Washington Administrative Code
2019 Archive

Chapter 173-240 WAC
Last Update: 7/11/00

SUBMISSION OF PLANS AND REPORTS FOR CONSTRUCTION OF WASTEWATER FACILITIES
PDF of Chapter Digest
WAC Sections
173-240-010Purpose and scope.
173-240-020Definitions.
DOMESTIC WASTEWATER FACILITIES
173-240-030Submission of plans and reports.
173-240-035Restrictions—Subsurface disposal systems.
173-240-040Review standards.
173-240-050General sewer plan.
173-240-060Engineering report.
173-240-070Plans and specifications.
173-240-075Construction quality assurance plan.
173-240-080Operation and maintenance manual.
173-240-090Declaration of construction completion.
173-240-095Form—Declaration of construction of water pollution control facilities.
173-240-100Requirement for certified operator.
173-240-104Ownership and operation and maintenance.
INDUSTRIAL WASTEWATER FACILITIES
173-240-110Submission of plans and reports.
173-240-120Review standards.
173-240-130Engineering report.
173-240-140Plans and specifications.
173-240-150Operation and maintenance manual.
DOMESTIC AND INDUSTRIAL WASTEWATER FACILITIES
173-240-160Requirement for professional engineer.
173-240-170Right of inspection.
173-240-180Approval of construction changes.
DISPOSITION OF SECTIONS FORMERLY CODIFIED IN THIS TITLE
173-240-105Form—Certificate of construction of water pollution control facilities. [Statutory Authority: RCW 90.48.110. WSR 79-02-033 (Order DE 78-10), § 173-240-105, filed 1/23/79. Formerly chapter 372-20 WAC.] Repealed by WSR 83-23-063 (Order DE 83-30), filed 11/16/83. Statutory Authority: Chapters 43.21A and 90.48 RCW.