Washington Administrative Code
2023 Archive

Chapter 173-219 WAC
Last Update: 1/23/18

RECLAIMED WATER
PDF of Chapter Digest
WAC Sections
173-219-010Definitions, abbreviations, and acronyms.
173-219-020Purpose and scope.
173-219-030Applicability.
173-219-040Direct enforceability.
173-219-050Lead agency designation.
173-219-060Agency requirements and responsibilities.
173-219-070Permit required.
173-219-080Applying for a reclaimed water permit.
173-219-090Water rights protection.
173-219-100Public access to information.
173-219-110Public notice.
173-219-120Public comment period.
173-219-130Public hearing request.
173-219-140Relationship with other ecology and health permits.
173-219-150Regulatory action for noncompliance.
173-219-160Appeals.
173-219-170Preplanning and project application.
173-219-180Feasibility analysis.
173-219-190Timing and signature requirements.
173-219-200Plan review and review standards.
173-219-210Engineering report.
173-219-220Plans and specifications.
173-219-230Construction and declaration of construction.
173-219-240Operations and maintenance.
173-219-250Certified operators.
173-219-260Monitoring, recording, and reporting.
173-219-270Reclaimed water permit terms and conditions.
173-219-280Fact sheet.
173-219-290Use agreements.
173-219-300Source control and pretreatment requirements.
173-219-310Cross-connection control.
173-219-320Class A and B reclaimed water.
173-219-330Performance standards.
173-219-340Disinfection process standards.
173-219-350Treatment reliability standards.
173-219-360Storage and distribution system requirements.
173-219-370Maintenance of chlorine residual.
173-219-380General use-based requirements.
173-219-390Specific use-based requirements.