EXCEPTIONS: | 1. Door openings required to comply with Section 716 of the International Building Code. |
| 2. Doors and door openings required to comply with UL 1784 by the International Building Code. |
[Statutory Authority: RCW
19.27A.020,
19.27A.025,
19.27A.160 and chapter
19.27 RCW. WSR 19-24-040, § 51-11C-40244, filed 11/26/19, effective 7/1/20. Statutory Authority: RCW
19.27A.025,
19.27A.160, and
19.27.074. WSR 16-03-072, § 51-11C-40244, filed 1/19/16, effective 7/1/16. Statutory Authority: RCW
19.27A.020,
19.27A.025 and chapters
19.27 and
34.05 RCW. WSR 13-04-056, § 51-11C-40244, filed 2/1/13, effective 7/1/13.]
(Effective October 29, 2023)
Section C402.5.6—Doors and access openings.
C402.5.6 Doors and access openings to shafts, chutes, stairways, and elevator lobbies. Doors and access openings from conditioned space to shafts, chutes, stairways and elevator lobbies shall be gasketed, weatherstripped or sealed.
EXCEPTIONS: | 1. Door openings required to comply with Section 716 of the International Building Code. |
| 2. Doors and door openings required to comply with UL 1784 by the International Building Code. |
[Statutory Authority: RCW
19.27A.020,
19.27A.025,
19.27A.160 and chapters
19.27A and
19.27 RCW. WSR 22-14-091 and 23-12-101, § 51-11C-40244, filed 7/1/22 and 6/7/23, effective 10/29/23. Statutory Authority: RCW
19.27A.020,
19.27A.025,
19.27A.160 and chapter
19.27 RCW. WSR 19-24-040, § 51-11C-40244, filed 11/26/19, effective 7/1/20. Statutory Authority: RCW
19.27A.025,
19.27A.160, and
19.27.074. WSR 16-03-072, § 51-11C-40244, filed 1/19/16, effective 7/1/16. Statutory Authority: RCW
19.27A.020,
19.27A.025 and chapters
19.27 and
34.05 RCW. WSR 13-04-056, § 51-11C-40244, filed 2/1/13, effective 7/1/13.]