CURRENT: |
WAC 480-108 |
Interconnection with electric generators. |
Al Wright (360) 664-1360 |
12/21/11 |
4/16/13 |
6/13/13 |
Consider amending existing rules in chapter 480-108 WAC to address issues raised by stakeholders in Docket UE-110667, and identified in UTC report to the legislature in that docket. |
|
Natural gas conservation programs inquiry. |
Deborah Reynolds (360) 664-1255 |
7/26/12 |
To be determined |
To be determined |
Inquiry to examine whether the commission should adopt new or modified regulations to address issues related to the avoided cost of natural gas, which affects natural gas conservation program planning and implementation. |
WAC 480-14 480-15 |
Motor carriers and household goods movers rule making. |
Suzanne Stillwell (360) 664-1103 |
2/14/13 |
8/21/13 |
10/10/13 |
Consider updating insurance rules to be consistent with insurance requirements in other transportation industries and clarify that the commission may deny a permit application or cancel a permit if the carrier is put out of service. |
WAC 480-30 |
Auto transportation rate flexibility rule making. |
Ann Rendahl (360) 664-1144 |
9/5/12 |
6/5/13 |
7/26/13 |
Considers amending chapter 480-30 WAC to allow flexibility in setting rates and promote competition in the auto transportation industry. |
WAC 480-07 |
Procedural rules. |
Greg Kopta (360) 664-1355 |
3/20/13 |
To be determined |
To be determined |
Examine the need to revise and clarify rules in chapter 480-07 WAC, Procedural rules. |
PROPOSED: |
"999" sections in various chapters of Title 480 WAC |
Adoption by reference expedited rule making. |
To be determined |
|
(CR-105) To be determined |
N/A |
Annual update of the citations to material that's incorporated by reference. |
WAC 480-90 480-100 |
Correcting gas and electric meter and billing problems. |
Roger Kouchi (360) 664-1101 |
To be determined |
To be determined |
To be determined |
Consider the need to modify existing rules in chapter 480-90 WAC (gas) and chapter 480-100 WAC (electric) to establish standard timeframes in which energy companies must correct meter and billing problems. |
WAC 480-109 |
Energy Independence Act revisions. |
Deborah Reynolds (360) 664-1255 |
To be determined |
To be determined |
To be determined |
Modify current rules to reflect statutory changes adopted in 2012 in ESB 5575 and new changes from 2013 session, including SB 5297, HB 1154, and SSB 5400. |
WAC 480-100 |
Disconnection of service. |
Rayne Pearson (360) 664-1103 |
7/2013 |
To be determined |
To be determined |
Consider whether changes to WAC 480-100-128 (6)(k) are warranted. |
WAC 480-90 |
Gas companies—Operations. |
Danny Kermode (360) 664-1253 |
7/2013 |
To be determined |
To be determined |
Consider whether to adopt rules governing gas hedging practices of natural gas distribution companies. |
WAC 480-70 |
Solid waste and/or refuse collection companies. |
Danny Kermode (360) 664-1253 |
7/2013 |
To be determined |
To be determined |
Consider whether to adopt rules governing the methodology for establishing the rate of return for solid waste collection companies (Lurito-Gallagher). |
WAC 480-120 480-121 |
Telephone companies. |
William Weinman (360) 664-1109 |
To be determined |
To be determined |
To be determined |
Consider amending or repealing rules governing telecommunications companies to streamline regulations. |
WAC 480-100-238 480-90-238 |
Integrated resource planning (IRP). |
Deborah Reynolds (360) 664-1255 |
To be determined |
To be determined |
To be determined |
Consider modifying current electric IRP rules to reflect statutory changes adopted in 2013 in EHB 1826. Further consider modifying gas IRP rules to match electric IRP rules. |
WAC 480-75 |
Civil penalty for violation of chapter 81.88 RCW. |
Joe Subsits (360) 664-1322 |
To be determined |
To be determined |
To be determined |
Consider amending existing rule by increasing the maximum administrative civil penalties for violation of the pipeline safety laws and regulations to $200,000 per violation per day of violations, with a maximum of $2,000,000 for a related series of violations. |
WAC 480-123 |
Universal service. |
Brian Thomas (360) 359-1049 |
To be determined |
To be determined |
To be determined |
Establish rules to implement a temporary state universal communications service program, due to legislation that may be enacted in the 2013 2nd sp. sess. |
WAC 480-70 |
Solid waste and/or refuse collection companies. |
Gene Eckhardt (360) 664-1249 |
7/2013 |
To be determined |
To be determined |
Consider whether to adopt rules governing a company's obligation to provide service during inclement weather and labor disruptions. |