EXPEDITED ADOPTION
Title of Rule: Chapter 173-145 WAC, Administration of flood control assistance account program.
Purpose: The purpose of this rule is to determine priorities and allocate available funds from the flood control assistance account program among those counties applying for assistance and to adopt rules establishing criteria by which the allocations are made.
Statutory Authority for Adoption: RCW 86.26.100.
Statute Being Implemented: RCW 86.26.100.
Summary: This amendment is proposed due to legislative changes to RCW 86.26.100 that increased the state share of funds to the flood control assistance account funding for flood control projects from 50% to 75% of total project costs. Amendments also reflect changes made in the 1999 legislature to RCW 86.26.100 and will correct errors in grammar and punctuation, as well as clarify the language of the rule without changing its effect.
Reasons Supporting Proposal: Amendments are necessary to make the rule consistent with legislative changes to RCW 86.26.100 and to comply with the executive order on regulatory improvement.
Name of Agency Personnel Responsible for Drafting: Dave Burdick, SEA NWRO, (425) 649-7139; Implementation and Enforcement: Gordon White, SEA Program, Olympia, (360) 407-6977.
Name of Proponent: Department of Ecology, governmental.
Rule is not necessitated by federal law, federal or state court decision.
Explanation of Rule, its Purpose, and Anticipated Effects: This rule determines priorities and allocates available funds from the flood control assistance account program to those counties applying for assistance and adopts rules establishing criteria by which the allocations are made.
Proposal Changes the Following Existing Rules: Implements
legislative changes to RCW 86.26.100 (without material change)
that increase the maximum state funding for FCAAP flood control
projects from 50% to 75%, and other previous legislative changes.
Amendments will correct errors in grammar and punctuation as well
as clarify the rule language without changing its effect.
THIS RULE IS BEING PROPOSED TO BE ADOPTED USING AN EXPEDITED RULE-MAKING PROCESS THAT WILL ELIMINATE THE NEED FOR THE AGENCY TO HOLD PUBLIC HEARINGS, PREPARE A SMALL BUSINESS ECONOMIC IMPACT STATEMENT, OR PROVIDE RESPONSES TO THE CRITERIA FOR A SIGNIFICANT LEGISLATIVE RULE. IF YOU OBJECT TO THIS RULE BEING ADOPTED USING THE EXPEDITED RULE-MAKING PROCESS, YOU MUST EXPRESS YOUR OBJECTIONS IN WRITING AND THEY MUST BE SENT TO Jerry Thielen, Rules Coordinator, Department of Ecology, P.O. Box 47600, Olympia, WA 98504-7600 , AND RECEIVED BY November 7, 2000.
August 31, 2000
Daniel J. Silver
Deputy Director
OTS-3613.2
AMENDATORY SECTION(Amending Order 86-36, filed 1/28/87)
WAC 173-145-010
Authority and purpose.
RCW 86.26.050
provides that counties and other municipal corporations
responsible for flood control maintenance may apply to the
department of ecology for financial assistance for the
preparation of comprehensive flood control management plans and
for flood control maintenance projects. The purpose of ((such))
those plans is described in RCW 86.26.105. The department shall
determine priorities and allocate available funds from the flood
control assistance account program (FCAAP) among those counties
applying for assistance, and shall adopt ((regulations)) rules
establishing the criteria by which ((such)) those allocations
((shall)) must be made. ((Such)) The criteria ((shall)) must be
based upon proposals ((which)) that are likely to bring about
public benefits commensurate with the amount of state funds
allocated thereto. This chapter describes the manner in which
ecology will implement the provisions of the act.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-010, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-010, filed 6/21/85.]
For the purposes of this
chapter, the following definitions ((shall be)) are used:
(1) "Applicant." An eligible municipal corporation seeking matching funds for flood control maintenance work.
(2) "Appropriate local authority." A county, city, or town
((having)) that has planning and land use jurisdiction within a
given area ((which)) that is covered by the comprehensive flood
control management plan.
(3) "Certification." Certification is the written
confirmation between ecology and the appropriate local authority
and the county engineer ((which)) who verifies the understanding
as to what the comprehensive flood control management plan will
contain, the timing and anticipated product, and a reporting
schedule that will allow for ecology review and input during the
plan development.
(4) "Comprehensive flood control management plan (CFCMP)."
A document ((which)) that determines the need for flood control
work, considers alternatives to in-stream flood control work,
identifies and considers potential impacts of in-stream flood
control work on the state's in-stream resources, and identifies
the river's meander belt or floodway, as described in WAC 173-145-040.
(5) "County engineer." The appointed public works director, county engineer, or the person designated to act for the county engineer.
(6) "Eligible municipal corporation." Counties, cities, towns, conservation districts, flood control zone districts, or any special districts subject to flood conditions.
(7) "Emergency fund." That portion of the biennial appropriation allocated to the flood control assistance account which is set aside for emergency projects.
(8) "Emergency project." Flood control work necessary for
reasons declared by the appropriate local authority and as
authorized and approved by ecology ((which)) that must be done
immediately to protect lives or property.
(9) "Flood compatible land uses." Those uses of the land
within the river's meander belt or floodway which comply with the
minimum state, federal, and local flood plain management
((regulation)) rule requirements.
(10) "Flood plain management activities." Activities described in WAC 173-145-050 performed by local governments through ordinances or other means to reduce the damaging effects of flooding.
(11) "Floodway." The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base (one hundred year frequency) flood without cumulatively increasing the water surface elevation more than a designated height.
(12) "Maintenance project." The work necessary to preserve or restore the natural condition or to restore man-made flood control facilities to their former condition using in-kind replacement materials or acceptable alternatives. This work is necessary due to anticipated or actual damage or destruction from flooding by action of erosion, stream flow, sheet runoff, or other damages by the sea or other bodies of water.
(13) "Meander belt." That portion of the flood plain, that
can be identified by the evidence of present and previous
meanders. This ((shall)) includes the present stream channel. Where there is no identified floodway, that area which is
floodprone and has similar topographic characteristics to present
and historic stream channels ((shall be)) is considered as a
meander belt.
(14) "Public benefit." Benefit to the health, safety, or
general welfare of the citizens of the state or community at
large ((which)) that results from a flood control project or
plan, or some benefit by which their rights or liabilities are
affected such as an effect on public property or facilities owned
or maintained by an eligible municipal corporation.
(15) "Special district." A district as defined in chapter 85.38 RCW ((which)) that is either a:
(a) Diking district; ((a))
(b) Drainage district; ((a))
(c) Diking, drainage, and/or sewerage improvement district;
((an))
(d) Intercounty diking and drainage district; ((a))
(e) Consolidated diking district, drainage district, diking
improvement district, and/or drainage improvement district; or
((a))
(f) Flood control district.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-020, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-020, filed 6/21/85.]
Criteria to be used in determining eligibility for FCAAP funds are as follows:
(1) Eligible municipal corporation. The applicant must be an eligible municipal corporation as defined in WAC 173-145-020(6).
(2) Public benefit. The applicant must demonstrate that
their comprehensive flood control management plans and flood
control maintenance projects ((shall)) will further the general
public and state interest as differentiated from a private
interest and that they ((shall)) will bring about public benefits
commensurate with FCAAP funds provided.
(3) Comprehensive flood control management plan. The requirements of WAC 173-145-040 must be complied with by the appropriate local authority with flood control jurisdiction over the area where the proposed project is located.
(4) Flood plain management activities. The appropriate
local authority within whose jurisdiction projects are located
((shall)) must be engaging in approved flood plain management
activities as described in WAC 173-145-050.
(5) Budget report. Any eligible municipal corporation
seeking FCAAP funds shall submit its annual budget for flood
control purposes to the county engineer within thirty calendar
days after its final adoption. The county engineer shall then
forward the budget report for eligible municipal corporations and
for the county to ecology. The information will provide the
basis for preparation of a preliminary plan for the most
beneficial and orderly allocation of FCAAP funds. Soil
conservation districts ((shall be)) are exempt from the
provisions of this section.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-030, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-030, filed 6/21/85.]
The county engineer of the county within which the
maintenance project is located ((must)) shall certify that the
CFCMP has been completed and adopted by the appropriate local
authority or is being prepared. Comprehensive flood control
management plans, and any revisions to the plans, must be
approved by ecology, in consultation with the department of
((fisheries)) fish and ((game)) wildlife. The ((())CFCMP(()))
must be completed and adopted within three years of the date that
it is certified as being prepared. If, after the three-year
period has elapsed, such a plan has not been completed and
adopted, the appropriate local authority may not make grants to
the county for flood control maintenance projects ((shall not be
made to the county for projects by the appropriate local
authority)) until the CFCMP is completed and adopted by the
appropriate local authority. During the three-year period,
projects within a drainage area, designated as the CFCMP study
area, may be funded as part of a phased project plan((,
provided)): Provided, That preliminary studies for the CFCMP
have been conducted to identify the one-hundred-year frequency
flood plain problem areas((,)) and factors contributing to
flooding((; and provided that)): And provided further, That the
proposed projects have been prioritized to achieve the greatest
efficiency in flood control for the overall CFCMP study area. These limitations on grants ((shall)) may not preclude
allocations for emergency purposes made ((pursuant to)) under RCW 86.26.060. The appropriate local authority may require the
applicant to fully or partially fund the preparation of the
CFCMP. The plan must include:
(1) Determination of the need for flood control work.
(a) Description of the watershed((.));
(b) Identification of types of watershed flood
problems((.));
(c) Location and identification of specific problem
areas((.));
(d) Description of flood damage history((.));
(e) Description of potential flood damages((.));
(f) Short-term and long-term goals and objectives for the
planning area((.));
(g) Description of ((regulations which)) rules that apply
within the watershed((,)) including, but not limited to, local
shoreline management master programs, and zoning, subdivision,
and flood hazard ordinances((.));
(h) Determination ((of)) that the instream flood control
work ((being)) is consistent with applicable policies and
((regulations)) rules.
(2) Alternative flood control work.
(a) Description of potential measures of instream flood
control work((.));
(b) Description of alternatives to instream flood control work.
(3) Identification and consideration of potential impacts of instream flood control work on the following instream uses and resources.
(a) Fish resources((.));
(b) Wildlife resources((.));
(c) Scenic, aesthetic, and historic resources((.));
(d) Navigation((.));
(e) Water quality((.));
(f) Hydrology((.));
(g) Existing recreation((.));
(h) Other impacts.
(4) Area of coverage for the comprehensive plan shall
include, as a minimum, the area of the one-hundred-year frequency
flood plain within a reach of the watershed of sufficient length
to ensure that a comprehensive evaluation can be made of the
flood problems for a specific reach of the watershed. The plan
may or may not include an entire watershed. Comprehensive plans
shall also include flood hazard areas not subject to riverine
flooding such as areas subject to coastal flooding, flash
flooding, or flooding from inadequate drainage. Either the
meander belt or floodway ((shall)) must be identified on aerial
photographs or maps ((which)) that will be included with the
plan.
(5) Conclusion and proposed solution(s). The CFCMP
((shall)) must be finalized by the following action from the
appropriate local authority:
(a) Evaluation of problems and needs;
(b) Evaluation of alternative solutions;
(c) Recommended corrective action(((s))) with proposed
impact resolution measures for resource losses; and
(d) Corrective action priority.
(6) A certification from the state department of community, trade, and economic development that the local emergency management organization is administering an acceptable comprehensive emergency operations plan.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-040, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-040, filed 6/21/85.]
Local
jurisdictions within which flood control maintenance projects are
located, must be engaging in flood plain management activities. ((Pursuant to)) Under chapter 86.26 RCW the director of the
department of ecology must approve the flood plain management
activities of the county, city, or town ((having)) that has
jurisdiction over the area where the project will be located. To
be eligible for FCAAP funding the local jurisdiction ((shall))
must be required to:
(1) Participate in the National Flood Insurance Program (NFIP) and meet all of the NFIP requirements.
(2) Restrict land uses within the meander belt or floodway of rivers to only flood compatible uses. Where applicable, adopted shoreline management master programs will be considered a minimum land use measure.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-050, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-050, filed 6/21/85.]
The
project application process for the eligible municipal
corporations' applications ((shall)) includes the following in
the general sequence given.
(1) The applicant shall prepare the project application to
comply with the provisions of chapter 86.26 RCW and this chapter.
The application ((shall)) must be made on a form furnished by
ecology. A complete application shall include the following:
(a) A written description of the project containing the following as a minimum: Name of applicant, name of affected water body, project summary, location, amount of local match, and proposed local funding source;
(b) A detailed cost estimate identifying major project elements;
(c) A map to identify water body names, stream river mile, section-township-range;
(d) Construction plans; and
(e) A description of the project benefits ((which)) that
describes how the project will mitigate flood damages and
describes development which exists on adjacent and nearby lands
which are protected by the facility.
(2) The applicant shall review the preliminary project
proposal with the county engineer, the Washington department((s))
of ((fisheries or game)) fish and wildlife and the department of
natural resources and any affected Indian tribes.
(3) The applicant shall submit a prioritized list of project applications to the county engineer.
(4) The county engineer shall submit a prioritized list of all project applications within the county to ecology.
(5) The county engineer shall furnish evidence to ecology
that the comprehensive flood control management plan described in
WAC 173-145-040 is being prepared or is completed and adopted by
the appropriate local authority ((or)) and the flood plain
management activities described in WAC 173-145-050 are being
implemented.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-060, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-060, filed 6/21/85.]
The
project approval process for the eligible municipal corporations'
applications ((shall)) includes the following in the general
sequence given.
(1) Ecology will review all projects for compliance with the
requirements ((pursuant to)) under this chapter and chapter 86.26 RCW.
(2) Ecology shall consult with the state department((s)) of
((fisheries)) fish and ((game)) wildlife in the development of a
project priority list. The state department of natural
resources, affected Indian tribes, and other affected parties may
review and comment on the proposed project plans ((prior to))
before the approval of those plans.
(3) Thirty days public notice ((shall)) must be given that
the project priority list will be the subject of a public
hearing. Notice of this hearing shall appear in the Washington
State Register ((pursuant to)) in accordance with chapter 34.08 RCW.
(4) The project priority list will be available at the
((flood plain management section)) shorelands and environmental
assistance program of the department of ecology, at least fifteen
days ((prior to)) before the public hearing.
(5) The public comments will be reviewed and ecology shall approve the project priority list as proposed or as revised in accordance with public comments.
(6) Ecology shall prepare and finalize the written agreements with the counties.
(7) The counties shall prepare and finalize the written agreements with the involved eligible municipal corporations within the county.
(8) ((The construction plans and specifications shall be
prepared by the applicant for approval by the county engineer
prior to submission)) The applicant shall prepare the
construction plans and specifications for approval by the county
engineer before submitting them to ecology for review and
approval of each project for compliance with all requirements.
(9) The applicant shall acquire the necessary federal, state, and local permits or authorizations along with any other permission required to complete the project.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-070, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-070, filed 6/21/85.]
The priority given to projects by ecology, the counties, and other eligible municipal corporations shall involve consideration of the following criteria:
(1) The relationship of public benefits to total project
costs((.));
(2) The priority ((which)) that has already been established
by each county((.));
(3) Intensity of local flood control management
problems((,)) including, but not limited to, their
inter-relationships with:
(a) Population affected;
(b) Property and related development affected;
(c) Land management and zoning;
(d) Existing flood control management practices.
(4) Where the CFCMP is completed and adopted, the following will be considered:
(a) Consistency with the plan or plan recommendations;
(b) Priority of the project as identified in the plan;
(c) Implementation of the plan or plan recommendations;
(d) Potential impacts of instream uses and resources;
(5) Where a CFCMP is being developed or has not been initiated, the following will be considered:
(a) Evidence of multijurisdictional cooperation necessary for development of a comprehensive county or multicounty comprehensive flood control management plan (CFCMP);
(b) Availability of qualified personnel or resources for planning purposes;
(c) Availability of qualified personnel or resources for project construction purposes;
(d) Other planning efforts undertaken or proposed within the planning jurisdiction and their relationship to flood control management;
(e) Ability to make rapid progress toward development of a comprehensive flood control management plan;
(f) Existing and proposed participation of community groups, private industry, professional organizations, the general public, and others toward the development and implementation of the proposed comprehensive flood control management plan.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-080, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-080, filed 6/21/85.]
The flood control assistance account
is established at four million dollars at the beginning of each
biennium. The following criteria ((shall)) must be used for
allocating FCAAP funds:
(1) The amount of FCAAP funding for any project, except
emergency projects described in WAC 173-145-100, ((shall)) may
not exceed ((fifty)) seventy-five percent of the total project
cost, including planning and design costs.
(2) The amount of FCAAP funds for cost sharing feasibility studies for new flood control projects shall not exceed fifty percent of the matching funds that are required by the federal government, and shall not exceed twenty-five percent of the total cost of the feasibility study.
(3) The amount of FCAAP funds to prepare a CFCMP ((shall))
may not exceed seventy-five percent of the full planning costs.
(((3))) (4) The amount of FCAAP funds available for all
nonemergency projects and CFCMP's in any county ((shall)) may not
exceed five hundred thousand dollars per biennium.
(((4))) (5) In addition to the limits in subsection (((3)))
(4) of this section, an agency formed under chapter 86.13 RCW
((shall)) must be allowed up to one hundred thousand dollars in
FCAAP funds per biennium.
(((5))) (6) In those areas where a designated CFCMP area
extends into two or more jurisdictions, costs for a CFCMP may be
shared by the involved local authorities.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-090, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-090, filed 6/21/85.]
Funds
((shall)) must be available for flood control projects in
response to unusual, unforseeable, and emergent flood conditions
and ((shall)) must be allocated in amounts adequate for the
preservation of life and property. The following criteria
((shall)) must be the basis of allocating the emergency funds:
(1) Appropriations from the FCAAP fund for emergency projects will require the declaration of an emergency by the appropriate local authority.
(2) Application for emergency funds must be made on the same form used for nonemergency fund applications.
(3) Payment of FCAAP funds for emergency projects will be based on project construction costs. Flood fighting costs may be included.
(4) Payment for emergency work ((shall)) must be allocated
on a first-come first-serve basis and ((shall)) may not be based
on any priority system.
(5) At the discretion of ecology, emergency funds may be made available for use on nonemergency projects.
(6) The maximum amount of emergency funds initially available for any one county is one hundred fifty thousand dollars per biennium. If the total available emergency funds are not needed by other counties, and the amount of emergency funds needed in a county exceeds one hundred fifty thousand dollars, the county can request additional emergency funds.
(7) The flood control assistance account contribution
((shall)) may not exceed eighty percent of the eligible project
cost of an emergency project.
(8) Emergency funds will only be made available to projects
((which)) that have been given approval for matching funds by the
department of ecology ((prior to)) before construction work
((being)) is performed.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-100, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-100, filed 6/21/85.]
Approval for
eligibility by ecology will only be required once for a project
((which)) that continues more than one biennium, but funding for
each subsequent biennium is subject to further FCAAP
appropriation by the legislature.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-110, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-110, filed 6/21/85.]
All
work ((which)) that is funded from the flood control assistance
account shall conform to the standards and specifications of the
county engineer.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-120, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-120, filed 6/21/85.]
The following are the responsibilities and criteria for project construction monitoring and final approval:
(1) County engineer responsibilities. Associated with responsibility for project plan approval and supervision of the project work, the county engineer shall provide inspection to assure that all project work is conducted and completed according to the construction plans and specifications.
(2) Ecology's responsibilities. The authorized
representative of the department of ecology ((shall have)) has
the right to enter at all reasonable times in or upon any
property, public or private, for the purpose of monitoring and
inspecting the project work as necessary to assure compliance
with the terms of the appropriate written agreement. The
authorized representative of the department of ecology is the
contract officer and ((shall)) must be identified in the written
agreement. The county engineer will be informed ((prior to))
before any inspection for purposes of construction monitoring and
guidance by any representative of ecology other than the contract
officer. Representatives of ecology may observe the construction
process without prior notification of the county engineer.
(3) Final inspection and approval. Upon completion of the
work, ((a final detailed inspection shall be made by)) the county
engineer, along with representatives from ecology and the
applicant, shall make a final detailed inspection. Results of
the final inspection ((shall)) must be displayed in a written
report prepared by ecology and, when appropriate, on "as built"
construction plans. "As built" construction plans ((shall)) must
be submitted to ecology within thirty days after the final
project inspection.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-130, filed 1/28/87; 85-14-002 (Order DE 85-10), § 173-145-130, filed 6/21/85.]
All flood control maintenance and comprehensive flood control
management planning (CFCMP) projects subject to the provisions of
this ((regulation shall)) rule must be conducted in accordance
with the plans, specifications, and conditions approved by
ecology. Any contemplated changes during construction or
planning process ((which)) that are significant deviations from
conditions of the approved agreement, ((shall)) must first be
submitted to ecology for approval. Any changes to the total cost
of the project following execution of the written agreement must
be submitted to ecology for approval ((prior to)) before the
construction or ((plan)) the completion of the plan.
[Statutory Authority: Chapter 86.26 RCW. 87-04-022 (Order 86-36), § 173-145-155, filed 1/28/87.]