WSR 06-22-038

PERMANENT RULES

DEPARTMENT OF LICENSING


[ Filed October 25, 2006, 2:52 p.m. , effective November 25, 2006 ]


     Effective Date of Rule: Thirty-one days after filing.

     Purpose: As part of an effort to better organize existing and future rules under one chapter heading that pertain to the professional practices of professional engineers and professional land surveyors.

     Citation of Existing Rules Affected by this Order: Repealing chapter 196-24 WAC.

     Statutory Authority for Adoption: RCW 18.43.035.

      Adopted under notice filed as WSR 06-18-076 on September 5, 2006.

     Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.

     Number of Sections Adopted at Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.

     Number of Sections Adopted on the Agency's Own Initiative: New 1, Amended 0, Repealed 0.

     Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 1, Amended 0, Repealed 0.

     Number of Sections Adopted Using Negotiated Rule Making: New 1, Amended 0, Repealed 0;      Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 0, Repealed 0.

     Date Adopted: October 11, 2006.

George A. Twiss

Executive Director

NEW CHAPTER

WAC 196-29

PROFESSIONAL PRACTICES
NEW SECTION
WAC 196-29-110   Land surveying practice standards.   Failure by any registrant to comply with the provisions of the Survey Recording Act, chapter 58.09 RCW and the survey standards, chapter 332-130 WAC shall be considered misconduct or malpractice as defined by RCW 18.43.105(11).

     The following standards shall also apply:

     (1) The monumentation, posting, and/or the marking of a boundary line between two existing corner monuments constitutes the "practice of land surveying" as defined in chapter 18.43 RCW and chapter 196-16 WAC, and consequently requires said work to be performed under the direct supervision of a registered professional land surveyor.

     (2) The field survey work performed to accomplish the monumentation, posting, and marking of a boundary line between two existing corner monuments shall meet the minimum standards imposed by chapter 332-130 WAC.

     (3) The monumentation, posting, and/or marking of a boundary line between two existing corner monuments involves a determination of the accuracy and validity of the existing monuments by the use of standard survey methods and professional judgment.

     (4) The monumentation, posting, and marking of a boundary line between two existing corner monuments shall require the filing of a record of survey according to chapter 58.09 RCW unless both corners satisfy one or both of the following requirements:

     (a) The corner(s) are shown as being established on a properly recorded or filed survey according to chapter 58.09 RCW and are accurately and correctly shown theron.

     (b) The corner(s) are described correctly, accurately, and properly on a land corner record according to chapter 58.09 RCW if their establishment was by a method not requiring the filing of a record of survey.

[]

     Reviser's note: The spelling error in the above section occurred in the copy filed by the agency and appears in the Register pursuant to the requirements of RCW 34.08.040.

© Washington State Code Reviser's Office