Eligible projects are:
(1) Improvements on federally classified routes;
(2) Within a city qualifying for urban designation upon the next federal census; or
(3) Within the urban area in counties.
Sidewalks with five feet minimum clear width are required on both sides of the arterial unless a deviation is granted under WAC
479-14-200.
[Statutory Authority: Chapter
47.26 RCW. WSR 23-08-032, § 479-14-121, filed 3/28/23, effective 4/28/23; WSR 18-08-068, § 479-14-121, filed 4/2/18, effective 5/3/18; WSR 12-08-060, § 479-14-121, filed 4/3/12, effective 5/4/12; WSR 07-18-050, § 479-14-121, filed 8/30/07, effective 9/30/07.]