WSR 99-01-088
PERMANENT RULES
DEPARTMENT OF
FISH AND WILDLIFE
[Order 98-252--Filed December 16, 1998, 3:08 p.m.]
Date of Adoption: December 4, 1998.
Purpose: Provide general rules for small scale prospecting and mining, and other prospecting and mining.
Citation of Existing Rules Affected by this Order: Repealing WAC 220-110-210 and 220-110-220; and amending WAC 220-110-020, 220-110-031, 220-110-200, 220-110-340, and 220-110-350.
Statutory Authority for Adoption: RCW 75.08.080, 75.20.100, 75.20.330.
Adopted under notice filed as WSR 98-21-071 on October 21, 1998.
Changes Other than Editing from Proposed to Adopted Version:
Change: WAC 220-110-020(27) to read: "Excavation site" means
the pit, furrow or hole (exact location) from which aggregate is
being removed for the processing and recovery of minerals.
Explanation: The previous definition of "Excavation site" was vague. The change of definition clarifies the definition but does not alter other rules regarding excavation sites.
Change: WAC 220-110-201(5) to read: A maximum of five individuals eight years of age and over may collect and process aggregate from any excavation site. No more than one pit, furrow or pothole at a time shall be excavated by any one individual.
Explanation: This change allows young children to work excavation sites without being counted in the five person maximum allowable for each excavation site. Children are still subject to the other provisions in these rules, however.
Change: WAC 220-110-201(22) to read: Entry onto private property or removal of mineral from an existing mining claim or state-owned lands without the permission of the landowner or claim holder is not authorized.
Explanation: The previous rule needed rewording so that access to private property or a mining claim was not restricted for the landowner or claim holder. The intent of the rule is to require permission for access to other's private property or to mine on another's claim.
Change: WAC 220-110-206 to read:
Chelan | July 1 - August 15 | Beaver Creek | July 1 - October 31 |
Colockum Creek | July 1 - October 31 | ||
Peshastin Creek | |||
--mouth to |
July 1 - August 15 | ||
--above |
July 1 - October 31 | ||
Squilchuck Creek | July 1 - October 31 | ||
Stemilt Creek | |||
--mouth to falls | July 1 - October 31 | ||
Wenatchee River | |||
--mouth to lake | July 1 - September 30 | ||
Yakima | June 1 - September 30 | Klickitat River | July 1 - August 15 |
Yakima River | |||
--mouth to Roza Dam | June 1 - September | ||
--Naches River | |||
----mouth to Tieton River | June 1 - October 31 | ||
----above confluence of Tieton River | June 1 - August 15 | ||
----Indian Creek (Rimrock Lake) | July 1 - July 31 | ||
----Tieton River | June 1 - August 15 | ||
----Little Naches River | July 15 - August 15 | ||
----Bumping River | July 15 - August 15 | ||
----American River | submit application | ||
----Rattlesnake Creek | July 15 - August 15 | ||
--Wenas Creek | August 1 - October 31 | ||
--all other Yakima River tributaries | July 15 - August 31 |
Explanation: Ingalls Creek supports a spawning population of bull trout that requires protection for a longer period of time for incubation than provided in the previous rule. Bumping River and Rattlesnake Creek support spawning populations of chinook salmon that require protection for different periods of time for incubation than provided in the previous rule.
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, amended 0, repealed 0; Federal Rules or Standards: New 0, amended 0, repealed 0; or Recently Enacted State Statutes: New 6, amended 5, repealed 1.
Number of Sections Adopted at Request of a Nongovernmental Entity: New 0, amended 0, repealed 0.
Number of Sections Adopted on the Agency's Own Initiative: New 3, amended 0, repealed 1.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 3, amended 0, repealed 1.
Number of Sections Adopted Using Negotiated Rule Making: New 0, amended 0, repealed 0; Pilot Rule Making: New 0, amended 0, repealed 0; or Other Alternative Rule Making: New 0, amended 0, repealed 0.
Effective Date of Rule: Thirty-one days after filing.
December 16, 1998
Lisa Pelly, Chair
Fish and Wildlife Commission
OTS-2554.4
AMENDATORY SECTION (Amending Order 97-84, filed 6/4/97, effective 7/5/97)
WAC 220-110-020 Definitions. As used in this chapter, unless the context clearly requires otherwise:
(1) "Aggregate" means a mixture of minerals separable by mechanical or physical means.
(2) "Aquatic beneficial plant" means native and nonnative aquatic plants not prescribed by RCW 17.10.010(10), and that are of value to fish life.
(((2))) (3) "Aquatic noxious weed" means an aquatic weed on
the state noxious weed list as prescribed by RCW 17.10.010(10).
(((3))) (4) "Aquatic plant" means any aquatic noxious weed
and aquatic beneficial plant that occurs within the ordinary high
water line of waters of the state.
(((4))) (5) "Bank" means any land surface above the ordinary
high water line that adjoins a body of water and contains it
except during floods. Bank also includes all land surfaces of
islands above the ordinary high water line that adjoin a water
body and that are below the flood elevation of their surrounding
water body.
(6) "Beach area" means the beds between the ordinary high water line and extreme low tide.
(((5))) (7) "Bed" means the land below the ordinary high
water lines of state waters. This definition shall not include
irrigation ditches, canals, storm water run-off devices, or other
artificial watercourses except where they exist in a natural
watercourse that has been altered by man.
(((6))) (8) "Bed materials" means ((natural-occurring))
naturally occurring material, including, but not limited to,
gravel, cobble, rock, rubble, sand, mud and aquatic plants, found
in the beds of state waters. Bed materials may be found in
deposits or bars above the wetted perimeter of water bodies.
(((7))) (9) "Bio-degradable" means material that is capable
of being readily decomposed by biological means, such as by
bacteria.
(((8))) (10) "Bio-engineering" means project designs or
construction methods which use live woody vegetation or a
combination of live woody vegetation and specially developed
natural or synthetic materials to establish a complex root grid
within the existing bank which is resistant to erosion, provides
bank stability, and maintains a healthy riparian environment with
habitat features important to fish life. Use of wood structures
or limited use of clean angular rock may be allowable to provide
stability for establishment of the vegetation.
(((9))) (11) "Bottom barrier or screen" means synthetic or
natural fiber sheets of material used to cover and kill plants
growing on the bottom of a watercourse.
(((10))) (12) "Boulder" means a stream substrate particle
larger than ten inches in diameter.
(13) "Bulkhead" means a vertical or nearly vertical erosion protection structure placed parallel to the shoreline consisting of concrete, timber, steel, rock, or other permanent material not readily subject to erosion.
(((11))) (14) "Concentrator" means a device used to
physically or mechanically separate and enrich the valuable
mineral content of aggregate. Pans, sluice boxes and mini-rocker
boxes are examples of concentrators.
(15) "Cofferdam" means a temporary enclosure used to keep water from a work area.
(((12))) (16) "Control" means level of treatment of aquatic
noxious weeds as prescribed by RCW 17.10.010(5).
(((13))) (17) "Department" means the department of fish and
wildlife.
(((14))) (18) "Diver-operated dredging" means the use of
portable suction or hydraulic dredges held by SCUBA divers to
remove aquatic plants.
(((15))) (19) "Drawdown" means decreasing the level of
standing water in a watercourse to expose bottom sediments and
rooted plants.
(((16))) (20) "Dredging" means removal of bed material using
other than hand held tools.
(((17))) (21) "Early infestation" means an aquatic noxious
weed whose stage of development, life history, or area of
coverage makes one hundred percent control and eradication as
prescribed by RCW 17.10.010(5) likely to occur.
(((18))) (22) "Emergency" means an immediate threat to life,
public or private property, or an immediate threat of serious
environmental degradation, arising from weather or stream flow
conditions, other natural conditions, or fire.
(((19))) (23) "Entrained" means the entrapment of fish into
a watercourse diversion without the presence of a screen, into
high velocity water along the face of an improperly designed
screen, or into the vegetation cut by a mechanical harvester.
(((20))) (24) "Equipment" means any device powered by
internal combustion; hydraulics; electricity, except less than
one horsepower; or livestock used as draft animals, except saddle
horses; and the lines, cables, arms, or extensions associated
with the device.
(((21))) (25) "Eradication" See "control."
(((22))) (26) "Established ford" means a crossing place in a
watercourse that was in existence and annually used prior to 1986
or subsequently permitted by the department, and, has
identifiable approaches on the ((streambanks)) banks.
(((23))) (27) "Excavation site" means the pit, furrow, or
hole from which aggregate is being removed for the processing and
recovery of minerals.
(28) "Extreme low tide" means the lowest level reached by a receding tide.
(((24))) (29) "Farm and agricultural land" means those lands
identified as such in RCW 84.34.020.
(((25))) (30) "Filter blanket" means a layer or combination
of layers of pervious materials (organic, mineral, or synthetic)
designed and installed in such a manner as to provide drainage,
yet prevent the movement of soil particles due to flowing water.
(((26))) (31) "Fish life" means all fish species, including
but not limited to food fish, shellfish, game fish, and other
nonclassified fish species and all stages of development of those
species.
(((27))) (32) "Fishway" means any facility or device that is
designed to enable fish to effectively pass around or through an
obstruction without undue stress or delay.
(33) "Food fish" means those species of the classes Osteichthyes, Agnatha, and Chondrichthyes that shall not be fished for except as authorized by rule of the director of the department of fish and wildlife.
(((28))) (34) "Freshwater area" means those state waters and
associated beds below the ordinary high water line that are
upstream of river mouths including all lakes, ponds, and streams.
(((29))) (35) "Game fish" means those species of the class
Osteichthyes that shall not be fished for except as authorized by
rule of the fish and wildlife commission.
(((30))) (36) "General provisions" means those provisions
that are contained in every HPA.
(((31))) (37) "Hand cutting" means the removal or control of
aquatic plants with the use of hand-held tools or equipment, or
equipment that is carried by a person when used.
(((32))) (38) "Hand-held tools" means tools that are held by
hand and are not powered by internal combustion, hydraulics,
pneumatics, or electricity. ((Examples are shovels, rakes,
hammers, etc.)) Some examples of hand-held tools are shovels,
rakes, hammers, pry bars and cable winches.
(((33))) (39) "Hatchery" means any water impoundment or
facility used for the captive spawning, hatching, or rearing of
fish and shellfish.
(((34))) (40) "Highbanker" means a stationary concentrator
capable of being operated outside the wetted perimeter of the
water body from which water is removed, and which is used to
separate gold and other minerals from aggregate with the use of
water supplied by hand or pumping, and consisting of a sluice
box, hopper, and water supply. Aggregate is supplied to the
highbanker by means other than suction dredging. This definition
excludes mini-rocker boxes.
(41) "Highbanking" means the use of a highbanker for the recovery of minerals.
(42) "Hydraulic project" means construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state. Hydraulic projects include forest practice activities, conducted pursuant to the forest practices rules (Title 222 WAC), that involve construction or performance of other work in or across the ordinary high water line of:
(a) Type 1-3 waters; or
(b) Type 4 and 5 waters with identifiable bed or banks where there is a hatchery water intake within two miles downstream; or
(c) Type 4 and 5 waters with identifiable bed or banks within one-fourth mile of Type 1-3 waters where any of the following conditions apply:
(i) Where the removal of timber adjacent to the stream is likely to result in entry of felled trees into flowing channels;
(ii) Where there is any felling, skidding, or ground lead yarding through flowing water, or through dry channels with identifiable bed or banks with gradient greater than twenty percent;
(iii) Where riparian or wetland leave trees are required and cable tailholds are on the opposite side of the channel;
(iv) Where road construction or placement of culverts occurs in flowing water;
(v) Where timber is yarded in or across flowing water;
(d) Type 4 and 5 waters with identifiable bed or banks that are likely to adversely affect fish life, where the HPA requirement is noted by the department in response to the forest practice application.
Hydraulic projects and associated permit requirements for specific project types are further defined in other sections of this chapter.
(((35))) (43) "Hydraulic project application" means a form
provided by and submitted to the department of fish and wildlife
accompanied by plans and specifications of the proposed hydraulic
project.
(((36))) (44) "Hydraulic project approval" (HPA) means:
(a) A written approval for a hydraulic project signed by the director of the department of fish and wildlife, or the director's designates; or
(b) A verbal approval for an emergency hydraulic project from the director of the department of fish and wildlife, or the director's designates; or
(c) The following printed pamphlet approvals and any supplemental approvals to them. See "supplemental approval":
(i) A "Gold and Fish" pamphlet issued by the department
which identifies and authorizes specific minor hydraulic project
activities for ((mineral prospecting (panning))) mineral
prospecting and placer mining; or
(((d))) (ii) An "Irrigation and Fish" pamphlet issued by the
department which identifies and authorizes specific minor
hydraulic project activities; or
(((e))) (iii) An "Aquatic Plants and Fish" pamphlet issued
by the department which identifies and authorizes specific
aquatic noxious weed and aquatic beneficial plant removal and
control activities.
(((37))) (45) "Hydraulicing" means the use of water spray or
water under pressure to dislodge minerals and other material.
(46) "Job site" means the space of ground including and immediately adjacent to the area where work is conducted under the authority of a hydraulic project approval. For mineral prospecting and placer mining projects, the job site includes the excavation site.
(47) "Lake" means any natural or impounded body of standing freshwater, except impoundments of the Columbia and Snake rivers.
(48) "Large woody material" means trees or tree parts larger than four inches in diameter and longer than six feet and rootwads, wholly or partially waterward of the ordinary high water line.
(((38))) (49) "Mean higher high water" or "MHHW" means the
tidal elevation obtained by averaging each day's highest tide at
a particular location over a period of nineteen years. It is
measured from the MLLW.= 0.0 tidal elevation.
(((39))) (50) "Mean lower low water" or "MLLW" means the 0.0
tidal elevation. It is determined by averaging each days' lowest
tide at a particular location over a period of nineteen years.
It is the tidal datum for vertical tidal references in the
saltwater area.
(((40))) (51) "Mechanical harvesting and cutting" means the
partial removal or control of aquatic plants with the use of
aquatic mechanical harvesters which cut and collect aquatic
plants, and mechanical cutters which only cut aquatic plants.
(((41))) (52) "Mineral prospecting equipment" means any
natural or manufactured device, implement, or animal other than
the human body used in any aspect of prospecting for or
recovering minerals. Classifications of mineral prospecting
equipment are as follows:
(a) Class 0 - nonmotorized pans.
(b) Class I.
(i) Pans.
(ii) Nonmotorized sluice boxes, concentrators and mini-rocker boxes with a riffle area not exceeding ten square feet, and not exceeding fifty percent of the width of the wetted perimeter of the stream.
(c) Class II.
(i) Suction dredges with a maximum nozzle size of four inches inside diameter.
(ii) Highbankers or suction dredge/highbanker combinations with a maximum water intake size of two and one-half inches inside diameter, when operated wholly below the ordinary high water line.
(d) Class III.
(i) Highbankers supplied with water from a pump with a maximum water intake size of two and one-half inches inside diameter, when used to process aggregate at locations two hundred feet or greater landward of the ordinary high water line.
(ii) Suction dredge/highbanker combinations supplied with water from a pump with a maximum water intake size of two and one-half inches inside diameter, when used to process aggregate at locations two hundred feet or greater landward of the ordinary high water line.
(iii) Other concentrators supplied with water from a pump with a maximum water intake size of two and one-half inches inside diameter, when used to process aggregate at locations two hundred feet or greater landward of the ordinary high water line.
(53) "Mini-rocker box" means a nonmotorized concentrator operated with a rocking motion and consisting of a hopper attached to a cradle and a sluice box with a riffle area not exceeding ten square feet. The mini-rocker box shall only be supplied with water by hand and be capable of being carried by one individual. A mini-rocker box shall not be considered a highbanker.
(54) "Mitigation" means actions which shall be required as provisions of the HPA to avoid or compensate for impacts to fish life resulting from the proposed project activity. The type(s) of mitigation required shall be considered and implemented, where feasible, in the following sequential order of preference:
(a) Avoiding the impact altogether by not taking a certain action or parts of an action;
(b) Minimizing impacts by limiting the degree or magnitude of the action and its implementation;
(c) Rectifying the impact by repairing, rehabilitating, or restoring the affected environment;
(d) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action;
(e) Compensating for the impact by replacing or providing substitute resources or environments; or
(f) Monitoring the impact and taking appropriate corrective measures to achieve the identified goal.
For projects with potentially significant impacts, a mitigation agreement may be required prior to approval. Replacement mitigation may be required to be established and functional prior to project construction.
(((42))) (55) "Natural conditions" means those conditions
which arise in or are found in nature. This is not meant to
include artificial or manufactured conditions.
(((43))) (56) "No-net-loss" means:
(a) Avoidance or mitigation of adverse impacts to fish life; or
(b) Avoidance or mitigation of net loss of habitat functions necessary to sustain fish life; or
(c) Avoidance or mitigation of loss of area by habitat type.
Mitigation to achieve no-net-loss should benefit those organisms being impacted.
(((44))) (57) "Ordinary high water line" means the mark on
the shores of all waters that will be found by examining the bed
and banks and ascertaining where the presence and action of
waters are so common and usual and so long continued in ordinary
years, as to mark upon the soil or vegetation a character
distinct from that of the abutting upland: Provided, That in any
area where the ordinary high water line cannot be found the
ordinary high water line adjoining saltwater shall be the line of
mean higher high water and the ordinary high water line adjoining
freshwater shall be the elevation of the mean annual flood.
(((45))) (58) "Pan" means the following equipment used to
separate gold or other metal from aggregate by washing:
(a) An open, metal or plastic dish operated by hand; or
(b) A motorized rotating open, metal or plastic dish without pumped or gravity-fed water supplies.
(59) "Panning" means the use of a pan to wash aggregate.
(60) "Person" means an individual or a public or private entity or organization. The term "person" includes local, state, and federal government agencies, and all business organizations.
(((46))) (61) "Placer" means a glacial or alluvial deposit
of gravel or sand containing eroded particles of minerals.
(62) "Pool" means a portion of the stream with reduced current velocity, often with water deeper than the surrounding areas.
(63) "Protection of fish life" means prevention of loss or injury to fish or shellfish, and protection of the habitat that supports fish and shellfish populations.
(((47))) (64) "Purple loosestrife" means Lythrum salicaria
and Lythrum virgatum as prescribed in RCW 17.10.010(10) and
defined in RCW 17.26.020 (5)(b).
(((48))) (65) "Riffle" means the bottom of a concentrator
containing a series of interstices or grooves to catch and retain
a mineral such as gold.
(66) "River or stream." See "watercourse."
(((49))) (67) "Rotovation" means the use of aquatic
rotovators which have underwater rototiller-like blades to uproot
aquatic plants as a means of plant control.
(((50))) (68) "Saltwater area" means those state waters and
associated beds below the ordinary high water line and downstream
of river mouths.
(((51))) (69) "Shellfish" means those species of saltwater
and freshwater invertebrates that shall not be taken except as
authorized by rule of the director of the department of fish and
wildlife. The term "shellfish" includes all stages of
development and the bodily parts of shellfish species.
(((52))) (70) "Sluice box" means a trough equipped with
riffles across its bottom, used to recover gold and other
minerals with the use of water.
(71) "Sluicing" means the use of a sluice box for the recovery of gold and other minerals.
(72) "Small scale mineral prospecting equipment" encompasses the equipment included in "mineral prospecting equipment, Class I."
(73) "Spartina" means Spartina alterniflora, Spartina anglica, Spartina x townsendii, and Spartina patens as prescribed in RCW 17.10.010(10) and defined in RCW 17.26.020 (5)(a).
(((53))) (74) "Special provisions" means those conditions
that are a part of the HPA, but are site or project specific, and
are used to supplement or amend the technical provisions.
(((54))) (75) "Streambank stabilization" means those
projects which prevent or limit erosion, slippage, and mass
wasting; including, but not limited to bank resloping, log and
debris relocation or removal, planting of woody vegetation, bank
protection (physical armoring of ((streambanks)) banks using rock
or woody material, or placement of jetties or groins), gravel
removal or erosion control.
(((55))) (76) "Suction dredge" means a machine equipped with
an internal combustion engine or electric motor powering a water
pump which is used to move submerged bed materials by means of
hydraulic suction. These bed materials are processed through an
attached sluice box for the recovery of gold and other minerals.
(77) "Suction dredging" means the use of a suction dredge for the recovery of gold and other minerals.
(78) "Supplemental approval" means a written addendum issued by the department to a pamphlet HPA for approved exceptions to conditions of that pamphlet HPA or for any additional authorization by the department when required by a pamphlet HPA. See "hydraulic project approval."
(79) "Tailings" means waste material remaining after processing aggregate for minerals.
(80) "Technical provisions" means those conditions that are a part of the HPA and apply to most projects of that nature.
(((56))) (81) "Toe of the bank" means the distinct break in
slope between the stream bank or shoreline and the stream bottom
or marine beach or bed, excluding areas of sloughing. For steep
banks that extend into the water, the toe may be submerged below
the ordinary high water line. For artificial structures, such as
jetties or bulkheads, the toe refers to the base of the
structure, where it meets the stream bed or marine beach or bed.
(((57))) (82) "Viable" means that any plant or plant part is
capable of taking root or living when introduced into a body of
water.
(((58))) (83) "Watercourse" and "river or stream" means any
portion of a channel, bed, bank, or bottom waterward of the
ordinary high water line of waters of the state including areas
in which fish may spawn, reside, or through which they may pass,
and tributary waters with defined bed or banks, which influence
the quality of fish habitat downstream. This includes
watercourses which flow on an intermittent basis or which
fluctuate in level during the year and applies to the entire bed
of such watercourse whether or not the water is at peak level.
This definition does not include irrigation ditches, canals,
storm water run-off devices, or other entirely artificial
watercourses, except where they exist in a natural watercourse
which has been altered by humans.
(((59))) (84) "Water right" means a certificate of water
right, a vested water right or a claim to a valid vested water
right, or a water permit, pursuant to Title 90 RCW.
(((60))) (85) "Waters of the state" or "state waters" means
all salt waters and fresh waters waterward of ordinary high water
lines and within the territorial boundaries of the state.
(((61))) (86) "Water type" means water categories as defined
in WAC 222-16-030 of the forest practice rules and regulations.
(((62))) (87) "Weed rolling" means the use of a mechanical
roller designed to control aquatic plant growth.
(((63))) (88) "Wetted perimeter" means the areas of a
watercourse covered with water, flowing or nonflowing.
[Statutory Authority: RCW 75.08.080. 97-13-001 (Order 97-84), § 220-110-020, filed 6/4/97, effective 7/5/97; 94-23-058 (Order 94-160), § 220-110-020, filed 11/14/94, effective 12/15/94; 87-15-086 (Order 87-48), § 220-110-020, filed 7/20/87. Statutory Authority: RCW 75.08.012, 75.08.080 and 75.20.100. 84-04-047 (Order 84-04), § 220-110-020, filed 1/30/84. Statutory Authority: RCW 75.20.100 and 75.08.080. 83-09-019 (Order 83-25), § 220-110-020, filed 4/13/83.]
AMENDATORY SECTION (Amending Order 97-84, filed 6/4/97, effective 7/5/97)
WAC 220-110-031 Pamphlet hydraulic project approvals--Procedures. (1) In those instances where a pamphlet is the
equivalent of an HPA as defined in WAC 220-110-020(((36))) (44),
a person shall obtain a pamphlet HPA issued by the department
which identifies and authorizes specific minor hydraulic project
activities before conducting a hydraulic project.
(2) Supplemental approvals to the pamphlet HPA as defined in WAC 220-110-020(44) and 220-110-020(78) shall require written authorization by the department.
(3) Applications submitted to the department for supplemental approvals may be verbal or written.
(a) Applications shall specify the requested exception or request for additional authorization and shall include the applicant's name, address and phone number. Written applications shall be signed and dated.
(b) The department shall grant or deny approval within forty-five calendar days of the receipt of a request for supplemental approval.
(4) The supplemental approval shall be attached to the pamphlet HPA and shall be on the job site when work is being conducted and shall be immediately available for inspection.
(5) The pamphlet HPA, or clear reproduction, shall be on the
((project)) job site when work is being conducted and shall be
immediately available for inspection.
(((3))) (6) The pamphlet HPA shall be conditioned to ensure
protection of fish life.
(((4))) (7) Pamphlet HPAs do not exempt the applicant from
obtaining other appropriate permits and following the rules or
regulations of local, federal, and other Washington state
agencies.
(((5))) (8) Administration of this chapter shall be
conducted in compliance with SEPA, chapter 43.21C RCW, and
chapters 197-11, 220-100, and 232-19 WAC.
[Statutory Authority: RCW 75.08.080. 97-13-001 (Order 97-84), § 220-110-031, filed 6/4/97, effective 7/5/97.]
AMENDATORY SECTION (Amending Order 94-160, filed 11/14/94, effective 12/15/94)
WAC 220-110-200 Mineral prospecting (((panning))) technical
provisions. ((A copy of the current Gold and Fish Pamphlet
available from the department shall be on the job site at all
times and shall serve as an HPA. The following technical
provisions are found in the pamphlet and apply to mineral
prospecting (panning) projects:
(1) Gold pans, mini-rocker boxes, and nonmotorized sluice
boxes are allowed. The riffle area of the sluice box shall not
exceed one-foot wide by three feet long, and shall not exceed
fifty percent of the width of the wetted perimeter of the stream.
(2) All work shall be performed by hand or with hand-held
tools only.
(3) There shall be no disturbance of graveled spawning
areas.
(4) There shall be no streambank excavation.
(5) There shall be no disturbance of rooted or embedded
woody plants (trees, shrubs, etc.) waterward of the ordinary high
water line.
(6) Materials too large to be moved by hand or hand-held
tools shall not be disturbed.
(7) There shall be no damming of the flowing stream.
(8) All pits, furrows, potholes and diversions shall be
filled, leveled, or removed prior to leaving the project site, to
prevent fish entrapment.
(9) No motorized, tracked, or wheeled vehicles shall be
allowed within the wetted perimeter of the stream.
(10) Siltation resulting from this project, which the
department considers damaging to fish life, may cause operations
to be terminated and the HPA cancelled.
(11) This HPA does not authorize entry onto private property
or removal of minerals from an existing mining claim on federal
property or on property covered under mineral prospecting leases
or mining contracts issued by the department of natural
resources. It is the applicant's responsibility to contact the
bureau of land management or department of natural resources to
determine if a claim, prospecting lease, or mining contract has
been issued. The office of state historic preservation should
be contacted to determine if there are any restrictions regarding
culturally sensitive areas in the vicinity.)) WAC 220-110-201
through 220-110-205 set forth technical provisions that shall
apply to mineral prospecting and placer mining projects as
necessary to protect fish life. Additional special provisions
may be included in written HPAs as necessary to address
site-specific conditions. Written HPAs shall also have specific
time limitations on project activities to protect fish life.
Timing limitations for projects conducted under authority of the
Gold and Fish pamphlet are found in WAC 220-110-206 through 220-110-209. Saltwater provisions may be applied to tidally
influenced areas upstream of river mouths and the mainstem
Columbia River downstream of Bonneville Dam where applicable in
written HPAs.
[Statutory Authority: RCW 75.08.080. 94-23-058 (Order 94-160), § 220-110-200, filed 11/14/94, effective 12/15/94; 87-15-086 (Order 87-48), § 220-110-200, filed 7/20/87. Statutory Authority: RCW 75.20.100 and 75.08.080. 83-09-019 (Order 83-25), § 220-110-200, filed 4/13/83.]
NEW SECTION
WAC 220-110-201 Common mineral prospecting technical provisions. A copy of the current Gold and Fish pamphlet available from the department shall serve as an HPA, unless otherwise indicated, and be on the job site at all times. Mineral prospecting and placer mining projects authorized through a written HPA may incorporate additional mitigation measures as necessary to achieve no-net-loss of productive capacity of fish and shellfish habitat. Project activities may be prohibited where project impacts adversely affect fish habitats for which no proven mitigation methods are available. The following technical provisions shall apply to all mineral prospecting and placer mining projects.
(1) Excavation, collection and processing of aggregate from the bed shall comply with the timing and location restrictions specified in WAC 220-110-206 through 220-110-209. Excavation, collection and processing of aggregate within the wetted perimeter shall only occur between 5:00 a.m. and 11:00 p.m.
(2) Excavation sites shall be separated by at least two hundred feet.
(3) There shall be no excavation, collection or processing of aggregate within four hundred feet of any fishway, dam or hatchery water intake.
(4) Except as specified in WAC 220-110-203, aggregate collected from outside the bed shall not be washed, sluiced, processed or deposited within two hundred feet landward of the ordinary high water line.
(5) A maximum of five individuals eight years of age and over may collect and process aggregate from any excavation site. No more than one pit, furrow or pothole at a time shall be excavated by any one individual.
(6) Excavations shall not occur between the ordinary high water line and two hundred feet landward of the ordinary high water line. Excavations between the ordinary high water line and the toe of the bank shall not result in undercutting below the ordinary high water line or in disturbance of land surfaces above the ordinary high water line.
(7) There shall be no disturbance of live rooted vegetation of any kind. Woody debris jams and large woody material shall not be disturbed in any manner.
(8) With the exception of aggregate excavated by a suction dredge, all excavations of aggregate shall only be performed by hand or with hand-held tools. A maximum of one hand-operated cable, chain or rope winch may be used to move bed material below the ordinary high water line. Additional safety cables, chains or ropes may be attached to this material provided they do not offer a mechanical advantage and are used solely to hold material in place. The use of horses, other livestock or motorized mineral prospecting equipment, except those specifically authorized under WAC 220-110-203 through 220-110-205, is prohibited. Materials too large to be moved with a single hand-operated cable, chain or rope winch shall not be disturbed.
(9) Boulders may be moved only to facilitate collection of aggregate underneath them. Boulders shall be immediately replaced in their original location prior to working another excavation site or leaving the excavation site. Not working the excavation site for more than sixteen hours constitutes leaving the site.
(10) Only equipment, methods, locations and timing for processing aggregate specified in WAC 220-110-201 through 220-110-209 are authorized. Exceptions shall require additional authorization from the department in the form of a supplemental approval to the Gold and Fish pamphlet or a written HPA. A written HPA shall be required for exceptions in cases where "submit application" or "closed" is listed for state waters in WAC 220-110-206 through 220-110-209. Only the following exceptions may be authorized through a supplemental approval to the Gold and Fish pamphlet:
(a) Timing and location only for Class I and Class II mineral prospecting equipment.
(b) Location only for Class III mineral prospecting equipment.
(11) With the exception of sieves for classifying aggregate, mineral prospecting equipment shall not be combined in series, joined or ganged with additional mineral prospecting equipment to increase the riffle area or efficiency of mineral recovery of a single piece of mineral prospecting equipment.
(12) There shall be no damming or diversion of the flowing stream except as provided in WAC 220-110-203 (4)(d).
(13) Prior to working another excavation site or leaving the excavation site, tailings of aggregate collected from below the ordinary high water line shall be returned to the location from which the aggregate was originally collected. Sand and lighter material washed away by the streamflow during aggregate processing and tailings resulting from suction dredging may be left where processed.
(14) Except as required in subsection (13) of this section, tailings shall not be deposited in existing pools.
(15) Incubating fish eggs or fry shall not be disturbed. If fish eggs or fry are encountered during excavation of the bed, operations shall immediately cease and the department shall be notified immediately. No further excavations shall occur until all eggs and fry have emerged from the gravel. Further approval shall be required by the department prior to resuming mineral prospecting or placer mining activities in that stream.
(16) Beds containing live freshwater mussels shall not be disturbed. If live mussels are encountered during excavation of the bed, operations shall immediately cease and shall be relocated a minimum of two hundred feet from them.
(17) All pits, furrows, tailing piles, and potholes created during excavation or processing of aggregate shall be leveled or refilled with bed materials or tailings prior to working another excavation site or leaving the excavation site. Not working the excavation site for more than sixteen hours constitutes leaving the site. No more than one pit, furrow or pothole at a time shall be excavated.
(18) Fish entrapped within pits, furrows or potholes created during excavation or processing of aggregate shall immediately be safely collected and returned to flowing waters and the pits, furrows or potholes leveled or filled.
(19) At no time shall mining or prospecting activity create a blockage or hindrance to either the upstream or downstream passage of fish.
(20) If at any time as a result of project activities or water quality problems, fish life are observed in distress or a fish kill occurs, operations shall cease and both the department and the department of ecology shall be notified of the problem immediately. Work shall not resume until further approval is given by the department. Additional measures to mitigate impacts may be required.
(21) No motorized, tracked, or wheeled vehicles shall be:
(a) Operated or allowed below the ordinary high water line of the stream; or
(b) Be operated so as to affect the bed or flow of waters of the state in any way.
(22) Entry onto private property or removal of minerals from an existing mining claim or state-owned lands without the permission of the landowner or claim holder is not authorized. The permittee is responsible for determining land ownership, land status (i.e., open to entry under the mining laws) and the status and ownership of any mining claims.
(23) Mercury and other hazardous materials shall not be used on the job site for amalgamating minerals.
(24) Mercury, lead and other hazardous materials removed from aggregate or collected in concentrators during processing of aggregate shall not be returned to waters of the state and shall be disposed of as specified by the department of ecology. Contact the department of ecology for direction on disposal.
(25) Once mining or prospecting at a job site is completed, or mining or prospecting is not conducted at the job site for more than one week, the job site shall be restored to preproject conditions, all disturbed areas shall be protected from erosion and revegetated with native plants, and all pits, furrows, tailing piles, and potholes shall be leveled or refilled as required in subsection (17) of this section.
[]
NEW SECTION
WAC 220-110-202 Use of Class 0 mineral prospecting equipment. A copy of the current Gold and Fish pamphlet available from the department contains the rules which shall be followed when using Class 0 mineral prospecting equipment. A copy of the current Gold and Fish pamphlet shall be on the job site at all times. Mineral prospecting and placer mining projects authorized through a written HPA may incorporate additional mitigation measures as necessary to achieve no-net-loss of productive capacity of fish and shellfish habitat. Project activities may be prohibited where project impacts adversely affect fish habitats for which no proven mitigation methods are available. The following technical provisions shall apply to all Class 0 mineral prospecting and placer mining projects:
(1) The common technical provisions as specified in WAC 220-110-201 and the timing and location restrictions as specified in WAC 220-110-209 shall apply to all mineral prospecting and placer mining projects conducted with Class 0 equipment.
(2) The use of a single hand-operated nonmotorized pan is authorized.
(3) Collection and processing of aggregate shall be limited to that portion of the bed above the wetted perimeter.
[]
NEW SECTION
WAC 220-110-203 Use of Class I mineral prospecting equipment. A copy of the current Gold and Fish pamphlet available from the department contains the rules which shall be followed when using Class I mineral prospecting equipment. A copy of the current Gold and Fish pamphlet shall be on the job site at all times. Mineral prospecting and placer mining projects authorized through a written HPA may incorporate additional mitigation measures as necessary to achieve no-net-loss of productive capacity of fish and shellfish habitat. Project activities may be prohibited where project impacts adversely affect fish habitats for which no proven mitigation methods are available. The following technical provisions shall apply to all Class I mineral prospecting and placer mining projects:
(1) The common technical provisions as specified in WAC 220-110-201 and the timing and location restrictions as specified in WAC 220-110-206 through 220-110-207 shall apply to all mineral prospecting and placer mining projects conducted with Class I equipment.
(2) The use of only Class I mineral prospecting equipment is authorized. In addition to the use of one hand-held pan, no more than one other piece of mineral prospecting equipment shall be operated by an individual at any one time and location.
(3) There shall be no hydraulicing.
(4) The following shall also apply to all mineral prospecting and placer mining projects conducted with Class I equipment during the general or specific tributary seasons as specified in WAC 220-110-206 and 220-110-207:
(a) Collection of aggregate shall be limited to the bed, or to two hundred feet or greater landward of the ordinary high water line.
(b) Aggregate may be processed either on or above the bed: Provided, That within two hundred feet landward of the ordinary high water line:
(i) Any water used shall be fully contained in pans, buckets or similar vessels.
(ii) Wastewater resulting from processing of aggregate shall be discharged two hundred feet or greater landward of the ordinary high water line.
(iii) Settleable solids shall be removed from wastewater. Sediments resulting from collection or processing of aggregate shall be deposited so they will not enter waters of the state.
(c) Class I mineral prospecting equipment shall only be supplied with water flowing naturally in the stream, or with water collected with and contained in hand-carried buckets or pans.
(d) There shall be no damming or diversion of the flowing stream beyond that necessary to direct water into a class I sluice box as described in (c) of this subsection, and in no case shall greater than fifty percent of the width of the wetted perimeter of the stream be dammed or diverted. In no case shall the stream be directed outside of the existing wetted perimeter. The site of the dam or diversion shall be restored to its original condition prior to working another site or leaving the site.
(5) The following shall also apply to all mineral prospecting and placer mining projects conducted with Class I equipment during the special Class I season as specified in WAC 220-110-207:
(a) Collection of aggregate shall be limited to that portion of the bed above the wetted perimeter, or to two hundred feet or greater landward of the ordinary high water line.
(b) Aggregate shall be processed above the wetted perimeter: Provided, That within two hundred feet landward of the ordinary high water line:
(i) Any water used shall be fully contained in pans, buckets or similar vessels.
(ii) Wastewater resulting from processing of aggregate shall be discharged two hundred feet or greater landward of the ordinary high water line.
(iii) Settleable solids shall be removed from wastewater. Sediments resulting from collection or processing of aggregate shall be deposited so they will not enter waters of the state.
(c) Equipment shall only be supplied with water collected with and contained in hand-carried buckets or pans.
(d) There shall be no damming or diversion of the flowing stream.
[]
NEW SECTION
WAC 220-110-204 Use of Class II mineral prospecting equipment. A copy of the current Gold and Fish pamphlet available from the department shall serve as an HPA, unless otherwise indicated, and be on the job site at all times. Mineral prospecting and placer mining projects authorized through a written HPA may incorporate additional mitigation measures as necessary to achieve no-net-loss of productive capacity of fish and shellfish habitat. Project activities may be prohibited where project impacts adversely affect fish habitats for which no proven mitigation methods are available. The following technical provisions shall apply to all Class II mineral prospecting and placer mining projects:
(1) The common technical provisions as specified in WAC 220-110-201 and the timing and location restrictions as specified in WAC 220-110-206 through 220-110-207 shall apply to all mineral prospecting and placer mining projects conducted with Class II equipment.
(2) With the exception of the use of one hand-held pan, the use of only Class II mineral prospecting equipment is authorized. In addition to the use of a hand-held pan, no more than one piece of mineral prospecting equipment shall be operated by an individual at any one time and location.
(3) Only one piece of Class II equipment shall be operated at any time at any excavation site.
(4) Collection of aggregate shall be limited to the bed.
(5) A nozzle greater than four inches inside diameter shall be used on a suction dredge only if a reducer or smaller diameter hose is attached to restrict the inside diameter to four inches or less.
(6) Any device used for diverting or pumping water from a fish-bearing stream shall be equipped with a fish guard to prevent passage of fish into the diversion device pursuant to RCW 75.20.040 and 77.16.220. To prevent fish from entering the system the pump intake shall be screened with either:
(a) Six one-thousandths inch (eighteen gauge) woven wire mesh with openings no greater than eighty-seven one-thousandths inches (six to fourteen mesh); or
(b) Perforated plate with openings no greater than ninety-four one-thousandths inch (three thirty-second inch); or
(c) Profile bar with openings no greater than one and seventy-five one-thousandths millimeter (sixty-nine one-hundredths inch).
The screened intake shall consist of a facility with enough surface area to ensure that the velocity through the screen is less than four-tenths feet per second, but in no case shall the surface area be less than one square foot. Screens shall be maintained to prevent injury or entrapment to juvenile fish and screens shall remain in place whenever water is withdrawn from the stream through the pump intake.
(7) There shall be no hydraulicing outside of the wetted perimeter. Hydraulicing may be conducted only for redistribution of tailings within the bed to level or fill pits, potholes or furrows, and the nozzle or jet shall be submerged at all times.
(8) Petroleum products or other harmful materials shall not enter waters of the state. Equipment shall be well maintained and inspected frequently to prevent fuel and fluid leaks.
(9) Water shall be pumped only from a water body to a suction dredge operated within the wetted perimeter or to a highbanker located below the ordinary high water line.
[]
NEW SECTION
WAC 220-110-205 Use of Class III mineral prospecting equipment. A copy of the current Gold and Fish pamphlet available from the department shall serve as an HPA, unless otherwise indicated, and be on the job site at all times. Mineral prospecting and placer mining projects authorized through a written HPA may incorporate additional mitigation measures as necessary to achieve no-net-loss of productive capacity of fish and shellfish habitat. Project activities may be prohibited where project impacts adversely affect fish habitats for which no proven mitigation methods are available. The following technical provisions shall apply to all Class III mineral prospecting and placer mining projects:
(1) The common technical provisions as specified in WAC 220-110-201 and the timing and location restrictions as specified in WAC 220-110-208 shall apply to all mineral prospecting projects conducted with Class III equipment.
(2) With the exception of the use of one hand-held pan, the use of only Class III mineral prospecting equipment is authorized. In addition to the use of a hand-held pan, no more than one piece of mineral prospecting equipment shall be operated by an individual at any one time and location.
(3) Aggregate shall be collected and processed two hundred feet or greater landward of the ordinary high water line.
(4) There shall be no motorized movement of bed materials.
(5) The pump intake shall be placed in the water without moving or relocating any material in or on the bed or banks.
(6) Any device used for diverting or pumping water from a fish-bearing stream shall be equipped with a fish guard to prevent passage of fish into the diversion device pursuant to RCW 75.20.040 and 77.16.220. To prevent fish from entering the system the pump intake shall be screened with either:
(a) Six one-thousandths inch (eighteen gauge) woven wire mesh with openings no greater than eighty-seven one-thousandths inches (six to fourteen mesh); or
(b) Perforated plate with openings no greater than ninety-four one-thousandths inch (three thirty-second inch); or
(c) Profile bar with openings no greater than one and seventy-five one-thousandths millimeter (sixty-nine one-hundredths inch).
The screened intake shall consist of a facility with enough surface area to ensure that the velocity through the screen is less than four-tenths feet per second, but in no case shall the surface area be less than one square foot. Screens shall be maintained to prevent injury or entrapment to juvenile fish and screens shall remain in place whenever water is withdrawn from the stream through the pump intake.
(7) Petroleum products or other harmful materials shall not enter waters of the state. Equipment shall be well maintained and inspected frequently to prevent fuel and fluid leaks.
(8) There shall be no hydraulicing.
(9) Settleable solids shall be removed from wastewater prior to the water reentering waters of the state. Sediments resulting from collection or processing of aggregate shall be deposited so they will not enter waters of the state.
[]
NEW SECTION
WAC 220-110-206 Authorized work times and watercourses for mineral prospecting and placer mining projects by specific watercourse, except the Columbia and Snake rivers, lakes, salt waters and waters within National Park boundaries using Class I and II equipment. Mineral prospecting and placer mining using Class I and II equipment pursuant to WAC 220-110-203 and 220-110-204 shall only occur in watercourses and times specified in the following table:
(1) The general work time for a county applies to all streams within that county, unless otherwise indicated under specific stream and tributary work times.
(2) The work time for a listed stream applies to all its tributaries, unless otherwise indicated. Some streams flow through multiple counties. Check the listing for the county in which mineral prospecting or placer mining is to be conducted to determine the work time for that stream.
(3) Where a tributary is listed as a boundary, that boundary shall be the line perpendicular to the receiving stream that is projected from the most upstream point of the tributary mouth to the opposite bank of the receiving stream. (See Figure 1)
Figure 1. Stream boundary line
Place illustration here. |
(4) Mineral prospecting and placer mining within two hundred feet landward of the ordinary high water line in state waters listed as "submit application" or "closed" is not authorized under the Gold and Fish pamphlet. Site review and a written HPA is required for these state waters.
AUTHORIZED WORK TIMES FOR MINERAL PROSPECTING AND PLACER MINING USING CLASS I AND II EQUIPMENT
specific stream & tributary work times | |||
county | general
work times |
stream & all tributaries | work time |
Adams | July 1 - October 31 | Esquatzel Creek | July 1 - September 30 |
Palouse River | June 15 - October 15 | ||
Asotin | July 1 - October 31 | Asotin Creek | July 15 - August 15 |
Grande Ronde River | July 15 - August 15 | ||
Benton | June 1 - September 30 | Yakima River tributaries | July 1 - September 30 |
--Corral Creek | July 15 - September 30 | ||
--Spring Creek | July 15 - September 30 | ||
Chelan | July 1 - August 15 | Beaver Creek | July 1 - October 31 |
Colockum Creek | July 1 - October 31 | ||
Peshastin Creek | |||
--mouth to Negro Creek | July 1 - August 15 | ||
--above Negro Creek | July 1 - October 31 | ||
Squilchuck Creek | July 1 - October 31 | ||
Stemilt Creek | |||
--mouth to falls | July 1 - October 31 | ||
Wenatchee River | |||
--mouth to lake | July 1 - September 30 | ||
Clallam | July 15 - September 30 | Bogachiel River | July 15 - August 15 |
Calawah River | July 15 - August 15 | ||
Clallum River | July 15 - September 15 | ||
Dungeness River | submit application | ||
Elwha | |||
--mouth to lower dam | July 1 - August 15 | ||
Hoko River | July 15 - September 15 | ||
Jimmycomelately Creek | submit application | ||
Lyre River | July 15 - September 15 | ||
McDonald Creek | July 1 - August 15 | ||
Morse Creek | July 1 - August 15 | ||
Pysht River | July 15 - September 15 | ||
Sekiu River | July 15 - September 15 | ||
Sol Duc River | July 15 - August 15 | ||
Sooes River | July 15 - September 15 | ||
Clark | July 1 - September 30 | Lewis River | |
--mouth to forks | June 1 - October 31 | ||
--East Fork Lewis River | |||
----mouth to LaCenter road bridge | July 1 - October 31 | ||
----above LaCenter & all tributaries | submit application | ||
--North Fork Lewis River | |||
----mouth to Merwin Dam | August 1 - August 31 | ||
----Cedar Creek | August 1 - September 30 | ||
----Merwin Dam to Swift Dam | July 1 - July 31 | ||
Lake River | June 1 - October 31 | ||
Washougal River | August 1 - August 31 | ||
Columbia | July 15 - October 31 | Tucannon River | July 15 - August 15 |
Touchet River | July 15 - August 15 | ||
Cowlitz | July 1 - September 30 | Cowlitz River | August 1 - August 31 |
--Coweeman River | August 1 - September 30 | ||
--Toutle River | submit application | ||
Kalama River | August 1 - August 31 | ||
Lewis River | |||
--mouth to forks | June 1 - October 31 | ||
--North Fork Lewis River | |||
----mouth to Merwin Dam | August 1 - August 31 | ||
----Merwin Dam to Lower Falls | July 1 - July 31 | ||
----above Lower Falls | July 1 - October 31 | ||
Douglas | July 1 - October 31 | None | |
Ferry | July 1 - August 31 | None | |
Franklin | June 1 - September 30 | Palouse River | |
--above falls | June 15 - October 15 | ||
Garfield | July 15 - October 31 | Asotin Creek | July 15 - August 15 |
Tucannon River | July 15 - August 15 | ||
Grant | July 1 - October 31 | None | |
Grays Harbor | July 15 - October 31 | Cedar Creek | July 15 - September 30 |
Chehalis River | |||
--mouth to Porter Creek | June 1 - October 31 | ||
--above Porter Creek | July 15 - September 30 | ||
Cloquallum River | July 15 - September 30 | ||
Copalis River | July 15 - October 15 | ||
Elk River | July 15 - September 30 | ||
Hoquiam River | July 15 - October 15 | ||
Humptulips River | July 15 - October 15 | ||
Johns River | July 15 - September 30 | ||
Moclips River | July 15 - October 15 | ||
North River | July 15 - September 15 | ||
Porter Creek | July 15 - September 30 | ||
Quinault River | July 15 - August 31 | ||
Satsop River | July 15 - August 31 | ||
Wishkah River | July 15 - October 15 | ||
Wynoochee River | July 15 - October 15 | ||
Island | June 15 - September 15 | None | |
Jefferson | July 15 - October 31 | Big Quilcene River | July 15 - August 31 |
Bogachiel River | July 15 - August 15 | ||
Chimacum Creek | July 15 - August 31 | ||
Clearwater River | July 15 - September 15 | ||
Donovan Creek | July 15 - September 30 | ||
Dosewallips River | July 15 - August 31 | ||
Duckabush River | July 15 - August 31 | ||
Dungeness River tributaries | submit application | ||
Hoh River | July 15 - August 15 | ||
Little Quilcene River | July 15 - August 31 | ||
Matheny Creek | July 15 - September 15 | ||
Queets River | July 15 - September 15 | ||
Quinault River | July 15 - August 15 | ||
Salmon Creek | submit application | ||
Sams River | July 15 - September 15 | ||
Snow Creek | submit application | ||
King | July 1 - September 30 | Green River (Duwamish) | August 1 - August 31 |
Greenwater River | July 15 - August 31 | ||
Lake Washington tributaries | |||
including Cedar and | |||
Sammamish rivers | July 1 - August 31 | ||
--Issaquah Creek | June 15 - July 31 | ||
Snoqualmie River | |||
--mouth to Snoqualmie Falls | July 1 - September 15 | ||
--Snoqualmie Falls to mouth of | |||
South Fork Snoqualmie River | June 15 - October 31 | ||
--North, Middle and South | |||
Fork Snoqualmie rivers | |||
and tributaries | July 15 - October 31 | ||
--Tolt River | |||
-----mouth to forks | July 15 - October 31 | ||
-----North Fork | |||
-------mouth to Yellow Creek | July 15 - September 15 | ||
-------above Yellow Creek | July 15 - October 31 | ||
-------mouth to dam | July 15 - September 15 | ||
-------above dam | July 15 - October 31 | ||
White River | July 15 - August 31 | ||
Kittitas | June 1 - September 30 | Colockum Creek | July 1 - October 31 |
Yakima River | |||
--above Roza Dam | submit application | ||
--Gold Creek (Lake Keechelus) | July 1 - July 31 | ||
--Kachess River | |||
----above Lake Kachess | July 1 - July 31 | ||
----Box Canyon Creek (Lake Kachess) | July 1 - July 31 | ||
--Little Naches River | July 15 - August 15 | ||
--Wenas Creek | August 1 - October 31 | ||
--other Yakima River tributaries | July 15 - August 31 | ||
Kitsap | July 15 - October 31 | Seabeck Creek | July 15 - August 31 |
Gorst Creek | July 15 - August 31 | ||
Klickitat | July 1 - September 30 | Klickitat River | July 1 - August 15 |
White Salmon River | July 1 - August 15 | ||
Lewis | July 1 - September 30 | Chehalis River | |
--upstream of South Fork | |||
Chehalis River confluence | July 1 - August 31 | ||
Cispus River | |||
--mouth to Walupt Creek | August 1 - August 31 | ||
--above Walupt Creek | submit application | ||
--McCoy Creek | August 1 - September 30 | ||
Connelly Creek | August 1 - September 30 | ||
Cowlitz River | August 1 - August 31 | ||
Newaukum River | July 1 - August 31 | ||
Nisqually River | |||
--above Alder Lake | July 1 - September 30 | ||
Skookumchuck River | July 1 - August 31 | ||
Tilton River | August 1 - September 30 | ||
Toutle River | |||
--tributaries | submit application | ||
Walupt Creek | submit application | ||
Packwood Lake tributaries | submit application | ||
Lincoln | June 15 - October 15 | None | |
Mason | July 15 - October 31 | Cloquallum Creek | July 15 - September 30 |
Coulter Creek | July 15 - September 15 | ||
Hamma Hamma River | |||
--mouth to falls | July 15 - August 31 | ||
--John Creek | July 15 - August 31 | ||
Johns Creek | July 15 - August 31 | ||
Lilliwaup River | |||
--below falls | July 15 - August 31 | ||
--above falls | July 1 - October 31 | ||
Mill Creek | July 15 - October 15 | ||
Satsop River | July 15 - August 31 | ||
Schaerer Creek | July 15 - August 31 | ||
Sherwood Creek | July 15 - September 15 | ||
Skokomish River | July 15 - September 15 | ||
Tahuya River | July 15 - September 15 | ||
Twanoh Creek | June 1 - October 31 | ||
Union River | June 1 - September 15 | ||
Okanogan | July 1 - August 15 | Aneas Creek | |
--mouth to falls | July 1 - October 31 | ||
Chewiliken Creek | |||
--mouth to falls | July 1 - October 31 | ||
Chiliwist Creek | |||
--mouth to falls | July 1 - October 31 | ||
Methow River | |||
--mouth to Carleton | July 1 - September 30 | ||
Mosquito Creek | July 1 - October 31 | ||
Nine Mile Creek | July 1 - October 31 | ||
Omak Creek | |||
--mouth to falls | July 1 - October 31 | ||
Similkameen River | |||
--mainstem | July 1 - September 30 | ||
--all Similkameen River tributaries | July 1 - August 15 | ||
Tunk Creek | |||
--mouth to falls | July 1 - October 31 | ||
Pacific | July 15 - September 30 | Chehalis River | July 1 - August 31 |
Chinook River | August 1 - August 31 | ||
Grays River | August 1 - September 30 | ||
North River | July 15 - September 15 | ||
Pend Oreille | July 1 - August 31 | Big Muddy Creek | June 1 - August 31 |
Bracket Creek | June 1 - August 31 | ||
Calispel Creek | |||
--mouth to Calispel Lake | June 1 - August 31 | ||
Exposure Creek | June 1 - August 31 | ||
Kent Creek | June 1 - August 31 | ||
Lime Creek | June 1 - August 31 | ||
Little Spokane River | June 15 - August 31 | ||
Lodge Creek | June 1 - August 31 | ||
Marshall Creek | June 1 - August 31 | ||
Pee Wee Creek | |||
--above falls | June 1 - October 31 | ||
Renshaw Creek | June 1 - August 31 | ||
Pierce | July 15 - August 31 | Nisqually River | |
--mouth to Alder Lake | July 1 - August 31 | ||
--tributaries below Alder Lake | submit application | ||
--above Alder Lake & tributaries | July 15 - September 15 | ||
Carbon River | July 15 - August 31 | ||
--South Prairie Creek | |||
----mouth to Forest Service road #7710 | July 15 - September 15 | ||
----above Forest Service road #7710 | July 1 - October 31 | ||
--Voights Creek | |||
----mouth to falls | July 15 - September 15 | ||
----above falls | July 15 - October 31 | ||
--Wilkeson Creek | |||
----mouth to Snell Lake | July 1 - September 30 | ||
----above Snell Lake | July 1 - October 31 | ||
Rocky Creek | July 15 - September 30 | ||
San Juan | June 1 - August 31 | None | |
Skagit | July 1 - September 30 | Baker River | |
--mouth to dam | June 15 - August 31 | ||
Cascade River | June 15 - July 15 | ||
Illabot Creek | June 15 - July 31 | ||
Samish River | submit application | ||
Skagit River | |||
--mouth to Sauk River | June 15 - August 31 | ||
--above Sauk River | June 15 - July 31 | ||
--Sauk River | July 15 - August 15 | ||
----Suiattle River | July 15 - August 15 | ||
Nooksack River | submit application | ||
Skamania | July 1 - September 30 | Cispus River | August 1 - August 31 |
Lewis River | |||
--East Fork Lewis River | submit application | ||
--North Fork Lewis River | |||
----Cougar Creek | June 1 - July 31 | ||
----Merwin Dam to Lower Falls & tributaries | July 1 - July 31 | ||
----above Lower Falls | July 1 - October 31 | ||
Little White Salmon River | July 1 - August 31 | ||
McCoy Creek | August 1 - September 30 | ||
Washougal River | August 1 - August 31 | ||
White Salmon River | July 1 - August 31 | ||
Wind River | August 1 - August 15 | ||
Snohomish | July 1 - September 30 | Lake Washington tributaries | July 1 - August 31 |
Sauk River | July 15 - August 15 | ||
--Suiattle River | July 15 - August 15 | ||
Snohomish River | |||
--mouth to Highway 9 | June 1 - October 31 | ||
--above Highway 9 | July 1 - August 31 | ||
--Pilchuck River | July 1 - August 31 | ||
----mouth to city of Snohomish diversions dam | July 1 - August 31 | ||
----above city of Snohomish diversion dam | July 1 - September 15 | ||
--Skykomish River | |||
----mouth to forks | July 1 - August 31 | ||
----North Fork Skykomish River | |||
----mouth to San Juan campground | July 1 - August 31 | ||
----San Juan campground to Deer Falls | submit application | ||
----above Deer Falls | July 15 - October 31 | ||
----Salmon Creek | submit application | ||
----South Fork Skykomish River | |||
----mouth to Sunset Falls | July 1 - August 31 | ||
----Sunset Falls to Alpine Falls | July 1 - September 15 | ||
----above Alpine Falls | July 15 - October 31 | ||
----Beckler River | |||
----mouth to Boulder Creek | July 1 - September 15 | ||
----above Boulder Creek | July 15 - October 31 | ||
----Rapid River | |||
----mouth to Meadow Creek | July 15 - September 15 | ||
----above Meadow Creek | July 15 - October 31 | ||
----Foss River | |||
----mouth to forks | July 15 - September 15 | ||
----East Fork Foss River | submit application | ||
----West Fork Foss River | July 15 - October 31 | ||
----Miller River | |||
----mouth to forks | July 1 - September 15 | ||
----above forks | July 1 - October 31 | ||
----Olney Creek | |||
----mouth to Olney Falls | July 1 - September 15 | ||
----above Olney Falls | July 1 - October 31 | ||
----Sultan River | |||
----mouth to old diversion dam | July 1 - August 31 | ||
----old diversion dam to Culmback Dam | July 1 - October 31 | ||
----tributaries above Culmback Dam | August 1 - October 31 | ||
----Wallace River | |||
----mouth to Wallace Falls | July 1 - September 1 | ||
----above Wallace Falls | July 1 - October 31 | ||
--Snoqualmie River | July 1 - August 31 | ||
--all other Snohomish River tributaries | July 1 - August 31 | ||
Stillaguamish River | |||
--mouth to forks | July 1 - August 31 | ||
--North and South Fork Stillaguamish Rivers | July 1 - August 15 | ||
--Deer Creek | submit application | ||
--Canyon Creek | submit application | ||
Spokane | June 15 - August 31 | Latah Creek | |
--mainstem | June 15 - October 31 | ||
--all Latah Creek tributaries | June 15 - August 31 | ||
Stevens | July 1 - August 31 | Big Sheep Creek | |
--mouth to Sheep Creek Falls | submit application | ||
--above Sheep Creek Falls | July 1 - August 31 | ||
Thurston | July 15 - September 15 | Cedar Creek | July 15 - September 30 |
Little Deschutes River | July 15 - October 31 | ||
McLane Creek | July 15 - October 31 | ||
Nisqually River | |||
--mainstem | July 1 - August 31 | ||
--all Nisqually River tributaries | submit application | ||
Porter Creek | July 15 - September 30 | ||
Schneider Creek | July 1 - October 31 | ||
Skookumchuck River | July 1 - August 31 | ||
Woodard Creek | July 1 - October 31 | ||
Woodland Creek | July 1 - October 31 | ||
Wahkiakum | July 15 - September 15 | Elochoman River | August 1 - September 30 |
Grays River | August 1 - September 30 | ||
Naselle River | July 15 - September 30 | ||
Walla Walla | July 15 - October 31 | Touchet River | July 15 - August 15 |
Walla Walla River | July 15 - August 15 | ||
Whatcom | July 1 - September 30 | Baker River | submit application |
Nooksack River | |||
--above forks | submit application | ||
--all Nooksack River tributaries | submit application | ||
Ross Lake tributaries | submit application | ||
Samish River | submit application | ||
Skagit River | June 15 - July 31 | ||
Whitman | June 15 - October 15 | Palouse River | |
--mouth to falls | June 1 - September 30 | ||
Yakima | June 1 - September 30 | Klickitat River | July 1 - August 15 |
Yakima River | |||
--mouth to Roza Dam | June 1 - September 15 | ||
--Naches River | |||
----mouth to Tieton River | June 1 - October 31 | ||
----above confluence of Tieton River | June 1 - August 15 | ||
----Indian Creek (Rimrock Lake) | July 1 - July 31 | ||
----Tieton River | June 1 - August 15 | ||
----Little Naches River | July 15 - August 15 | ||
----Bumping River | July 15 - August 15 | ||
------American River | submit application | ||
----Rattlesnake Creek | July 15 - August 15 | ||
--Wenas Creek | August 1 - October 31 | ||
--all other Yakima River tributaries | July 15 - August 31 |
[]
NEW SECTION
WAC 220-110-207 Authorized work times and watercourses for mineral prospecting and placer mining projects in the Columbia and Snake rivers, lakes, salt waters and waters within National Park boundaries using Class I and II equipment. Mineral prospecting and placer mining using Class I and II equipment pursuant to WAC 220-110-203 and 220-110-204 shall only occur in watercourses and times specified in the following table:
(1) Where a tributary is listed as a boundary, that boundary shall be the line perpendicular to the receiving stream and which is projected from the most upstream point of the tributary mouth to the opposite bank of the receiving stream. (See Figure 1, WAC 220-110-206.)
(2) The general and special Class I work times apply only to the watercourses listed. See WAC 220-110-206 for work times and locations for tributaries to the listed watercourses.
(3) Use of Class I equipment only is authorized for the special Class I work times.
(4) Mineral prospecting and placer mining within two hundred feet landward of the ordinary high water line in state waters listed as "submit application" or "closed" is not authorized under the Gold and Fish pamphlet. Site review and a written HPA is required for these state waters.
authorized work times for mineral prospecting and placer mining
using class i and ii equipment
watercourse | general work time | special class i work time |
Columbia River | ||
--mouth to Snake River | submit application | June 1 - October 31 |
--Snake River to Priest Rapids Dam | August 1 - August 31 | June 1 - August 1 |
--Priest Rapids Dam to Wenatchee River | October 16 - October 31 | June 1 - October 16 |
--above Wenatchee River | September 1 - October 31 | June 1 - September 1 |
Snake River | August 1 - August 31 | June 1 - August 1 |
Lakes | closed | closed |
--Columbia River reservoirs | see Columbia River above | see Columbia River above |
--Snake River reservoirs | see Snake River above | see Snake River above |
Salt waters | closed | closed |
All watercourses, including tributaries, within National Park boundaries | closed | closed |
[]
NEW SECTION
WAC 220-110-208 Authorized work times and watercourses for mineral prospecting and placer mining projects using Class III equipment only. Mineral prospecting and placer mining using Class III equipment pursuant to WAC 220-110-205 shall only occur in watercourses and times specified in the following table:
(1) The work times apply to all watercourses listed and their tributaries.
(2) Mineral prospecting and placer mining within two hundred feet landward of the ordinary high water line in streams listed as "closed" is not authorized.
authorized work times for mineral prospecting and placer mining using class iii equipment
watercourse | work time |
All watercourses not listed as "closed" in WAC 220-110-206 and 220-110-207 | January 1 - December 31 |
All watercourses listed as "closed" in WAC 220-110-206 and 220-110-207 | closed |
[]
NEW SECTION
WAC 220-110-209 Authorized work times and watercourses for mineral prospecting and placer mining projects using Class 0 equipment only. Mineral prospecting and placer mining using Class 0 equipment pursuant to WAC 220-110-202 shall only occur in watercourses and times specified in the following table:
(1) The work times apply to all watercourses listed and their tributaries.
(2) Mineral prospecting and placer mining within two hundred feet landward of the ordinary high water line in state waters listed as "submit application" or "closed" is not authorized under the Gold and Fish pamphlet. Site review and a written HPA is required for these state waters.
authorized work times for mineral prospecting and placer mining using class 0 equipment
watercourse | work time |
All watercourses not listed
as "submit application" or
"closed" in WAC 220-110-206 and 220-110-207 |
January 1 - December 31 |
All watercourses listed as
"submit application" in
WAC 220-110-206 and 220-110-207 |
submit application |
All watercourses listed as "closed" in WAC 220-110-206 and 220-110-207 | closed |
[]
AMENDATORY SECTION (Amending Order 94-160, filed 11/14/94, effective 12/15/94)
WAC 220-110-340 Informal appeal of adverse administrative decisions. It is recommended that an aggrieved party contact the local habitat biologist responsible for the hydraulic permit decision of concern prior to initiating an informal or formal appeal. Discussion of concerns with the habitat biologist often results in resolution of the problem without the need for an informal or formal appeal. The habitat biologist may request review of your concerns by his or her supervisor.
All parties are encouraged to take advantage of this informal appeal process prior to initiating a formal appeal. However, this informal appeal process is not mandatory, and a person may proceed directly to a formal appeal.
(1) The following procedures shall govern informal appeals of department actions taken pursuant to RCW 75.20.100, 75.20.103, 75.20.106, and 75.20.160. This rule does not apply to any provisions or conditions in pamphlets or supplemental approvals as defined in WAC 220-110-020 (44)(c). A person who disagrees with a provision or condition in a pamphlet HPA or its supplemental approval may apply for an individual written HPA. A person who is aggrieved or adversely affected by the following department actions may request an informal review:
(a) The denial or issuance of an HPA, or the conditions or provisions made part of an HPA; or
(b) An order imposing civil penalties.
(2) A request for an informal review shall be in writing and
shall be received by the department within thirty days of the
denial or issuance of an HPA or receipt of an order imposing
civil penalties. The thirty-day time requirement may be stayed
by the department if negotiations are occurring between the
aggrieved party and the habitat biologist and/or their
supervisor. Requests for informal review shall be mailed ((or
delivered to the following address: Department of Fish and
Wildlife, Habitat Management Division, Natural Resources
Building, Fifth Floor, 1111 Washington Street, Post Office Box
43155, Olympia, Washington 98504-3155)) to Department of Fish
and Wildlife, Habitat and Lands Services Program, 600 Capitol Way
N., Olympia, Washington 98501-1091, or hand delivered to 1111
Washington Street S.E., Habitat and Lands Services Program, Fifth
floor.
(3) Upon receipt of a written request for informal agency review, the department shall initiate a review of the agency decision. This review shall be conducted by the regulatory services division manager or the division manager's designee. Upon completion of the comprehensive review, the division manager, or designee shall recommend a decision to the director or the director's designee. This recommended decision shall be approved or disapproved by the director or the director's designee within sixty days of the date the informal appeal was received by the department. The department shall notify the appellant in writing of the decision of the director or the director's designee.
(4) If, following this informal agency review process, the appellant still wishes to contest the agency action, a formal appeal may be initiated pursuant to WAC 220-110-350. Formal review must be requested within the time periods specified in WAC 220-110-350.
[Statutory Authority: RCW 75.08.080. 94-23-058 (Order 94-160), § 220-110-340, filed 11/14/94, effective 12/15/94; 87-15-086 (Order 87-48), § 220-110-340, filed 7/20/87. Statutory Authority: RCW 75.08.012, 75.08.080 and 75.20.100. 84-04-047 (Order 84-04), § 220-110-340, filed 1/30/84. Statutory Authority: RCW 75.20.100 and 75.08.080. 83-09-019 (Order 83-25), § 220-110-340, filed 4/13/83.]
AMENDATORY SECTION (Amending Order 94-160, filed 11/14/94, effective 12/15/94)
WAC 220-110-350 Formal appeal of administrative decisions. (1) The following procedures shall govern formal appeals of department actions taken pursuant to RCW 75.20.100 or 75.20.106. This rule does not apply to any provisions or conditions in pamphlets or supplemental approvals as defined in WAC 220-110-020 (44)(c). A person who disagrees with a provision or condition in a pamphlet HPA or its supplemental approval may apply for an individual written HPA. This rule does not apply to an appeal in which a person contests the denial, conditioning or issuance of an HPA issued pursuant to RCW 75.20.103 or 75.20.160, which shall be heard by the hydraulic appeals board. A person who is aggrieved or adversely affected by the following department actions may request a formal appeal:
(a) The denial or issuance of an HPA, or the conditions or provisions made part of an HPA;
(b) An order imposing civil penalties; or
(c) Any other "agency action" for which an adjudicative proceeding is required under the Administrative Procedure Act, chapter 34.05 RCW.
(2) As required by the Administrative Procedure Act, the department shall inform the permittee, or person subject to civil penalty or order of the department, of the opportunity for appeal, the time within which to file a written request for an appeal, and the place to file it.
(3) A request for an appeal shall be in writing and shall be
received during office hours by the department within thirty days
of the agency action that is being challenged. Requests for
appeal shall be mailed ((or delivered to the following address:
Department of Fish and Wildlife, Habitat Management Division,
Natural Resources Building, Fifth Floor, 1111 Washington Street,
Post Office Box 43155, Olympia, Washington 98504-3155)) to
Department of Fish and Wildlife, Habitat and Lands Services
Program, 600 Capitol Way N., Olympia, Washington 98501-1091, or
hand delivered to 1111 Washington Street SE, Habitat and Lands
Services Program, Fifth floor. If there is no timely request for
an appeal, the agency action shall be final and unappealable.
(4) The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, the deadline for requesting a formal appeal shall be within thirty days of the date of the department's written decision in response to the informal appeal. (5) The written request for an appeal shall be plainly labeled as "Request for Formal Appeal" and shall contain the following:
(a) The name, address, and phone number of the person requesting the appeal;
(b) The specific agency action that the person contests; for example, denial of an HPA, a particular condition in an HPA, order imposing civil penalties, etc.;
(c) Whether the person is the permittee, landowner, resident, or other basis for the person's interest in the agency action in question;
(d) The date of denial, issuance, or condition of an HPA, if the person is contesting denial, issuance, or conditioning of an HPA;
(e) Specific relief requested; and
(f) The attorney's name, address, and phone number, if the person is represented by legal counsel.
(6) The appeal may be conducted by the director, the director's designee, or by an administrative law judge (ALJ) appointed by the office of administrative hearings. If conducted by an ALJ, the ALJ shall issue an initial order pursuant to RCW 34.05.461. The director or the director's designee shall review the initial order and enter a final order as provided by RCW 34.05.464.
(7) All hearings conducted by the director, the director's designee, or an ALJ pursuant to subsection (6) of this section, shall comply with the Administrative Procedure Act and the model rules of procedure, chapter 10-08 WAC.
[Statutory Authority: RCW 75.08.080. 94-23-058 (Order 94-160), § 220-110-350, filed 11/14/94, effective 12/15/94; 87-15-086 (Order 87-48), § 220-110-350, filed 7/20/87. Statutory Authority: RCW 75.08.012, 75.08.080 and 75.20.100. 84-04-047 (Order 84-04), § 220-110-350, filed 1/30/84. Statutory Authority: RCW 75.20.100 and 75.08.080. 83-09-019 (Order 83-25), § 220-110-350, filed 4/13/83.]
REPEALER
The following sections of the Washington Administrative Code are repealed:
WAC 220-110-210 Mineral prospecting (sluicing).
WAC 220-110-220 Mineral prospecting (dredging).