PERMANENT RULES
LABOR AND INDUSTRIES
(Board of Boiler Rules)
Purpose: The purpose of this rule making is to make clarification and technical changes to the Board of Boiler Rules substantive (chapter 296-104 WAC) based on actions and requests of the Board of Boiler Rules. The changes will make clarification and technical changes to the Board of Boiler Rules, which will make the rules easier to use.
The technical changes include:
• | Incorporating new 2004 code editions; |
• | WAC 296-104-200 will include new ASME Section XII for construction and technical requirements; |
• | WAC 296-104-210 will include material requirements for technical review; and |
• | WAC 296-104-220 will include construction drawing and photos to technical requirements. |
• | Clarify the rules so that they are easier to use and understand; |
• | Make changes to ensure consistency with statute; |
• | Eliminate rules that are unnecessary or that are no longer necessary; and |
• | Make several other necessary changes identified by the Board of Boiler Rules. |
Citation of Existing Rules Affected by this Order: Amending WAC 296-104-018, 296-104-102, 296-104-200, 296-104-210, 296-104-220, 296-104-302, and 296-104-701.
Statutory Authority for Adoption: RCW 70.79.030, 70.79.040, 70.79.150, 70.79.290, 70.79.330, and 70.79.350.
Adopted under notice filed as WSR 05-16-095 on August 2, 2005.
Changes Other than Editing from Proposed to Adopted Version: The following changes were made to the proposed wording:
• | WAC 296-104-050 was removed from the proposed wording. The Board of Boiler Rules wants to continue to review applications before applicants can take the written examination. |
• | WAC 296-104-200(1) was amended to include Division 1, 2, and 3 to Section VIII and add Section XII to the list. It will now read "ASME Boiler and Pressure Vessel Code, 2004 edition, with addenda Sections I, III, IV, VIII Division 1, 2, 3, X, and XII." |
• | WAC 296-104-302(1) was amended to remove "greater than 400,000 BTU/hr and less than or equal to 12,500,000 BTU/hr." The requirements are covered in CSD-1 (CF) and the board thought it might create confusion by having duplicative requirements. |
• | WAC 296-104-701: |
- Subsection (4) was amended to update the reference to RCW 70.79.61 [70.79.361].
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.
Number of Sections Adopted at Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.
Number of Sections Adopted on the Agency's Own Initiative: New 0, Amended 8, Repealed 0.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 8, Repealed 0.
Number of Sections Adopted Using Negotiated Rule Making: New 0, Amended 0, Repealed 0; Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 8, Repealed 0.
Date Adopted: November 1, 2005.
Craig Hopkins, Chair
Board of Boiler Rules
OTS-8249.2
AMENDATORY SECTION(Amending WSR 99-22-026, filed 10/26/99,
effective 11/26/99)
WAC 296-104-018
Administration -- How are rules
interpreted and revised?
Stakeholders may request
clarifications and interpretations of these rules by
contacting the chief inspector. Interpretations will be
brought to the board if the inquirer is aggrieved by the
interpretation of the chief inspector (RCW 70.79.360). The
board will consider written requests for interpretations and
revisions to these definitions, rules, and regulations. Inquiries shall be limited to requests for interpretation of
the rules or to proposed revisions to the existing rules and
shall be submitted to the department of labor and industries
forty-five days prior to the board of boiler rules meeting
date in the following format:
(1) Scope. Identify a single rule or closely related rules that are in dispute.
(2) Background. State the purpose of the inquiry, which should be either to obtain an interpretation or to propose a revision to existing rules. Provide concise information needed for the board's understanding of the inquiry, including references to the WAC section as well as other code and/or standards paragraphs.
(3) Inquiry structure. Provide statements in a condensed and precise question format and, where appropriate, compose in such a way that "yes" or "no" (perhaps with provisos) would be an acceptable reply.
(4) Proposed reply. State what it is believed the rule requires. If in the inquirer's opinion a revision to the definitions, rules, and regulations is needed, recommended wording should be provided.
Inquiries shall be submitted by mail to:
Board of Boiler Rules
% Chief Inspector
Department of Labor & Industries
Boiler Section
P.O. Box 44410
Olympia, WA 98504-4410
or
Inquiries shall be submitted by delivery to:
Board of Boiler Rules
% Chief Inspector
Department of Labor & Industries
Boiler Section
7273 Linderson Way SW
Tumwater, WA 98501
[Statutory Authority: RCW 70.79.030 and 70.79.040. 99-22-026, § 296-104-018, filed 10/26/99, effective 11/26/99. Statutory Authority: RCW 70.79.040. 92-11-070, § 296-104-018, filed 5/20/92, effective 6/20/92.]
(1) The standard for inspection of nonnuclear boilers,
unfired pressure vessels, and safety devices is the National
Board Inspection Code (NBIC), ((2001)) 2004 edition, with
addenda. This code may be used on or after the date of issue
and becomes mandatory twelve months after adoption by the
board as specified in RCW 70.79.050(2).
(2) The standard for inspection of historical steam boilers of riveted construction preserved, restored, or maintained for hobby or demonstration use, shall be Appendix "C" of the National Board Inspection Code as referenced in subsection (1) of this section.
(3) The standard for inspection of nuclear items is ASME section XI. The applicable ASME Code edition and addenda shall be as specified in the owner in-service inspection program plan.
(4) Where a petroleum or chemical process industry owner/user inspection agency so chooses, the standard for inspection of unfired pressure vessels used by the owner shall be the API-510 Pressure Vessel Inspection Code, eighth edition, with addenda. This code may be used on or after the date of issue.
(5) TAPPI TIP 0402-16, dated 2001 may be used for both pulp dryers and paper machine dryers when requested by the owner. When requested by the owner, this document becomes a requirement and not a guideline.
[Statutory Authority: Chapter 70.79 RCW. 04-21-069, § 296-104-102, filed 10/19/04, effective 1/1/05. Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150, 70.79.290, 70.79.330, 70.79.350, and chapter 70.79 RCW. 01-24-061, § 296-104-102, filed 11/30/01, effective 12/31/01. Statutory Authority: RCW 70.79.030 and 70.79.040. 99-22-026, § 296-104-102, filed 10/26/99, effective 11/26/99; 98-22-024, § 296-104-102, filed 10/28/98, effective 11/28/98; 96-21-081, § 296-104-102, filed 10/16/96, effective 11/16/96. Statutory Authority: RCW 70.79.040. 94-21-002, § 296-104-102, filed 10/5/94, effective 11/5/94.]
(1) ASME Boiler and Pressure Vessel Code, 2004 edition, with addenda Sections I, III, IV, VIII, Division 1, 2, 3, X, XII;
(2) ASME PVHO-1 2002-2003 Safety Standard for Pressure Vessels for Human Occupancy; and
(3) ASME CSD-1 2002 edition with addenda (as referenced
in WAC ((296-104-300(3))) 296-104-302); and
(4) NFPA 85 Boiler and Combustion Systems Hazards Code 2004 edition (for use with boilers with fuel input ratings of 12, 500,000 BTU/hr) or greater; and
(5) Standards of construction approved by the chief inspector and meeting the National Board Criteria for Registration of Boilers, Pressure Vessels and Other Pressure Retaining Items.
These codes and standards may be used on or after the date of issue and become mandatory twelve months after adoption by the board as specified in RCW 70.79.050(2). ASME Code Cases may be approved for use when accepted by the chief inspector. The board recognizes that the ASME Code states that new editions of the code become mandatory on issue and that subsequent addenda become mandatory six months after the date of issue. For nuclear systems, components and parts the time period for addenda becoming mandatory is defined in the Code of Federal Regulations.
[Statutory Authority: Chapter 70.79 RCW. 04-21-069, § 296-104-200, filed 10/19/04, effective 1/1/05. Statutory Authority: RCW 70.79.030, 70.79.040, 70.79.150, 70.79.290, 70.79.330, 70.79.350, and chapter 70.79 RCW. 02-23-036, § 296-104-200, filed 11/13/02, effective 12/14/02; 01-24-061, § 296-104-200, filed 11/30/01, effective 12/31/01. Statutory Authority: RCW 70.79.030, 70.79.040 and chapter 70.79 RCW. 00-21-024, § 296-104-200, filed 10/10/00, effective 11/13/00. Statutory Authority: RCW 70.79.030 and 70.79.040. 98-22-024, § 296-104-200, filed 10/28/98, effective 11/28/98; 97-20-109, § 296-104-200, filed 9/30/97, effective 10/31/97; 96-21-081, § 296-104-200, filed 10/16/96, effective 11/16/96. Statutory Authority: RCW 70.79.040. 93-12-014, § 296-104-200, filed 5/21/93, effective 6/21/93; 92-11-070, § 296-104-200, filed 5/20/92, effective 6/20/92; 91-11-107, § 296-104-200, filed 5/22/91, effective 6/22/91; 90-04-009, § 296-104-200, filed 1/26/90, effective 2/26/90. Statutory Authority: RCW 70.79.040 and 70.79.050. 86-01-088 (Order 85-26), § 296-104-200, filed 12/19/85. Statutory Authority: RCW 70.79.030 and 70.79.330. 84-11-016 (Order 84-09), § 296-104-200, filed 5/10/84; 82-24-025 (Order 82-36), § 296-104-200, filed 11/23/82, effective 1/1/83. Statutory Authority: RCW 70.79.030. 82-05-003 (Order 82-2), § 296-104-200, filed 2/4/82; 81-12-012 (Order 81-10), § 296-104-200, filed 5/28/81; 81-01-114 (Order 80-28), § 296-104-200, filed 12/24/80; 80-05-065 (Order 80-7), § 296-104-200, filed 4/23/80; 79-05-054 (Order 79-7), § 296-104-200, filed 4/30/79; 78-10-096 (Order 78-19), § 296-104-200, filed 10/3/78; Order 77-23, § 296-104-200, filed 11/8/77; Order 77-9, § 296-104-200, filed 5/26/77; Order 75-35, § 296-104-200, filed 10/29/75; Order 74-37, § 296-104-200, filed 11/8/74; Order 73-1, § 296-104-200, filed 3/22/73; Order 72-17, § 296-104-200, filed 9/28/72; Order 72-11, § 296-104-200, filed 7/7/72; Part IV, § 1, filed 3/23/60.]
[Statutory Authority: RCW 70.79.030, 70.79.040 and chapter 70.79 RCW. 00-21-024, § 296-104-210, filed 10/10/00, effective 11/13/00. Statutory Authority: RCW 70.79.030 and 70.79.040. 96-21-081, § 296-104-210, filed 10/16/96, effective 11/16/96. Statutory Authority: RCW 70.79.040 and 70.79.050. 86-07-064 (Order 86-02), § 296-104-210, filed 3/19/86; Order 73-1, § 296-104-210, filed 3/22/73; Part IV, § 3, filed 3/23/60.]
[Statutory Authority: RCW 70.79.030, 70.79.040 and chapter 70.79 RCW. 00-21-024, § 296-104-220, filed 10/10/00, effective 11/13/00. Statutory Authority: RCW 70.79.030 and 70.79.040. 96-21-081, § 296-104-220, filed 10/16/96, effective 11/16/96. Statutory Authority: RCW 70.79.240. 88-01-064 (Order 87-25), § 296-104-220, filed 12/17/87; Part IV, § 5, filed 3/23/60.]
(1) All boilers ((excluding lined potable water heaters
of all BTU input)) installed or refitted after December 1998,
with fuel input ratings of less than 12,500,000 BTU/hr which
are fired by gas, oil, or a combination of gas or oil shall
comply with the fuel train requirements defined in ASME CSD-1
(CF), as adopted in WAC 296-104-200 where applicable.
(2) Verification of fuel train compliance will be per CSD-1. A CSD-1 report will be completed and signed by an authorized representative of the manufacturer and/or the installing contractor.
(3) The CSD-1 report must be made available to the authorized inspection agency or the inspector after which a certificate of operation may be issued. The report shall remain in the possession of the boiler owner.
[Statutory Authority: Chapter 70.79 RCW. 04-21-069, § 296-104-302, filed 10/19/04, effective 1/1/05.]
Operating under pressure a boiler or pressure vessel which the
department has condemned, has issued a red tag or has
suspended the inspection certificate:
First offense . . . . . . . . . . . . | $150.00 |
Second offense . . . . . . . . . . . . | $300.00 |
Each additional offense . . . . . . . . . . . . | $500.00 |
Operating under pressure a boiler or pressure vessel without a
valid inspection certificate:
First offense . . . . . . . . . . . . | $ 50.00 |
Second offense . . . . . . . . . . . . | $100.00 |
Each additional offense . . . . . . . . . . . . | $200.00 |
Installation of a boiler or pressure vessel without meeting
prior filing requirements of WAC 296-104-020:
First offense . . . . . . . . . . . . | $100.00 |
Second offense . . . . . . . . . . . . | $200.00 |
Each additional offense . . . . . . . . . . . . | $500.00 |
First offense . . . . . . . . . . . . | $150.00 |
Second offense . . . . . . . . . . . . | $300.00 |
Each additional offense . . . . . . . . . . . . | $500.00 |
First offense . . . . . . . . . . . . | $150.00 |
Second offense . . . . . . . . . . . . | $300.00 |
Each additional offense . . . . . . . . . . . . | $500.00 |
First offense . . . . . . . . . . . . | $150.00 |
Second offense . . . . . . . . . . . . | $300.00 |
Each additional offense . . . . . . . . . . . . | $500.00 |
Each offense . . . . . . . . . . . . | $100.00 |
Within 90 days . . . . . . . . . . . . | $100.00 |
Within 91-180 days . . . . . . . . . . . . | $250.00 |
Within 181-270 days . . . . . . . . . . . . | $400.00 |
Within 271-360 days . . . . . . . . . . . . | $500.00 |
Failure to file a report of inspection per WAC 296-104-040:
Each offense . . . . . . . . . . . . | $50.00 |
Each offense . . . . . . . . . . . . | $50.00 |
Each offense . . . . . . . . . . . . | $50.00 |
(3) The department shall by certified mail notify a person of its determination that the person has violated this section.
(4) Any person aggrieved by an order or act under the
boiler and unfired pressure vessels law or under the rules and
regulations may((, within fifteen days after such order or
act,)) appeal to the board of boiler rules. This appeal shall
be filed within twenty days after service of the notice of the
penalty to the assessed party by filing a written notice of
appeal with the chief boiler inspector per RCW 70.79.361.
(5) Each day that a violation occurs will be a separate offense. A violation will be a second or additional offense only if it occurs within one year from the first violation.
[Statutory Authority: Chapter 70.79 RCW. 04-21-069, § 296-104-701, filed 10/19/04, effective 1/1/05. Statutory Authority: RCW 70.79.030, 70.79.040 and chapter 70.79 RCW. 00-21-024, § 296-104-701, filed 10/10/00, effective 11/13/00. Statutory Authority: Chapter 70.79 RCW. 87-12-003 (Order 87-10), § 296-104-701, filed 5/21/87.]