PDFRCW 47.60.838

Vessel and terminal electrification program.

It is the intent of the legislature to fully fund the vessel and terminal electrification program in accordance with the Washington state ferries 2040 long range plan. The legislature finds that to attain the 2040 target fleet size of 26 vessels, a biennial replacement schedule is necessary to ensure the level of ferry service and reliability expected by the public. Therefore, by June 30, 2025, the legislature will secure funding options, including but not limited to a vessel surcharge, to devote the resources necessary to fulfill the vessel and terminal needs outlined in the 2040 long range plan.
[ 2022 c 182 s 431.]

NOTES:

IntentEffective date2022 c 182: See notes following RCW 70A.65.240.