PDFRCW 70A.15.6450

Boiler or process heatersAssessment and reporting requirements.

(1) An owner or operator of an industrial, commercial, or institutional boiler or process heater required to complete an energy assessment under 40 C.F.R. Part 63 subpart DDDDD shall:
(a) By January 31, 2018, submit nonproprietary information reported in the energy assessment electronically to the department or air pollution control authority that issues the air operating permit for the source, following completion of the assessment; and
(b) By January 31, 2018, submit a report electronically to the Washington State University extension energy program that identifies, if applicable, the economic, technical, and other barriers to implementing thermal efficiency opportunities identified in the energy assessment.
(2) An owner or operator of an industrial, commercial, or institutional boiler or process heater who has not completed an energy assessment under 40 C.F.R. Part 63 subpart DDDDD must request a free combined heat and power site qualification screening from the United States department of energy.
(3) The requirements established in this section shall not apply to an owner or operator of an industrial, commercial, or institutional boiler or process heater if:
(a) The owner or operator is not required to complete an energy assessment under 40 C.F.R. Part 63 subpart DDDDD as it existed on October 9, 2015; or
(b) Prior to the dates in subsection (1) of this section, the owner or operator is no longer required to complete an energy assessment under 40 C.F.R. Part 63 subpart DDDDD.
[ 2015 3rd sp.s. c 19 s 14. Formerly RCW 70.94.992.]

NOTES:

FindingIntent2015 3rd sp.s. c 19: See note following RCW 39.35.010.