Sections |
80.60.005 | Findings. |
80.60.010 | Definitions. |
80.60.020 | Available on first-come, first-served basis—Interconnected metering systems allowed—Charges to customer-generator—Consumer-owned utility may develop standard rate or tariff schedule. |
80.60.030 | Net energy measurement, charges for kilowatt-hour consumption, and credits for excess kilowatt-hour generation—Required calculation—Unused credit—Net metering system—Customer-generator meter aggregation. |
80.60.040 | Safety, power quality, and interconnection requirements—Customer-generator's expense—Commission may adopt additional requirements. |