Ventilation rates (Lpm, ATPS(1)) | Breathing machine tidal volumes (L) | Breathing machine frequencies (breaths per min.) | CO2 injection rates (Lpm, STPD (2)) |
22.5 | 1.5 | 15 | 0.90 |
40.0 | 2.0 | 20 | 1.35 |
62.5 | 2.5 | 25 | 2.25 |
(1) | ATPS means ambient temperature and pressure, saturated with water. |
(2) | STPD means standard temperature and pressure, dry; the standard temperature is 32 degrees F (0 degrees C). |
(v) When using a work rate (i.e., breathing-machine tidal volume and frequency) other than the work rates listed in the table above, addition of the appropriate combinations of ventilation rates and CO2-injection rates;
(vi) Performance of the CO2 injection at a constant (steady) and continuous rate during each testing trial;
(vii) Determination of canister duration using a minimum of four water temperatures, including 40, 50, 70, and 90 degrees F (4.4, 10.0, 21.1, and 32.2 degrees C, respectively);
(viii) Monitoring of the breathing-gas temperature at the rebreather mouthpiece (at the "chrome T" connector), and ensuring that this temperature conforms to the temperature of a diver's exhaled breath at the water temperature and ventilation rate used during the testing trial;(1)
(ix) Implementation of at least eight testing trials for each combination of temperature and ventilation-CO2-injection rates (for example, eight testing trials at 40 degrees F using a ventilation rate of 22.5 Lpm at a CO2-injection rate of 0.90 Lpm);
(x) Allowing the water temperature to vary no more than 2.0 degrees F (1.0 degree C) between each of the eight testing trials, and no more than 1.0 degree F (0.5 degree C) within each testing trial;
(xi) Use of the average temperature for each set of eight testing trials in the statistical analysis of the testing-trial results, with the testing-trial results being the time taken for the inhaled breathing gas to reach 0.005 ATA of CO2 (i.e., the canister-duration results);
(xii) Analysis of the canister-duration results using the repeated-measures statistics described in NEDU Report 2-99;
(xiii) Specification of the replacement schedule for the CO2-sorbent materials in terms of the lower prediction line (or limit) of the 95% confidence interval; and
(xiv) Derivation of replacement schedules only by interpolating among, but not by extrapolating beyond, the depth, water temperatures, and exercise levels used during canister testing.