PDF
RCW
47.56.120
Toll bridges
—
Construction directed
—
Costs.
In the event that any toll bridge should be constructed, all cost thereof including right-of-way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.
[
2008 c 122 § 13
;
1977 ex.s. c 151 § 70
;
1961 c 13 § 47.56.120
. Prior:
1937 c 173 § 4
; RRS § 6524-4.]