION. Sec. 170. FOR THE MILITARY DEPARTMENT
Omnibus Preservation Projects - Statewide (06-1-003)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,723,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,723,000
NEW SECTION. Sec. 171. FOR THE MILITARY DEPARTMENT
Omnibus Support for Federal Minor Works Projects - Statewide (06-2-001)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,851,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,142,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $18,993,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$77,571,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$96,564,000
NEW SECTION. Sec. 172. FOR THE STATE CONVENTION AND TRADE CENTER
Minor Works: Facility Preservation (06-1-001)
Appropriation:
State Convention and Trade Center Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,770,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,770,000
PART 2
HUMAN SERVICES
NEW SECTION. Sec. 201. FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
School Mapping (06-1-100)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the initial mapping of schools and production of software and may not be used to supplant any local government's existing school or other building mapping program that can transfer data to a statewide first responder building mapping information system. The criminal justice training commission shall work with the office of the superintendent of public instruction to ensure school mapping is part of newly constructed or renovated construction projects and shall develop policies and procedures to ensure efficient use and implementation of such procedures.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 202. FOR THE CRIMINAL JUSTICE TRAINING COMMISSION
Washington State Criminal Justice Training Commission Omnibus Minor Works (06-1-003)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 203. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES Echo Glen Children's Center - Site: Infrastructure Improvements (96-2-229)
Reappropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$925,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $830,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,755,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,654,300
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,409,300
NEW SECTION. Sec. 204. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Green Hill School: New IMU, Health Center, and Administration (06-2-202)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,250,000
NEW SECTION. Sec. 205. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Juvenile Rehabilitation - Acute Mental Health Unit: New Facilities (04-2-203)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,400,000
NEW SECTION. Sec. 206. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital: Legal Offender Unit (98-2-052)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$50,794,341
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$51,294,341
NEW SECTION. Sec. 207. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Child Study and Treatment Center - Cottages: Modifications, Phase 3 (00-1-015)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,800,000
NEW SECTION. Sec. 208. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Echo Glen Children's Center - Eleven Cottages: Renovation (00-1-041)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,605,495
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,100,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,205,495
NEW SECTION. Sec. 209. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Special Commitment Center - Secure Facility: Construction, Phase 3 (00-2-001)
The reappropriation in this section is subject to the following conditions and limitations: To the extent that the department projects savings and efficiencies through design or scope changes, funds reappropriated in this section may be transferred to minor works-health, safety, and code requirements (project No. 06-1-111) for expenditure for minor works projects.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,359,008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,559,008
NEW SECTION. Sec. 210. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mental Health: Omnibus Programmatic Projects (04-2-365)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $450,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
NEW SECTION. Sec. 211. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Omnibus Preservation: Facility Preservation (04-1-112)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 212. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Omnibus Preservation: Health, Safety, and Code Requirements (04-1-111)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 213. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Omnibus Preservation: Infrastructure Preservation (04-1-113)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 214. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Rainier School - Wastewater Treatment Plant: Construction (Buckley) (04-1-950)
Reappropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$60,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $190,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,350,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,600,000
NEW SECTION. Sec. 215. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Residential Habilitation Center Consolidation (04-1-958)
Reappropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,100,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,900,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 216. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Special Commitment Center - Regional Secure Community Transition Facility: New 12 Bed Facility (04-2-502)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,700,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 217. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Emergency and Unanticipated Repair Projects (04-1-116)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
NEW SECTION. Sec. 218. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Developmental Disabilities: Omnibus Programmatic Projects (06-2-465)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 219. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Capital Project Management (06-1-110)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,100,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,350,000
NEW SECTION. Sec. 220. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Eastern State Hospital - Westlake Building: Fire Alarm Upgrade (06-1-370)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,650,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,650,000
NEW SECTION. Sec. 221. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Fircrest School - Health and Safety Improvements (06-1-852)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
NEW SECTION. Sec. 222. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Juvenile Rehabilitation: Omnibus Programmatic Projects (06-2-265)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 223. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Lakeland Village - Nine Cottages: Renovation, Phase 4, 5, and 6 (06-1-402)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,100,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500,000
NEW SECTION. Sec. 224. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES Mental Health Division - Clark County: Center for Community Health (06-4-351)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 225. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mental Health Division - CLIP Facilities: Preservation (06-4-353)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,300,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,300,000
NEW SECTION. Sec. 226. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mental Health Division - Highline Mental Health: Preservation (06-4-313)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$50,000
NEW SECTION. Sec. 227. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mental Health Division - North Sound Evaluation and Treatment: Air Conditioning (06-4-356)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,000
NEW SECTION. Sec. 228. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mental Health Division - Eastern Washington: Evaluation and Treatment (06-4-352)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 229. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Mental Health: Omnibus Programmatic Projects (06-2-365)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 230. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Omnibus Preservation: Facility Preservation (06-1-112)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 231. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Omnibus Preservation: Health, Safety and Code Requirements (06-1-111)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 232. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Omnibus Preservation: Infrastructure Preservation (06-1-113)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 233. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Project Savings: Infrastructure and Preservation Projects (06-1-114)
The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
NEW SECTION. Sec. 234. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Emergency and Unanticipated Repair Projects (06-1-101)
The appropriation in this section is subject to the following conditions and limitations: The appropriation shall only be used for unanticipated building or infrastructure repairs necessary for the protection of capital assets or protection of health or safety.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,600,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,400,000
NEW SECTION. Sec. 235. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Facilities Assessment and Preservation Planning, Phase 2 (06-1-120)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$300,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
NEW SECTION. Sec. 236. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Statewide: Hazards Abatement and Demolition (06-1-119)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,300,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,700,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,000,000
NEW SECTION. Sec. 237. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Western State Hospital - Laundry: New Construction (06-3-325)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely to assess the feasibility of constructing a new western state hospital laundry using certificates of participation. The feasibility analysis shall include, but not be limited to, the following:
(1) An assessment of the feasibility and costs for remodeling the existing building versus new construction;
(2) An assessment of what facilities and equipment would be required to process the laundry for western state hospital, Rainier school, and Francis Haddon Morgan center;
(3) An assessment of other potential clients to western state hospital laundry operations; and
(4) An assessment of the region for the processing of western state hospital, Rainier school, and Francis Haddon Morgan center laundry including private vendors, nonprofit vendors, the department of corrections, or others.
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 238. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Pediatric Interim Care Newborn Nursery (06-4-951)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $617,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $617,000
NEW SECTION. Sec. 239. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Cliff Bailey Center (06-4-952)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $225,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $225,000
NEW SECTION. Sec. 240. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Washington Information Network 2-1-1 (06-2-850)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 241. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Juvenile Rehabilitation Administration Strategic Facilities Study (06-2-851)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for the development of a strategic facilities plan, based on data from the caseload forecast council and the September 2004 juvenile rehabilitation master plan, which considers the strategic direction of the juvenile rehabilitation administration and its changing demographics. In developing the plan, the appropriateness of the location of facilities, both in terms of community impacts and the value of the location in program function, should be considered as well as the capital, opportunity, and operational costs of consolidated or alternative facilities. The department of social and health services shall report to the fiscal committees of the legislature no later than November 1, 2005.
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 242. FOR THE DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Special Commitment Center on McNeil Island: Additional Capacity (06-2-505)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,500,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,600,000
NEW SECTION. Sec. 243. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Biosafety Level 3 Facility (02-2-001)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for a comprehensive predesign exploring all alternatives for a biosafety level 3 facility and central receiving area. The agency shall also explore the feasibility of collaboration and colocation with the University of Washington's proposed bioresearch laboratory. The predesign is subject to review and approval by the office of financial management in accordance with section 903 of this act.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $101,485
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $301,485
NEW SECTION. Sec. 244. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Chiller Plant Upgrade (02-1-004)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,040,000
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $315,142
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,855,142
NEW SECTION. Sec. 245. FOR THE DEPARTMENT OF HEALTH
Drinking Water Assistance Program (04-4-003)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for an interagency agreement with the department of community, trade, and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.
Reappropriation:
Drinking Water Assistance Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$29,820,094
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,401,906
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$46,222,000
NEW SECTION. Sec. 246. FOR THE DEPARTMENT OF HEALTH
Drinking Water Assistance Program (06-4-001)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for an interagency agreement with the department of community, trade and economic development to make, in cooperation with the public works board, loans to local governments and public water systems for projects and activities to protect and improve the state's drinking water facilities and resources.
Appropriation:
Drinking Water Assistance Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,122,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $112,488,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $140,610,000
NEW SECTION. Sec. 247. FOR THE DEPARTMENT OF HEALTH
Public Health Laboratory: Roof Replacement (06-1-002)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,625,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,625,000
NEW SECTION. Sec. 248. FOR THE DEPARTMENT OF VETERANS AFFAIRS
240 Bed Nursing Facility (02-2-008)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,670,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,170,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$46,730,700
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$48,900,700
NEW SECTION. Sec. 249. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Spokane Veterans Home Kitchen (04-2-004)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $753,830
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $953,830
NEW SECTION. Sec. 250. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Emergency Funds (06-1-006)
The appropriation in this section is subject to the following conditions and limitations: The appropriation shall only be used for unanticipated building or infrastructure repairs necessary for the protection of capital assets or protection of health or safety.
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,500,000
NEW SECTION. Sec. 251. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Infrastructure Projects - Savings (06-1-001)
The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
NEW SECTION. Sec. 252. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Minor Works Health, Safety, Code Requirements (06-1-007)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$120,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120,000
NEW SECTION. Sec. 253. FOR THE DEPARTMENT OF VETERANS AFFAIRS
Minor Works Infrastructure Preservation (06-1-002)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$55,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $816,912
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $871,912
NEW SECTION. Sec. 254. FOR THE DEPARTMENT OF CORRECTIONS
Coyote Ridge Corrections Center: Expansion (98-2-011)
The appropriations in this section are subject to the following conditions and limitations: The appropriations are provided solely for the development of a request for proposal and the selection and management of a proposer to, at a minimum, design and construct a medium/hybrid security prison at Coyote Ridge corrections center in Connell, Washington.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $921,140
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,070,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $986,347
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,977,487
NEW SECTION. Sec. 255. FOR THE DEPARTMENT OF CORRECTIONS
Correctional Industries Space (98-2-005)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,549,994
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,250,006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,800,000
NEW SECTION. Sec. 256. FOR THE DEPARTMENT OF CORRECTIONS
Violent Offender/Truth in Sentencing Grant Administration (99-2-004)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $66,667
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,333
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $505,993
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $580,993
NEW SECTION. Sec. 257. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: 100-Bed Management and Segregation Unit (00-2-008)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $819,229
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,674,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,493,229
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,944,803
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$39,438,032
NEW SECTION. Sec. 258. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Replace Electrical Supply System (02-1-024)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $425,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,878,715
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,303,715
NEW SECTION. Sec. 259. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Replace Sanitary/Domestic Water Lines (02-1-026)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $925,000
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,962,235
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,457,167
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,344,402
NEW SECTION. Sec. 260. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center: Replace Submarine Electric Power Cable (04-1-006)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,200,000
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,856,331
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,702,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,758,331
NEW SECTION. Sec. 261. FOR THE DEPARTMENT OF CORRECTIONS
Omnibus Preservation: Facility Preservation (Minor Works) (04-1-001)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,852,961
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,052,961
NEW SECTION. Sec. 262. FOR THE DEPARTMENT OF CORRECTIONS
Omnibus Preservation: Health, Safety, and Code (04-1-021)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,250,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,750,000
NEW SECTION. Sec. 263. FOR THE DEPARTMENT OF CORRECTIONS
Omnibus Preservation: Infrastructure Preservation (Minor Works) (04-1-003)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 264. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Regional Infrastructure (04-2-008)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,593,000
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,196,001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $57,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,846,001
NEW SECTION. Sec. 265. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Convert BAR Units from Medium to Close Custody (04-2-004)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,209,202
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,809,202
NEW SECTION. Sec. 266. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: North Close Security Compound (04-2-005)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$124,000,000
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,818,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,940,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $140,758,000
NEW SECTION. Sec. 267. FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay Corrections Center: Replace Support Building Roof (06-1-044)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,752,053
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,752,053
NEW SECTION. Sec. 268. FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay Corrections Center: Replace Water Tanks (06-1-003)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,501,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,501,000
NEW SECTION. Sec. 269. FOR THE DEPARTMENT OF CORRECTIONS
Clallam Bay Corrections Center: Install Close Custody Slider Doors (06-2-070)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,500,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,600,000
NEW SECTION. Sec. 270. FOR THE DEPARTMENT OF CORRECTIONS
Monroe Corrections Center: Improve C and D Units Security Features (06-1-046)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,898,269
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,898,269
NEW SECTION. Sec. 271. FOR THE DEPARTMENT OF CORRECTIONS
McNeil Island Corrections Center: Predesign/Design Replace/Stabilize Housing Unit Siding (06-1-005)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $794,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,214,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,008,000
NEW SECTION. Sec. 272. FOR THE DEPARTMENT OF CORRECTIONS
Mission Creek: Add 120 Beds (06-2-017)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,425,184
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,425,184
NEW SECTION. Sec. 273. FOR THE DEPARTMENT OF CORRECTIONS
Omnibus Preservation: Facility Preservation (Minor Works) (06-1-035)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,833,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,200,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,033,000
NEW SECTION. Sec. 274. FOR THE DEPARTMENT OF CORRECTIONS Omnibus Preservation: Health, Safety, and Code (Minor Works) (06-1-027)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,054,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,154,000
NEW SECTION. Sec. 275. FOR THE DEPARTMENT OF CORRECTIONS
Omnibus Preservation: Infrastructure Preservation (Minor Works) (06-1-025)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,826,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,800,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,626,000
NEW SECTION. Sec. 276. FOR THE DEPARTMENT OF CORRECTIONS
Omnibus Program: Programmatic Projects (Minor Works) (06-2-033)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,915,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,915,000
NEW SECTION. Sec. 277. FOR THE DEPARTMENT OF CORRECTIONS
Stafford Creek Corrections Center: Correct Security Deficiencies (06-1-013)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,593,266
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,593,266
NEW SECTION. Sec. 278. FOR THE DEPARTMENT OF CORRECTIONS
Emergency Projects (06-1-036)
The appropriations in this section are subject to the following conditions and limitations: The appropriations shall only be used for unanticipated building or infrastructure repairs necessary for the protection of capital assets or protection of health or safety.
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$900,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,600,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
NEW SECTION. Sec. 279. FOR THE DEPARTMENT OF CORRECTIONS
Infrastructure Projects - Savings (06-1-001)
The appropriation in this section is subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
NEW SECTION. Sec. 280. FOR THE DEPARTMENT OF CORRECTIONS
Statewide: Inflow and Infiltration Analysis (06-2-034)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 281. FOR THE DEPARTMENT OF CORRECTIONS
Statewide: Seismic Study (06-1-039)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 282. FOR THE DEPARTMENT OF CORRECTIONS
Class II/Class III Offender Work Program Master Plan (06-2-075)
Appropriation:
Charitable, Educational, Penal, and Reformatory
Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$150,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
NEW SECTION. Sec. 283. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Predesign/Design Health Care Facility Remodel (06-2-072)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,834,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,034,000
NEW SECTION. Sec. 284. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center: Replace G Building Roof (06-1-077)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,776,477
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,776,477
NEW SECTION. Sec. 285. FOR THE DEPARTMENT OF CORRECTIONS
Washington Corrections Center for Women: Predesign/Design Replace Steamlines (06-1-018)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,016,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,016,000
NEW SECTION. Sec. 286. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Design South Close Security Complex (06-2-021)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$54,917,295
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$58,917,295
NEW SECTION. Sec. 287. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Replace 6 Wing Roof (06-1-009)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,096,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,096,000
NEW SECTION. Sec. 288. FOR THE DEPARTMENT OF CORRECTIONS
Washington State Penitentiary: Replace Correctional Industries Roof (06-1-023)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,772,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,772,000
NEW SECTION. Sec. 289. FOR THE EMPLOYMENT SECURITY DEPARTMENT
Employment Resource Center (05-2-001)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is to purchase and install state of the art equipment for a 40,000 square foot facility supporting work force development programs using funds available to the state in section 903(d) of the Social Security Act (Reed act).
Reappropriation:
Unemployment Compensation Administration
Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 290. FOR THE EMPLOYMENT SECURITY DEPARTMENT
Walla Walla WorkSource Office: Training Room Expansion (06-2-001)
The appropriation in this section is subject to the following conditions and limitations: This appropriation is to build a training and meeting room at the Walla Walla WorkSource building using funds available to the state in section 903(d) of the Social Security Act (Reed act).
Appropriation:
Unemployment Compensation Administration
Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
PART 3
NATURAL RESOURCES
NEW SECTION. Sec. 301. FOR THE DEPARTMENT OF ECOLOGY
Water Supply Facilities (74-2-006)
Reappropriation:
State Drought Preparedness--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$205,000
State and Local Improvements Revolving Account
(Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,869,674
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,074,674
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,431,709
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,506,383
NEW SECTION. Sec. 302. FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Fund (86-2-007)
Reappropriation:
Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$287,359
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,293,656
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,581,015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,761,004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,342,019
NEW SECTION. Sec. 303. FOR THE DEPARTMENT OF ECOLOGY
Local Toxics Grants for Cleanup and Prevention (88-2-008)
Reappropriation:
Local Toxics Control Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,435,524
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $258,835,524
NEW SECTION. Sec. 304. FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Account (90-2-002)
Reappropriation:
Water Pollution Control Revolving
Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,828,872
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,528,483
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,357,355
NEW SECTION. Sec. 305. FOR THE DEPARTMENT OF ECOLOGY
Low-Level Nuclear Waste Disposal Trench Closure (97-2-012)
Reappropriation:
Site Closure Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,131,732
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,087,335
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,219,067
NEW SECTION. Sec. 306. FOR THE DEPARTMENT OF ECOLOGY
Water Irrigation Efficiencies (01-H-010)
The reappropriations in this section are subject to the following conditions and limitations:
(1) The reappropriations are provided solely to provide grants to conservation districts to assist the agricultural community to implement water conservation measures and irrigation efficiencies in the 16 critical basins. A conservation district receiving funds shall manage each grant to ensure that a portion of the water saved by the water conservation measure or irrigation efficiency will be placed as a purchase or a lease in the trust water rights program to enhance instream flows. The proportion of saved water placed in the trust water rights program must be equal to the percentage of the public investment in the conservation measure or irrigation efficiency. The percentage of the public investment may not exceed 85 percent of the total cost of the conservation measure or irrigation efficiency. In awarding grants, a conservation district shall give first priority to family farms.
(2) $344,000 of the water quality account reappropriation is provided for water leases or projects in the Yakima river basin for aquifer recharge necessary to allow the use of drought wells to meet essential irrigation needs. Essential irrigation needs is defined as eighty percent of the water a farmer would ordinarily receive from the irrigation district, less the water that is actually delivered and regardless of crops grown.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $495,963
State and Local Improvements Revolving Account
(Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,983,926
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,663,103
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,142,992
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,979,657
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,122,649
NEW SECTION. Sec. 307. FOR THE DEPARTMENT OF ECOLOGY
Water Measuring Devices (01-H-009)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for water measuring devices and gauges. The department shall prioritize the distribution of water measuring devices and gauges to locations participating in the department of fish and wildlife's fish screens and cooperative compliance programs.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,611,941
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,088,059
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,700,000
NEW SECTION. Sec. 308. FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Fund (02-4-007)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is subject to the conditions and limitations of section 315, chapter 8, Laws of 2001 2nd sp. sess.
Reappropriation:
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,828,687
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,874,259
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,702,946
NEW SECTION. Sec. 309. FOR THE DEPARTMENT OF ECOLOGY
Padilla Bay Expansion (02-2-006)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,693,690
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $281,734
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,975,424
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,849,509
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,824,933
NEW SECTION. Sec. 310. FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Account (02-4-002)
Reappropriation:
Water Pollution Control Revolving
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$47,002,053
Water Pollution Control Revolving
Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $774,704
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$47,776,757
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$91,623,880
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $139,400,637
NEW SECTION. Sec. 311. FOR THE DEPARTMENT OF ECOLOGY
Water Supply Facilities (02-4-006)
Reappropriation:
State and Local Improvements Revolving Account
(Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,243,909
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,201,906
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,445,815
NEW SECTION. Sec. 312. FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Fund (04-4-007)
The reappropriations in this section are subject to the following conditions and limitations:
(1) Up to $7,547,044 of the water quality account--state reappropriation is provided for the extended grant payment to metro/King county.
(2) Up to $10,000,000 of the state building construction account--state reappropriation is provided for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.
(3) $2,000,000 of the state building construction account--state reappropriation is provided solely for water quality facility grants for communities with a population of less than 5,000. The department shall give priority consideration to: (a) Communities subject to a regulatory order from the department of ecology for noncompliance with water quality rules; (b) projects for which design work has been completed; and (c) projects with a local match from reasonable water quality rates and charges.
(4) $760,000 of the state building construction account--state reappropriation is provided solely for the Klickitat wastewater treatment project.
(5) $800,000 of the state building construction account--state reappropriation is provided solely for the comprehensive irrigation district management program.
(6) $150,000 of the water quality account--state reappropriation is to contract with a regional salmon enhancement organization for planning activities related to improving water quality in the Hood Canal, particularly research, preservation, and restoration of molluscan ecosystem including bivalves and other important filtering organisms in Hood Canal.
(7) The remaining reappropriation in this section is provided for statewide water quality implementation and planning grants and loans. The department shall give priority consideration to projects located in basins with critical or depressed salmonid stocks.
(8) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,981,926
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,109,075
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,091,001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,958,999
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$45,050,000
NEW SECTION. Sec. 313. FOR THE DEPARTMENT OF ECOLOGY
Columbia Basin Ground Water Management (04-2-952)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely to the department of ecology to make grants to implement the Columbia basin ground water management area plan.
Reappropriation:
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 314. FOR THE DEPARTMENT OF ECOLOGY
Local Toxics Grants for Cleanup and Prevention (04-4-008)
Reappropriation:
Local Toxics Control Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $24,208,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$249,042,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $273,250,000
NEW SECTION. Sec. 315. FOR THE DEPARTMENT OF ECOLOGY
Site Closure - Nuclear Waste Trench Site Investigation (04-4-010)
Reappropriation:
Site Closure Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,135,470
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,945
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,141,415
NEW SECTION. Sec. 316. FOR THE DEPARTMENT OF ECOLOGY
Twin Lake Aquifer Recharge Project (04-2-951)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely to recover the department of ecology's cost in evaluating and issuing decisions on water right applications and restoration of the Twin Lakes in the Methow valley.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $715,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
NEW SECTION. Sec. 317. FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Account (04-4-002)
Reappropriation:
Water Pollution Control Revolving
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$54,935,416
Water Pollution Control Revolving
Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$33,730,455
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$88,665,871
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$65,128,587
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $153,794,458
NEW SECTION. Sec. 318. FOR THE DEPARTMENT OF ECOLOGY
Water Rights Purchase/Lease (04-1-005)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided for the purchase or lease of water rights. It is also provided for the purpose of improving stream and river flows in fish critical basins under the trust water rights program under chapters 90.42 and 90.38 RCW.
Reappropriation:
State Drought Preparedness--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,470,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 319. FOR THE DEPARTMENT OF ECOLOGY
Water Supply Facilities (04-4-006)
The reappropriations in this section are subject to the following conditions and limitations:
(1)(a) $541,951 of the state building construction account reappropriation and $1,733,812 of the state and local improvements revolving account reappropriation are provided solely for expenditure under a contract between the department of ecology and the United States bureau of reclamation for the development of plans, engineering, and financing reports and other preconstruction activities associated with the development of water storage projects in the Yakima river basin, consistent with the Yakima river basin water enhancement project, P.L. 103-434. It is the intent of the legislature that the contract include provision for participation of the Yakama nation, on a government-to-government basis, in the development of plans and other preconstruction activities concerning salmon recovery and instream flow. The initial water storage feasibility study shall be for the Black Rock reservoir project. The department shall seek federal funds to augment the funding provided by this appropriation.
(b) Up to $2,240,000 of the state building construction account--state reappropriation is provided solely for phase 1 of restoration of anadromous fish habitat in Manastash creek.
(c) The remainder of the state building construction account reappropriation is provided solely for grants for the development of plans, engineering and financing reports, acquiring land and facilities, and other preconstruction activities associated with the development of water storage and groundwater storage and recovery projects. Proposed projects must be consistent with the recommendations of the water storage task force and the governor's water strategy. Priority for the use of these funds must be given to: Projects that have been identified for early action through watershed plans, comprehensive irrigation district management plans, or similar plans; to projects that are part of an approved habitat conservation plan or other intergovernmental agreement; or to joint projects with federal entities such as the bureau of reclamation. The department shall develop and administer this grants program in conjunction with the departments of agriculture and fish and wildlife. Decisions regarding which projects are funded must be by unanimous agreement of all three departments. The department shall seek local and federal funds to augment the funding provided by this reappropriation.
(2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,759,519
State and Local Improvements Revolving Account
(Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,779,173
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,538,692
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,111,308
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,650,000
NEW SECTION. Sec. 320. FOR THE DEPARTMENT OF ECOLOGY
Quad Cities Water Right Mitigation (05-2-852)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,186,549
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $13,451
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,200,000
NEW SECTION. Sec. 321. FOR THE DEPARTMENT OF ECOLOGY
Sunnyside Valley Irrigation District Water Conservation (05-2-851)
Reappropriation:
State and Local Improvements Revolving Account
(Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$424,085
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,878,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,915
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,676,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,079,000
NEW SECTION. Sec. 322. FOR THE DEPARTMENT OF ECOLOGY
Water Conveyance Infrastructure Projects (05-2-850)
The reappropriations in this section are subject to the following conditions and limitations:
(1) $1,500,000 of the state building construction account--state appropriation is provided solely for water conveyance facilities to implement the 1996 memorandum of agreement regarding utilization of Skagit river basin water resources for in-stream and out-of-stream purposes.
(2) $300,000 of the state and local improvements revolving account--state appropriation is provided solely for the Bertrand watershed improvement district to address unpermitted water use and environmental compliance and fund early action planning, feasibility studies, and construction of early action projects.
(3) $1,600,000 of the state building construction account--state appropriation is provided solely for the Middle Fork Nooksack river water diversion system.
(4) First priority from the remaining appropriation, $1,475,000 from the state and local improvements revolving account--state appropriation, $350,000 from the state building construction account--state appropriation, and the water quality account--state appropriation, shall be the following projects: Piping in the upper Yakima river; piping for Bull canal; piping for the Lowden number 2 ditch; diversion reconstruction and piping in Beaver creek; conjunctive use of surface and ground water in the Chewuch river; replacing surface diversions with wells and consolidation of diversions in the Entiat river; replacing a check dam with a siphon on Little Naneum creek; consolidate diversions on Simcoe creek; and ground water recharge of reclaimed water on Kitsap peninsula. The purpose of this funding is to develop projects and take other water management actions that benefit streamflows and enhance water supply to resolve conflicts among water needs for municipal water supply, agricultural water supply, and fish restoration. The streamflow or other public benefits secured from these projects should be commensurate with the investment of state funds.
(5) $50,000 of the state building construction account--state reappropriation is provided solely for Ahtanum creek watershed restoration and Pine Hollow reservoir.
Reappropriation:
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $525,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,500,000
State and Local Improvements Revolving Account
(Water Supply Facilities)--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,772,949
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,797,949
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,051
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,800,000
NEW SECTION. Sec. 323. FOR THE DEPARTMENT OF ECOLOGY
Centennial Clean Water Program (06-4-007)
The appropriations in this section are subject to the following conditions and limitations:
(1) Up to $10,000,000 of the state building construction account--state appropriation is provided for the extended grant payment to Spokane for the Spokane-Rathdrum Prairie aquifer.
(2) $5,000,000 of the state building construction account--state appropriation is provided solely for water quality grants for hardship communities with a population of less than 5,000. The department shall give priority consideration to: (a) Communities subject to a regulatory order from the department of ecology for noncompliance with water quality rules; (b) projects for which design work has been completed; and (c) projects with a local match from reasonable water quality rates and charges.
(3) $1,000,000 of the state building construction account--state appropriation is provided to design appropriate wastewater treatment facilities to serve the Hoodsport to Skokomish reservation areas of Hood Canal. The exact facilities will be based upon the recommendations from an analysis of wastewater management options for the Hoodsport to Skokomish river currently being undertaken by Mason county.
(4) $750,000 of the state building construction account--state appropriation is provided solely for assistance in management and clean up activities at Long Lake in Kitsap county.
(5) $320,000 of the water quality account--state appropriation is provided to Mason county to develop a septic system data base and identify failing septic systems in Hood Canal.
(6) $70,000 of the water quality account--state appropriation will be provided to Kitsap county for surveys of septic systems in Hood Canal.
(7) $70,000 of the water quality account--state appropriation will be provided to Jefferson county for surveys of septic systems in Hood Canal.
(8) The remaining appropriation in this section is provided for statewide water quality implementation and planning grants and loans.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,000,000
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $43,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $211,808,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $254,808,000
NEW SECTION. Sec. 324. FOR THE DEPARTMENT OF ECOLOGY
State Drought Preparedness (05-4-009)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section is provided solely for response to the statewide drought that was declared pursuant to chapter 43.83B RCW. The department of ecology may provide funding or compensation for purchase or lease of water rights and to public bodies as defined in RCW 43.83B.050 in connection with projects and measures designed to alleviate drought conditions which may affect: Public health and safety; drinking water supplies; agricultural activities; or fish and wildlife survival.
(2) Projects or measures for which funding or compensation will be provided must be connected with a water system, water source, or water body which is receiving, or has been projected to receive, less than seventy-five percent of normal water supply, as the result of natural drought conditions. This reduction in water supply must be such that it is causing, or will cause, undue hardship for the entities or fish or wildlife depending on the water supply. General criteria for guidelines to be established by the department of ecology for distribution of funds must include: A balanced and equitable distribution of the funds among the different sectors affected by drought; a funding process that ensures funds are available for drought impacts that arise both early and later during the course of the drought; and preference for projects that leverage other federal and local funds.
Reappropriation:
State Drought Preparedness Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,200,000
NEW SECTION. Sec. 325. FOR THE DEPARTMENT OF ECOLOGY
Local Toxics Grants for Cleanup and Prevention (06-4-008)
The appropriation in this section is subject to the following conditions and limitations: $67,000,000 of the appropriation is provided solely for remedial action grants.
Appropriation:
Local Toxics Control Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$45,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $315,000,000
NEW SECTION. Sec. 326. FOR THE DEPARTMENT OF ECOLOGY
Minor Works (06-1-004)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $555,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $555,000
NEW SECTION. Sec. 327. FOR THE DEPARTMENT OF ECOLOGY
Safe Soil Remediation and Awareness Projects (06-2-001)
Appropriation:
State Toxics Control Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 328. FOR THE DEPARTMENT OF ECOLOGY
Water Irrigation Efficiencies (06-2-009)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,500,000
NEW SECTION. Sec. 329. FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Revolving Account (06-4-002)
The appropriations in this section are subject to the following conditions and limitations: The department shall give priority loan funding consideration to on-site septic system rehabilitation and replacement programs in Mason, Kitsap, and Jefferson counties for at least $1,000,000 from the water pollution control revolving account--state in the second year of the funding cycle.
Appropriation:
Water Pollution Control Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $162,839,146
Water Pollution Control Revolving Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$76,777,140
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $239,616,286
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $912,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,151,616,286
NEW SECTION. Sec. 330. FOR THE DEPARTMENT OF ECOLOGY
Watershed Plan Implementation and Flow Achievement (06-2-003)
The appropriation in this section is subject to the following conditions and limitations: $12,000,000 of the appropriation is provided solely for projects and water right acquisitions to support watershed planning efforts and achieving instream flows subject to the following project types, conditions, and limitations:
(1) Up to $1,353,172 of the appropriation is provided to improve irrigation efficiency and to achieve associated flow improvements in the Twisp and Methow rivers by providing for cleaning and piping of 30,943 linear feet of the irrigation canal within the lower (downstream) seven miles of the Methow Valley irrigation district's west canal. Of this amount, up to $100,000 is provided for a neutral independent consultant to provide management assistance to the Methow Valley irrigation district for purposes of identifying structural and operational improvements to increase overall system water use efficiency.
(2) Up to $200,000 of the appropriation is provided for a portion of the costs of the project level environmental impact statement for the Ahtanum creek watershed restoration program, including construction of the Pine Hollow reservoir, provided there is agreement among the Yakama nation, Ahtanum irrigation district, and other jurisdictional federal, state, and local agencies and entities to proceed with the environmental impact statement.
(3) Up to $75,000 of the appropriation is provided to formalize the Ahtanum creek watershed restoration program, including identification of site specific habitat improvement projects and determination of the most appropriate restoration program alternative to implement.
(4) Up to $1,500,000 of the appropriation is provided to reduce diversions from the Dungeness river through pipeline projects identified in the Dungeness river comprehensive irrigation district management plan.
(5) $100,000 of the appropriation is provided solely to the city of Normandy Park to implement the basin plan for the Miller/Walker and Salmon creek basins.
(6) Water storage grants for the development of plans, engineering and financing reports, acquiring lands and facilities, and other preconstruction activities associated with the development of water storage and groundwater storage and recovery projects. Proposed projects should be consistent with the recommendations of the water storage task force. The department of ecology would issue grants in consultation with the departments of agriculture and fish and wildlife.
(7) Infrastructure improvement projects and other water management actions that benefit stream flows and enhance water supply to resolve conflicts among water needs for municipal water supply, agriculture water supply, and fish restoration. The stream flow improvements and other public benefits secured from these projects should be commensurate with the investment of state funds.
(8) Projects for planning, acquisition, construction, and improvement of agriculture water supply facilities and achieving water conservation and water use efficiency improvements.
(9) Financial assistance to purchase and install water measuring devices at points of diversion and withdrawal. Preference would be given to fish-critical basins, to areas participating in the department of fish and wildlife fish screening and cooperative compliance programs, and to basins where watershed planning has determined additional water diversion and withdrawal information is needed.
(10) Funding for acquisition of either water or water rights, or both, for instream flow achievement and establishment of water accounts. The appropriation is provided for either the purchase or lease, or both, of water rights. It is also provided for the purpose of improving stream and river flows in fish critical basins under the trust water rights program under chapters 90.42 and 90.38 RCW.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$48,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$60,000,000
NEW SECTION. Sec. 331. FOR THE STATE PARKS AND RECREATION COMMISSION
Donation for Construction of Cama Beach State Park (99-2-001)
The reappropriation in this section is subject to the following conditions and limitations: The funding is solely and directly from donations intended for this facility.
Reappropriation:
Parks Renewal and Stewardship Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $249,951
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $249,951
NEW SECTION. Sec. 332. FOR THE STATE PARKS AND RECREATION COMMISSION
Lewis and Clark Bicentennial (00-1-010)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation in this section is provided solely to renovate facilities and enhance exhibits at Lewis and Clark trail interpretive centers located at Sacajawea state park, Beacon Rock state park, and Cape Disappointment state park.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,437,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,037,000
NEW SECTION. Sec. 333. FOR THE STATE PARKS AND RECREATION COMMISSION
Major Park Renovation - Cama Beach (02-1-022)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided to complete electrical power, water, and sewer utilities, and for other park development and renovation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,200,000
Parks Renewal and Stewardship Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,400,000
NEW SECTION. Sec. 334. FOR THE STATE PARKS AND RECREATION COMMISSION
Park Housing (02-2-008)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,150,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,300,000
NEW SECTION. Sec. 335. FOR THE STATE PARKS AND RECREATION COMMISSION
Spokane Centennial Trail - Unanticipated receipt (03-2-001)
Reappropriation:
General Fund--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $162,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $212,000
NEW SECTION. Sec. 336. FOR THE STATE PARKS AND RECREATION COMMISSION
Deception Pass Renovation (04-1-019)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is for design and permits for park and marine crew area relocation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 337. FOR THE STATE PARKS AND RECREATION COMMISSION
Historic Stewardship (04-1-010)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 338. FOR THE STATE PARKS AND RECREATION COMMISSION
Minor Works: Facility Preservation (04-1-001)
The reappropriations in this section are subject to the following conditions and limitations: The reappropriations in this section are provided solely to continue minor works projects that reduce the deferred maintenance backlog.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $147,269
Parks Renewal and Stewardship Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,600,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,747,269
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,990,231
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,737,500
NEW SECTION. Sec. 339. FOR THE STATE PARKS AND RECREATION COMMISSION
Parkland Acquisition (04-2-013)
Reappropriation:
Parkland Acquisition Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$412,690
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $412,690
NEW SECTION. Sec. 340. FOR THE STATE PARKS AND RECREATION COMMISSION
Recreation Development (04-2-002)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Up to $100,000 of the reappropriation shall be used to retain a consultant to conduct a predesign study for a headquarters building located in Thurston county. The predesign shall compare a new leased facility against options to build and evaluate appropriate funding strategies.
(2) $900,000 of the reappropriation shall be used to install fee collection stations at selected parks statewide.
(3) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the commission shall file quarterly project progress reports with the office of financial management.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,200,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,900,000
NEW SECTION. Sec. 341. FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Boat Pumpout - Federal Clean Vessel Act (04-4-014)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 342. FOR THE STATE PARKS AND RECREATION COMMISSION
Jefferson County Public Utility District Grant (05-1-006)
Reappropriation:
Parks Renewal and Stewardship Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265,000
NEW SECTION. Sec. 343. FOR THE STATE PARKS AND RECREATION COMMISSION
Donation for Construction of Cama Beach State Park (06-2-853)
Appropriation:
Parks Renewal and Stewardship Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,916,036
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,916,036
NEW SECTION. Sec. 344. FOR THE STATE PARKS AND RECREATION COMMISSION
Beacon Rock - Pierce Trust (06-1-030)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is provided to make improvements to the group camp at Beacon Rock state park.
(2) The funding has been provided solely and directly for this project.
Appropriation:
Parks Renewal and Stewardship Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
NEW SECTION. Sec. 345. FOR THE STATE PARKS AND RECREATION COMMISSION
Cama Beach - New Destinations (06-2-011)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,820,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,700,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,520,000
NEW SECTION. Sec. 346. FOR THE STATE PARKS AND RECREATION COMMISSION
Cape Disappointment - Renewed Traditions (06-2-027)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 347. FOR THE STATE PARKS AND RECREATION COMMISSION
Coastal Parks - Renewed Traditions (06-2-012)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 348. FOR THE STATE PARKS AND RECREATION COMMISSION
Hoko River Initial Property Development (06-2-850)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 349. FOR THE STATE PARKS AND RECREATION COMMISSION
Cowan Barn and House (06-2-851)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
NEW SECTION. Sec. 350. FOR THE STATE PARKS AND RECREATION COMMISSION
Deception Pass - Renewed Traditions (06-2-013)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500,000
NEW SECTION. Sec. 351. FOR THE STATE PARKS AND RECREATION COMMISSION
Emergency and Unforeseen Needs (06-1-024)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is not intended to be used for routine maintenance.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,750,000
NEW SECTION. Sec. 352. FOR THE STATE PARKS AND RECREATION COMMISSION
Facility Preservation - Facilities (06-1-004)
The appropriation in this section is subject to the following conditions and limitations:
(1) Up to $2,000,000 may be used toward deferred maintenance projects after the reappropriation in project 04-1-001 has been expended. A list will be provided to the office of financial management before funds from this project will be allotted for deferred maintenance.
(2) $600,000 of the appropriation shall be used to replace the wastewater system at Dosewallips state park.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,000,000
NEW SECTION. Sec. 353. FOR THE STATE PARKS AND RECREATION COMMISSION
Federal Authority (06-2-021)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 354. FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden - Facilities (06-1-003)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,530,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,530,000
NEW SECTION. Sec. 355. FOR THE STATE PARKS AND RECREATION COMMISSION
Historic Stewardship - Stewardship (06-1-002)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,000,000
NEW SECTION. Sec. 356. FOR THE STATE PARKS AND RECREATION COMMISSION
Ice Age Floods - Cherished Resources (06-2-014)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,300,000
NEW SECTION. Sec. 357. FOR THE STATE PARKS AND RECREATION COMMISSION
Local Authority (06-2-022)
Appropriation:
Parks Renewal and Stewardship Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 358. FOR THE STATE PARKS AND RECREATION COMMISSION
Natural Resources - Stewardship (06-1-001)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $860,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $860,000
NEW SECTION. Sec. 359. FOR THE STATE PARKS AND RECREATION COMMISSION
Parkland Acquisition Account (06-2-020)
Appropriation:
Parkland Acquisition Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000
NEW SECTION. Sec. 360. FOR THE STATE PARKS AND RECREATION COMMISSION
Rocky Reach - Chelan County Public Utility District (06-1-023)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is provided to construct and surface the northern mile of Rocky Reach trail, and partially fund installation of signs, interpretive panels, and bridges related to the 5.1 mile project.
(2) The funding is provided by Chelan county public utility district solely and directly for the work referenced in subsection (1) of this section.
Appropriation:
Parks Renewal and Stewardship Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 361. FOR THE STATE PARKS AND RECREATION COMMISSION
Statewide Boat Pumpout - Federal Clean Vessel Act (06-4-018)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 362. FOR THE STATE PARKS AND RECREATION COMMISSION
Trails (06-2-017)
The appropriation in this section is subject to the following conditions and limitations: $150,000 of the appropriation is provided solely for the development of the North creek trail in the city of Mill Creek.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 363. FOR THE STATE PARKS AND RECREATION COMMISSION
Southeast Washington Parks (06-2-852)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 364. FOR THE STATE PARKS AND RECREATION COMMISSION
Road Development - Facilities (06-1-008)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,000,000
NEW SECTION. Sec. 365. FOR THE STATE PARKS AND RECREATION COMMISSION
Revenue Creation - Financial Strategy (06-2-010)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,200,000
NEW SECTION. Sec. 366. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Facilities Projects (BFP) (98-2-001)
Reappropriation:
Recreation Resources Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,116,820
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,457,191
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,574,011
NEW SECTION. Sec. 367. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Firearms and Archery Range Program (FARP) (98-2-004)
Reappropriation:
Firearms Range Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $31,478
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $542,191
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $573,669
NEW SECTION. Sec. 368. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Nonhighway Off-road Vehicle Program (NOVA) (98-2-002)
Reappropriation:
Nonhighway and Off-Road Vehicle Activities
Program Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,243,986
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,851,937
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,095,923
NEW SECTION. Sec. 369. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Washington Wildlife and Recreation Program (WWRP) (98-2-003)
The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.
Reappropriation:
Outdoor Recreation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,547,515
Habitat Conservation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,170,894
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,718,409
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$71,883,173
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$77,601,582
NEW SECTION. Sec. 370. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Aquatic Lands Enhancement Account Reappropriation (00-2-014)
Reappropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$161,668
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,097,397
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,259,065
NEW SECTION. Sec. 371. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Salmon Recovery Funding Board Programs (SRFB) (00-2-001)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,227,424
Salmon Recovery Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,366,010
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,593,434
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$88,031,707
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $101,625,141
NEW SECTION. Sec. 372. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Aquatic Lands Enhancement Grants (02-4-018)
Reappropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$213,720
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,440,712
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,654,432
NEW SECTION. Sec. 373. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Facilities Program (BFP) (02-4-001)
Reappropriation:
Recreation Resources Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,455,586
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,478,427
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,934,013
NEW SECTION. Sec. 374. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Infrastructure Grant (BIG) (02-4-010)
Reappropriation:
Recreation Resources Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,322,153
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $677,847
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 375. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Firearms and Archery Range Program (02-0-001)
Reappropriation:
Firearms Range Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $44,677
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $355,323
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
NEW SECTION. Sec. 376. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Hatchery Management Program (02-4-009)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,704,190
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,495,810
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,200,000
NEW SECTION. Sec. 377. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Land and Water Conservation Fund (02-4-005)
Reappropriation:
Recreation Resources Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,904,639
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,595,361
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500,000
NEW SECTION. Sec. 378. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
National Recreation Trails Program (NRTP) (02-4-006)
Reappropriation:
Recreation Resources Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $178,120
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,954,816
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,132,936
NEW SECTION. Sec. 379. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Nonhighway Off-Road Vehicle (NOVA) (02-4-002)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation for the nonhighway and off road vehicle program under RCW 46.09.170(2)(d)(i) is subject to the following conditions and limitations: A portion of the reappropriation may be used for grants to projects to research, develop, publish, and distribute informational guides and maps of nonhighway and off road vehicle trails and associated facilities meeting the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act.
(2) The reappropriation for the nonhighway and off road vehicle program under RCW 46.09.170(2)(d)(ii) is subject to the following conditions and limitations: The portion of the reappropriation that applies to grants for capital facilities may be used for grants to projects that meet the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act and do not compromise or impair sensitive natural resources. The portion of the reappropriation that applies to grants for management, maintenance, and operation of existing off road vehicle recreation facilities may be used to bring the facilities into compliance with the requirements, guidelines, spirit, and intent of the federal Americans with disabilities act.
(3) The reappropriation for the nonhighway and off road vehicle program under RCW 46.09.170(2)(d)(iii) is subject to the following conditions and limitations: Funds may be expended for nonhighway road recreation facilities which may include recreational trails that are accessed by nonhighway roads and are intended solely for nonmotorized recreational uses.
Reappropriation:
Nonhighway and Off-Road Vehicle Activities
Program Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,262,736
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,264,815
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,527,551
NEW SECTION. Sec. 380. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Salmon Recovery Funding Board Programs (SRFB) (02-4-007)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,785,129
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,283,674
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,068,803
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$53,924,197
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$74,993,000
NEW SECTION. Sec. 381. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Wildlife and Recreation Program (WWRP) (02-4-003)
The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund projects in the following order: (1) The department of natural resources Cypress Island project; and (2) alternate projects approved by the legislature from the same account in biennia succeeding that in which the funds were originally appropriated.
Reappropriation:
Outdoor Recreation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,041,864
Habitat Conservation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,928,926
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,970,790
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,029,210
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$45,000,000
NEW SECTION. Sec. 382. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Aquatic Lands Enhancement (04-4-018)
Reappropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,329,280
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,027,120
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,356,400
NEW SECTION. Sec. 383. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Infrastructure Grant (BIG) (04-4-009)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 384. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Facilities Program (BFP) (04-4-003)
Reappropriation:
Recreation Resources Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,753,480
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,753,479
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,506,959
NEW SECTION. Sec. 385. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Firearms and Archery Range Program (04-4-006)
Reappropriation:
Firearms Range Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $144,997
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $105,003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 386. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Family Forest Fish Blockages Program (04-4-011)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $780,379
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,219,621
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 387. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Hatchery Management Program (04-4-010)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,505,749
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,494,251
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
NEW SECTION. Sec. 388. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Land and Water Conservation Fund (04-4-007)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,833,091
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,901,909
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,735,000
NEW SECTION. Sec. 389. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
National Recreation Trails Program (NRTP) (04-4-008)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,130,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,130,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,260,000
NEW SECTION. Sec. 390. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Nonhighway and Off-Road Vehicle Activities Program (NOVA) (04-4-004)
Reappropriation:
NOVA Program Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,492,729
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,433,581
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,926,310
NEW SECTION. Sec. 391. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Salmon Recovery Funding Board Programs (SRFB) (04-4-001)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,832,305
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,500,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,332,305
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$45,332,305
NEW SECTION. Sec. 392. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Washington Wildlife and Recreation Program (WWRP) (04-4-002)
The reappropriations in this section are subject to the following conditions and limitations: Any amount of the reappropriations that is not obligated to a specific project may be used to fund alternate projects approved by the legislature from the same account in biennia succeeding that in which the moneys were originally appropriated.
Reappropriation:
Outdoor Recreation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $12,272,014
Habitat Conservation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $16,707,815
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,979,829
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,022,171
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$45,002,000
NEW SECTION. Sec. 393. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Aquatic Lands Enhancement Account (06-4-018)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is provided for a list of projects in LEAP capital document No. 2005-15, developed on April 9, 2005.
(2) The committee shall submit a list of recommended projects to be funded from the aquatic lands enhancement account in the 2007-2009 capital budget. The list shall result from a competitive grants program developed by the committee based upon, at a minimum: (a) A uniform criteria for selecting projects and awarding grants for up to fifty percent of the total project cost; (b) local community support for the project; and (c) environmental benefits to be derived from projects. The list of projects must be submitted to the office of financial management by September 15, 2006.
Appropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,024,500
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,900,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,924,500
NEW SECTION. Sec. 394. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Facilities Program (BFP) (06-4-003)
Appropriation:
Recreation Resources Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,597,535
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,947,535
NEW SECTION. Sec. 395. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Boating Infrastructure Grant (BIG) (06-4-009)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 396. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Firearms and Archery Range Program (06-4-006)
Appropriation:
Firearms Range Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $222,300
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $777,470
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $999,770
NEW SECTION. Sec. 397. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Family Forest Fish Passage Program (06-4-011)
The appropriations in this section are subject to the following conditions and limitations:
(1) The appropriation is provided solely for the salmon recovery funding board in consultation with the small forest landowner office of the department of natural resources and the department of fish and wildlife to provide grants to correct fish passage blockages on nonindustrial forest lands. Selection of projects must be coordinated with the other salmon recovery grant programs provided in section 402 of this act.
(2) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the committee shall file quarterly project progress reports with the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $217,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,217,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,217,000
NEW SECTION. Sec. 398. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Improve Hatchery Management (06-4-010)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,000,000
NEW SECTION. Sec. 399. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Land and Water Conservation Fund (06-4-007)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,500,000
NEW SECTION. Sec. 400. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Nonhighway and Off-Road Vehicle Program (NOVA) (06-4-004)
Appropriation:
Nonhighway and Off-Road Vehicle Activities
Program Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,579,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$39,946,858
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$47,525,858
NEW SECTION. Sec. 401. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
National Recreation Trails Program (NRTP) (06-4-008)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,750,000
NEW SECTION. Sec. 402. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Salmon Recovery Funding Board Programs (SRFB) (06-4-001)
The appropriations in this section are subject to the following conditions and limitations:
(1) $500,000 of the general fund--federal appropriation is provided solely for the state conservation commission to contract with a qualified external vendor to provide a web-based, statewide, single repository with mapping capabilities to track, manage, and report on all habitat projects developed by the forty-seven conservation districts. The commission shall be assisted by the department of information services and the governor's salmon recovery office to select a private vendor. In conjunction with the pilot, the commission will work with the department of ecology, the department of fish and wildlife, and the department of natural resources to select a watershed in western Washington, in which all habitat projects sponsors will use the single repository and the three natural resource agencies will provide newly collected watershed data to the single repository through use of hand-held data collection devices.
(2) The remaining appropriations are provided solely for grants for other salmon recovery efforts. These grants may include a grant to any regional recovery board and/or may include grants for additional restoration projects, monitoring activities, or other salmon recovery actions.
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,000,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $64,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $304,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $368,000,000
NEW SECTION. Sec. 403. FOR THE INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION
Washington Wildlife and Recreation Program (WWRP) (06-4-002)
The appropriations in this section are subject to the following conditions and limitations:
(1) The appropriation is provided for the approved list of projects in LEAP capital document No. 2005-14 as developed on April 9, 2005.
(2) Funds appropriated for distribution according to RCW 79A.15.050 shall fulfill the uses and restrictions of each category whether the funds are distributed according to the statutory allotment, the unallocated distribution, or a reassignment of reappropriations. If the cumulative total for acquisition projects is less than the statutory requirement, the difference may be allocated to the remaining development projects.
(3) Funds appropriated for distribution according to the provisions of RCW 79A.15.040(c) shall be allocated forty percent to local government projects and sixty percent to state agency projects. If the cumulative total of local government projects is less than forty percent of the total distribution to this category, the difference may be allocated to state agency projects.
Appropriation:
Outdoor Recreation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $25,000,000
Habitat Conservation Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $25,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000,000
NEW SECTION. Sec. 404. FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program (04-4-004)
The reappropriation in this section is subject to the following conditions and limitations: The total cumulative dollar value of state conservation reserve enhancement program grant obligations incurred by the conservation commission and conservation districts shall not exceed $20,000,000, as provided in the conservation reserve enhancement program agreement between the United States department of agriculture, commodity credit corporation, and the state of Washington executed on October 19, 1998, and subsequent amendments.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 405. FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program (06-4-001)
The appropriation in this section is subject to the following conditions and limitations: The total cumulative dollar value of state conservation reserve enhancement program grant obligations incurred by the conservation commission and conservation districts shall not exceed $20,000,000, as provided in the conservation reserve enhancement program agreement between the United States department of agriculture, commodity credit corporation, and the state of Washington executed on October 19, 1998, and subsequent amendments.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,500,000
NEW SECTION. Sec. 406. FOR THE STATE CONSERVATION COMMISSION
Conservation Reserve Enhancement Program - Loans (06-4-004)
The appropriation in this section is subject to the following conditions and limitations: The conservation assistance revolving account appropriation is provided solely for loans under the conservation reserve enhancement program.
Appropriation:
Conservation Assistance Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 407. FOR THE STATE CONSERVATION COMMISSION
Puget Sound District Grants (04-4-005)
Reappropriation:
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$75,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $765,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $840,000
NEW SECTION. Sec. 408. FOR THE STATE CONSERVATION COMMISSION
Puget Sound District Grants (06-4-003)
Appropriation:
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $840,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,360,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,200,000
NEW SECTION. Sec. 409. FOR THE STATE CONSERVATION COMMISSION
Water Quality Grants Program (04-4-002)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,250,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 410. FOR THE STATE CONSERVATION COMMISSION
Water Quality Grants Program (06-4-007)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,500,000
NEW SECTION. Sec. 411. FOR THE STATE CONSERVATION COMMISSION
Livestock Water Quality - Landowner Cost Share (06-4-006)
Appropriation:
Water Quality Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,500,000
NEW SECTION. Sec. 412. FOR THE STATE CONSERVATION COMMISSION
Skokomish Anaerobic Digester (06-4-009)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for a grant to the Mason conservation district for construction of an anaerobic digester in the Skokomish river watershed. Up to $50,000 of this amount may be spent on completing design concepts and feasibility analysis. The remaining funds shall be allotted only after the following has occurred: (1) Mason conservation district secures nonstate matching funds or in-kind contributions of at least twenty-five percent of the total project cost; (2) a feasibility study is completed and submitted to the Puget Sound action team and the state conservation commission; and (3) the Puget Sound action team and the state conservation commission approve the project proposal.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $560,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $560,000
NEW SECTION. Sec. 413. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Culvert Replacement (03-S-001)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,800,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 414. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Deschutes Hatchery (04-2-011)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $670,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
NEW SECTION. Sec. 415. FOR THE DEPARTMENT OF FISH AND WILDLIFE Facility, Infrastructure, Lands, and Access Condition Improvement (04-1-003)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,550,000
Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $40,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,590,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,385,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,975,000
NEW SECTION. Sec. 416. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Fish and Wildlife Opportunity Improvements (04-2-006)
Reappropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$152,000
Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $652,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,450,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,102,000
NEW SECTION. Sec. 417. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Fish and Wildlife Population and Habitat Protection (04-1-002)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,600,000
NEW SECTION. Sec. 418. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Hatchery Reform, Retrofits, and Condition Improvement (04-1-001)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,300,000
Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,480,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,420,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,900,000
NEW SECTION. Sec. 419. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Internal and External Partnership Improvements (04-1-007)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,918,418
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,918,418
NEW SECTION. Sec. 420. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Region 1 Office - Spokane (04-2-009)
The reappropriations in this section are subject to the following conditions and limitations: The reappropriations are provided solely for the construction of the eastern region headquarters office complex to be located at Mirabeau Point.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50,000
Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $550,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,850,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,400,000
NEW SECTION. Sec. 421. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Department of Fish and Wildlife Energy Savings (04-1-016)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 422. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Facility, Infrastructure, Lands, and Access Condition Improvements (06-1-002)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,457,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,107,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,600,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$34,707,000
NEW SECTION. Sec. 423. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Fish and Wildlife Opportunity Improvements (06-2-004)
The appropriations in this section are subject to the following conditions and limitations: It is the intent of the legislature that expenditures from the wildlife account--state appropriation shall only be made to the extent funds are available in the account and will not result in a reduction to other programs or activities.
Appropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$300,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Warm Water Game Fish Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,900,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,700,000
NEW SECTION. Sec. 424. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Fish and Wildlife Population and Habitat Protection (06-1-003)
The appropriations in this section are subject to the following conditions and limitations: It is the intent of the legislature that expenditures from the wildlife account--state appropriation shall only be made to the extent funds are available in the account and will not result in a reduction to other programs or activities.
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,830,000
General Fund--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,500,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,200,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,030,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$34,920,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$43,950,000
NEW SECTION. Sec. 425. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Hatchery Reform, Retrofits, and Condition Improvement (06-1-001)
The appropriations in this section are subject to the following conditions and limitations: $380,000 of the state building construction account--state appropriation shall be used to implement a pollution abatement pond and fish passage corrections or improvements at the Hoodsport hatchery.
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,000,000
General Fund--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Recreational Fisheries Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$400,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,650,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15,550,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$64,600,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$80,150,000
NEW SECTION. Sec. 426. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Internal and External Partnership Improvements (06-1-005)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
General Fund--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Game Special Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000
Game Special Wildlife Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$400,000
Game Special Wildlife Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$700,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $14,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$51,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$65,600,000
NEW SECTION. Sec. 427. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Region 1 Office Phase 2 - Spokane (06-2-006)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,790,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,790,000
NEW SECTION. Sec. 428. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Department of Natural Resources - Department of Fish and Wildlife Land Exchange (06-2-014)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 429. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Sustainability and Department of Fish and Wildlife Energy Savings (06-1-009)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,500,000
NEW SECTION. Sec. 430. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Youth Sport Fishing Program (06-2-010)
Appropriation:
Wildlife Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,250,000
NEW SECTION. Sec. 431. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Fish Screens (01-H-011)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $550,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $550,000
NEW SECTION. Sec. 432. FOR THE DEPARTMENT OF FISH AND WILDLIFE
Wind Power Mitigation (06-2-850)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided to support the development and implementation of a wind power alternative mitigation pilot program, the purpose of which is to maximize the habitat value of mitigation funds and streamline the mitigation process for wind power projects. The program must combine the acquisition of strategically important habitat by the department with annual funding from wind developers for restoration, management, and monitoring of these critical habitat areas. The appropriation is for the department to undertake the acquisition component of the program.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 433. FOR THE DEPARTMENT OF NATURAL RESOURCES
Forest Legacy (04-2-015)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,650,000
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,900,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$56,550,000
NEW SECTION. Sec. 434. FOR THE DEPARTMENT OF NATURAL RESOURCES
Community and Technical College Trust Land Acquisition (06-2-014)
Appropriation:
Comm/Tech College Forest Reserve Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $558,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,658,000
NEW SECTION. Sec. 435. FOR THE DEPARTMENT OF NATURAL RESOURCES
Deep Water Geoduck and Sea Cucumber Population Surveys (06-2-850)
Appropriation:
Resources Management Cost Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
NEW SECTION. Sec. 436. FOR THE DEPARTMENT OF NATURAL RESOURCES
Molluscan Model and Monitoring (06-2-851)
Appropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$200,500
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,500
NEW SECTION. Sec. 437. FOR THE DEPARTMENT OF NATURAL RESOURCES
Marine Station Public Access (02-2-019)
Reappropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,138
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $53,862
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$65,000
NEW SECTION. Sec. 438. FOR THE DEPARTMENT OF NATURAL RESOURCES
Marine Station Public Access (04-2-019)
Reappropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$93,840
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,160
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 439. FOR THE DEPARTMENT OF NATURAL RESOURCES
Federal HCP Land Acquisition Grants (05-2-021)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,820,630
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,820,630
NEW SECTION. Sec. 440. FOR THE DEPARTMENT OF NATURAL RESOURCES
Department of Natural Resources - Department of Fish and Wildlife Land Exchange (06-2-009)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
NEW SECTION. Sec. 441. FOR THE DEPARTMENT OF NATURAL RESOURCES
Land Bank (06-2-015)
Appropriation:
Resources Management Cost Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,462,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$55,462,000
NEW SECTION. Sec. 442. FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor Works - Preservation (06-1-001)
Appropriation:
Forest Development Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$224,000
Resources Management Cost Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $384,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $144,000
Agricultural College Trust Management Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$48,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,776,500
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,976,500
NEW SECTION. Sec. 443. FOR THE DEPARTMENT OF NATURAL RESOURCES
Minor Works - Programmatic (06-2-002)
Appropriation:
Forest Development Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$112,000
Resources Management Cost Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $192,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $447,000
Agricultural College Trust Management Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$775,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,010,200
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,968,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,753,200
NEW SECTION. Sec. 444. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural Areas Facilities Preservation (06-1-010)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $658,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,298,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,456,000
NEW SECTION. Sec. 445. FOR THE DEPARTMENT OF NATURAL RESOURCES
Natural Resources Real Property Replacement (06-2-013)
Appropriation:
Natural Resources Real Property
Replacement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,961,300
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $178,961,300
NEW SECTION. Sec. 446. FOR THE DEPARTMENT OF NATURAL RESOURCES
Recreation Facilities Preservation (06-1-011)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $865,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $698,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,840,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,403,000
NEW SECTION. Sec. 447. FOR THE DEPARTMENT OF NATURAL RESOURCES
Right of Way Acquisition (06-2-006)
Appropriation:
Forest Development Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$250,000
Resources Management Cost Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $750,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $945,409
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,750,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,695,409
NEW SECTION. Sec. 448. FOR THE DEPARTMENT OF NATURAL RESOURCES
Riparian Open Space Program (06-2-018)
The appropriation in this section is subject to the following conditions and limitations:
(1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.
(2) The department may not expend more than $100,000 of the appropriation for administrative or staff costs.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,998,600
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,498,600
NEW SECTION. Sec. 449. FOR THE DEPARTMENT OF NATURAL RESOURCES
Small Timber Landowner (FREP) (06-2-019)
The appropriation in this section is subject to the following conditions and limitations:
(1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.
(2) The department may not expend more than $200,000 of the appropriation for administrative or staff costs.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,750,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$57,750,000
NEW SECTION. Sec. 450. FOR THE DEPARTMENT OF NATURAL RESOURCES
State Lands Maintenance (06-1-004)
Appropriation:
Forest Development Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$225,000
Resources Management Cost Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $375,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,360,814
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,900,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,860,814
NEW SECTION. Sec. 451. FOR THE DEPARTMENT OF NATURAL RESOURCES
Statewide Aquatic Restoration Projects (06-2-008)
Appropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$300,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$450,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,200,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,850,000
NEW SECTION. Sec. 452. FOR THE DEPARTMENT OF NATURAL RESOURCES
Trust Land Transfer (06-2-012)
The appropriation in this section is subject to the following conditions and limitations:
(1) The total appropriation is provided to the department solely to transfer from trust status or enter into thirty-year timber harvest restrictive easements/leases for certain trust lands of state-wide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes.
(2) Property transferred under this section shall be appraised and transferred at fair market value. The value of the timber transferred shall be deposited by the department to the common school construction account in the same manner as timber revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040. The value of the land transferred shall be deposited in the natural resources real property replacement account. These funds shall be expended by the department for the exclusive purpose of acquiring nonagricultural real property of equal value to be managed as common school trust land.
(3) Property subject to easement/lease agreements under this section shall be appraised at fair market value both with and without the imposition of the easement/lease. The entire difference in appraised value shall be deposited by the department to the common school construction fund in the same manner as lease revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040.
(4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of this appropriation. Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs.
(5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.
(6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section for a minimum period of thirty years. The department of natural resources, in consultation with the receiving state agencies, shall develop policy to address requests to replace transferred properties subject to the recorded property instrument that are no longer deemed appropriate for the purposes identified in subsection (1) of this section.
(7) The department and receiving agencies shall work in good faith to carry out the intent of this section. However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.
(8) Except as provided in subsection (11) of this section, the department shall execute trust land transfers and easements/leases such that, after the deduction of reasonable costs as provided in subsection (4) of this section, eighty percent of the appropriation in this section is deposited in the common school construction fund. To achieve the 80:20 ratio, the department may offset transfers of property with low timber-to-land ratios with easements/leases on other properties.
(9) On June 30, 2007, the state treasurer shall transfer all remaining uncommitted funds from this appropriation to the common school construction fund and the appropriation in this section shall be reduced by an equivalent amount.
(10) The appropriation in this section is provided for a list of projects in LEAP capital document No. 2005-11, as developed on April 4, 2005.
(11) The department shall execute trust land transfers, after the deduction of reasonable costs as provided in subsection (4) of this section, for Smugglers Cove, Cultus Bay, and Strawberry Point as described in LEAP capital document No. 2005-11, as developed on April 4, 2005.
Appropriation:
Natural Resources Real Property Replacement
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,670,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$61,610,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75,280,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$115,228,800
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $201,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $391,908,800
NEW SECTION. Sec. 453. FOR THE DEPARTMENT OF NATURAL RESOURCES
Wetland Grants (06-2-017)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,000,000
NEW SECTION. Sec. 454. FOR THE DEPARTMENT OF NATURAL RESOURCES
Wetland Grants (04-2-004)
Reappropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $108,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $392,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 455. FOR THE DEPARTMENT OF NATURAL RESOURCES
Statewide Estuarine Restoration Projects (04-2-021)
Reappropriation:
Aquatic Lands Enhancement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$80,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
NEW SECTION. Sec. 456. FOR THE DEPARTMENT OF NATURAL RESOURCES
Riparian Open Space Program (04-2-023)
The reappropriation in this section is subject to the following conditions and limitations:
(1) In addition to the annual project progress reporting requirement of RCW 43.88.160(3), the department shall file quarterly project progress reports with the office of financial management.
(2) The department may not expend more than $100,000 of the reappropriation for administrative or staff costs.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,500,000
NEW SECTION. Sec. 457. FOR THE DEPARTMENT OF AGRICULTURE
Fair Improvements (06-4-850)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
PART 4
TRANSPORTATION
NEW SECTION. Sec. 501. FOR THE WASHINGTON STATE PATROL
Minor Work Projects (06-1-001)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $495,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $450,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $945,000
NEW SECTION. Sec. 502. FOR THE WASHINGTON STATE PATROL
Vancouver Crime Lab - Phase II (06-2-003)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,825,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,947,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,772,000
NEW SECTION. Sec. 503. FOR THE DEPARTMENT OF TRANSPORTATION
Columbia River Dredging (03-H-001)
The reappropriation in this section is provided solely to fund the second phase of a multiphase cooperative project with the state of Oregon to dredge the Columbia river. The amount in this section lapses unless the state of Oregon appropriates a dollar-for-dollar match to fund its share of the project.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,700,000
PART 5
EDUCATION
NEW SECTION. Sec. 601. FOR THE STATE BOARD OF EDUCATION
Common School Construction Account Deposits
The appropriations in this section are subject to the following conditions and limitations:
(1) $15,000,000 in fiscal year 2006 and $15,000,000 in fiscal year 2007 of the education savings account appropriation shall be deposited in the common school construction account.
(2) $105,245,000 of the education construction account appropriation shall be deposited in the common school construction account.
Appropriation:
Education Savings Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30,000,000
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $105,245,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $135,245,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $135,245,000
NEW SECTION. Sec. 602. FOR THE STATE BOARD OF EDUCATION
Construction Assistance Grants (02-4-001)
Reappropriation:
Common School Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$136,811,979
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $148,811,979
NEW SECTION. Sec. 603. FOR THE STATE BOARD OF EDUCATION
Port Angeles School District North Olympic Skills Center (04-4-852)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,500,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 604. FOR THE STATE BOARD OF EDUCATION
School Construction Assistance Program (04-4-001)
The reappropriations in this section are subject to the following conditions and limitations:
(1) The reappropriations are subject to the conditions and limitations of section 606, chapter 26, Laws of 2003 1st sp. sess. and is pro-rated based on prior expenditures.
(2) $2,500,000 of this reappropriation is provided solely for design and construction of additional space at the new market vocational skills center.
Reappropriation:
Common School Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$160,000,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$107,050,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$267,050,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$135,218,513
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $402,268,513
NEW SECTION. Sec. 605. FOR THE STATE BOARD OF EDUCATION
School Construction Assistance Program (06-4-100)
The appropriations in this section are subject to the following conditions and limitations:
(1) For state assistance grants for purposes of calculating square foot eligibility, kindergarten student headcount shall not be reduced by fifty percent.
(2) $3,700,000 from this appropriation is provided solely for minor works projects at skills centers that are included on the prioritized list of capital items submitted by the state board of education and $150,000 from this appropriation is provided solely for a comprehensive feasibility study for the development of a skills center in Skagit county. Skills centers shall submit a budget plan to the state board of education and the appropriate fiscal committees of the legislature for proposed expenditures and the proposed expenditures shall conform to state board of education rules and procedures for reimbursement of capital items. The state board of education shall develop a plan to include skills center capital requests within the state construction assistance program.
(3) $160,233,081 of this appropriation is provided solely to increase the area cost allowance by $12.86 per square foot for grades K-12 for fiscal year 2006, an additional $12.87 per square foot for grades K-12 for fiscal year 2007, the student square footage allocation in fiscal year 2007 in accordance with the first step in the state board of education six-year plan, and the amount of state assistance provided for modernization and new in-lieu projects to one hundred percent of the area cost allowance.
(4) The appropriation in this section includes the amounts deposited in the common school construction account under section 601 of this act.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$138,200,000
Common School Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$460,150,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $598,350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,532,456,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,130,806,000
NEW SECTION. Sec. 606. FOR THE STATE BOARD OF EDUCATION
Environmental Learning Centers (06-2-951)
The appropriation in this section is subject to the following conditions and limitations:
(1) $2,000,000 from this appropriation is provided solely for capital projects at the Chewelah peak learning center. The Chewelah peak learning center shall submit a budget plan to the state board of education and the appropriate fiscal committees of the legislature for proposed expenditures.
(2) $400,000 of this appropriation is provided solely for capital projects at Camp Waskowitz learning center. Camp Waskowitz shall submit a budget plan to the state board of education and the appropriate fiscal committees of the legislature for proposed expenditures.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,400,000
NEW SECTION. Sec. 607. FOR THE STATE BOARD OF EDUCATION
Apple Award Construction Achievement Grants (06-4-850)
The appropriation in this section is subject to the following conditions and limitations: Grants of $25,000 are provided to public elementary schools whose students have shown the greatest combined average increase in the percentage of students meeting the fourth grade reading, mathematics, and writing standards on the Washington assessment of student learning from 2005-06 and 2006-07. $250,000 shall be available for awards in 2005-06 and $250,000 in 2006-07. The program shall be administered by the state board of education which shall determine categories for selection that provides geographic and school district size representation.
The grants shall be used for capital construction purposes as determined by the students in the schools and approved by the district's school directors. The funds may be used exclusively for capital construction projects on school property or on other public property in the community, city, or county in which the school is located.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 608. FOR THE STATE BOARD OF EDUCATION
Emergency School Repair (06-4-851)
The appropriation in this section is subject to the following conditions and limitations:
(1) $2,631,000 of the appropriation in this section is provided solely for nonrecurring costs associated with urgent health and safety school facility repairs and renovations and minimal administrative costs associated with administering the program. The state board of education and the office of the superintendent of public instruction, after consulting with maintenance and operations administrators of school districts, shall develop criteria for providing funding for specific projects that stay within the appropriation level provided in this section. The criteria shall include, but is not limited to, the following: (a) Limiting recipient district applications to one hundred thousand dollars per three-year period; (b) limiting districts eligible to receive the grant only once in any three-year period; and (c) any district receiving funding provided in this section demonstrating a consistent commitment to addressing school facilities needs. A portion of this appropriation may be used to develop and administer the program. It is the intent of the legislature that the state board of education and the office of the superintendent of public instruction keep the administrative costs of the program to a minimum by using criteria from the prior federal rengrant program and other efficiency measures to avoid duplication.
(2) $269,000 of the appropriation is provided solely for roof repairs in the White Pass school district.
(3) $100,000 of the appropriation is provided solely for drainage issues related to the freshman campus and Ferguson creek in the Snohomish school district.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 609. FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
High Performance Buildings (06-4-852)
The appropriation in this section is subject to the following conditions and limitations:
(1) Additional funding will be provided to school districts constructing public schools to recognized standards for high performance public buildings for a transition period of three years. The districts building high performance public schools will be granted funding per school project for capital-related costs associated with the design and construction of public K-12 schools that meet or exceed comprehensive design, construction, and operating standards for high performance and sustainable school buildings. No more than $250,000 will be allotted for each elementary school built to high performance standards, no more than $350,000 will be allotted for each middle school built to high performance standards, and no more than $500,000 will be allotted to each high school built to high performance standards. These levels may be modified, in a limited manner, if specific project conditions warrant and as determined by the office of the superintendent of public instruction.
(2) It is the intent of the legislature to provide additional transition funding for public school districts constructing to recognized standards for high performance public buildings in the 2007-2009 biennium. $13,000,000 is reserved in the common school construction account--state cash balance under the school construction assistance program for this purpose.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,500,000
NEW SECTION. Sec. 610. FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION
State School Construction Assistance Program Administration (06-2-001)
Appropriation:
Common School Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,279,004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,969,379
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,554,882
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,803,265
NEW SECTION. Sec. 611. FOR THE STATE SCHOOL FOR THE BLIND
Kennedy, Dry, and Irwin Building Preservation (04-1-002)
The reappropriation in this section is subject to the following conditions and limitations: All funds reappropriated to be used for funding of new physical education center.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,379,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,279,000
NEW SECTION. Sec. 612. FOR THE STATE SCHOOL FOR THE BLIND
Campus Preservation (06-1-003)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,800,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,500,000
NEW SECTION. Sec. 613. FOR THE STATE SCHOOL FOR THE DEAF
Omnibus Minor Works - Preservation (06-1-002)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $775,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $975,000
NEW SECTION. Sec. 614. FOR THE STATE SCHOOL FOR THE DEAF
Omnibus Minor Works - Safety (06-1-001)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,816
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,816
NEW SECTION. Sec. 615. FOR THE HIGHER EDUCATION COORDINATING BOARD Snohomish, Skagit, and Island County Higher Education Needs Assessment (06-2-850)
The appropriation in this section is subject to the following conditions and limitations:
(1) The higher education coordinating board is directed to assess the higher education needs in Snohomish, Skagit, and Island counties and recommend to the legislature solutions to the higher education needs. Solutions that the board should consider include, but should not be limited to, establishment of new institutions, expansion of existing institutions, and colocation of institutions. In conducting its assessment, the board shall take into account but not be limited to the following: Population growth, higher education participation rates, economic demand and work force needs, and drive and commute times to existing higher education institutions.
(2) The board may contract for an assessment of sites to meet higher education needs in the counties.
(3) In conducting the assessment and siting study, the higher education coordinating board shall consult with the state board for community and technical colleges, the workforce training and education coordinating board, the North Snohomish, Island, and Skagit higher education consortium, and the existing research and comprehensive institutions.
(4) The advisory committee on higher education created pursuant to chapter . . . (Engrossed Second Substitute Senate Bill No. 5441 (studying early learning, K-12, and higher education)), Laws of 2005 shall serve as a steering committee and direct the board in the conduct of the assessment and siting study.
(5) The board shall assemble a local advisory committee to assist in the conduct of the assessment and siting study. The committee shall include: (a) The Snohomish county executive; (b) three members of the house of representatives, including two from the majority party and one from the minority party, appointed by the speaker of the house of representatives; (c) three members of the senate, including two from the majority party and one from the minority party, appointed by the president of the senate; and (d) six education or business leaders, two each from Snohomish, Island, and Skagit counties.
(6) The recommendations to the legislature shall include, but are not limited to: (a) The type of institution or institutions to be established; (b) a business and operations plan for the institution if a new institution is recommended; (c) potential sites for establishment of an institution; (d) identification of site acquisition costs; and (e) identification of costs and a process for completing a master plan for higher education expansion.
(7) The board shall provide an interim report to the legislature and the governor by January 15, 2006, and a final report by December 1, 2006.
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,000
NEW SECTION. Sec. 616. FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma Campus Phase 2A (00-2-017)
The reappropriation in this section is subject to the following conditions and limitations: No money from the reappropriation in this section may be expended that would be inconsistent with the recommendations of the higher education coordinating board and the project design, scope, and schedule approved by the office of financial management.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,505,280
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,130,653
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$37,635,933
NEW SECTION. Sec. 617. FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma Land Acquisition/Soils Remediation (01-2-029)
Reappropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$620,455
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,329,545
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,450,000
NEW SECTION. Sec. 618. FOR THE UNIVERSITY OF WASHINGTON
UW Bothell/Cascadia Community College - SR 522 Off Ramp (02-2-014)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,742,500
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,550,000
NEW SECTION. Sec. 619. FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma Campus Phase 2B (02-2-027)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,356,356
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$41,992,644
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,349,000
NEW SECTION. Sec. 620. FOR THE UNIVERSITY OF WASHINGTON
Facility Preservation Backlog Reduction (04-1-951)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the reappropriation is provided solely to accomplish preservation work that improves existing state facilities in the worst relative condition for housed programs and current building occupants.
(2) With this reappropriation, the intention is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preservation backlog reduction project funds shall be prioritized at local discretion to achieve the above stated goal, with particular attention given to buildings currently rated in adequate to marginal condition.
(3) This section is subject to the same allotment procedures as a minor works category.
(4) Section 906 of this act does not apply to this appropriation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,227,404
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,372,596
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,600,000
NEW SECTION. Sec. 621. FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Program (04-2-004)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,131,540
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,117,650
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,249,190
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,250,810
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,500,000
NEW SECTION. Sec. 622. FOR THE UNIVERSITY OF WASHINGTON
UW Campus Communications Infrastructure (04-1-011)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,000,000
NEW SECTION. Sec. 623. FOR THE UNIVERSITY OF WASHINGTON
UW Emergency Power Expansion - Phase 1 (02-1-009)
Reappropriation:
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,262,357
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,737,643
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,000,000
NEW SECTION. Sec. 624. FOR THE UNIVERSITY OF WASHINGTON
UW Emergency Power Expansion - Phase 2 (04-1-024)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,803,379
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,148,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,951,379
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $696,621
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,648,000
NEW SECTION. Sec. 625. FOR THE UNIVERSITY OF WASHINGTON
UW Johnson Hall Renovation (04-1-005)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,470,762
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,552,000
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,187,630
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,210,392
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,844,608
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$53,055,000
NEW SECTION. Sec. 626. FOR THE UNIVERSITY OF WASHINGTON
Classroom Improvements (05-1-850)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,856,812
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $143,188
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
NEW SECTION. Sec. 627. FOR THE UNIVERSITY OF WASHINGTON
Guthrie Hall Psychology Facilities Renovation (05-2-851)
The reappropriation in this section is subject to the following conditions and limitations: Allotment for this reappropriation is contingent on the commitment of at least three million dollars in matching federal funds for this facility.
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 628. FOR THE UNIVERSITY OF WASHINGTON
UW Bothell Phase 2B (06-2-851)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$47,690,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$49,890,000
NEW SECTION. Sec. 629. FOR THE UNIVERSITY OF WASHINGTON
UW Tacoma - Assembly Hall (06-2-007)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500,000
NEW SECTION. Sec. 630. FOR THE UNIVERSITY OF WASHINGTON
Infectious Disease Laboratory Facilities (05-2-850)
The reappropriation in this section is subject to the following conditions and limitations: Allotment for this reappropriation is contingent on the commitment of at least four million dollars in matching federal funds for this facility.
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 631. FOR THE UNIVERSITY OF WASHINGTON
Architecture Hall Renovation (06-1-008)
The appropriation in this section is subject to the following conditions and limitations: No money from the appropriation in this section may be expended on surge space.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,850,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,474,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,324,000
NEW SECTION. Sec. 632. FOR THE UNIVERSITY OF WASHINGTON
Clark Hall Renovation (06-1-007)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of renovation of Clark Hall. The office of financial management shall not allot funding for the design until after sine die adjournment of the 2006 regular legislative session and only if the predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval as per RCW 43.88.110(6) prior to the start of the 2006 regular legislative session.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,500,000
NEW SECTION. Sec. 633. FOR THE UNIVERSITY OF WASHINGTON
Guggenheim Hall Renovation (06-1-006)
The appropriation in this section is subject to the following conditions and limitations: No money from the appropriation in this section may be expended on surge space.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,812,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,312,000
NEW SECTION. Sec. 634. FOR THE UNIVERSITY OF WASHINGTON
Health Sciences - H Wing (06-1-001)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,000,000
NEW SECTION. Sec. 635. FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Facility Preservation (06-1-002)
Appropriation:
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$84,800,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $106,000,000
NEW SECTION. Sec. 636. FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Health, Safety, and Code Requirements (06-1-003)
Appropriation:
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$55,000,000
NEW SECTION. Sec. 637. FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Infrastructure Preservation (06-1-004)
Appropriation:
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,000,000
NEW SECTION. Sec. 638. FOR THE UNIVERSITY OF WASHINGTON
Infrastructure Savings (06-1-751)
The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2
NEW SECTION. Sec. 639. FOR THE UNIVERSITY OF WASHINGTON
Preventive Facility Maintenance and Building System Repairs (06-1-750)
The appropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
(2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds shall be allocated at local discretion to achieve the above stated performance goal, with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
(3) Section 906 of this act does not apply to this appropriation.
(4) There is no intent to reappropriate amounts not expended by June 30, 2007.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $25,825,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,825,000
NEW SECTION. Sec. 640. FOR THE UNIVERSITY OF WASHINGTON
Minor Works - Program (06-2-009)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000
University of Washington Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,800,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,700,000
NEW SECTION. Sec. 641. FOR THE UNIVERSITY OF WASHINGTON
Savery Hall Renovation (06-1-005)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is provided solely for predesign and design of renovation of Savery Hall. The office of financial management shall not allot funding for the design until after sine die adjournment of the 2006 regular legislative session and only if the predesign has been submitted to the legislative fiscal committees and to the office of financial management for review and approval as per RCW 43.88.110(6) prior to the start of the 2006 regular legislative session.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$54,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$60,600,000
NEW SECTION. Sec. 642. FOR THE UNIVERSITY OF WASHINGTON
UW Playhouse Theater (05-1-004)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,000,000
NEW SECTION. Sec. 643. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Education Addition Cleveland Hall (98-2-032)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,700,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,700,000
NEW SECTION. Sec. 644. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Johnson Hall Addition-Plant Bioscience Building (00-2-007)
The reappropriations in this section are subject to the following conditions and limitations: Allotment for this reappropriation is contingent on the commitment of at least $10,000,000 in federal funds for a related facility or addition.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $606,500
Washington State University Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,606,500
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,393,500
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$39,000,000
NEW SECTION. Sec. 645. FOR WASHINGTON STATE UNIVERSITY
WSU Vancouver - Student Services Center (00-2-905)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,155,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,155,000
NEW SECTION. Sec. 646. FOR WASHINGTON STATE UNIVERSITY
WSU Spokane Riverpoint - Academic Center Building: New Facility (00-2-906)
The reappropriation in this section is subject to the following conditions and limitations: It is intended that the project funded in this section shall constitute the university's highest capital project priority through the 2005-07 biennium.
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,350,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$33,850,000
NEW SECTION. Sec. 647. FOR WASHINGTON STATE UNIVERSITY
Facility Preservation Backlog Reduction (04-1-951)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the reappropriation is provided solely to accomplish preservation work that improves existing state facilities in the worst relative condition for housed programs and current building occupants.
(2) With this reappropriation, the legislature intends to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preservation backlog reduction project funds shall be prioritized at local discretion to achieve the above stated goal, with particular attention given to buildings currently rated in adequate to marginal condition.
(3) This section is subject to the same allotment procedures as a minor works category.
(4) Section 906 of this act does not apply to this appropriation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Washington State University Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$38,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$42,000,000
NEW SECTION. Sec. 648. FOR WASHINGTON STATE UNIVERSITY
WSU Spokane - Nursing Building at Riverpoint (04-2-941)
The reappropriation in this section is subject to the following conditions and limitations: Upon completion of construction of this facility at the Riverpoint campus in Spokane, the existing land and facilities housing the intercollegiate nursing center adjacent to Spokane Falls Community College shall be transferred to the state board for community and technical colleges for the use of community college district 17, community colleges of Spokane.
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 649. FOR WASHINGTON STATE UNIVERSITY
WSU Tri-Cities - Bioproducts Facility (04-2-940)
The appropriations in this section are subject to the following conditions and limitations: Allotment for this appropriation is contingent on the commitment of at least an additional $10,000,000 provided through a lease revenue structure secured by a twenty year lease with Battelle and authorized in section 909(6) of this act.
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,650,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,750,000
NEW SECTION. Sec. 650. FOR WASHINGTON STATE UNIVERSITY
Center for Precision Agriculture (06-2-850)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,800,000
NEW SECTION. Sec. 651. FOR WASHINGTON STATE UNIVERSITY
WSU Pullman - Biotechnology/Life Sciences 2 (04-2-085)
Reappropriation:
Washington State University Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,250,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$45,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$49,650,000
NEW SECTION. Sec. 652. FOR WASHINGTON STATE UNIVERSITY
WSU Vancouver - Campus Utilities/Infrastructure: Infrastructure (04-2-916)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,300,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,300,000
NEW SECTION. Sec. 653. FOR WASHINGTON STATE UNIVERSITY
WSU Prosser - Multipurpose Building (04-2-942)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 654. FOR WASHINGTON STATE UNIVERSITY
Agricultural Research Facility Renovation and Repair (05-2-952)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation is provided solely for facility construction, renovation, and repair at agricultural research facilities other than in Pullman.
(2) Washington State University shall retain ownership of 22 acres of the lower pasture area south of the WSU Puyallup research campus and continue its existing use for agricultural research.
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 655. FOR WASHINGTON STATE UNIVERSITY
Campus Infrastructure (06-1-073)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,000,000
NEW SECTION. Sec. 656. FOR WASHINGTON STATE UNIVERSITY
Infrastructure Savings (06-1-751)
The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2
NEW SECTION. Sec. 657. FOR WASHINGTON STATE UNIVERSITY
Preventive Facility Maintenance and Building System Repairs (06-1-750)
The appropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
(2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds shall be allocated at local discretion to achieve the above stated performance goal, with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
(3) Section 906 of this act does not apply to this appropriation.
(4) There is no intent to reappropriate amounts not expended by June 30, 2007.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $10,115,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,115,000
NEW SECTION. Sec. 658. FOR WASHINGTON STATE UNIVERSITY
Equipment Omnibus (06-2-003)
Appropriation:
Washington State University Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,000,000
NEW SECTION. Sec. 659. FOR WASHINGTON STATE UNIVERSITY
Minor Capital Improvements (MCI) (06-2-002)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Washington State University Building Account--
State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,000,000
NEW SECTION. Sec. 660. FOR WASHINGTON STATE UNIVERSITY
Minor Works - Facility Preservation (06-1-001)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,000,000
Washington State University Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,500,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,500,000
NEW SECTION. Sec. 661. FOR WASHINGTON STATE UNIVERSITY
Minor Works - Health, Safety, and Code (06-1-002)
Appropriation:
Washington State University Building Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
NEW SECTION. Sec. 662. FOR EASTERN WASHINGTON UNIVERSITY
EWU Computing and Engineering Sciences Building (Cheney Hall) (00-2-009)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,059,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,841,482
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,900,482
NEW SECTION. Sec. 663. FOR EASTERN WASHINGTON UNIVERSITY
EWU Senior Hall Renovation (00-1-003)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,938,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,493,012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,431,012
NEW SECTION. Sec. 664. FOR EASTERN WASHINGTON UNIVERSITY
EWU Campus Network Upgrade (04-2-003)
Reappropriation:
Eastern Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,215,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,160,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,375,000
NEW SECTION. Sec. 665. FOR EASTERN WASHINGTON UNIVERSITY
Cheney Hall Renovation (06-1-703)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,002,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,002,000
NEW SECTION. Sec. 666. FOR EASTERN WASHINGTON UNIVERSITY
Isle Hall Renovation (06-1-705)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $119,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,505,489
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,624,489
NEW SECTION. Sec. 667. FOR EASTERN WASHINGTON UNIVERSITY
Martin Williamson Renovation (06-1-706)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,436,277
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,636,277
NEW SECTION. Sec. 668. FOR EASTERN WASHINGTON UNIVERSITY
Hargreaves Hall Renovation (06-1-701)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,414,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,821,204
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,235,204
NEW SECTION. Sec. 669. FOR EASTERN WASHINGTON UNIVERSITY
Surplus Sales Building Renovation (Matlocks) (06-1-704)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,651,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,651,000
NEW SECTION. Sec. 670. FOR EASTERN WASHINGTON UNIVERSITY
Walkway Pavers (06-1-702)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,600,482
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,600,482
NEW SECTION. Sec. 671. FOR EASTERN WASHINGTON UNIVERSITY
Spokane Riverpoint Nursing Building (06-2-850)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$31,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$31,600,000
NEW SECTION. Sec. 672. FOR EASTERN WASHINGTON UNIVERSITY
EWU Minor Works - Preservation (02-1-003)
Reappropriation:
Eastern Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $566,168
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,433,832
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,000,000
NEW SECTION. Sec. 673. FOR EASTERN WASHINGTON UNIVERSITY
EWU Water System Preservation and Expansion (02-1-008)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $196,072
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,039,928
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,736,000
NEW SECTION. Sec. 674. FOR EASTERN WASHINGTON UNIVERSITY
EWU Infrastructure Preservation (04-1-006)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,600,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,850,000
NEW SECTION. Sec. 675. FOR EASTERN WASHINGTON UNIVERSITY
EWU University Visitor Center and Formal Entry (04-2-010)
Reappropriation:
Eastern Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $900,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $975,000
NEW SECTION. Sec. 676. FOR EASTERN WASHINGTON UNIVERSITY
Facility Preservation Backlog Reduction (04-1-952)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., this reappropriation is provided solely to accomplish preservation work that improves existing state facilities in the worst relative condition for housed programs and current building occupants.
(2) With this reappropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preservation backlog reduction project funds shall be prioritized at local discretion to achieve the above stated goal, with particular attention given to buildings currently rated in adequate to marginal condition.
(3) This section is subject to the same allotment procedures as a minor works category.
(4) Section 906 of this act does not apply to this reappropriation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,750,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,250,000
NEW SECTION. Sec. 677. FOR EASTERN WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (06-1-710)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,000,000
NEW SECTION. Sec. 678. FOR EASTERN WASHINGTON UNIVERSITY
Minor Works - Health Safety and Code Compliance (06-1-711)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,700,000
NEW SECTION. Sec. 679. FOR EASTERN WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (06-1-712)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,500,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,500,000
NEW SECTION. Sec. 680. FOR EASTERN WASHINGTON UNIVERSITY
Infrastructure Savings (06-1-751)
The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2
NEW SECTION. Sec. 681. FOR EASTERN WASHINGTON UNIVERSITY
Preventive Facility Maintenance and Building System Repairs (06-1-750)
The appropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
(2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds shall be allocated at local discretion to achieve the above stated performance goal, with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
(3) Section 906 of this act does not apply to this appropriation.
(4) There is no intent to reappropriate amounts not expended by June 30, 2007.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,217,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,217,000
NEW SECTION. Sec. 682. FOR EASTERN WASHINGTON UNIVERSITY
Minor Works Program (06-2-006)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,600,000
Eastern Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $15,600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$59,600,000
NEW SECTION. Sec. 683. FOR CENTRAL WASHINGTON UNIVERSITY
Music Education Facility (00-2-001)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,600,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,600,000
NEW SECTION. Sec. 684. FOR CENTRAL WASHINGTON UNIVERSITY
CWU/Des Moines Higher Education Center (02-2-101)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,575,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,575,000
NEW SECTION. Sec. 685. FOR CENTRAL WASHINGTON UNIVERSITY
Combined Utility Upgrade (04-1-952)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,800,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,400,000
NEW SECTION. Sec. 686. FOR CENTRAL WASHINGTON UNIVERSITY
CWU/Moses Lake Higher Education Center (04-2-031)
Reappropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $280,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $320,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
NEW SECTION. Sec. 687. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works - Program (04-2-028)
Reappropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,600,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 688. FOR CENTRAL WASHINGTON UNIVERSITY
CWU/Wenatchee Higher Education Center (05-2-850)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500,000
NEW SECTION. Sec. 689. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code Requirements (05-1-850)
Reappropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $450,000
NEW SECTION. Sec. 690. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works - Infrastructure (05-1-851)
Reappropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $113,500
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $713,500
NEW SECTION. Sec. 691. FOR CENTRAL WASHINGTON UNIVERSITY
Combined Utilities (06-1-007)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,400,000
NEW SECTION. Sec. 692. FOR CENTRAL WASHINGTON UNIVERSITY
Dean Hall Renovation (06-1-004)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,600,000
NEW SECTION. Sec. 693. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (06-1-003)
Appropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,058,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,080,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,138,000
NEW SECTION. Sec. 694. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code Requirements (06-1-001)
Appropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,200,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 695. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (06-1-002)
Appropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,500,000
NEW SECTION. Sec. 696. FOR CENTRAL WASHINGTON UNIVERSITY
Infrastructure Savings (06-1-751)
The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2
NEW SECTION. Sec. 697. FOR CENTRAL WASHINGTON UNIVERSITY
Preventive Facility Maintenance and Building System Repairs (06-1-750)
The appropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
(2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds shall be allocated at local discretion to achieve the above stated performance goal, with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
(3) Section 906 of this act does not apply to this appropriation.
(4) There is no intent to reappropriate amounts not expended by June 30, 2007.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,422,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,422,000
NEW SECTION. Sec. 698. FOR CENTRAL WASHINGTON UNIVERSITY
Minor Works Program (06-2-005)
Appropriation:
Central Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,390,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,272,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,662,000
NEW SECTION. Sec. 699. FOR CENTRAL WASHINGTON UNIVERSITY
Nicholson Pavilion Indoor Air/Asbestos (06-1-008)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,100,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,100,000
NEW SECTION. Sec. 700. FOR THE EVERGREEN STATE COLLEGE
Seminar Building Phase II - Construction (02-2-004)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation shall not be used for
vehicles, laptop computers, small printers, disposable items, or other items with a useful life of less than one year.
Reappropriation:
The Evergreen State College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$42,550,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$43,250,000
NEW SECTION. Sec. 701. FOR THE EVERGREEN STATE COLLEGE
Daniel J. Evans Building - Modernization (04-2-006)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,500,000
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$43,750,000
NEW SECTION. Sec. 702. FOR THE EVERGREEN STATE COLLEGE
Facility Preservation Backlog Reduction (04-1-951)
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., this reappropriation is provided solely to accomplish preservation work that improves existing state facilities in the worst relative condition for housed programs and current building occupants.
(2) With this reappropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preservation backlog reduction project funds shall be prioritized at local discretion to achieve the above stated goal, with particular attention given to buildings currently rated in adequate to marginal condition.
(3) This section is subject to the same allotment procedures as a minor works category.
(4) Section 906 of this act does not apply to this reappropriation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $300,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,950,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,250,000
NEW SECTION. Sec. 703. FOR THE EVERGREEN STATE COLLEGE
Infrastructure Preservation (04-1-001)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,950,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,550,000
NEW SECTION. Sec. 704. FOR THE EVERGREEN STATE COLLEGE
Minor Works - Health, Safety, and Code (04-1-004)
Reappropriation:
The Evergreen State College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,800,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,500,000
NEW SECTION. Sec. 705. FOR THE EVERGREEN STATE COLLEGE
Health, Safety, and Code Requirements (06-1-002)
Appropriation:
The Evergreen State College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,000,000
NEW SECTION. Sec. 706. FOR THE EVERGREEN STATE COLLEGE
Infrastructure Preservation (06-1-004)
Appropriation:
The Evergreen State College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,450,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,450,000
NEW SECTION. Sec. 707. FOR THE EVERGREEN STATE COLLEGE
Infrastructure Savings (06-1-751)
The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2
NEW SECTION. Sec. 708. FOR THE EVERGREEN STATE COLLEGE
Preventive Facility Maintenance and Building System Repairs (06-1-750)
The appropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
(2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds shall be allocated at local discretion to achieve the above stated performance goal, with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
(3) Section 906 of this act does not apply to this appropriation.
(4) There is no intent to reappropriate amounts not expended by June 30, 2007.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$760,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $760,000
NEW SECTION. Sec. 709. FOR THE EVERGREEN STATE COLLEGE
Minor Works - Facility Preservation (06-1-003)
Appropriation:
The Evergreen State College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
NEW SECTION. Sec. 710. FOR THE EVERGREEN STATE COLLEGE
Minor Works Program (06-2-005)
Appropriation:
The Evergreen State College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,725,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,225,000
NEW SECTION. Sec. 711. FOR WESTERN WASHINGTON UNIVERSITY
Campus Infrastructure Development (98-2-024)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,420,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,859,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,279,000
NEW SECTION. Sec. 712. FOR WESTERN WASHINGTON UNIVERSITY
Academic Instructional Center (02-2-026)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$51,438,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,733,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$57,171,000
NEW SECTION. Sec. 713. FOR WESTERN WASHINGTON UNIVERSITY
Communications Facility (98-2-053)
Reappropriation:
Western Washington University Capital
Projects Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,043,400
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,393,400
NEW SECTION. Sec. 714. FOR WESTERN WASHINGTON UNIVERSITY
Bond Hall Renovation/Asbestos Abatement (04-1-080)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $400,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,900,000
NEW SECTION. Sec. 715. FOR WESTERN WASHINGTON UNIVERSITY
Campus Roadway Development (04-2-073)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The purpose of the reappropriation is to complete a predesign of potential south campus roadway options and general circulation issues that avoids significant impacts on adjacent neighborhoods and conforms to the city of Bellingham traffic plans.
(2) The predesign shall also investigate options to achieve higher rates of alternative modes of transportation among faculty, staff, and students, minimize surface parking, and make improvements for traffic circulation, including public transit. Safe movement of pedestrians and bicyclists shall be a priority.
(3) Allotment for predesign is contingent upon the completion of a communication and public involvement plan for this project that is consistent with the significant projects section of the Western Washington University institutional master plan and adjacent neighborhood plans adopted by the city of Bellingham, the city of Bellingham Western Washington University neighborhood plan, and the neighborhood meeting requirements contained in Bellingham municipal code 20.40.060. The communication and public involvement plan shall seek to maximize public input through coordination of the planning effort with established neighborhood advisory groups and boards recognized by the city of Bellingham.
Reappropriation:
Western Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $38,826
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $290,174
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,625,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,954,000
NEW SECTION. Sec. 716. FOR WESTERN WASHINGTON UNIVERSITY
Facility Preservation Backlog Reduction (04-1-952)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the reappropriation is provided solely to accomplish preservation work that improves existing state facilities in the worst relative condition for housed programs and current building occupants.
(2) With this reappropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preservation backlog reduction project funds shall be prioritized at local discretion to achieve the above stated goal, with particular attention given to buildings currently rated in adequate to marginal condition.
(3) This section is subject to the same allotment procedures as a minor works category.
(4) Section 906 of this act does not apply to this reappropriation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,950,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,300,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,250,000
NEW SECTION. Sec. 717. FOR WESTERN WASHINGTON UNIVERSITY
Miller Hall Renovation (04-1-953)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $62,418
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $187,582
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$34,750,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,000,000
NEW SECTION. Sec. 718. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code (04-1-074)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 719. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (04-1-075)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $130,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,420,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,550,000
NEW SECTION. Sec. 720. FOR WESTERN WASHINGTON UNIVERSITY
Infrastructure Savings (06-1-751)
The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2
NEW SECTION. Sec. 721. FOR WESTERN WASHINGTON UNIVERSITY
Preventive Facility Maintenance and Building System Repairs (06-1-750)
The appropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
(2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds shall be allocated at local discretion to achieve the above stated performance goal, with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
(3) Section 906 of this act does not apply to this appropriation.
(4) There is no intent to reappropriate amounts not expended by June 30, 2007.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,614,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,614,000
NEW SECTION. Sec. 722. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works - Program (04-2-077)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $550,000
NEW SECTION. Sec. 723. FOR WESTERN WASHINGTON UNIVERSITY
Shannon Point Marine - Undergraduate Center (04-2-059)
The reappropriation in this section is subject to the following conditions and limitations: Any further appropriations for equipment or furnishings shall be met with local funds.
Reappropriation:
Western Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $998,329
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,998,329
NEW SECTION. Sec. 724. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works - Facility Preservation (06-1-083)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,290,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,290,000
NEW SECTION. Sec. 725. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works - Health, Safety, and Code (06-1-082)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,580,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,580,000
NEW SECTION. Sec. 726. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works - Infrastructure Preservation (06-1-084)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,630,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,630,000
NEW SECTION. Sec. 727. FOR WESTERN WASHINGTON UNIVERSITY
Minor Works - Program (06-2-085)
Appropriation:
Western Washington University Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,900,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$36,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,900,000
NEW SECTION. Sec. 728. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Lewis and Clark Interpretive Infrastructure Grant (02-4-001)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,806,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $194,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 729. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Pacific-Lewis and Clark Station Camp Park Project (02-S-001)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,047,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,505,226
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,552,226
NEW SECTION. Sec. 730. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Washington Heritage Projects (02-4-004)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $399,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,601,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 731. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Stadium Way Research Center-Code Violation Correction (04-1-003)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $293,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $168,200
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $461,200
NEW SECTION. Sec. 732. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Washington Heritage Projects (04-4-004)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,563,339
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $436,661
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,000,000
NEW SECTION. Sec. 733. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Olympia - State Capital Museum: Building Preservation (06-1-003)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $330,694
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $330,694
NEW SECTION. Sec. 734. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Statewide - Washington Heritage Project Grants (06-4-004)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is subject to the provisions of RCW 27.34.330.
(2) The appropriation is provided for the following list of projects:
Project Amount Recommended
Whatcom museum of history and art $133,303
Fort Walla Walla museum $150,000
Northwest maritime center $345,000
Squaxin Island tribal museum library and research center $210,539
Confluence project $500,000
City of Tumwater $70,901
City of Tacoma $350,000
Fox theater $102,000
Shoreline historical museum $143,578
Metro park district of Tacoma $35,000
Seattle parks department $150,000
Armed forces and aerospace museum $295,000
City of Lynnwood $85,294
Meadowbrook farm interpretive center $72,149
Center for wooden boats $100,000
Bainbridge Island historical society $207,957
Quileute tribal council $150,000
Northwest railway museum $360,000
Port Gamble S'Klallam tribe $363,579
Concrete heritage museum association $12,750
Quincy Valley historical society and museum $23,300
Foss waterway development authority $250,000
Broadway center for the performing arts $225,000
Village theatre $65,581
White river valley museum $99,069
Cascade land conservancy $112,500
TOTAL $4,612,500
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,612,500
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,612,500
NEW SECTION. Sec. 735. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Tacoma - Research Center: Building Preservation (06-1-002)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $181,650
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $181,650
NEW SECTION. Sec. 736. FOR THE WASHINGTON STATE HISTORICAL SOCIETY
Tacoma-State History Museum Building Preservation (06-1-001)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $481,344
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $481,344
NEW SECTION. Sec. 737. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
History and American Indian Education Classrooms (06-2-002)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $156,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $156,000
NEW SECTION. Sec. 738. FOR THE EASTERN WASHINGTON STATE HISTORICAL SOCIETY
Museum Preservation (06-1-001)
The appropriation in this section is subject to the following conditions and limitations: $114,000 is to be used for exterior preservation and sewer line repair of historic Campbell house and Carriage house. The balance of the request is for unforeseen emergencies that might endanger the museum structures or the valuable collections they contain, or affect staff and visitor health and safety.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,150,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,435,000
NEW SECTION. Sec. 739. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark College: Clark Center at WSU Vancouver (00-2-680)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $27,902
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,860,252
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,888,154
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,885,646
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,773,800
NEW SECTION. Sec. 740. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Highline Community College: Higher Education Center/Childcare (00-2-678)
The reappropriations in this section are subject to the following conditions and limitations: Up to $550,000 may be used to develop additional parking needed to support this project.
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $320,035
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,400,406
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,720,441
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,726,559
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,447,000
NEW SECTION. Sec. 741. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College Puyallup: Phase III Expansion (00-2-676)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,101,510
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,233,464
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,334,974
NEW SECTION. Sec. 742. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Puget Sound Community College: Humanities/General Education Complex (00-2-679)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,875,459
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,379,789
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,255,248
NEW SECTION. Sec. 743. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Whatcom Community College: Classroom/Lab Building (00-2-677)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $219,893
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,684,407
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,904,300
NEW SECTION. Sec. 744. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College: Higher Education Center (00-2-954)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $777,312
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,722,688
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,500,000
NEW SECTION. Sec. 745. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College: Science Building (01-2-688)
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $957,375
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,407,344
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,539,034
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$29,903,753
NEW SECTION. Sec. 746. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Tacoma Community College: Science Building (01-2-687)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,324,163
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$29,517,238
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,154,837
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$31,996,238
NEW SECTION. Sec. 747. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bates Technical College: LRC/Vocational (02-2-684)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $953,271
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,169,058
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $937,281
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,059,610
NEW SECTION. Sec. 748. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellingham Technical College: Replacement (02-1-239)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $311,102
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,046,798
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,357,900
NEW SECTION. Sec. 749. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Cascadia Community College/University of Washington Bothell: Phase 2B Off Ramp (02-2-999)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,742,500
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,550,000
NEW SECTION. Sec. 750. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Edmonds Community College: Instructional Lab Building - Construction (02-2-685)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $573,448
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,490,832
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,423,612
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,487,892
NEW SECTION. Sec. 751. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Facility Repairs "A" (02-1-050)
Reappropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,425,677
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,234,651
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$21,660,328
NEW SECTION. Sec. 752. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lake Washington Technical College: Replacement (02-1-240)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,593,957
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,321,343
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,915,300
NEW SECTION. Sec. 753. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Peninsula College: Buildings D and E Renovation (02-1-310)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $259,718
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,410,082
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,669,800
NEW SECTION. Sec. 754. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College: Edison Hall Renovation (02-1-315)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,317,752
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,491,448
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,809,200
NEW SECTION. Sec. 755. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College: Portables Replacement (02-1-215)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,209,830
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $687,570
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,897,400
NEW SECTION. Sec. 756. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Shoreline Community College: Building 800 Renovation (02-1-319)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $403,444
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,617,656
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,021,100
NEW SECTION. Sec. 757. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Skagit Valley College: Office Space Replacement (02-1-213)
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $355,690
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $406,999
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $762,689
NEW SECTION. Sec. 758. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Puget Sound Community College: Family Education Center/Child Center (02-1-238)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $458,285
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,673,715
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,132,000
NEW SECTION. Sec. 759. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle Community College: Building "A" Replacement (02-1-217)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75,588
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,401,812
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,477,400
NEW SECTION. Sec. 760. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Falls Community College: Library Renovation (02-1-331)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $231,625
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,370,375
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,602,000
NEW SECTION. Sec. 761. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Tacoma Community College: Information Technology Vocational Center (02-2-683)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,825,132
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,904,868
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,730,000
NEW SECTION. Sec. 762. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Walla Walla Community College: Basic Skills/Computer Lab (02-2-686)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $508,951
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,569,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,349
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,178,300
NEW SECTION. Sec. 763. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Job Creation and Infrastructure Projects (03-1-001)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The reappropriation in this section shall support the projects as listed in section 224, chapter 238, Laws of 2002.
(2) The legislature does not intend to reappropriate amounts not expended by June 30, 2007.
Reappropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,310,520
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,289,655
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,600,175
NEW SECTION. Sec. 764. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bates-Clover Park Equipment Improvements (04-2-950)
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $179,975
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,820,025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 765. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellevue Community College: NWCET Expansion (04-2-402)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The purpose of the reappropriation is to build an additional 4,000 square feet of open lab space to accommodate new and expanding information technology and media programs.
(2) State funds will be matched with nonstate resources of at least $500,000.
(3) Allotment of funds shall be in accordance with RCW 43.88.150.
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $312,493
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $187,507
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 766. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellevue Community College: "D" Building Renovation (04-1-308)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,418,700
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $973,646
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$12,392,346
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,026,354
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,418,700
NEW SECTION. Sec. 767. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellevue Community College: Science and Technology (04-2-690)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,647,600
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,791,460
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$38,529,060
NEW SECTION. Sec. 768. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellingham Technical College: Welding/Auto Collision Replacement (04-1-213)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,704,053
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,357,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,061,053
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $776,947
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,838,000
NEW SECTION. Sec. 769. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Cascadia Community College: Center for Arts, Technology, Communications (04-2-693)
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,031,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $159,900
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,636,100
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$35,827,000
NEW SECTION. Sec. 770. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Centralia Community College: Science Building (04-2-850)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,247,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,676,490
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,073,490
NEW SECTION. Sec. 771. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark College: East County Satellite (04-1-689)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $74,507
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,392,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $225,493
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,777,125
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,469,125
NEW SECTION. Sec. 772. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark College: Renovation - Applied Arts 5 (04-1-303)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $927,047
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,945,366
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,872,413
NEW SECTION. Sec. 773. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark College: Stout Hall (04-1-203)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,810,514
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $239,375
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,049,889
NEW SECTION. Sec. 774. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Columbia Basin College: Renovation T Building (04-1-307)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $531,710
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,526,790
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,058,500
NEW SECTION. Sec. 775. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Edmonds Community College: Renovation - Mountlake Terrace Hall (04-1-311)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,399,092
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,427,938
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,827,030
NEW SECTION. Sec. 776. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Everett Community College: Pilchuck/Glacier (04-1-205)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $907,033
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,633,300
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $404,667
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,945,000
NEW SECTION. Sec. 777. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Everett Community College: Replacement - Monte Cristo Hall (04-1-305)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,926,247
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $425,753
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,352,000
NEW SECTION. Sec. 778. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Everett Community College: Undergraduate Education Center (04-2-692)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,363,700
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $126,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,407,540
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$34,897,240
NEW SECTION. Sec. 779. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Facility Preservation Backlog Reduction (04-1-951)
The reappropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the reappropriation is provided solely to accomplish preservation work that improves existing state facilities in the worst relative condition for housed programs and current building occupants.
(2) With this reappropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preservation backlog reduction project funds shall be prioritized at local discretion to achieve the above stated goal, with particular attention given to buildings currently rated in adequate to marginal condition.
(3) This section is subject to the same allotment procedures as a minor works category.
(4) Section 906 of this act does not apply to this reappropriation.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$40,824,753
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,475,247
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$64,300,000
NEW SECTION. Sec. 780. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Grays Harbor College: Replacement - Instructional Building (04-1-204)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $229,284
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,471,749
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$19,701,033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,034,016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,735,049
NEW SECTION. Sec. 781. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College: Computer Technology Center (04-2-682)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,228,751
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,770,749
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,999,500
NEW SECTION. Sec. 782. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lake Washington Technical College: Renovation - East/West Buildings (04-1-312)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,463,880
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $956,920
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,420,800
NEW SECTION. Sec. 783. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lake Washington Technical College: Redmond Land Acquisition (04-2-403)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The purpose of the reappropriation is to purchase property for expansion, storm water retention, and parking requirements.
(2) State funds must be matched with nonstate resources of at least $500,000.
(3) Allotment of funds shall be in accordance with RCW 43.88.150.
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 784. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lower Columbia College: Instructional Fine Arts Building (04-1-214)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,758,314
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,589,727
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,348,041
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,333,976
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $979,758
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,661,775
NEW SECTION. Sec. 785. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Minor Works - Program (Minor Improvements) (04-2-130)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,257,113
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,894,945
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,152,058
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,827,159
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,979,217
NEW SECTION. Sec. 786. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
North Seattle Community College: Arts and Science Renovation (04-1-309)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $303,265
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,482,435
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,785,700
NEW SECTION. Sec. 787. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Olympic College: Science and Technology Building Replacement (04-1-202)
The reappropriation in this section is subject to the following conditions and limitations: Up to $8,110,000 is provided as additional support for this project by the reappropriation in section 779 of this act.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10,998,000
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,361,964
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,359,964
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $638,036
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$13,998,000
NEW SECTION. Sec. 788. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Peninsula College: Replacement Science and Technology Building (04-1-208)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $468,734
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,423,200
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $748,066
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,640,000
NEW SECTION. Sec. 789. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College - Fort Steilacoom: Science and Technology (04-2-694)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,986,447
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $190,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,106,553
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,283,000
NEW SECTION. Sec. 790. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College Puyallup: Community Arts/Allied Health (04-2-691)
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,946,716
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $150,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,303,284
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,400,000
NEW SECTION. Sec. 791. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College Fort Steilacoom: Childcare Center (04-2-401)
The reappropriation in this section is subject to the following conditions and limitations:
(1) The purpose of the reappropriation is to construct a 10,000 square foot childcare center as identified in the college's master plan.
(2) State funds must be matched with nonstate resources in the amount of $2,250,000.
(3) Allotment of funds shall be in accordance with RCW 43.88.150.
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $497,338
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,662
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 792. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Renton Technical College: Portable Replacement (04-1-215)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $404,905
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,976,235
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $14,395
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,395,535
NEW SECTION. Sec. 793. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Roof Repairs "A" (04-1-010)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,572,735
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,692,942
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,265,677
NEW SECTION. Sec. 794. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College: Replacement North Plaza Building (04-1-275)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,976,200
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,976,200
NEW SECTION. Sec. 795. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Site Repairs "A" (04-1-090)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,692,856
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,612,768
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,305,624
NEW SECTION. Sec. 796. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Skagit Valley College: Science Building Replacement (04-1-209)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $14,664
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,693,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285,336
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,268,049
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$27,261,049
NEW SECTION. Sec. 797. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Puget Sound Community College: Science Complex (04-2-695)
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,160,500
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $93,200
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,867,300
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$29,121,000
NEW SECTION. Sec. 798. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle Community College: Instruction Technology Center (04-2-681)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,280,107
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,580,893
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,861,000
NEW SECTION. Sec. 799. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle Community College: Renovation - Pastry Vocational Program (04-1-314)
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,545,470
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $67,630
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,613,100
NEW SECTION. Sec. 800. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Community College: Science Building Replacement (04-1-212)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,838,825
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $882,775
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,721,600
NEW SECTION. Sec. 801. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Tacoma Community College: Renovation - Building 7 (04-1-313)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,759,822
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $228,178
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,988,000
NEW SECTION. Sec. 802. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Tacoma Community College: Replacement - Portable Buildings (04-1-206)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,401,778
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $220,222
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,622,000
NEW SECTION. Sec. 803. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Walla Walla Community College: Health Science Facility (04-1-211)
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,763,672
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $497,728
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,261,400
NEW SECTION. Sec. 804. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College: Glenn/Anthon Hall - Replacement (04-1-207)
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,645,152
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,645,152
NEW SECTION. Sec. 805. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College: Renovation - Sundquist (04-1-302)
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $654,799
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,197,901
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,852,700
NEW SECTION. Sec. 806. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Columbia Basin College: Health Sciences Center (05-2-851)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,857,624
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $142,376
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,000,000
NEW SECTION. Sec. 807. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Employability Colocation Study (05-4-850)
Reappropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $18,167
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $31,833
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$50,000
NEW SECTION. Sec. 808. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle: Training Facility (05-1-854)
The appropriation in this section is subject to the following conditions and limitations: The appropriation is for the construction of a training facility and a separate academic/administrative facility to replace light wood frame structures.
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $710,002
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$9,272,283
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $11,998
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,994,283
NEW SECTION. Sec. 809. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Falls: Business and Social Science Building (05-1-853)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,754,854
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$18,512,385
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45,146
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,312,385
NEW SECTION. Sec. 810. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Wenatchee Valley College: Anderson Hall and Portable Replacement (05-1-852)
Reappropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,285,924
Appropriation:
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,042,145
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $332,076
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$24,660,145
NEW SECTION. Sec. 811. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Bellevue Community College: Flood Damage (06-1-331)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $700,000
NEW SECTION. Sec. 812. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Big Bend Community College: Performing Arts and Fine Arts (06-1-309)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,698,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,698,000
NEW SECTION. Sec. 813. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark College: Gaiser Hall Renovation (06-1-302)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,374,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,374,000
NEW SECTION. Sec. 814. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clark College: O'Connell Sports Center Improvements (06-2-403)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $650,000
NEW SECTION. Sec. 815. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clover Park Technical College: Allied Health Care Facility (06-2-699)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $160,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,085,285
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$25,245,285
NEW SECTION. Sec. 816. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Clover Park Technical College: Personal Care Services Facility (06-1-310)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,499,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $6,499,000
NEW SECTION. Sec. 817. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Columbia Basin College: Diversity Initiatives Office (06-2-409)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 818. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Edmonds Community College: Brier Hall Renovation (06-1-307)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,133,020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,133,020
NEW SECTION. Sec. 819. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Everett Community College: Paine Field Technical Center (06-2-408)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 820. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Facility Repairs (06-1-050)
Appropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,327,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$92,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $114,327,000
NEW SECTION. Sec. 821. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Grays Harbor College: Ilwaco Education Center (06-2-401)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $350,000
NEW SECTION. Sec. 822. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Grays Harbor College: Vocational Education Renovation (06-1-303)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$5,371,199
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5,371,199
NEW SECTION. Sec. 823. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College: General Classroom Building (06-1-205)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $137,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,629,327
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,766,327
NEW SECTION. Sec. 824. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College: Water System Replacement (06-1-501)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,951,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,951,000
NEW SECTION. Sec. 825. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College: Physical Education Renovation (06-1-313)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $477,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,437,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,914,000
NEW SECTION. Sec. 826. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Green River Community College: Skills Support Center Addition (06-2-405)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $800,000
NEW SECTION. Sec. 827. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Highline Community College: Primary Power Branch Replacement (06-1-503)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,717,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,717,000
NEW SECTION. Sec. 828. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Highline Community College: Marine Science and Technology (06-2-406)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
NEW SECTION. Sec. 829. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lake Washington Technical College: Allied Health Building (06-2-697)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $197,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$29,379,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$29,576,000
NEW SECTION. Sec. 830. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Lake Washington Technical College: Science Lab Renovation (06-1-308)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,758,237
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,758,237
NEW SECTION. Sec. 831. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Minor Works: Program (06-2-130)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,002,598
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$80,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100,002,598
NEW SECTION. Sec. 832. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Minor Works Preservation (RMI) (06-1-001)
Appropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$67,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$81,000,000
NEW SECTION. Sec. 833. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Infrastructure Savings (06-1-751)
The appropriations in this section are subject to the following conditions and limitations: Projects that are completed in accordance with section 906 of this act may have their remaining funds transferred to this appropriation for other preservation projects approved by the office of financial management.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Gardner-Evans Higher Education Construction
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2
NEW SECTION. Sec. 834. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Preventive Facility Maintenance and Building System Repairs (06-1-750)
The appropriation in this section is subject to the following conditions and limitations:
(1) Pursuant to definitions and provisions in section 925, chapter 26, Laws of 2003 1st sp. sess., the appropriation is provided solely to maintain facilities housing educational and general programs and to maintain its major building systems and campus infrastructure. Building maintenance, mechanical adjustments, repairs, and minor works for the facility or its major building systems and campus infrastructure must extend the remaining useful life of the facility or keep it safe and functioning normally.
(2) With this appropriation, the intent is to improve the average condition of state facilities as compared to the baseline conditions documented in report 03-1 of the joint legislative audit and review committee. Preventive facility maintenance project funds shall be allocated at the state board's discretion to achieve the above stated performance goal, with particular attention given to buildings currently rated in superior to adequate condition so as to maximize useful life given both the passage of time and intensity with which the space is used.
(3) Section 906 of this act does not apply to this appropriation.
(4) There is no intent to reappropriate amounts not expended by June 30, 2007.
Appropriation:
Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $22,802,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$22,802,000
NEW SECTION. Sec. 835. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
North Seattle Community College: Wellness Center Repairs (06-1-330)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3,000,000
NEW SECTION. Sec. 836. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Olympic College: Bremer Student Center (06-2-411)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600,000
NEW SECTION. Sec. 837. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Olympic College: Humanities and Student Services (06-1-204)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,499,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$39,615,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$43,114,000
NEW SECTION. Sec. 838. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Peninsula College: Library Renovation (06-1-305)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,000,000
NEW SECTION. Sec. 839. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Peninsula College: Phase II Cultural and Arts Center (06-2-412)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 840. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Pierce College Fort Steilacoom: Cascade Building Renovation (06-1-326)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,350,622
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$14,601,736
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$17,952,358
NEW SECTION. Sec. 841. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Roof Repairs (06-1-010)
Appropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,840,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$28,840,000
NEW SECTION. Sec. 842. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College: Greenhouse/Educational Center (06-2-410)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
NEW SECTION. Sec. 843. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College: Maritime Academy Repairs (06-1-502)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,856,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,856,000
NEW SECTION. Sec. 844. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Seattle Central Community College: Information Technology and Visual Communications (06-1-304)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,096,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,096,000
NEW SECTION. Sec. 845. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Shoreline Community College: Annex Renovation (06-1-312)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,739,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,739,000
NEW SECTION. Sec. 846. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Site Repairs (06-1-090)
Appropriation:
Community/Technical College Capital Projects
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,837,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$23,837,000
NEW SECTION. Sec. 847. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Skagit Valley College: Campus Fire Loop Replacement (06-1-504)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,634,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,634,000
NEW SECTION. Sec. 848. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Puget Sound Community College: Learning Resource Center (06-2-698)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $197,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$38,650,300
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$38,847,300
NEW SECTION. Sec. 849. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle Community College: Automotive Collision Technology (06-1-306)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,972,300
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,972,300
NEW SECTION. Sec. 850. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle Community College: Horticulture/SCGS Classrooms (06-2-404)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $557,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $557,000
NEW SECTION. Sec. 851. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Spokane Falls Community College: Campus Classrooms (06-2-696)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $82,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,488,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$20,570,000
NEW SECTION. Sec. 852. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Walla Walla Community College: Clarkston Health Science Facility (06-2-402)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 853. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Wenatchee Valley College: Brown Library Renovation (06-1-311)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,404,300
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,404,300
NEW SECTION. Sec. 854. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College: Center for Workforce Education (06-2-407)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
NEW SECTION. Sec. 855. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Yakima Valley Community College: Raymond Hall Renovation (06-1-325)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,168,350
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,168,350
NEW SECTION. Sec. 856. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM North Seattle Community College: Employment Resource Center (06-2-851)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation in this section is provided solely for predesign and design funding of a colocated one-stop office on the North Seattle Community College campus with the employment security department, the department of social and health services, and WorkSource partnering agencies. The facility will provide integrated services to offer direct opportunities for skill improvement and to enhance employment outcomes of Washington state citizens.
(2) Prior to allotment for design, the state board for community and technical colleges shall submit a predesign document to the office of financial management and legislative fiscal committees identifying and outlining the project, scope, schedule, and preliminary cost estimates anticipated for the building, including identification of a revenue stream sufficient to pay future debt service costs on a certificate of participation.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $520,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $520,000
NEW SECTION. Sec. 857. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
Walla Walla Community College: Center for Water and Environmental Studies (06-2-853)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,000,000
NEW SECTION. Sec. 858. FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM Edmonds Community College: Center for Fine Arts and Performing Arts (06-2-950)
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000
PART 6
MISCELLANEOUS AND SUPPLEMENTAL PROVISIONS
MISCELLANEOUS PROVISIONS
NEW SECTION. Sec. 901. The estimated debt service costs impacting future general fund expenditures related solely to new capital appropriations within this act are $19,503,912 during the 2005-2007 fiscal period; $128,151,322 during the 2007-2009 fiscal period; $200,451,220 during the 2009-2011 fiscal period; $207,686,311 during the 2011-2013 fiscal period; and $210,558,739 during the 2013-2015 period.
NEW SECTION. Sec. 902. (1) Allotments for appropriations in this act shall be provided in accordance with the capital project review requirements adopted by the office of financial management. The office of financial management shall notify the house of representatives capital budget committee and the senate ways and means committee of allotment releases based on review by the office of financial management. No expenditure may be incurred or obligation entered into for appropriations in this act until the office of financial management has given final approval to the allotment of the funds to be expended or encumbered. For allotments under this act, the allotment process includes, in addition to the statement of proposed expenditures for the current biennium, a category or categories for any reserve amounts and amounts expected to be expended in future biennia. Projects that will be employing alternative public works construction procedures under chapter 39.10 RCW are subject to the allotment procedures defined in this section and RCW 43.88.110. Contracts shall not be executed that call for expenditures in excess of the approved allotment, and the total amount shown in such contracts for the cost of future work that has not been appropriated shall not exceed the amount identified for such work in the level of funding approved by the office of financial management at the completion of predesign.
(2) The legislature intends that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
NEW SECTION. Sec. 903. To ensure that major construction projects are carried out in accordance with legislative and executive intent, appropriations in this act in excess of $5,000,000 shall not be expended or encumbered until the office of financial management has reviewed and approved the agency's predesign and other documents, and approved an allotment for the project that includes specific authorization to enter into a contract to expend or encumber funds. The predesign document shall include but not be limited to program, site, and cost analysis in accordance with the predesign manual adopted by the office of financial management. To improve monitoring of major construction projects, progress reports shall be submitted by the agency administering the project to the office of financial management and to the fiscal committees of the house of representatives and senate. Reports will be submitted on July 1st and December 31st each year in a format to be developed by the office of financial management.
NEW SECTION. Sec. 904. Appropriations in this act for design and construction of facilities on higher education campuses shall be expended only after funds are allotted to institutions of higher education on the basis of: (1) Comparable unit cost standards, as determined by the office of financial management in consultation with the higher education coordinating board; (2) costs consistent with other higher education teaching facilities in the state; and (3) student full-time equivalent enrollment levels as established by the office of financial management in consultation with the higher education coordinating board.
NEW SECTION. Sec. 905. (1) To ensure that minor works appropriations are carried out in accordance with legislative intent, funds appropriated in this act shall not be allotted until project lists are on file at the office of financial management and the office of financial management has formally approved the lists. Proposed revisions to the lists must be filed with and approved by the office of financial management before funds may be expended on the revisions.
(2)(a) Minor works projects are single line appropriations that include multiple projects valued between $25,000 and $1,000,000 each that are of a similar nature and can generally be completed within two years of the appropriation with the funding provided. Minor works categories include (i) health, safety, and code requirements; (ii) facility preservation; (iii) infrastructure preservation; and (iv) program improvement or expansion. Improvements for accessibility in compliance with the Americans with disabilities act may be included in any of the above minor works categories.
(b) Minor works appropriations shall not be used for, among other things: Studies, except for technical or engineering reviews or designs that lead directly to and support a project on the same minor works list; planning; design outside the scope of work on a minor works list; moveable, temporary, and traditionally funded operating equipment not in compliance with the equipment criteria established by the office of financial management; software not dedicated to control of a specialized system; moving expenses; land or facility acquisition; or to supplement funding for projects with funding shortfalls unless expressly authorized elsewhere in this act. The office of financial management may make an exception to the limitations described in this subsection (2)(b) for exigent circumstances after notifying the legislative fiscal committees and waiting ten days for comments by the legislature regarding the proposed exception.
(3) The office of financial management shall forward copies of these project lists and revised lists to the house of representatives capital budget committee and the senate ways and means committee. No expenditure may be incurred or obligation entered into for minor works appropriations until the office of financial management has approved the allotment of the funds to be expended. The office of financial management shall encourage state agencies to incorporate accessibility planning and improvements into the normal and customary capital program.
(4) It is generally not intended to make future appropriations for capital expenditures or for maintenance and operating expenses for an acquisition project or a significant expansion project that is initiated through the minor works process and therefore does not receive a policy and fiscal analysis by the legislature. Minor works projects are intended to be one-time expenditures that do not require future state resources to complete.
NEW SECTION. Sec. 906. (1) The governor, through the office of financial management, may authorize a transfer of appropriation authority provided for a capital project that is in excess of the amount required for the completion of such project to another capital project for which the appropriation is insufficient. No such transfer may be used to expand the capacity of any facility beyond that intended by the legislature in making the appropriation. Such transfers may be effected only between capital appropriations to a specific department, commission, agency, or institution of higher education and only between capital projects that are funded from the same fund or account. No transfers may occur between projects to local government agencies except where the grants are provided within a single omnibus appropriation and where such transfers are specifically authorized by the implementing statutes that govern the grants.
(2) For purposes of this section, the governor may find that an amount is in excess of the amount required for the completion of a project only if: (a) The project as defined in the notes to the budget document is substantially complete and there are funds remaining; or (b) bids have been let on a project and it appears to a substantial certainty that the project as defined in the notes to the budget document can be completed within the biennium for less than the amount appropriated in this act.
(3) For the purposes of this section, the intent is that each project be defined as proposed to the legislature in the governor's budget document, unless it clearly appears from the legislative history that the legislature intended to define the scope of a project in a different way.
(4) Transfers of funds to an agency's infrastructure savings appropriation are subject to review and approval by the office of financial management. Expenditures from an infrastructure savings appropriation are limited to projects that have a primary purpose to correct infrastructure deficiencies or conditions that: (a) Adversely affect the ability to utilize the infrastructure for its current programmatic use; (b) reduce the life expectancy of the infrastructure; or (c) increase the operating costs of the infrastructure for its current programmatic use. Eligible infrastructure projects may include structures and surface improvements, site amenities, utility systems outside building footprints and natural environmental changes or requirements as part of an environmental regulation, a declaration of emergency for an infrastructure issue in conformance with RCW 43.88.250, or infrastructure planning as part of a facility master plan.
(5) A report of any transfer effected under this section, except emergency projects or any transfer under $250,000, shall be filed with the legislative fiscal committees of the senate and house of representatives by the office of financial management at least thirty days before the date the transfer is effected. The office of financial management shall report all emergency or smaller transfers within thirty days from the date of transfer.
NEW SECTION. Sec. 907. (1) It is expected that projects be ready to proceed in a timely manner depending on the type or phase of the project or program that is the subject of the appropriation in this act. Except for major projects that customarily may take more than two biennia to complete from predesign to the end of construction, or large infrastructure grant or loan programs supporting projects that often take more than two biennia to complete, the legislature generally does not intend to reappropriate funds more than once, particularly for smaller grant programs, local/community projects, and minor works.
(2) Agencies shall expedite the expenditure of reappropriations and appropriations in this act in order to: (a) Rehabilitate infrastructure resources; (b) accelerate environmental rehabilitation and restoration projects for the improvement of the state's natural environment; (c) reduce additional costs associated with acquisition and construction inflationary pressures; and (d) provide additional employment opportunities associated with capital expenditures.
(3) To the extent feasible, agencies are directed to accelerate expenditure rates at their current level of permanent employees and shall use contracted design and construction services wherever necessary to meet the goals of this section.
(4) The office of financial management shall report the following to the appropriate fiscal committees of the legislature by January 30, 2007: (a) A listing of reappropriations in the governor's 2007-2009 capital budget recommendation that will be reappropriated more than once and have ten percent or more of the original appropriation unexpended; and (b) an explanation of why the appropriation remains unexpended.
NEW SECTION. Sec. 908. The legislature finds that the state's public four-year institutions and the higher education coordinating board have made substantial progress in developing a process to create a single prioritized list of capital project requests as required under RCW 28B.76.220. The legislature also recognizes that continuing work by the institutions and the board is needed to refine the methodology for determining the ranking of project requests, and that this work will benefit from additional legislative guidance. Therefore, the higher education coordinating board and the public four-year institutions, in developing and submitting the single prioritized project list of capital project requests under RCW 28B.76.220, shall use the following additional guidelines:
(1) Representatives of the board shall participate in the process of scoring projects using the criteria in the board's biennial budget guidelines. Representatives of the board shall also review the preliminary project list to verify the scoring and ranking of projects. As required under RCW 28B.76.210, institutions must submit the preliminary project list to the board by August 1st of each even-numbered year to enable this review. Any disagreements over project scorings or rankings shall be resolved as provided under RCW 28B.76.220(4).
(2) The board's biennial budget guidelines and the prioritization process shall place a greater emphasis on early critical review of project proposals at the pre-design phase, rather than deferring critical review and prioritization to the design or construction phases of a project.
(3) When projects are aggregated into single line-item requests, each project must meet the definition of minor works according to the capital budget instructions issued by the office of financial management. All major projects must be listed and ranked as individual line-item requests.
(4) The scoring and ranking of projects shall not be based on assigning an equal number of overall points to each public four-year institution, but shall reflect an assignment of points to individual projects based on the priorities and criteria in this section and in the board's biennial budget guidelines.
(5) Projects shall not be ranked on the basis of a project funding source.
(6) In consultation with the appropriate fiscal and policy committees of the legislature, the board shall identify statewide priorities for higher education capital investments and incorporate those priorities into its biennial budget guidelines. The statewide priorities shall address the need for higher education capital projects to:
(a) Implement a specific legislatively authorized program or planning priority;
(b) Reduce the backlog of deferred building or system preservation, renewal, or replacement;
(c) Provide additional capacity or adaptation of space for high demand instructional or research programs;
(d) Provide additional instructional program capacity for under-served geographic regions or populations; and
(e) Reflect institutional planning priorities and areas of emphasis.
(7) The board's biennial budget guidelines shall include a quantitative method for scoring projects on the identified priorities. The quantitative method shall include use of the facility condition index developed by the joint legislative audit and review committee for assessing building or system condition, and use of the board's space utilization and allocation standards for assessing the need for additional capacity.
NEW SECTION. Sec. 909. ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
(1) Department of general administration:
(a) Enter into a financing contract for up to $12,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the fifth and final phase of the roof membrane replacement at the east plaza parking structure as well as safety improvements to the parking garage below the plaza.
(b) Enter into a financing contract for up to $6,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for the fourth phase of the office building-2 rehabilitation that will renew failing building systems, correct code deficiencies, and improve access.
(2) Liquor control board: Enter into a financing contract for up to $17,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an extension to the liquor control board's distribution center to meet liquor sales growth through 2018.
(3) Department of corrections:
(a) Enter into a financing contract for up to $400,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a waste transfer station and purchase a garbage truck at the McNeil Island corrections center.
(b) Enter into a financing contract for up to $4,588,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a transportation services warehouse and offices for correctional industries.
(c) Enter into a financing contract for up to $4,536,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct additions to the food factory and warehouses at the Airway Heights corrections center for correctional industries.
(4) Parks and recreation commission: Enter into a financing contract in an amount not to exceed $4,800,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop Cama Beach state park.
(5) Community and technical colleges:
(a) Enter into a financing contract on behalf of Bellevue Community College for up to $20,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase the North Center building.
(b) Enter into a financing contract on behalf of Clark College for up to $9,100,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a parking structure.
(c) Enter into a financing contract on behalf of Clover Park Technical College for up to $14,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student center.
(d) Enter into a financing contract on behalf of Columbia Basin College for up to $1,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate the Hawk Union building.
(e) Enter into a financing contract on behalf of Edmonds Community College for up to $4,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a black box theater as a part of the Instructional Lab building.
(f) Enter into a financing contract on behalf of Green River Community College for up to $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase Kent Station higher education center.
(g) Enter into a financing contract on behalf of Olympic College for up to $3,600,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the student center bookstore.
(h) Enter into a financing contract on behalf of Shoreline Community College for up to $15,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student union building.
(i) Enter into a financing contract on behalf of Skagit Valley Community College for up to $3,200,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to renovate existing space into a new student center.
(j) Enter into a financing contract on behalf of Walla Walla Community College for up to $2,175,100 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land and construct a building for the enology program.
(k) Enter into a financing contract on behalf of Walla Walla Community College for up to $640,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the health sciences building at the Clarkston center.
(l) Enter into a financing contract on behalf of Seattle Central Community College for up to $3,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a math and science building.
(m) Enter into a financing contract on behalf of Pierce College/Puyallup for up to $8,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student gym and fitness center.
(n) Enter into a financing contract on behalf of Pierce College/Ft. Steilacoom for up to $5,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the college health and wellness center.
(o) Enter into a financing contract on behalf of South Puget Sound Community College for up to $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land for a Hawks Prairie campus.
(p) The projects in (a), (f), (k), (m), (n), and (o) of this subsection are reauthorizations of projects originally authorized in the 2003-2005 biennium. If the college enters into a financing contract before the effective date of this section, then the appropriate reauthorization contained in this section is null and void.
(6) Washington State University: Enter into a financing contract for up to $11,650,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a bioproducts facility in the Tri-Cities.
(7) Secretary of state: Enter into a financing contract on behalf of TVW for up to $3,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to support the conversion of TVW from analog to digital equipment.
NEW SECTION. Sec. 910. It is in the public interest to provide more prison capacity in Washington state. During the 2005-2007 biennium, the department of corrections shall solicit proposals for an approximate 2,000 bed, medium/hybrid security prison in Franklin county. The department of corrections, in consultation with the department of general administration, will evaluate and choose from among the broadest possible set of options with regards to cost, quality, and timeliness. Upon the department of correction's approval of the selected proposal, which approval shall be made only with the concurrence of the department of general administration, the department of corrections shall enter into a financing contract or financing contracts for the prison pursuant to chapter 39.94 RCW and the certificate of participation program established by the state treasurer thereunder. The amount financed for the prison shall not exceed $245,000,000, plus financing costs and required reserves.
NEW SECTION. Sec. 911. FOR THE ARTS COMMISSION--ART WORK ALLOWANCE POOLING. (1) One-half of one percent of moneys appropriated in this act for original construction of school plant facilities is provided solely for the purposes of RCW 28A.335.210. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the superintendent of public instruction and representatives of school district boards.
(2) One-half of one percent of moneys appropriated in this act for original construction or any major renovation or remodel work exceeding two hundred thousand dollars by colleges or universities is provided solely for the purposes of RCW 28B.10.027. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the board of regents or trustees.
(3) One-half of one percent of moneys appropriated in this act for original construction of any public building by a state agency as defined in RCW 43.17.020 is provided solely for the purposes of RCW 43.17.200. The Washington state arts commission may combine the proceeds from individual projects in order to fund larger works of art or mobile art displays in consultation with the state agency.
(4) At least eighty-five percent of the moneys spent by the Washington state arts commission during the 2005-2007 biennium for the purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be expended solely for direct acquisition of works of art.
NEW SECTION. Sec. 912. The amounts shown under the headings "Prior Biennia," "Future Biennia," and "Total" in this act are for informational purposes only and do not constitute legislative approval of these amounts. "Prior biennia" typically refers to the immediate prior biennium for reappropriations, but may refer to multiple biennia in the case of specific projects. A "future biennia" amount is an estimate of what may be appropriated for the project or program in the 2007-09 biennium and the following four biennia; an amount of zero does not necessarily constitute legislative intent to not provide funding for the project or program in the future.
NEW SECTION. Sec. 913. "Reappropriations" in this act are appropriations and, unless the context clearly provides otherwise, are subject to the relevant conditions and limitations applicable to appropriations. Reappropriations shall be limited to the unexpended balances remaining on June 30, 2005, from the 2003-2005 biennial appropriations for each project.
NEW SECTION. Sec. 914. To carry out the provisions of this act, the governor may assign responsibility for predesign, design, construction, and other related activities to any appropriate agency.
NEW SECTION. Sec. 915. If any federal moneys appropriated by this act for capital projects are not received by the state, the department or agency to which the moneys were appropriated may replace the federal moneys with funds available from private or local sources. No replacement may occur under this section without the prior approval of the director of financial management in consultation with the senate ways and means committee and the house of representatives capital budget committee.
NEW SECTION. Sec. 916. (1) Unless otherwise stated, for all appropriations under this act that require a match of nonstate money or in-kind contributions, the following requirement, consistent with RCW 43.88.150, shall apply: Expenditures of state money shall be timed so that the state share of project expenditures never exceeds the intended state share of total project costs.
(2) Provision of the full amount of required matching funds is not required to permit the expenditure of capital budget appropriations for phased projects if a proportional amount of the required matching funds is provided for each distinct, identifiable phase of the project.
NEW SECTION. Sec. 917. Any capital improvements or capital projects involving construction or major expansion of a state office facility, including, but not limited to, district headquarters, detachment offices, and off-campus faculty offices, must be reviewed by the department of general administration for possible consolidation, colocation, and compliance with state office standards before allotment of funds. The intent of the requirement imposed by this section is to eliminate duplication and reduce total office space requirements where feasible, while ensuring proper service to the public.
NEW SECTION. Sec. 918. The military department shall file quarterly progress reports in addition to the annual project progress reporting requirement of RCW 43.88.160(3). These reports must contain local, state, and federal funding reconciliation and balance sheets for all appropriated readiness center projects and detail any federal intentions on future readiness centers and other facilities.
NEW SECTION. Sec. 919. NONTAXABLE AND TAXABLE BOND PROCEEDS. Portions of the appropriation authority granted by this act from the state building construction account may be transferred to the state taxable building construction account as deemed necessary by the state finance committee to comply with the federal internal revenue service rules and regulations pertaining to the use of nontaxable bond proceeds. The state treasurer shall submit written notification to the director of financial management if it is determined that a shift of appropriation authority from the state building construction account to the state taxable building construction account is necessary.
NEW SECTION. Sec. 920. The office of financial management, in consultation with the department of general administration, shall identify capital projects that may benefit from an energy analysis to determine whether there are alternate, more economical, and energy efficient means of completing the work. The office of financial management shall hold appropriations in allotment reserve on the following types of capital projects until this analysis can be completed: Heating, ventilation, and air conditioning modifications, chiller plants, steam plants, boilers, chilled water or steam lines, building control systems, lighting improvements, or other major energy using systems that may warrant additional analysis. Agencies receiving appropriations for such projects are encouraged to utilize energy performance contracts or alternative financing for equipment in lieu of state appropriated funds. The office of financial management may transfer funds remaining in allotment reserve to infrastructure savings projects within the agency that has realized savings from energy efficiency alternatives.
Sec. 921. RCW 43.135.045 and 2003 1st sp.s. c 25 s 920 are each amended to read as follows:
(1) The emergency reserve fund is established in the state treasury. During each fiscal year, the state treasurer shall deposit in the emergency reserve fund all general fund--state revenues in excess of the state expenditure limit for that fiscal year. Deposits shall be made at the end of each fiscal quarter based on projections of state revenues and the state expenditure limit. The treasurer shall make transfers between these accounts as necessary to reconcile actual annual revenues and the expenditure limit for fiscal year 2000 and thereafter.
(2) The legislature may appropriate moneys from the emergency reserve fund only with approval of at least two-thirds of the members of each house of the legislature, and then only if the appropriation does not cause total expenditures to exceed the state expenditure limit under this chapter.
(3) The emergency reserve fund balance shall not exceed five percent of annual general fund--state revenues as projected by the official state revenue forecast. Any balance in excess of five percent shall be transferred on a quarterly basis by the state treasurer as follows: Seventy-five percent to the student achievement fund hereby created in the state treasury and twenty-five percent to the general fund balance. The treasurer shall make transfers between these accounts as necessary to reconcile actual annual revenues for fiscal year 2000 and thereafter. When per-student state funding for the maintenance and operation of K-12 education meets a level of no less than ninety percent of the national average of total funding from all sources per student as determined by the most recent published data from the national center for education statistics of the United States department of education, as calculated by the office of financial management, further deposits to the student achievement fund shall be required only to the extent necessary to maintain the ninety-percent level. Remaining funds are part of the general fund balance and these funds are subject to the expenditure limits of this chapter.
(4) The education construction fund is hereby created in the state treasury.
(a) Funds may be appropriated from the education construction fund exclusively for common school construction or higher education construction. During the fiscal years beginning July 1, 2005, and ending June 30, 2007, funds may also be used for higher education facilities preservation and maintenance.
(b) Funds may be appropriated for any other purpose only if approved by a two-thirds vote of each house of the legislature and if approved by a vote of the people at the next general election. An appropriation approved by the people under this subsection shall result in an adjustment to the state expenditure limit only for the fiscal period for which the appropriation is made and shall not affect any subsequent fiscal period.
(5) Funds from the student achievement fund shall be appropriated to the superintendent of public instruction strictly for distribution to school districts to meet the provisions set out in the student achievement act. Allocations shall be made on an equal per full-time equivalent student basis to each school district.
(6) Earnings of the emergency reserve fund under RCW 43.84.092(4)(a) shall be transferred quarterly to the multimodal transportation account, except for those earnings that are in excess of thirty-five million dollars each fiscal year. Within thirty days following any fiscal year in which earnings transferred to the multimodal transportation account under this subsection did not total thirty-five million dollars, the state treasurer shall transfer from the emergency reserve fund an amount necessary to bring the total deposited in the multimodal transportation account under this subsection to thirty-five million dollars. The revenues to the multimodal transportation account reflected in this subsection provide ongoing support for the transportation programs of the state. However, it is the intent of the legislature that any new long-term financial support that may be subsequently provided for transportation programs will be used to replace and supplant the revenues reflected in this subsection, thereby allowing those revenues to be returned to the purposes to which they were previously dedicated. No transfers from the emergency reserve fund to the multimodal fund shall be made during the 2003-05 fiscal biennium.
Sec. 922. RCW 43.88.032 and 1997 c 96 s 5 are each amended to read as follows:
(1) Normal maintenance costs, except for funds appropriated for facility preservation of state institutions of higher education, shall be programmed in the operating budget rather than in the capital budget.
(2) All debt-financed pass-through money to local governments shall be programmed and separately identified in the budget document.
Sec. 923. RCW 28B.50.360 and 2004 c 277 s 910 are each amended to read as follows:
Within thirty-five days from the date of start of each quarter all collected building fees of each such community and technical college shall be paid into the state treasury, and shall be credited as follows:
(1) On or before June 30th of each year the college board if issuing bonds payable out of building fees shall certify to the state treasurer the amounts required in the ensuing twelve-month period to pay and secure the payment of the principal of and interest on such bonds. The state treasurer shall thereupon deposit the amounts so certified in the community and technical college capital projects account. Such amounts of the funds deposited in the community and technical college capital projects account as are necessary to pay and secure the payment of the principal of and interest on the building bonds issued by the college board as authorized by this chapter shall be exclusively devoted to that purpose. If in any twelve-month period it shall appear that the amount certified by the college board is insufficient to pay and secure the payment of the principal of and interest on the outstanding building bonds, the state treasurer shall notify the college board and such board shall adjust its certificate so that all requirements of moneys to pay and secure the payment of the principal and interest on all such bonds then outstanding shall be fully met at all times.
(2) The community and technical college capital projects account is hereby created in the state treasury. The sums deposited in the capital projects account shall be appropriated and expended exclusively to pay and secure the payment of the principal of and interest on bonds payable out of the building fees and for the construction, reconstruction, erection, equipping, maintenance, demolition and major alteration of buildings and other capital assets owned by the state board for community and technical colleges in the name of the state of Washington, and the acquisition of sites, rights-of-way, easements, improvements or appurtenances in relation thereto, ((and, during the 2003-05 biennium,)) engineering and architectural services provided by the department of general administration, and for the payment of principal of and interest on any bonds issued for such purposes.
NEW SECTION. Sec. 924. In accordance with the recommendation of the joint legislative audit and review committee report "Performance Audit of Capital Budget Processes," the office of financial management shall develop a plan, in consultation with legislative fiscal committees, to address weaknesses identified in that report in the oversight of facility projects. The report shall address, but not be limited to:
(1) Aligning resources to program workload;
(2) Identifying and institutionalizing best practices;
(3) Creating easily accessible and reliable information systems; and
(4) Improving the review and evaluation of projects at the predesign stage prior to the authorization of design and construction.
The office of financial management shall report on its plan to the governor and the senate committee on ways and means and house of representatives capital budget committee no later than December 1, 2005.
Sec. 925. RCW 43.155.050 and 2001 c 131 s 2 are each amended to read as follows:
The public works assistance account is hereby established in the state treasury. Money may be placed in the public works assistance account from the proceeds of bonds when authorized by the legislature or from any other lawful source. Money in the public works assistance account shall be used to make loans and to give financial guarantees to local governments for public works projects. Moneys in the account may also be appropriated to provide for state match requirements under federal law for projects and activities conducted and financed by the board under the drinking water assistance account. Not more than fifteen percent of the biennial capital budget appropriation to the public works board from this account may be expended or obligated for preconstruction loans, emergency loans, or loans for capital facility planning under this chapter; of this amount, not more than ten percent of the biennial capital budget appropriation may be expended for emergency loans and not more than one percent of the biennial capital budget appropriation may be expended for capital facility planning loans. For the 2005-2007 biennium, moneys in the account may be used for grants for projects identified in section 137 of this act.
NEW SECTION. Sec. 926. If chapter ... (Engrossed Substitute House Bill No. 1903), Laws of 2005 does not become law by June 30, 2005, section 925 of this act is null and void.
NEW SECTION. Sec. 927. To provide additional financial assistance and relief to irrigation districts and farmers during the current drought, loan principal and interest payments due to the department of ecology from previous biennia loans and loans in the 2005-2007 biennium for drought assistance or agricultural water supply projects may be deferred for the 2005-2007 biennium. Deferrals are intended only for loan recipients that involve a significant number of farmers who are temporarily leasing or not using their water rights for the benefit of the drought response. The deferrals shall apply to loans from the state drought preparedness account, the state emergency water projects revolving account, and state and local improvement revolving account (water supply facilities). Such loan repayments will resume consistent with the original loan agreement at the beginning of the 2007-2009 biennium.
NEW SECTION. Sec. 928. (1) The house of representatives capital budget committee, with staff support provided by the office of program research, shall research and develop recommendations and findings comparing the stewardship costs to properly manage public lands compared to private lands and the fiscal impacts on counties of purchasing additional public lands under chapter 79A.15 RCW. The capital budget committee shall work with the interagency committee for outdoor recreation, the department of fish and wildlife, the department of natural resources, and counties to obtain necessary information to complete the report.
(a) The private versus public stewardship comparison component of the report shall include, but not be limited to, weed control, diking and drainage, fencing, signage, and other land management activities.
(b) The county fiscal impact component of the report shall include, but not be limited to, a financial analysis determining the difference by county of assessing property taxes on lands acquired under chapter 79A.15 RCW based on one hundred percent of a property's true and fair value compared to assessing property as open space under chapter 84.34 RCW. The analysis shall also compare the fiscal impacts of using these different property tax rates by county for existing game lands held by the department of fish and wildlife and natural areas managed by the department of natural resources.
(2) The capital budget committee shall prepare the report by December 1, 2005.
SUPPLEMENTAL PROVISIONS
Sec. 929. 2003 1st sp.s. c 26 s 115 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Public Works Trust Fund (04-4-001)
The appropriation in this section is subject to the following conditions and limitations: Expenditures of the appropriation shall comply with chapter 43.155 RCW.
Appropriation:
Public Works Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($261,200,000))
$416,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,319,499,999
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (($1,580,699,999))
$1,735,699,999
Sec. 930. 2003 1st sp.s. c 26 s 131 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water SRF - Authorization to Use Loan Repayments (04-4-010)
The appropriation in this section is subject to the following conditions and limitations: Expenditures of the appropriation shall comply with RCW 70.119A.170.
Appropriation:
((Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$11,200,000))
Drinking Water Assistance Repayment
Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$15,200,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($11,200,000))
$15,200,000
Sec. 931. 2004 c 277 s 201 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF COMMUNITY, TRADE, AND ECONOMIC DEVELOPMENT
Drinking Water Assistance Account (04-4-002)
The appropriations in this section are subject to the following conditions and limitations:
(1) Expenditures of the appropriation shall comply with RCW 70.119A.170.
(2)(a) The state building construction account appropriation is provided solely to provide assistance to counties, cities, and special purpose districts to identify, acquire, and rehabilitate public water systems that have water quality problems or have been allowed to deteriorate to a point where public health is an issue. Eligibility is confined to applicants that already own at least one group A public water system and that demonstrate a track record of sound drinking water utility management. Funds may be used for: Planning, design, and other preconstruction activities; system acquisition; and capital construction costs.
(b) The state building construction account appropriation must be jointly administered by the department of health, the public works board, and the department of community, trade, and economic development using the drinking water state revolving fund loan program as an administrative model. In order to expedite the use of these funds and minimize administration costs, this appropriation must be administered by guidance, rather than rule. Projects must generally be prioritized using the drinking water state revolving fund loan program criteria. All financing provided through this program must be in the form of grants that must partially cover project costs. The maximum grant to any eligible entity may not exceed twenty-five percent of the funds allocated to this appropriation.
Appropriation:
Drinking Water Assistance Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($12,700,000))
$8,500,000
Drinking Water Assistance Repayment Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,200,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$4,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $16,700,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$32,400,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$49,100,000
NEW SECTION. Sec. 932. A new section is added to 2004 c 277 (uncodified) to read as follows:
FOR THE MILITARY DEPARTMENT
Alteration of Building No. 2 - Camp Murray (05-1-001)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $140,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,260,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,400,000
NEW SECTION. Sec. 933. A new section is added to 2004 c 277 (uncodified) to read as follows:
FOR THE MILITARY DEPARTMENT
Courseware Development Support Facility (05-2-002)
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $138,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,237,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,375,000
NEW SECTION. Sec. 934. A new section is added to 2004 c 277 (uncodified) to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Jefferson County Public Utility District Grant (05-1-006)
Appropriation:
Parks Renewal and Stewardship Account--Private/Local. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265,000
Sec. 935. 2004 c 277 s 110 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Engineering and Architectural Services (04-2-014)
The appropriations in this section are subject to the following conditions and limitations:
(1) The appropriation in this section shall be used to provide project management services to state agencies as required by RCW 43.19.450 that are essential and mandated activities defined as core services and are included in the engineering and architectural services' responsibilities and task list for general public works projects of normal complexity. The general public works projects included are all those financed by the state capital budget for the biennium ending June 30, 2005, with individual total project values up to $20 million.
(2) The department may negotiate agreements with agencies for additional fees to manage projects financed by financial contracts, other alternative financing, projects with a total value greater than $20 million, or for the nonstate funded portion of projects with mixed funding sources.
(3) The department shall review each community and technical college request and the requests of other client agencies for funding any project over $2.5 million for inclusion in the 2004 supplemental capital budget and the 2005-07 capital budget to ensure that the amount requested by the agency is appropriate for predesign, design, and construction, depending on the phase of the project being requested. The department shall pay particular attention: (a) That the budgeted amount requested is at an appropriate level for the various components that make up the cost of the project such as project management; and (b) that standard measurements such as cost per square foot are reasonable. The department shall also assist the office of financial management with review of other agency projects as requested.
Appropriation:
Charitable, Educational, Penal, and Reformatory Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $140,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (($6,996,000))
$7,723,000
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (($937,000))
$210,000
Community and Technical College Capital Projects Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,513,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $9,586,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($0))
$41,308,400
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($9,586,000))
$50,894,400
Sec. 936. 2004 c 277 s 209 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF GENERAL ADMINISTRATION
Legislative Building: Rehabilitation and Capital Addition (01-1-008)
The appropriations in this section are subject to the following conditions and limitations: The reappropriation in this section is subject to the conditions and limitations of section 109, chapter 238, Laws of 2002 and section 904, chapter 10, Laws of 2003.
Reappropriation:
Capital Historic District Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $68,450,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$6,000,000
Subtotal Reappropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$74,450,000
Appropriation:
Thurston County Capital Facilities Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4,800,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$7,100,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $11,900,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$26,031,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($105,281,000))
$112,381,000
Sec. 937. 2003 1st sp.s. c 26 s 240 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF VETERANS AFFAIRS
Retsil: 240 Bed Nursing Facility (02-2-008)
Reappropriation:
Charitable, Educational, Penal, and Reformatory Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Appropriation:
General Fund--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$30,730,700
Charitable, Educational, Penal, and Reformatory Institutions Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (($12,000,000))
$13,420,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($42,980,700))
$44,400,700
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($2,500,000))
$4,000,000
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($45,980,700))
$48,900,700
Sec. 938. 2004 c 277 s 221 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
Water Pollution Control Program (04-4-002)
Appropriation:
Water Pollution Control Revolving Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (($81,054,333))
$102,614,743
Water Pollution Control Revolving Account--Federal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$44,466,666
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($125,520,999))
$147,081,409
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $462,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($587,520,999))
$609,081,409
NEW SECTION. Sec. 939. A new section is added to 2004 c 277 (uncodified) to read as follows:
FOR THE DEPARTMENT OF ECOLOGY
State Drought Preparedness (05-4-009)
The appropriations in this section are subject to the following conditions and limitations:
(1) $8,200,000 of the state taxable building construction account--state appropriation shall be deposited in the state drought preparedness account.
(2) The appropriations in this section are provided solely for response to the statewide drought that was declared pursuant to chapter 43.83B RCW. The department of ecology may provide funding or compensation for purchase or lease of water rights and to public bodies as defined in RCW 43.83B.050 in connection with projects and measures designed to alleviate drought conditions that may affect: Public health and safety; drinking water supplies; agricultural activities; or fish and wildlife survival.
(3) Projects or measures for which funding or compensation will be provided must be connected with a water system, water source, or water body that is receiving, or has been projected to receive, less than seventy-five percent of normal water supply, as the result of natural drought conditions. This reduction in water supply must be such that it is causing, or will cause, undue hardship for the entities or fish or wildlife depending on the water supply. General criteria for guidelines to be established by the department of ecology for distribution of funds must include: A balanced and equitable distribution of the funds among the different sectors affected by drought; a funding process that ensures funds are available for drought impacts that arise both early and later during the course of the drought; and preference for projects that leverage other federal and local funds.
Appropriation:
State Drought Preparedness Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,200,000
State Taxable Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$8,200,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $16,400,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,400,000
Sec. 940. 2003 1st sp.s. c 26 s 330 (uncodified) is amended to read as follows:
FOR THE STATE PARKS AND RECREATION COMMISSION
Fort Worden (02-1-003)
The reappropriation in this section is subject to the following conditions and limitations: The reappropriation is provided solely for park preservation and for development of the multipurpose dining and meeting facility.
Reappropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (($1,500,000))
$1,910,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($4,569,365))
$73,350
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($6,069,365))
$1,983,350
Sec. 941. 2003 1st sp.s. c 26 s 403 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF FISH AND WILDLIFE
Region 1 Office - Spokane (04-2-009)
The appropriations in this section ((is)) are subject to the following conditions and limitations: The appropriations ((is)) are provided solely for the construction of the eastern region headquarters office complex to be located at Mirabeau Point.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$3,900,000
State Wildlife Account. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(($3,900,000))
$4,400,000
Sec. 942. 2003 1st sp.s. c 26 s 421 (uncodified) is amended to read as follows:
FOR THE DEPARTMENT OF NATURAL RESOURCES
Trust Land Transfer Program (04-2-010)
The state building construction account appropriation in this section is subject to the following conditions and limitations:
(1) The total appropriation is provided to the department solely to transfer from trust status or enter into thirty-year timber harvest restrictive easements/leases for certain trust lands of state-wide significance deemed appropriate for state park, fish and wildlife habitat, natural area preserve, natural resources conservation area, open space, or recreation purposes.
(2) Property transferred under this section shall be appraised and transferred at fair market value. The value of the timber transferred shall be deposited by the department to the common school construction account in the same manner as timber revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040. The value of the land transferred shall be deposited in the natural resources real property replacement account. These funds shall be expended by the department for the exclusive purpose of acquiring commercial real property of equal value to be managed as common school trust land.
(3) Property subject to easement/lease agreements under this section shall be appraised at fair market value both with and without the imposition of the easement/lease. The entire difference in appraised value shall be deposited by the department to the common school construction fund in the same manner as lease revenues from other common school trust lands. No deduction shall be made for the resource management cost account under RCW 79.64.040.
(4) All reasonable costs incurred by the department to implement this section are authorized to be paid out of this appropriation. Authorized costs include the actual cost of appraisals, staff time, environmental reviews, surveys, and other similar costs.
(5) Intergrant exchanges between common school and other trust lands of equal value may occur if the exchange is in the interest of each trust, as determined by the board of natural resources.
(6) Prior to or concurrent with conveyance of these properties, the department, with full cooperation of the receiving agencies, shall execute and record a real property instrument that dedicates the transferred properties to the purposes identified in subsection (1) of this section for a minimum period of thirty years. The department of natural resources, in consultation with the receiving state agencies, shall develop policy to address requests to replace transferred properties subject to the recorded property instrument that are no longer deemed appropriate for the purposes identified in subsection (1) of this section.
(7) The department and receiving agencies shall work in good faith to carry out the intent of this section. However, the department or receiving agencies may remove a property from the transfer list based on new, substantive information, if it is determined that transfer of the property is not in the statewide interest of either the common school trust or the receiving agency.
(8) Except as provided in subsections (12) and (13) of this section, the department shall execute trust land transfers and easements/leases such that, after the deduction of reasonable costs as provided in subsection (4) of this section, eighty percent of the appropriation in this section is deposited in the common school construction fund. To achieve the 80:20 ratio, the department may offset transfers of property with low timber-to-land ratios with easements/leases on other properties.
(9) On June 30, 2005, the state treasurer shall transfer all remaining uncommitted funds from this appropriation to the common school construction fund, except as provided in subsection (13) of this section, and the appropriation in this section shall be reduced by an equivalent amount.
(10) Except as provided in subsection (13) of this section, the appropriation in this section is provided for a list of projects in LEAP capital document No. 2003-17, as developed on June 4, 2003.
(11) The department of natural resources shall manage lands acquired as "Bone river natural area preserve" as a natural resources conservation area under chapter 79.71 RCW.
(12) The department shall execute trust land transfers, after the deduction of reasonable costs as provided in subsection (4) of this section, for Obstruction Pass and Point Lawrence as described in LEAP capital document No. 2003-17, as developed on June 4, 2003.
(13) Up to $4,500,000 of the appropriation from the state building construction account--state appropriation is provided solely for the transfer of trust land known as Harbour Pointe to the city of Mukilteo. Four acres of buildable land shall be dedicated for use of a recreational facility to serve only school-age children. Recreational space shall also be designated as ball fields for the purposes of serving the area youth.
Appropriation:
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$55,000,000
Natural Resources Real Property Replacement Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $11,000,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $66,000,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $250,000,000
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $316,000,000
Sec. 943. 2004 c 277 s 262 (uncodified) is amended to read as follows:
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM
South Seattle: Training Facility (05-1-854)
The appropriation in this section is subject to the following conditions and limitations:
(1) The appropriation is solely for the design of a ((single shop and classroom)) training facility and a separate academic/administrative facility to replace ((eight)) light wood frame structures.
(2) Prior to allotment for design, the state board for community and technical colleges shall submit a predesign document to the office of financial management and legislative fiscal committees identifying and outlining the project or projects, scope, schedule, and preliminary cost estimates for capital projects related to the replacement of the portables.
Appropriation:
Gardner-Evans Higher Education Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $722,000
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,342,480
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $8,064,480
Sec. 944. 2004 c 277 s 236 (uncodified) is amended to read as follows:
FOR THE STATE BOARD OF EDUCATION
School Construction Assistance Grants (04-4-001)
The appropriations in this section ((is)) are subject to the following conditions and limitations:
(1) For state assistance grants for purposes of calculating square foot eligibility, kindergarten student headcount shall not be reduced by fifty percent.
(2) $2,000,000 from this appropriation is provided for skills centers capital improvements. Skills centers shall submit a budget plan to the state board of education and the appropriate fiscal committees of the legislature for proposed expenditures and the proposed expenditures shall conform with state board of education rules and procedures for reimbursement of capital items. Funds not expended by June 30, 2005, shall lapse.
(3) $32,868,105 of this appropriation is provided solely to increase the area cost allowance by $15.00 per square foot for grades K-12 for fiscal year 2004 and an additional $4.49 per square foot for grades K-12 for fiscal year 2005.
(4) The appropriation in this section includes the amounts deposited in the common school construction account under section 603 of this act.
(5) $2,500,000 of this appropriation is provided solely for design and construction of additional space at the new market vocational skills center.
(6) Beginning in their 2005-07 capital budget submittal to the governor, the state board of education, in consultation with the Washington state skills centers, shall develop and submit a prioritized list of capital preservation, equipment with long life-cycles, and space expansion and improvement projects. The list shall be developed based on, but not limited to, the following factors: Projected enrollment growth; local school district participation and financial support; changes in the business and industry needs in the state; and efficiency in program delivery and operations.
Appropriation:
Common School Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (($402,268,513))
$295,218,513
State Building Construction Account--State. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$107,050,000
Subtotal Appropriation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $402,268,513
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$0
Future Biennia (Projected Costs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$1,858,456,614
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2,260,725,127
Sec. 945. 2004 c 277 s 911 (uncodified) is amended to read as follows:
((During the 2003-05 biennium,)) The state parks and recreation commission shall ((study the various options regarding the future of Old Man House state park. These alternatives include retention as a state park, roles of volunteer community groups, transfer to the Suquamish tribe, sale as surplus property, or other alternatives. The commission may, if it deems it appropriate after studying the various options, transfer the park to the Suquamish tribe. Any action shall provide for continued public access and use of the site for public recreation, and include a limited waiver of sovereignty by the tribe restricted to the enforceability of the reversion clause pursuant to RCW 79A.05.170)) transfer Old Man House state park to the Suquamish tribe. Any transfer shall provide for continued public access and use of the site for public recreation, and include a limited waiver of sovereignty by the tribe to enforce the reversionary clause pursuant to RCW 79A.05.170.
Sec. 946. 2004 c 277 s 904 (uncodified) is amended to read as follows:
ACQUISITION OF PROPERTIES AND FACILITIES THROUGH FINANCIAL CONTRACTS. The following agencies may enter into financial contracts, paid from any funds of an agency, appropriated or nonappropriated, for the purposes indicated and in not more than the principal amounts indicated, plus financing expenses and required reserves pursuant to chapter 39.94 RCW. When securing properties under this section, agencies shall use the most economical financial contract option available, including long-term leases, lease-purchase agreements, lease-development with option to purchase agreements or financial contracts using certificates of participation. Expenditures made by an agency for one of the indicated purposes before the issue date of the authorized financial contract and any certificates of participation therein are intended to be reimbursed from proceeds of the financial contract and any certificates of participation therein to the extent provided in the agency's financing plan approved by the state finance committee.
State agencies may enter into agreements with the department of general administration and the state treasurer's office to develop requests to the legislature for acquisition of properties and facilities through financial contracts. The agreements may include charges for services rendered.
(1) Department of general administration: Enter into a financing contract for an amount approved by the office of financial management for costs and financing expenses and required reserves pursuant to chapter 39.94 RCW to lease develop or lease purchase a state office building of 150,000 to 200,000 square feet on state-owned property in Tumwater according to the terms of the agreement with the Port of Olympia when the property was acquired or within the preferred development/leasing areas in Thurston county. The building shall be constructed and financed so that agency occupancy costs will not exceed comparable private market rental rates. The comparable general office space rate shall be calculated based on the three latest Thurston county leases of new space of at least 100,000 rentable square feet adjusted for inflation as determined by the department of general administration. The department of general administration shall coordinate with potential state agency tenants whose current lease expire near the time of occupancy so that buyout of current leases do not add to state expense. The office of financial management shall certify to the state treasurer: (a) The project description and dollar amount; and (b) that all requirements of this subsection (1) have been met.
(2) Enter into, after approval by the office of financial management and the state finance committee and a positive result from the joint legislative audit and review committee leasing model, a long-term lease of up to twenty-five years, or long-term lease with an option to purchase, with the city of Seattle, for up to 250,000 square feet of office space that is being lease developed by the city of Seattle. Agency occupancy costs will not exceed comparable private market rental rates in downtown Seattle. The comparable general office space rate shall be calculated based on lease rates (adjusted for inflation) of the tenants at the time of proposed occupancy as determined by the department of general administration.
(3) Department of veterans affairs: Enter into a financing contract in an amount not to exceed $1,441,500 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to build and equip a kitchen in existing shell space at the Spokane veterans home and provide space for displaced functions.
(4) Department of corrections:
(a) Enter into a financing contract for up to $400,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a waste transfer station and purchase a garbage truck at the McNeil Island corrections center.
(b) Enter into a financing contract for up to $4,588,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a transportation services warehouse and offices for correctional industries.
(c) Enter into a financing contract for up to $4,536,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct additions to the food factory and warehouses at the Airway Heights corrections center for correctional industries.
(5) Parks and recreation commission: Enter into a financing contract in an amount not to exceed $4,800,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to develop Cama Beach state park.
(6) Community and technical colleges:
(a) Enter into a financing contract on behalf of Bellevue Community College for up to $20,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase North Center campus.
(b) Enter into a financing contract on behalf of Big Bend Community College for up to $6,500,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an international conference and training center and dining services center building.
(c) Enter into a financing contract on behalf of Clark Community College for up to $9,839,464 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a bookstore, meeting rooms, student lounge, and study space.
(d) Enter into a financing contract on behalf of Green River Community College for up to $7,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase Kent Station higher education center.
(e) Enter into a financing contract on behalf of Seattle Central Community College for up to $1,300,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW for land acquisition and development of parking facilities.
(f) Enter into a financing contract on behalf of Seattle Central Community College for up to $3,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct ((an above-ground parking garage)) a math and science building.
(g) Enter into a financing contract on behalf of South Puget Sound Community College for up to $660,000 plus financing expenses and reserves pursuant to chapter 39.94 RCW to construct parking and storm water mitigation facilities.
(h) Enter into a financing contract on behalf of Spokane Community College for up to $725,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land.
(i) Enter into a financing contract on behalf of Walla Walla Community College for up to $2,175,100 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land and construct a building for professional-technical instruction.
(j) Enter into a financing contract on behalf of Walla Walla Community College for up to $504,400 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to purchase land and buildings at the Clarkston center.
(k) Enter into a financing contract on behalf of Pierce College/Ft. Steilacoom for up to $5,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct an addition to the college health and wellness center.
(l) Enter into a financing contract on behalf of Pierce College/Puyallup for up to $8,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct a student gym and fitness center.
(m) Enter into a financing contract on behalf of Columbia Basin College for up to $8,000,000 plus financing expenses and required reserves pursuant to chapter 39.94 RCW to construct the medical technology and science education addition to the T-Building renovation and establish the Washington institute of science education (WISE).
NEW SECTION. Sec. 947. Sections 921 and 922 of this act expire June 30, 2007.
NEW SECTION. Sec. 948. Part headings in this act are not any part of the law.
NEW SECTION. Sec. 949. The following acts or parts of acts are each repealed:
(1) 2003 1st sp.s. c 26 s 603 (uncodified); and
(2) 2004 c 277 s 302 (uncodified).
NEW SECTION. Sec. 950. If any provision of this act or its application to any person or circumstance is held invalid, the remainder of the act or the application of the provision to other persons or circumstances is not affected.
NEW SECTION. Sec. 951. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately, except for sections 921 and 922 of this act, which take effect June 30, 2005.
On page 1, line 1 of the title, after "budget;" strike the remainder of the title and insert "making appropriations and authorizing expenditures for capital improvements; amending RCW 43.135.045, 43.88.032, 28B.50.360, and 43.155.050; amending 2003 1st sp.s. c 26 ss 115, 131, 240, 330, 403, and 421 (uncodified); amending 2004 c 277 ss 201, 110, 209, 221, 262, 236, 911, and 904 (uncodified); adding new sections to 2004 c 277 (uncodified); creating new sections; repealing 2003 1st sp.s. c 26 s 603 (uncodified); repealing 2004 c 277 s 302 (uncodified); providing an effective date; providing an expiration date; and declaring an emergency."
Signed by Representatives Dunshee, Chairman; Ormsby, Vice Chairman; Jarrett, Ranking Minority Member; Hankins, Assistant Ranking Minority Member; Blake; Chase; Cox; DeBolt; Eickmeyer; Ericks; Flannigan; Green; Hasegawa; Kretz; Lantz; McCune; Moeller; Morrell; Newhouse; O'Brien; Roach; Schual-Berke; Serben; Springer; Strow and Upthegrove.
MINORITY recommendation: Do not pass. Signed by Representatives Ericksen; Holmquist and Kristiansen.
There being no objection, the bills listed on the day's committee reports sheet under the fifth order of business were referred to the committees so designated, except for ENGROSSED SUBSTITUTE SENATE BILL NO. 6094 which was placed on the Second Reading calendar.
SECOND READING
SENATE BILL NO. 5564, By Senators Schmidt, Kastama, Weinstein, Roach, Shin, Rockefeller, Oke and Kohl-Welles
Requiring the secretary of state to prepare a manual of election laws and rules.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representative Haigh spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5564.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5564 and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 5564, having received the necessary constitutional majority, was declared passed.
SENATE BILL NO. 5565, By Senators Schmidt, Kastama, Weinstein, Roach, Keiser, Sheldon, Shin, Rockefeller, Oke and Kohl-Welles
Informing out-of-state, overseas, and service voters of rights and procedures.
The bill was read the second time.
Representative Nixon moved the adoption of the following amendment (468):
Strike everything after the enacting clause and insert the following:
"Sec. 1. RCW 29A.40.150 and 2003 c 111 s 1015 are each amended to read as follows:
The secretary of state shall produce and furnish envelopes and instructions for out-of-state voters, overseas voters, and service voters to the county auditors. The information on the envelopes or instructions must explain that:
(1) Return postage is free if the ballot is mailed through the United States postal service, United States armed forces postal service, or the postal service of a United States foreign embassy;
(2) The date of the signature is considered the date of mailing;
(3) The envelope must be signed by election day;
(4) The signed declaration on the envelope is the equivalent of voter registration;
(5) A voter may fax a voted ballot and the accompanying envelope if the voter agrees to waive secrecy. The ballot will be counted if the original documents are received before certification of the election; and
(6) A voter may obtain a ballot via electronic mail, which the voter may print out, vote, and return by mail. In order to facilitate the electronic acquisition of ballots by out-of-state, overseas, and service voters, the ballot instructions shall include the web site of the office of the secretary of state."
Representatives Nixon and Haigh spoke in favor of adoption of the amendment.
The amendment was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Haigh and Nixon spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5565, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5565, as amended by the House, and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 5565, as amended by the House, having received the necessary constitutional majority, was declared passed.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5395, By Senate Committee on Government Operations & Elections (originally sponsored by Senators Kastama, Haugen, Roach, Rockefeller, Schmidt, Kohl-Welles, Spanel, Pridemore, Kline, McAuliffe and Franklin)
Requiring voting devices to produce paper records.
The bill was read the second time.
On motion of Representative Haigh, the committee amendment by the Committee on State Government Operations & Accountability was adopted. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
With the consent of the House, amendments (483) and (491) were withdrawn.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Nixon and Haigh spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5395, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5395, as amended by the House, and the bill passed the House by the following vote: Yeas - 95, Nays - 1, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 95.
Voting nay: Representative Hunt - 1.
Excused: Representatives Condotta and Tom - 2.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5395, as amended by the House, having received the necessary constitutional majority, was declared passed.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5034, By Senate Committee on Government Operations & Elections (originally sponsored by Senator Kastama; by request of Public Disclosure Commission)
Making restrictions on campaign funding.
The bill was read the second time.
Representative Haigh moved the adoption of the committee amendment by the Committee on State Government Operations & Accountability. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
Representative Nixon requested a scope and object ruling on the committee amendment to ENGROSSED SUBSTITUTE SENATE BILL NO. 5034.
Mr. Speaker (Representative Lovick presiding): "ENGROSSED SUBSTITUTE SENATE BILL NO. 5034 is entitled an act relating to 'disclosure of and restrictions on campaign funding'.
The bill as passed by the Senate changes campaign funding laws by:
(1) regulating electioneering communications, including delineating when such communications are subject to campaign contribution limits; and
(2) changing the campaign contribution limits in RCW 42.17.530.
The bill also includes a variety of technical amendments relating to standards for false political advertising, report requirements for continuing political committees, and clarification of the offices subject to campaign funding laws.
The committee amendment delineates how campaign contribution limits are applied to affiliated entities.
Given that the bill has a broad title and includes multiple changes to campaign funding laws, the Speaker finds that the committee amendment is within the scope and object of the bill.
Representative Nixon, your point of order is not well taken."
Representatives Hunt, Haigh and Williams spoke in favor of adoption of the committee amendment.
Representatives Nixon, Armstrong, Ericksen, Sump and Orcutt spoke against the adoption of the committee amendment.
An electronic roll call vote was demanded and the demand was sustained.
The Speaker (Representative Lovick presiding) stated the question before the House to be adoption of the committee amendment to Engrossed Substitute Senate Bill No. 5034.
ROLL CALL
The Clerk called the roll on the adoption of the committee amendment to Engrossed Substitute Senate Bill No. 5034, and the amendment was adopted by the following vote: Yeas - 55, Nays - 41, Absent - 0, Excused - 2.
Voting yea: Representatives Appleton, Blake, Chase, Clibborn, Cody, Conway, Darneille, Dickerson, Dunshee, Eickmeyer, Ericks, Flannigan, Fromhold, Grant, Green, Haigh, Hasegawa, Hudgins, Hunt, Hunter, Kagi, Kenney, Kessler, Kilmer, Kirby, Lantz, Linville, Lovick, McCoy, McDermott, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, O'Brien, Ormsby, Pettigrew, Quall, Roberts, Santos, Schual-Berke, Sells, Simpson, Sommers, Springer, B. Sullivan, P. Sullivan, Takko, Upthegrove, Wallace, Williams, Wood and Mr. Speaker - 55.
Voting nay: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Buck, Buri, Campbell, Chandler, Clements, Cox, Crouse, Curtis, DeBolt, Dunn, Ericksen, Haler, Hankins, Hinkle, Holmquist, Jarrett, Kretz, Kristiansen, McCune, McDonald, Newhouse, Nixon, Orcutt, Pearson, Priest, Roach, Rodne, Schindler, Serben, Shabro, Skinner, Strow, Sump, Talcott, Walsh and Woods - 41.
Excused: Representatives Condotta and Tom - 2.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Haigh, Simpson, Miloscia and Hunt spoke in favor of passage of the bill.
Representatives Nixon, Armstrong, Anderson, Buck, Ahern, Orcutt, Hinkle and Serben spoke against the passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5034, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5034, as amended by the House, and the bill passed the House by the following vote: Yeas - 56, Nays - 40, Absent - 0, Excused - 2.
Voting yea: Representatives Appleton, Blake, Campbell, Chase, Clibborn, Cody, Conway, Darneille, Dickerson, Dunshee, Eickmeyer, Ericks, Flannigan, Fromhold, Grant, Green, Haigh, Hasegawa, Hudgins, Hunt, Hunter, Kagi, Kenney, Kessler, Kilmer, Kirby, Lantz, Linville, Lovick, McCoy, McDermott, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, O'Brien, Ormsby, Pettigrew, Quall, Roberts, Santos, Schual-Berke, Sells, Simpson, Sommers, Springer, B. Sullivan, P. Sullivan, Takko, Upthegrove, Wallace, Williams, Wood and Mr. Speaker - 56.
Voting nay: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Buck, Buri, Chandler, Clements, Cox, Crouse, Curtis, DeBolt, Dunn, Ericksen, Haler, Hankins, Hinkle, Holmquist, Jarrett, Kretz, Kristiansen, McCune, McDonald, Newhouse, Nixon, Orcutt, Pearson, Priest, Roach, Rodne, Schindler, Serben, Shabro, Skinner, Strow, Sump, Talcott, Walsh and Woods - 40.
Excused: Representatives Condotta and Tom - 2.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5034, as amended by the House, having received the necessary constitutional majority, was declared passed.
I intended to vote YEA on ENGROSSED SUBSTITUTE SENATE BILL NO. 5034.
SHIRLEY HANKINS, 8th District
SUBSTITUTE SENATE BILL NO. 6037, By Senate Committee on Government Operations & Elections (originally sponsored by Senators Sheldon and Rockefeller)
Changing provisions relating to limited development of rural areas.
The bill was read the second time.
Representative Simpson moved the adoption of the following amendment (489):
Strike everything after the enacting clause and insert the following:
"Sec. 1. RCW 36.70A.070 and 2004 c 196 s 1 are each amended to read as follows:
The comprehensive plan of a county or city that is required or chooses to plan under RCW 36.70A.040 shall consist of a map or maps, and descriptive text covering objectives, principles, and standards used to develop the comprehensive plan. The plan shall be an internally consistent document and all elements shall be consistent with the future land use map. A comprehensive plan shall be adopted and amended with public participation as provided in RCW 36.70A.140.
Each comprehensive plan shall include a plan, scheme, or design for each of the following:
(1) A land use element designating the proposed general distribution and general location and extent of the uses of land, where appropriate, for agriculture, timber production, housing, commerce, industry, recreation, open spaces, general aviation airports, public utilities, public facilities, and other land uses. The land use element shall include population densities, building intensities, and estimates of future population growth. The land use element shall provide for protection of the quality and quantity of ground water used for public water supplies. Where applicable, the land use element shall review drainage, flooding, and storm water run-off in the area and nearby jurisdictions and provide guidance for corrective actions to mitigate or cleanse those discharges that pollute waters of the state, including Puget Sound or waters entering Puget Sound.
(2) A housing element ensuring the vitality and character of established residential neighborhoods that: (a) Includes an inventory and analysis of existing and projected housing needs that identifies the number of housing units necessary to manage projected growth; (b) includes a statement of goals, policies, objectives, and mandatory provisions for the preservation, improvement, and development of housing, including single-family residences; (c) identifies sufficient land for housing, including, but not limited to, government-assisted housing, housing for low-income families, manufactured housing, multifamily housing, and group homes and foster care facilities; and (d) makes adequate provisions for existing and projected needs of all economic segments of the community.
(3) A capital facilities plan element consisting of: (a) An inventory of existing capital facilities owned by public entities, showing the locations and capacities of the capital facilities; (b) a forecast of the future needs for such capital facilities; (c) the proposed locations and capacities of expanded or new capital facilities; (d) at least a six-year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes; and (e) a requirement to reassess the land use element if probable funding falls short of meeting existing needs and to ensure that the land use element, capital facilities plan element, and financing plan within the capital facilities plan element are coordinated and consistent. Park and recreation facilities shall be included in the capital facilities plan element.
(4) A utilities element consisting of the general location, proposed location, and capacity of all existing and proposed utilities, including, but not limited to, electrical lines, telecommunication lines, and natural gas lines.
(5) Rural element. Counties shall include a rural element including lands that are not designated for urban growth, agriculture, forest, or mineral resources. The following provisions shall apply to the rural element:
(a) Growth management act goals and local circumstances. Because circumstances vary from county to county, in establishing patterns of rural densities and uses, a county may consider local circumstances, but shall develop a written record explaining how the rural element harmonizes the planning goals in RCW 36.70A.020 and meets the requirements of this chapter.
(b) Rural development. The rural element shall permit rural development, forestry, and agriculture in rural areas. The rural element shall provide for a variety of rural densities, uses, essential public facilities, and rural governmental services needed to serve the permitted densities and uses. To achieve a variety of rural densities and uses, counties may provide for clustering, density transfer, design guidelines, conservation easements, and other innovative techniques that will accommodate appropriate rural densities and uses that are not characterized by urban growth and that are consistent with rural character.
(c) Measures governing rural development. The rural element shall include measures that apply to rural development and protect the rural character of the area, as established by the county, by:
(i) Containing or otherwise controlling rural development;
(ii) Assuring visual compatibility of rural development with the surrounding rural area;
(iii) Reducing the inappropriate conversion of undeveloped land into sprawling, low-density development in the rural area;
(iv) Protecting critical areas, as provided in RCW 36.70A.060, and surface water and ground water resources; and
(v) Protecting against conflicts with the use of agricultural, forest, and mineral resource lands designated under RCW 36.70A.170.
(d) Limited areas of more intensive rural development. Subject to the requirements of this subsection and except as otherwise specifically provided in this subsection (5)(d), the rural element may allow for limited areas of more intensive rural development, including necessary public facilities and public services to serve the limited area as follows:
(i) Rural development consisting of the infill, development, or redevelopment of existing commercial, industrial, residential, or mixed-use areas, whether characterized as shoreline development, villages, hamlets, rural activity centers, or crossroads developments.
(A) A commercial, industrial, residential, shoreline, or mixed-use area shall be subject to the requirements of (d)(iv) of this subsection, but shall not be subject to the requirements of (c)(ii) and (iii) of this subsection.
(B) Any development or redevelopment other than an industrial area or an industrial use within a mixed-use area or an industrial area under this subsection (5)(d)(i) must be principally designed to serve the existing and projected rural population.
(C) Any development or redevelopment in terms of building size, scale, use, or intensity shall be consistent with the character of the existing areas. Development and redevelopment may include changes in use from vacant land or a previously existing use so long as the new use conforms to the requirements of this subsection (5);
(ii) The intensification of development on lots containing, or new development of, small-scale recreational or tourist uses, including commercial facilities to serve those recreational or tourist uses, that rely on a rural location and setting, but that do not include new residential development. A small-scale recreation or tourist use is not required to be principally designed to serve the existing and projected rural population. Public services and public facilities shall be limited to those necessary to serve the recreation or tourist use and shall be provided in a manner that does not permit low-density sprawl, such as a connection to an existing sewer line where such connection serves only the recreational or tourist use and is not available to adjacent nonrecreational or nontourist use parcels;
(iii) The intensification of development on lots containing isolated nonresidential uses or new development of isolated cottage industries and isolated small-scale businesses that are not principally designed to serve the existing and projected rural population and nonresidential uses, but do provide job opportunities for rural residents. Rural counties may allow the expansion of small-scale businesses as long as those small-scale businesses conform with the rural character of the area as defined by the local government according to RCW 36.70A.030(14). Rural counties may also allow new small-scale businesses to utilize a site previously occupied by an existing business as long as the new small-scale business conforms to the rural character of the area as defined by the local government according to RCW 36.70A.030(14). Public services and public facilities shall be limited to those necessary to serve the isolated nonresidential use and shall be provided in a manner that does not permit low-density sprawl;
(iv) A county shall adopt measures to minimize and contain the existing areas or uses of more intensive rural development, as appropriate, authorized under this subsection. Lands included in such existing areas or uses shall not extend beyond the logical outer boundary of the existing area or use, thereby allowing a new pattern of low-density sprawl. Existing areas are those that are clearly identifiable and contained and where there is a logical boundary delineated predominately by the built environment, but that may also include undeveloped lands if limited as provided in this subsection. The county shall establish the logical outer boundary of an area of more intensive rural development. In establishing the logical outer boundary the county shall address (A) the need to preserve the character of existing natural neighborhoods and communities, (B) physical boundaries such as bodies of water, streets and highways, and land forms and contours, (C) the prevention of abnormally irregular boundaries, and (D) the ability to provide public facilities and public services in a manner that does not permit low-density sprawl;
(v) For purposes of (d) of this subsection, an existing area or existing use is one that was in existence:
(A) On July 1, 1990, in a county that was initially required to plan under all of the provisions of this chapter;
(B) On the date the county adopted a resolution under RCW 36.70A.040(2), in a county that is planning under all of the provisions of this chapter under RCW 36.70A.040(2); or
(C) On the date the office of financial management certifies the county's population as provided in RCW 36.70A.040(5), in a county that is planning under all of the provisions of this chapter pursuant to RCW 36.70A.040(5).
(e) Exception. This subsection shall not be interpreted to permit in the rural area a major industrial development or a master planned resort unless otherwise specifically permitted under RCW 36.70A.360 and 36.70A.365.
(6) A transportation element that implements, and is consistent with, the land use element.
(a) The transportation element shall include the following subelements:
(i) Land use assumptions used in estimating travel;
(ii) Estimated traffic impacts to state-owned transportation facilities resulting from land use assumptions to assist the department of transportation in monitoring the performance of state facilities, to plan improvements for the facilities, and to assess the impact of land-use decisions on state-owned transportation facilities;
(iii) Facilities and services needs, including:
(A) An inventory of air, water, and ground transportation facilities and services, including transit alignments and general aviation airport facilities, to define existing capital facilities and travel levels as a basis for future planning. This inventory must include state-owned transportation facilities within the city or county's jurisdictional boundaries;
(B) Level of service standards for all locally owned arterials and transit routes to serve as a gauge to judge performance of the system. These standards should be regionally coordinated;
(C) For state-owned transportation facilities, level of service standards for highways, as prescribed in chapters 47.06 and 47.80 RCW, to gauge the performance of the system. The purposes of reflecting level of service standards for state highways in the local comprehensive plan are to monitor the performance of the system, to evaluate improvement strategies, and to facilitate coordination between the county's or city's six-year street, road, or transit program and the department of transportation's six-year investment program. The concurrency requirements of (b) of this subsection do not apply to transportation facilities and services of statewide significance except for counties consisting of islands whose only connection to the mainland are state highways or ferry routes. In these island counties, state highways and ferry route capacity must be a factor in meeting the concurrency requirements in (b) of this subsection;
(D) Specific actions and requirements for bringing into compliance locally owned transportation facilities or services that are below an established level of service standard;
(E) Forecasts of traffic for at least ten years based on the adopted land use plan to provide information on the location, timing, and capacity needs of future growth;
(F) Identification of state and local system needs to meet current and future demands. Identified needs on state-owned transportation facilities must be consistent with the statewide multimodal transportation plan required under chapter 47.06 RCW;
(iv) Finance, including:
(A) An analysis of funding capability to judge needs against probable funding resources;
(B) A multiyear financing plan based on the needs identified in the comprehensive plan, the appropriate parts of which shall serve as the basis for the six-year street, road, or transit program required by RCW 35.77.010 for cities, RCW 36.81.121 for counties, and RCW 35.58.2795 for public transportation systems. The multiyear financing plan should be coordinated with the six-year improvement program developed by the department of transportation as required by RCW 47.05.030;
(C) If probable funding falls short of meeting identified needs, a discussion of how additional funding will be raised, or how land use assumptions will be reassessed to ensure that level of service standards will be met;
(v) Intergovernmental coordination efforts, including an assessment of the impacts of the transportation plan and land use assumptions on the transportation systems of adjacent jurisdictions;
(vi) Demand-management strategies.
(b) After adoption of the comprehensive plan by jurisdictions required to plan or who choose to plan under RCW 36.70A.040, local jurisdictions must adopt and enforce ordinances which prohibit development approval if the development causes the level of service on a locally owned transportation facility to decline below the standards adopted in the transportation element of the comprehensive plan, unless transportation improvements or strategies to accommodate the impacts of development are made concurrent with the development. These strategies may include increased public transportation service, ride sharing programs, demand management, and other transportation systems management strategies. For the purposes of this subsection (6) "concurrent with the development" shall mean that improvements or strategies are in place at the time of development, or that a financial commitment is in place to complete the improvements or strategies within six years.
(c) The transportation element described in this subsection (6), and the six-year plans required by RCW 35.77.010 for cities, RCW 36.81.121 for counties, RCW 35.58.2795 for public transportation systems, and RCW 47.05.030 for the state, must be consistent.
(7) An economic development element establishing local goals, policies, objectives, and provisions for economic growth and vitality and a high quality of life. The element shall include: (a) A summary of the local economy such as population, employment, payroll, sectors, businesses, sales, and other information as appropriate; (b) a summary of the strengths and weaknesses of the local economy defined as the commercial and industrial sectors and supporting factors such as land use, transportation, utilities, education, work force, housing, and natural/cultural resources; and (c) an identification of policies, programs, and projects to foster economic growth and development and to address future needs. A city that has chosen to be a residential community is exempt from the economic development element requirement of this subsection.
(8) A park and recreation element that implements, and is consistent with, the capital facilities plan element as it relates to park and recreation facilities. The element shall include: (a) Estimates of park and recreation demand for at least a ten-year period; (b) an evaluation of facilities and service needs; and (c) an evaluation of intergovernmental coordination opportunities to provide regional approaches for meeting park and recreational demand.
(9) It is the intent that new or amended elements required after January 1, 2002, be adopted concurrent with the scheduled update provided in RCW 36.70A.130. Requirements to incorporate any such new or amended elements shall be null and void until funds sufficient to cover applicable local government costs are appropriated and distributed by the state at least two years before local government must update comprehensive plans as required in RCW 36.70A.130.
NEW SECTION. Sec. 2. This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect immediately.
NEW SECTION. Sec. 3. Section 1 of this act expires August 31, 2005."
Correct the title.
Representatives Simpson and Schindler spoke in favor of adoption of the amendment.
The amendment was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Simpson and Schindler spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 6037, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Substitute Senate Bill No. 6037, as amended by the House, and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
SUBSTITUTE SENATE BILL NO. 6037, as amended by the House, having received the necessary constitutional majority, was declared passed.
SUBSTITUTE SENATE BILL NO. 5085, By Senate Committee on Transportation (originally sponsored by Senators Weinstein, Haugen, Jacobsen and Kline)
Holding child car seat installers harmless for damages.
The bill was read the second time.
On motion of Representative Williams, the committee amendment by the Committee on Judiciary was before the House for purpose of amendments. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
Representative Williams moved the adoption of amendment (425) to the committee amendment:
On page 1, line 11 of the striking amendment, after "old" strike "((and/or)) or" and insert "and/or"
On page 1, at the beginning of line 14 of the striking amendment, strike "((will)) must" and insert "will"
Representative Williams spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
The committee amendment as amended was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Williams and Priest spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 5085, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Substitute Senate Bill No. 5085, as amended by the House, and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
SUBSTITUTE SENATE BILL NO. 5085, as amended by the House, having received the necessary constitutional majority, was declared passed.
SUBSTITUTE SENATE BILL NO. 5899, By Senate Committee on Human Services & Corrections (originally sponsored by Senators Kohl-Welles, Brandland and Rasmussen)
Changing provisions relating to background checks.
The bill was read the second time.
On motion of Representative O'Brien, the committee amendment by the Committee on Criminal Justice & Corrections was before the House for purpose of amendments. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
With the consent of the House, amendments (488), (461), (469) and (462) were withdrawn.
Representative Appleton moved the adoption of amendment (525) to the committee amendment:
On page 2, line 36 of the striking amendment, after "law." insert "The record does not include offenses for which a person has been exonerated. As used in this subsection, "exonerated" means to be freed from a question of guilt or absolved from all question of blame."
Representative Appleton spoke in favor of the adoption of the amendment to the committee amendment.
Representatives Pearson and O'Brien spoke against the adoption of the amendment to the committee amendment.
There being no objection, the House deferred action on SUBSTITUTE SENATE BILL NO. 5899 and it held its place on the Second Reading calendar.
HOUSE CONCURRENT RESOLUTION NO. 4410, By Representatives Schual-Berke, Cody, Haler, Moeller, Clibborn, Darneille, Fromhold and Chase
Establishing the joint public health financing committee.
The concurrent resolution was read the second time.
With the consent of the House, amendment (501) was withdrawn.
Representative Bailey moved the adoption of the following amendment (530):
On page 2, line 10, after "That the" strike "public health financing task force" and insert "joint select committee on public health financing"
On page 2, line 13, after "The" strike "task force" and insert "joint select committee"
On page 2, line 16, after "The" strike all material through "necessary" on line 18 and insert "joint select committee shall elect one of its members to serve as its chair"
On page 2, line 20, after "research" strike ", Senate committee services, and the joint legislative audit and review committee" and insert "and Senate committee services"
On page 2, line 21, after "of the" strike "task force" and insert "joint select committee"
On page 2, line 26, after "That the" strike all material through "provide" on line 27 and insert "joint select committee review all current and potential local, state, and federal funding sources and expenditures for public health services and recommend potential sources of future funding"
On page 2, line 31, after "That the" strike "task force" and insert "joint select committee"
On page 2, line 23, after "44.04.120" strike all material through "43.03.060" on line 25
Representatives Bailey and Schual-Berke spoke in favor of adoption of the amendment.
The amendment was adopted.
The concurrent resolution was ordered engrossed.
There being no objection, the rules were suspended, the second reading considered the third and the concurrent resolution was placed on final passage.
Representatives Schual-Berke and Bailey spoke in favor of passage of the concurrent resolution.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed House Concurrent Resolution No. 4410.
ENGROSSED HOUSE CONCURRENT RESOLUTION NO. 4410 was adopted.
SUBSTITUTE SENATE BILL NO. 5899, By Senate Committee on Human Services & Corrections (originally sponsored by Senators Kohl-Welles, Brandland and Rasmussen)
Changing provisions relating to background checks.
The House resumed consideration.
With the consent of the House, amendment (525) was withdrawn.
Representative O'Brien moved the adoption of amendment (494) to the committee amendment:
On page 8, line 6 of the amendment, after "who" strike "has been" and insert "((has been)) may be"
On page 12, after line 35 of the amendment, insert the following:
"Sec. 9. RCW 10.97.050 and 1990 c 3 s 129 are each amended to read as follows:
(1) Conviction records may be disseminated without restriction.
(2) Any criminal history record information which pertains to an incident that occurred within the last twelve months for which a person is currently being processed by the criminal justice system, including the entire period of correctional supervision extending through final discharge from parole, when applicable, may be disseminated without restriction with the exception of a record being disseminated in response to a request for a conviction record under RCW 43.43.832. A request for a conviction record under RCW 43.43.832 shall not contain information for a person who, within the last twelve months, is currently being processed by the criminal justice system unless it pertains to information relating to a crime against a person as defined in RCW 9.94A.411.
(3) Criminal history record information which includes nonconviction data may be disseminated by a criminal justice agency to another criminal justice agency for any purpose associated with the administration of criminal justice, or in connection with the employment of the subject of the record by a criminal justice or juvenile justice agency. A criminal justice agency may respond to any inquiry from another criminal justice agency without any obligation to ascertain the purpose for which the information is to be used by the agency making the inquiry.
(4) Criminal history record information which includes nonconviction data may be disseminated by a criminal justice agency to implement a statute, ordinance, executive order, or a court rule, decision, or order which expressly refers to records of arrest, charges, or allegations of criminal conduct or other nonconviction data and authorizes or directs that it be available or accessible for a specific purpose.
(5) Criminal history record information which includes nonconviction data may be disseminated to individuals and agencies pursuant to a contract with a criminal justice agency to provide services related to the administration of criminal justice. Such contract must specifically authorize access to criminal history record information, but need not specifically state that access to nonconviction data is included. The agreement must limit the use of the criminal history record information to stated purposes and insure the confidentiality and security of the information consistent with state law and any applicable federal statutes and regulations.
(6) Criminal history record information which includes nonconviction data may be disseminated to individuals and agencies for the express purpose of research, evaluative, or statistical activities pursuant to an agreement with a criminal justice agency. Such agreement must authorize the access to nonconviction data, limit the use of that information which identifies specific individuals to research, evaluative, or statistical purposes, and contain provisions giving notice to the person or organization to which the records are disseminated that the use of information obtained therefrom and further dissemination of such information are subject to the provisions of this chapter and applicable federal statutes and regulations, which shall be cited with express reference to the penalties provided for a violation thereof.
(7) Every criminal justice agency that maintains and disseminates criminal history record information must maintain information pertaining to every dissemination of criminal history record information except a dissemination to the effect that the agency has no record concerning an individual. Information pertaining to disseminations shall include:
(a) An indication of to whom (agency or person) criminal history record information was disseminated;
(b) The date on which the information was disseminated;
(c) The individual to whom the information relates; and
(d) A brief description of the information disseminated.
The information pertaining to dissemination required to be maintained shall be retained for a period of not less than one year.
(8) In addition to the other provisions in this section allowing dissemination of criminal history record information, RCW 4.24.550 governs dissemination of information concerning offenders who commit sex offenses as defined by RCW 9.94A.030. Criminal justice agencies, their employees, and officials shall be immune from civil liability for dissemination on criminal history record information concerning sex offenders as provided in RCW 4.24.550.
NEW SECTION. Sec. 10. A new section is added to chapter 43.43 RCW to read as follows:
When the Washington state patrol disseminates conviction record information in response to a request under RCW 43.43.832, it shall clearly state that: (1) The conviction record data does not include information on civil adjudications, administrative findings, or disciplinary board final decisions and that all such information must be obtained from the courts and licensing agencies; (2) the conviction record that is being disseminated includes information for which a person is currently being processed by the criminal justice system relating to only crimes against a person as defined in RCW 9.94A.411 and that it does not include any other current or pending charge information for which a person could be in the current process of being processed by the criminal justice system; and (3) an arrest is not a conviction or a finding of guilt."
Correct the title.
Representatives O'Brien and Pearson spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
The committee amendment as amended was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives O'Brien and Pearson spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Substitute Senate Bill No. 5899, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Substitute Senate Bill No. 5899, as amended by the House, and the bill passed the House by the following vote: Yeas - 90, Nays - 6, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 90.
Voting nay: Representatives Appleton, Chase, Eickmeyer, Hasegawa, McDermott and Roberts - 6.
Excused: Representatives Condotta and Tom - 2.
SUBSTITUTE SENATE BILL NO. 5899, as amended by the House, having received the necessary constitutional majority, was declared passed.
SENATE BILL NO. 5518, By Senators Eide, Swecker, Spanel, Stevens, Mulliken, Rasmussen and Benson
Increasing certain fees of licensing subagents.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives Wallace and Woods spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Senate Bill No. 5518.
ROLL CALL
The Clerk called the roll on the final passage of Senate Bill No. 5518 and the bill passed the House by the following vote: Yeas - 93, Nays - 3, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 93.
Voting nay: Representatives Darneille, Hudgins and Upthegrove - 3.
Excused: Representatives Condotta and Tom - 2.
SENATE BILL NO. 5518, having received the necessary constitutional majority, was declared passed.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5720, By Senate Committee on Labor, Commerce, Research & Development (originally sponsored by Senators Keiser, Franklin and McAuliffe)
Placing limitations on employee noncompetition agreements in the broadcasting industry.
The bill was read the second time.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
Representatives Wood, Conway, Flannigan and Wood (again) spoke in favor of passage of the bill.
Representatives Sump, Serben, Buck, DeBolt, Sump (again), Dunn and Ahern spoke against the passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5720.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5720 and the bill passed the House by the following vote: Yeas - 56, Nays - 40, Absent - 0, Excused - 2.
Voting yea: Representatives Appleton, Blake, Campbell, Chase, Clibborn, Cody, Conway, Darneille, Dickerson, Dunshee, Eickmeyer, Ericks, Flannigan, Fromhold, Grant, Green, Haigh, Hasegawa, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kirby, Lantz, Linville, Lovick, McCoy, McDermott, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, O'Brien, Ormsby, Pettigrew, Quall, Roberts, Santos, Schual-Berke, Sells, Simpson, Sommers, Springer, B. Sullivan, P. Sullivan, Takko, Upthegrove, Wallace, Williams, Wood and Mr. Speaker - 56.
Voting nay: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Buck, Buri, Chandler, Clements, Cox, Crouse, Curtis, DeBolt, Dunn, Ericksen, Haler, Hankins, Hinkle, Holmquist, Kilmer, Kretz, Kristiansen, McCune, McDonald, Newhouse, Nixon, Orcutt, Pearson, Priest, Roach, Rodne, Schindler, Serben, Shabro, Skinner, Strow, Sump, Talcott, Walsh and Woods - 40.
Excused: Representatives Condotta and Tom - 2.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5720, having received the necessary constitutional majority, was declared passed.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5788, By Senate Committee on Water, Energy & Environment (originally sponsored by Senators Doumit, Kastama, Mulliken, Haugen, Morton, Poulsen, Pridemore and Berkey)
Improving recycling.
The bill was read the second time.
On motion of Representative B. Sullivan, the committee amendment by the Committee on Natural Resources, Ecology & Parks was before the House for purpose of amendments. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
With the consent of the House, amendment (526) was withdrawn.
Representative B. Sullivan moved the adoption of amendment (428) to the committee amendment:
On page 4, line 17 of the amendment, after "landfill." strike "A transporter may deliver recyclable materials to an intermediate solid waste handling facility that maintains recyclable materials in a source separated state and further processes and markets the recyclable materials for recycling."
Representative B. Sullivan spoke in favor of the adoption of the amendment to the committee amendment.
The amendment to the committee amendment was adopted.
The committee amendment as amended was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives B. Sullivan, Buck and Orcutt spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5788, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5788, as amended by the House, and the bill passed the House by the following vote: Yeas - 95, Nays - 1, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 95.
Voting nay: Representative Nixon - 1.
Excused: Representatives Condotta and Tom - 2.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5788, as amended by the House, having received the necessary constitutional majority, was declared passed.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5806, By Senate Committee on Human Services & Corrections (originally sponsored by Senators Kohl-Welles, Hargrove, Rasmussen and Jacobsen)
Requiring child care agencies to provide additional information to parents.
The bill was read the second time.
On motion of Representative Kagi, the committee amendment by the Committee on Children & Family Services was adopted. (For committee amendment, see Journal, 82nd Day, April 1, 2005.)
Representative Hinkle moved the adoption of amendment (524):
On page 1, after line 18, insert the following:
"NEW SECTION. Sec. 2. A new section is added to chapter 74.15 RCW to read as follows:
For the purposes of this act, "enforcement action" means denial, suspension, revocation, modification, or nonrenewal of a license pursuant to RCW 74.15.130(1) or assessment of civil monetary penalties pursuant to RCW 74.15.130(4)."
Renumber the remaining sections consecutively and correct any internal references accordingly.
Beginning on page 3, line 33, strike all of section 5 and insert the following:
"Sec. 5. RCW 74.15.130 and 1998 c 314 s 6 are each amended to read as follows:
(1) An agency may be denied a license, or any license issued pursuant to chapter 74.15 RCW and RCW 74.13.031 may be suspended, revoked, modified, or not renewed by the secretary upon proof (a) that the agency has failed or refused to comply with the provisions of chapter 74.15 RCW and RCW 74.13.031 or the requirements promulgated pursuant to the provisions of chapter 74.15 RCW and RCW 74.13.031; or (b) that the conditions required for the issuance of a license under chapter 74.15 RCW and RCW 74.13.031 have ceased to exist with respect to such licenses. RCW 43.20A.205 governs notice of a license denial, revocation, suspension, or modification and provides the right to an adjudicative proceeding.
(2) In any adjudicative proceeding regarding the denial, modification, suspension, or revocation of a foster family home license, the department's decision shall be upheld if there is reasonable cause to believe that:
(a) The applicant or licensee lacks the character, suitability, or competence to care for children placed in out-of-home care, however, no unfounded report of child abuse or neglect may be used to deny employment or a license;
(b) The applicant or licensee has failed or refused to comply with any provision of chapter 74.15 RCW, RCW 74.13.031, or the requirements adopted pursuant to such provisions; or
(c) The conditions required for issuance of a license under chapter 74.15 RCW and RCW 74.13.031 have ceased to exist with respect to such licenses.
(3) In any adjudicative proceeding regarding the denial, modification, suspension, or revocation of any license under this chapter, other than a foster family home license, the department's decision shall be upheld if it is supported by a preponderance of the evidence.
(4) The department may assess civil monetary penalties upon proof that an agency has failed or refused to comply with the rules adopted under the provisions of this chapter and RCW 74.13.031 or that an agency subject to licensing under this chapter and RCW 74.13.031 is operating without a license except that civil monetary penalties shall not be levied against a licensed foster home. Monetary penalties levied against unlicensed agencies that submit an application for licensure within thirty days of notification and subsequently become licensed will be forgiven. These penalties may be assessed in addition to or in lieu of other disciplinary actions. Civil monetary penalties, if imposed, may be assessed and collected, with interest, for each day an agency is or was out of compliance. Civil monetary penalties shall not exceed seventy-five dollars per violation for a family day-care home and two hundred fifty dollars per violation for group homes, child day-care centers, and child-placing agencies. Each day upon which the same or substantially similar action occurs is a separate violation subject to the assessment of a separate penalty. The department shall provide a notification period before a monetary penalty is effective and may forgive the penalty levied if the agency comes into compliance during this period. The department may suspend, revoke, or not renew a license for failure to pay a civil monetary penalty it has assessed pursuant to this chapter within ten days after such assessment becomes final. Chapter 43.20A RCW governs notice of a civil monetary penalty and provides the right of an adjudicative proceeding. The preponderance of evidence standard shall apply in adjudicative proceedings related to assessment of civil monetary penalties.
(5)(a) In addition to or in lieu of an enforcement action being taken, the department may place a child day-care center or family day-care provider on nonreferral status if the center or provider has failed or refused to comply with this chapter or rules adopted under this chapter or an enforcement action has been taken. The nonreferral status may continue until the department determines that: (i) No enforcement action is appropriate; or (ii) a corrective action plan has been successfully concluded.
(b) Whenever a child day-care center or family day-care provider is placed on nonreferral status, the department shall provide written notification to the child day-care center or family day-care provider.
(6) The department shall notify appropriate public and private child care resource and referral agencies of the department's decision to: (a) Take an enforcement action against a child day-care center or family day-care provider; or (b) place or remove a child day-care center or family day-care provider on nonreferral status."
Representatives Hinkle and Kagi spoke in favor of the adoption of the amendment.
The amendment was adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill, as amended by the House, was placed on final passage.
Representatives Kagi and Hinkle spoke in favor of passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5806, as amended by the House.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5806, as amended by the House, and the bill passed the House by the following vote: Yeas - 96, Nays - 0, Absent - 0, Excused - 2.
Voting yea: Representatives Ahern, Alexander, Anderson, Appleton, Armstrong, Bailey, Blake, Buck, Buri, Campbell, Chandler, Chase, Clements, Clibborn, Cody, Conway, Cox, Crouse, Curtis, Darneille, DeBolt, Dickerson, Dunn, Dunshee, Eickmeyer, Ericks, Ericksen, Flannigan, Fromhold, Grant, Green, Haigh, Haler, Hankins, Hasegawa, Hinkle, Holmquist, Hudgins, Hunt, Hunter, Jarrett, Kagi, Kenney, Kessler, Kilmer, Kirby, Kretz, Kristiansen, Lantz, Linville, Lovick, McCoy, McCune, McDermott, McDonald, McIntire, Miloscia, Moeller, Morrell, Morris, Murray, Newhouse, Nixon, O'Brien, Orcutt, Ormsby, Pearson, Pettigrew, Priest, Quall, Roach, Roberts, Rodne, Santos, Schindler, Schual-Berke, Sells, Serben, Shabro, Simpson, Skinner, Sommers, Springer, Strow, B. Sullivan, P. Sullivan, Sump, Takko, Talcott, Upthegrove, Wallace, Walsh, Williams, Wood, Woods and Mr. Speaker - 96.
Excused: Representatives Condotta and Tom - 2.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5806, as amended by the House, having received the necessary constitutional majority, was declared passed.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5348, By Senate Committee on Water, Energy & Environment (originally sponsored by Senators Pridemore, Kastama, Fraser and Kline)
Authorizing certain PUDs to operate an electrical appliance repair service.
The bill was read the second time.
With the consent of the House, amendment (402) was withdrawn.
Representative Orcutt moved the adoption of the following amendment (418):
On page 2, at the beginning of line 6, strike "Any" and insert "(1) Except as otherwise provided under this section, any"
On page 2, after line 9, insert the following:
"(2) A public utility district that operates an electrical appliance repair service under subsection (1) of this section shall not repair electrical appliances made or installed after the year 1990."
Representative Orcutt spoke in favor of adoption of the amendment.
Representative Fromhold spoke against the adoption of the amendment.
The amendment was not adopted.
Representative Curtis moved the adoption of the following amendment (399):
On page 2, line 9, after "territory" insert "for customers sixty-one years of age or older with combined disposable income of thirty-five thousand dollars or less"
Representatives Curtis and Orcutt spoke in favor of adoption of the amendment.
Representative Morris spoke against the adoption of the amendment.
The amendment was not adopted.
Representative Curtis moved the adoption of the following amendment (400):
On page 2, line 15, after "(1)" insert "Contract with privately owned electrical appliance repair services to conduct the repairs;
(2)"
Renumber the remaining subsections consecutively.
Representatives Curtis, Orcutt and Curtis (again) spoke in favor of adoption of the amendment.
Representatives Fromhold and Morris spoke against the adoption of the amendment.
Division was demanded. The Speaker (Representative Lovick presiding) divided the House. The result was 42 - YEAS; 54 -NAYS.
The amendment was not adopted.
Representative Orcutt moved the adoption of the following amendment (403):
On page 2, after line 19, insert the following:
"NEW SECTION. Sec. 4. This act expires December 31, 2020."
Correct the title.
Representative Orcutt spoke in favor of adoption of the amendment.
Representative Moeller spoke against the adoption of the amendment.
The amendment was not adopted.
Representative Orcutt moved the adoption of the following amendment (408):
On page 2, after line 19, insert the following:
"NEW SECTION. Sec. 4. A new section is added to chapter 54.16 RCW to read as follows:
(1) When a public utility district provides electrical appliance repair services under section 2 of this act, the state auditor must contract with an independent auditor to conduct an annual audit of the public utility district's electrical appliance repair department.
(2) The annual audit shall investigate whether the electrical appliance repair department and the electrical appliance repair services are subsidized by any other customer rate structures."
Representative Orcutt spoke in favor of adoption of the amendment.
Representative Wallace spoke against the adoption of the amendment.
The amendment was not adopted.
There being no objection, the rules were suspended, the second reading considered the third and the bill was placed on final passage.
There being no objection, House Rule 13(c) was suspended.
Representatives Fromhold and Wallace spoke in favor of passage of the bill.
Representative Curtis spoke against the passage of the bill.
The Speaker (Representative Lovick presiding) stated the question before the House to be the final passage of Engrossed Substitute Senate Bill No. 5348.
ROLL CALL
The Clerk called the roll on the final passage of Engrossed Substitute Senate Bill No. 5348 and the bill passed the House by the following vote: Yeas - 51, Nays - 45, Absent - 0, Excused - 2.
Voting yea: Representatives Appleton, Blake, Campbell, Chase, Clibborn, Cody, Conway, Darneille, Dickerson, Dunshee, Eickmeyer, Ericks, Flannigan, Fromhold, Grant, Green, Haigh, Hasegawa, Hudgins, Hunt, Hunter, Kagi, Kenney, Kirby, Lantz, Linville, Lovick, McCoy, McDermott, McIntire, Miloscia, Moeller, Morrell, Murray, O'Brien, Ormsby, Pettigrew, Roberts, Santos, Schual-Berke, Simpson, Sommers, B. Sullivan, P. Sullivan, Takko, Talcott, Upthegrove, Wallace, Williams, Wood and Mr. Speaker - 51.
Voting nay: Representatives Ahern, Alexander, Anderson, Armstrong, Bailey, Buck, Buri, Chandler, Clements, Cox, Crouse, Curtis, DeBolt, Dunn, Ericksen, Haler, Hankins, Hinkle, Holmquist, Jarrett, Kessler, Kilmer, Kretz, Kristiansen, McCune, McDonald, Morris, Newhouse, Nixon, Orcutt, Pearson, Priest, Quall, Roach, Rodne, Schindler, Sells, Serben, Shabro, Skinner, Springer, Strow, Sump, Walsh and Woods - 45.
Excused: Representatives Condotta and Tom - 2.
ENGROSSED SUBSTITUTE SENATE BILL NO. 5348, having received the necessary constitutional majority, was declared passed.
There being no objection, the Rules Committee was relieved of further consideration of the following bills which were placed on the Second Reading calendar.
ENGROSSED SENATE BILL NO. 5089,
ENGROSSED SUBSTITUTE SENATE BILL NO. 5121,
ENGROSSED SECOND SUBSTITUTE SENATE BILL NO. 5213,
SUBSTITUTE SENATE BILL NO. 5290,
ENGROSSED SUBSTITUTE SENATE BILL NO. 5415,
ENGROSSED SUBSTITUTE SENATE BILL NO. 5432,
SUBSTITUTE SENATE BILL NO. 5623,
ENGROSSED SUBSTITUTE SENATE BILL NO. 5732,
SUBSTITUTE SENATE BILL NO. 5850,
SUBSTITUTE SENATE BILL NO. 6064,
There being no objection, the House advanced to the eleventh order of business.
There being no objection, the House adjourned until 10:00 a.m., April 14, 2005, the 95th Day of the Regular Session.
FRANK CHOPP, Speaker
RICHARD NAFZIGER, Chief Clerk