WSR 02-19-110

DEPARTMENT OF ECOLOGY


[ Filed September 18, 2002, 10:28 a.m. ]


Notice of Permit Modification Correcting Typographical Error

Industrial Stormwater General Permit



     The industrial stormwater general permit issued August 21, 2002, had an error in Special Condition S7. - Compliance with Standards. The first sentence in S7.B incorrectly referred to "Special Condition S3.G," which does not exist in the permit. It was changed to refer to the intended permit condition, Special Condition S3.E.


     "Ecology will apply a mixing zone where one is authorized and consistent with Special Condition S3.E."


     Ecology announced issuing the permit in the State Register, WSR 02-16-094. Most industrial facilities that discharge stormwater to a surface waterbody are included for coverage under the industrial stormwater general permit. The purpose of the permit is to protect waters of the state through the regulation of industrial stormwater discharges. The permit became effective September 20, 2002.

     If you have any questions about this permit modification please contact Keith Johnson by e-mail at kjoh461@ecy.wa.gov or by phone at (360) 407-6442. You can also find additional information at the Washington State Department of Ecology web page: http://www.ecy.wa.gov/programs/wq/stormwater/.

© Washington State Code Reviser's Office