WSR 18-01-113 PERMANENT RULES DEPARTMENT OF LABOR AND INDUSTRIES [Filed December 19, 2017, 11:25 a.m., effective January 31, 2018]
Effective Date of Rule: January 31, 2018.
Purpose: The purpose of this rule making is to adopt amendments to sections in chapter 296-104 WAC, Board of boiler rules—Substantive, to update and clarify the rules and for technical changes. The boiler rules are reviewed on a regular basis to ensure the rules are consistent with national boiler and unfired pressure vessel safety standards and industry practice, for rule clarity, housekeeping, etc. This rule making will:
Citation of Rules Affected by this Order: Amending WAC 296-104-010, 296-104-015, 296-104-020, 296-104-102, 296-104-502, 296-104-700, and 296-104-701.
Statutory Authority for Adoption: Chapter 70.79 RCW, Boilers and unfired pressure vessels.
Adopted under notice filed as WSR 17-20-078 on October 3, 2017.
A final cost-benefit analysis is available by contacting Alicia Curry, P.O. Box 44400, Olympia, WA 98504-4400, phone 360-902-6244, fax 360-902-5292, email Alicia.Curry@Lni.wa.gov, web site www.lni.wa.gov.
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.
Number of Sections Adopted at the Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.
Number of Sections Adopted on the Agency's own Initiative: New 0, Amended 7, Repealed 0.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 0, Repealed 0.
Number of Sections Adopted using Negotiated Rule Making: New 0, Amended 0, Repealed 0; Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 7, Repealed 0.
Date Adopted: December 19, 2017.
Terry Chapin, Chair
Board of Boiler Rules
AMENDATORY SECTION (Amending WSR 15-14-100, filed 6/30/15, effective 9/1/15)
WAC 296-104-010 Administration—What are the definitions of terms used in this chapter?
"Accident" shall mean a failure of the boiler or unfired pressure vessel resulting in personal injury or property loss or an event which renders a boiler or unfired pressure vessel unsafe to return to operation.
"Agriculture purposes" shall mean any act performed on a farm in production of crops or livestock, and shall include the storage of such crops and livestock in their natural state, but shall not be construed to include the processing or sale of crops or livestock.
"Attendant" shall mean the person in charge of the operation of a boiler or unfired pressure vessel.
"Automatic operation of a boiler" shall mean automatic unattended control of feed water and fuel in order to maintain the pressure and temperature within the limits set. Controls must be such that the operation follows the demand without interruption. Manual restart may be required when the burner is off because of low water, flame failure, power failure, high temperatures or pressures.
"Board of boiler rules" or "board" shall mean the board created by law and empowered under RCW 70.79.010.
"Boiler and unfired pressure vessel installation/reinstallation permit," shall mean a permit approved by the chief inspector before starting installation or reinstallation of any boiler and unfired pressure vessel within the jurisdiction of Washington.
((Owner/user inspection agency's, and Washington specials are exempt from "boiler and unfired pressure vessel installation/reinstallation permit."))
"Boilers and/or unfired pressure vessels" - Below are definitions for types of boilers and unfired pressure vessels used in these regulations:
"Certificate of competency" shall mean a certificate issued by the Washington state board of boiler rules to a person who has passed the tests as set forth in WAC 296-104-050.
"Certificate of inspection" shall mean a certificate issued by the chief boiler inspector to the owner/user of a boiler or unfired pressure vessel upon inspection by an inspector. The boiler or unfired pressure vessel must comply with rules, regulations, and appropriate fee payment shall be made directly to the chief boiler inspector.
"Code, API-510" shall mean the Pressure Vessel Inspection Code of the American Petroleum Institute with addenda and revisions, thereto made and approved by the institute which have been adopted by the board of boiler rules in accordance with the provisions of RCW 70.79.030.
"Code, ASME" shall mean the boiler and pressure vessel code of the American Society of Mechanical Engineers with addenda thereto made and approved by the council of the society which have been adopted by the board of boiler rules in accordance with the provisions of RCW 70.79.030.
"Code, NBIC" shall mean the National Board Inspection Code of the National Board of Boiler and Pressure Vessel Inspectors with addenda and revisions, thereto made and approved by the National Board of Boiler and Pressure Vessel Inspectors and adopted by the board of boiler rules in accordance with the provisions of RCW 70.79.030.
"Commission" shall mean an annual commission card issued to a person in the employ of Washington state, an insurance company or a company owner/user inspection agency holding a Washington state certificate of competency which authorizes them to perform inspections of boilers and/or unfired pressure vessels.
"Department" as used herein shall mean the department of labor and industries of the state of Washington.
"Director" shall mean the director of the department of labor and industries.
"Domestic and/or residential purposes" shall mean serving a private residence or an apartment house of less than six families.
"Existing installations" shall mean any boiler or unfired pressure vessel constructed, installed, placed in operation, or contracted for before January 1, 1952.
"Inspection certificate" see "certificate of inspection."
"Inspection, external" shall mean an inspection made while a boiler or unfired pressure vessel is in operation and includes the inspection and demonstration of controls and safety devices required by these rules.
"Inspection, internal" shall mean an inspection made when a boiler or unfired pressure vessel is shut down and handholes, manholes, or other inspection openings are open or removed for examination of the interior. An external ultrasonic examination of unfired pressure vessels less than 36" inside diameter shall constitute an internal inspection.
"Inspector" shall mean the chief boiler inspector, a deputy inspector, or a special inspector.
"Jacketed steam kettle" shall mean a pressure vessel with inner and outer walls that is subject to steam pressure and is used to boil or heat liquids or to cook food. Jacketed steam kettles with a total volume greater than or equal to one and one-half cubic feet (11.25 gallons) shall be ASME code stamped.
(a) "Unfired jacketed steam kettle" is one where the steam within the jacket's walls is generated external to itself, such as from a boiler or other steam source.
(b) "Direct fired jacketed steam kettle" is a jacketed steam kettle having its own source of energy, such as gas or electricity for generating steam within the jacket's walls.
"Nationwide engineering standard" shall mean a nationally accepted design method, formulae and practice acceptable to the board.
"Operating permit" see "certificate of inspection."
"Owner" or "user" shall mean a person, firm, or corporation owning or operating any boiler or unfired pressure vessel within the state.
"Owner/user inspection agency" shall mean an owner or user of boilers and/or pressure vessels that maintains an established inspection department, whose organization and inspection procedures meet the requirements of a nationally recognized standard acceptable to the department.
"Place of public assembly" or "assembly hall" shall mean a building or portion of a building used for the gathering together of 50 or more persons for such purposes as deliberation, education, instruction, worship, entertainment, amusement, drinking, or dining or waiting transportation. This shall also include child care centers (those agencies which operate for the care of thirteen or more children), public and private hospitals, nursing homes and assisted living facilities.
"Special design" shall mean a design using nationally or internationally recognized engineering standards other than the codes adopted in WAC 296-104-200.
AMENDATORY SECTION (Amending WSR 09-12-033, filed 5/27/09, effective 6/30/09)
WAC 296-104-015 Administration—When and where are the board meetings held?
The board of boiler rules shall hold its regular meetings ((in February, May, September and November of each year)) quarterly. The time, place, and date of each regular meeting shall be set by the department, approved by the board chair and published annually. Special meetings may be called by the chair.
AMENDATORY SECTION (Amending WSR 09-12-033, filed 5/27/09, effective 6/30/09)
WAC 296-104-020 Administration—What are the filing requirements for boilers and unfired pressure vessels before their installation/reinstallation?
((A "boiler and pressure vessel installation/reinstallation permit," as defined in WAC 296-104-010 shall be submitted by the owner or designee on a form approved by the chief inspector.)) (1) "Boiler/pressure vessel, water heater installation or reinstallation permit" shall mean a permit approved by the chief inspector and submitted by the installer prior to starting installation or reinstallation of any boiler/pressure vessel or water heater within the jurisdiction of Washington.
(2) The "installer" is any entity or person who physically or mechanically installs a boiler, pressure vessel or water heater that meets the in-service inspection requirements of this chapter. The installer is responsible for the installation/reinstallation permit fee per WAC 296-104-700.
(3) The following pressure retaining items, as defined in WAC 296-104-010, require a boiler/pressure vessel and water heater installation or reinstallation permit:
• Expansion tanks;
• Historical boilers and unfired pressure vessels;
• Hot water heaters;
• Indirect water heaters;
• Jacketed steam kettles;
• Low pressure boilers;
• Nonstandard boilers and unfired pressure vessels;
• Pool heaters;
• Power boilers;
• Reinstalled boilers and unfired pressure vessels;
• Secondhand boilers and unfired pressure vessels;
• Standard boilers and unfired pressure vessels;
• Unfired pressure vessels;
• Unfired steam boilers.
(4) The installer shall notify the chief inspector utilizing the permit form to request a permit inspection not less than ten working days prior to placing equipment in operation. Equipment shall not be operated other than for testing, prior to an inspection being conducted which finds the boiler or pressure vessel to be in compliance with this chapter.
(5) If an emergency installation (due to leakage, failure, etc.) situation occurs, the installer will notify the chief inspector within forty-eight hours after installation, utilizing the permit form to request an immediate inspection of the installation.
(6) The installer may be subject to civil penalties per WAC 296-104-701 for failure to comply with the filing requirements of the installation permit.
AMENDATORY SECTION (Amending WSR 15-14-100, filed 6/30/15, effective 9/1/15)
WAC 296-104-102 Inspection—What are the standards for in-service inspection?
Where a conflict exists between the requirements of the standards listed below and this chapter, this chapter shall prevail. The duties of the in-service inspector do not include the installation's compliance with other standards and requirements (environmental, construction, electrical, undefined industrial standards, etc.), for which other regulatory agencies have authority and responsibility to oversee.
(1) The standard for inspection of nonnuclear boilers, unfired pressure vessels, and safety devices in the National Board Inspection Code (NBIC), current edition Part 2, excluding Section 6, Supplements 1, ((2,)) 5, 6, and 7 which may be used as nonmandatory guidelines.
(2) The standard for inspection of historical steam boilers of riveted construction preserved, restored, or maintained for hobby or demonstration use, shall be ((Appendix "C")) Part 2, Section 6, Supplement 2 of the National Board Inspection Code (NBIC) ((2004)) current edition ((with 2006 addenda)).
(3) The standard for inspection of nuclear items is ASME section XI. The applicable ASME Code edition and addenda shall be as specified in the owner in-service inspection program plan.
(4) Where a petroleum or chemical process industry owner/user inspection agency so chooses, the standard for inspection of unfired pressure vessels used by the owner shall be the API-510 Pressure Vessel Inspection Code, current edition. This code may be used on or after the date of issue.
(5) TAPPI TIP 0402-16, revised 2011 may be used for both pulp dryers and paper machine dryers when requested by the owner. When requested by the owner, this document becomes a requirement and not a guideline.
AMENDATORY SECTION (Amending WSR 14-13-087, filed 6/17/14, effective 8/1/14)
WAC 296-104-502 Repairs—What is the standard for nonnuclear repairs and alterations?
The standard for repairs/alterations is:
(1) National Board Inspection Code (NBIC), ((2013)) current edition Part 3, excluding Section 6, Supplements 1, ((2,)) 5, 6, and 10 which may be used as nonmandatory guidelines.
(2) The standard for repair of historical boilers or riveted construction preserved, restored, or maintained for hobby or demonstration use, shall be ((Appendix C)) Part 3, Section 6, Supplement 2 of the National Board Inspection Code (NBIC) ((2004)) current edition ((with 2006 addenda)).
AMENDATORY SECTION (Amending WSR 17-13-105, filed 6/20/17, effective 7/31/17)
WAC 296-104-700 What are the inspection fees—Examination fees—Certificate fees—Expenses?
The following fees shall be paid by, or on behalf of, the owner or user upon the completion of the inspection. The inspection fees apply to inspections made by inspectors employed by the state.
The boiler and pressure vessel installation/reinstallation permit (((excludes inspection and certificate of inspection fee):)) fee of $54.00 shall be paid by the installer, as defined in WAC 296-104-010.
Certificate of inspection fees: For objects inspected, the certificate of inspection fee per object is $23.30.
Hot water heaters per RCW 70.79.090, inspection fee: $7.10.
Examination fee: A fee of $88.00 will be charged for each applicant sitting for an inspection examination(s).
Special inspector commission: A fee of $47.50 for initial work card. A fee of $29.50 for annual renewal.
If a special inspector changes companies: A work card fee of $47.50.
Expenses shall include:
Travel time and mileage: The department shall charge for its inspectors' travel time from their offices to the inspection sites and return. The travel time shall be charged for at the same rate as that for the inspection, audit, or survey. The department shall also charge the current Washington office of financial management accepted mileage cost fees or the actual cost of purchased transportation. Hotel and meals: Actual cost not to exceed the office of financial management approved rate.
Requests for Washington state specials and extensions of inspection frequency: For each vessel to be considered by the board, a fee of $442.60 must be paid to the department before the board meets to consider the vessel. The board may, at its discretion, prorate the fee when a number of vessels that are essentially the same are to be considered.
AMENDATORY SECTION (Amending WSR 05-22-092, filed 11/1/05, effective 1/1/06)
WAC 296-104-701 What are the civil penalties?
(1) An installer, owner, user, or operator of a boiler or pressure vessel that violates a provision of chapter 70.79 RCW, or of the rules adopted under that chapter, is liable for a civil penalty based on the following schedule.
Operating under pressure a boiler or pressure vessel which the department has condemned, has issued a red tag or has suspended the inspection certificate:
Each day of such unlawful operation shall be deemed a separate offense.
Operating under pressure a boiler or pressure vessel without a valid inspection certificate:
Each day of such unlawful operation shall be deemed a separate offense.
Installation of a boiler or pressure vessel without meeting prior filing requirements of WAC 296-104-020:
Performing a repair to a boiler or pressure vessel, involving welding to a pressure retaining part, without meeting requirements of WAC 296-104-502:
Performing an alteration to a boiler or pressure vessel without meeting requirements of WAC 296-104-502:
Performing resetting, repair or restamping of safety valves, safety relief valves, or rupture discs, without meeting requirements of WAC 296-104-520:
Failure of owner to notify chief inspector in case of accident which serves to render a boiler or unfired pressure vessel inoperative, as required by WAC 296-104-025:
Failure to comply with a noncompliance report requirement:
(2) The inspection agency responsible for the in-service inspector of a boiler or unfired pressure vessel that violates a provision of chapter 296-104 WAC, or the rules adopted under that chapter, is liable for a civil penalty based on the following schedule.
Failure to file a report of inspection per WAC 296-104-040:
Failure to apply a state serial number per WAC 296-104-140:
Failure to attach a "Red TAG" per WAC 296-104-110:
Each object (boiler or unfired pressure vessel) is considered a separate offense.
(3) The department shall by certified mail notify a person of its determination that the person has violated this section.
(4) Any person aggrieved by an order or act under the boiler and unfired pressure vessels law or under the rules and regulations may appeal to the board of boiler rules. This appeal shall be filed within twenty days after service of the notice of the penalty to the assessed party by filing a written notice of appeal with the chief boiler inspector per RCW 70.79.361.
(5) Each day that a violation occurs will be a separate offense. A violation will be a second or additional offense only if it occurs within one year from the first violation.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||