(1) Residential. | |
(a) Single- and two-family residential (New Construction). | |
Notes: (1) Square footage is the area included within the surrounding exterior walls of a building exclusive of any interior courts. (This includes any floor area in an attached garage, basement, or unfinished living space.) (2) "Inspected with the service" means that a separate service inspection fee is included on the same electrical work permit. (3) "Inspected at the same time" means all wiring is to be ready for inspection during the initial inspection trip. (4) An "outbuilding" is a structure that serves a direct accessory function to the residence, such as a pump house or storage building. Outbuilding does not include buildings used for commercial type occupancies or additional dwelling occupancies. | |
(i) First 1300 sq. ft. | (($112.60))$119.90 |
Each additional 500 sq. ft. or portion of | (($35.90))$38.20 |
(ii) Each outbuilding or detached garage - Inspected at the same time as a dwelling unit on the property | (($46.80))$49.80 |
(iii) Each outbuilding or detached garage - Inspected separately | (($74.00))$78.80 |
(iv) Each swimming pool - Inspected with the service | (($74.00))$78.80 |
(v) Each swimming pool - Inspected separately | (($112.60))$119.90 |
(vi) Each hot tub, spa, or sauna - Inspected with the service | (($46.80))$49.80 |
(vii) Each hot tub, spa, or sauna - Inspected separately | (($74.00))$78.80 |
(viii) Each septic pumping system - Inspected with the service | (($46.80))$49.80 |
(ix) Each septic pumping system - Inspected separately | (($74.00))$78.80 |
(b) Multifamily residential and miscellaneous residential structures, services and feeders (New Construction). | |
Each service and/or feeder | ||||||
Ampacity | Service/Feeder | Additional Feeder | ||||
0 to 200 | (($121.50))$129.40 | (($35.90))$38.20 | ||||
201 to 400 | (($151.20))$161.00 | (($74.30))$79.10 | ||||
401 to 600 | (($207.70))$221.20 | (($103.20))$109.90 | ||||
601 to 800 | (($266.50))$283.80 | (($141.90))$151.10 | ||||
801 and over | (($380.30))$405.00 | (($285.10))$303.60 | ||||
(c) Single or multifamily altered services or feeders including circuits. | ||||||
(i) Each altered service and/or altered feeder | ||||||
Ampacity | Service/Feeder | |||||
0 to 200 | (($103.20))$109.90 | |||||
201 to 600 | (($151.20))$161.00 | |||||
601 and over | (($227.90))$242.70 | |||||
(ii) Maintenance or repair of a meter or mast (no alterations to the service or feeder) | (($55.80))$59.40 | |||||
(d) Single or multifamily residential circuits only (no service inspection). | ||||||
Note: Altered or added circuit fees are calculated per panelboard. Total cost of the alterations in an individual panel should not exceed the cost of a complete altered service or feeder of the same rating, as shown in subsection (1) residential (c) (table) of this section. | ||||||
(i) 1 to 4 circuits (see note above) | (($74.00))$78.80 | |||||
(ii) Each additional circuit (see note above) | (($7.70)) $8.20 | |||||
(e) Mobile homes and modular homes. | |
(i) Mobile home or modular home service or feeder only | (($74.00))$78.80 |
(ii) Mobile home service and feeder | (($121.50)) $129.40 |
(f) Mobile home park sites and RV park sites. | |
Note: For master service installations, see subsection (2) commercial/industrial of this section. | |
(i) First site service or site feeder | (($74.00))$78.80 |
(ii) Each additional site service; or additional site feeder inspected at the same time as the first service or feeder | (($46.80))$49.80 |
(2) Commercial/industrial. | ||||
(a) New service or feeder, and additional new feeders inspected at the same time (includes circuits). | ||||
Note: For large commercial/industrial projects that include multiple feeders, "inspected at the same time" can be interpreted to include additional inspection trips for a single project. The additional inspections must be for electrical work specified on the permit at the time of purchase. The permit fee for such projects must be calculated using this section. However, the total fee must not be less than the number of progress inspection (one-half hour) units times the progress inspection fee rate from subsection (8) progressinspections of this section. | ||||
Ampacity | Service/Feeder | Additional Feeder | ||
0 to 100 | (($121.50))$129.40 | (($74.00)) $78.80 | ||
101 to 200 | (($148.00))$157.60 | (($94.40))$100.50 | ||
201 to 400 | (($285.10))$303.60 | (($112.60))$119.90 | ||
401 to 600 | (($332.30))$353.90 | (($132.60))$141.20 | ||
601 to 800 | (($430.00))$457.90 | (($180.70))$192.40 | ||
801 to 1000 | (($524.90))$559.00 | (($218.60))$232.80 | ||
1001 and over | (($572.70))$609.90 | (($305.20))$325.00 | ||
(b) Altered services/feeders (no circuits). | |||
(i) Service/feeder | |||
Ampacity | Service/Feeder | ||
0 to 200 | (($121.50))$129.40 | ||
201 to 600 | (($285.10))$303.60 | ||
601 to 1000 | (($430.00))$457.90 | ||
1001 and over | (($477.60))508.60 | ||
(ii) Maintenance or repair of a meter or mast (no alterations to the service or feeder) | (($103.20))$109.90 | ||
(c) Circuits only. | |||
Note: Altered/added circuit fees are calculated per panelboard. Total cost of the alterations in a panel (or panels) should not exceed the cost of a new feeder (or feeders) of the same rating, as shown in subsection (2) commercial/industrial (2)(a)(table) above. | |||
(i) First 5 circuits per branch circuit panel | (($94.40))$100.50 |
(ii) Each additional circuit per branch circuit panel | (($7.70))$8.20 |
(d) Over 600 volts surcharge per permit. | (($94.40))$100.50 |
(3) Temporary service(s). | |
Notes: (1) See WAC 296-46B-590 for information about temporary installations. (2) Temporary stage or concert inspections requested outside of normal business hours will be subject to the portal-to-portal hourly fees in subsection (11) other inspections. The fee for such after hours inspections will be the greater of the fee from this subsection or the portal-to-portal fee. | |
Temporary services, temporary stage or concert productions. | ||||
Ampacity | Service/Feeder | Additional Feeder | ||
0 to 60 | (($64.90))$69.10 | (($33.20))$35.30 | ||
61 to 100 | (($74.00))$78.80 | (($35.90))$38.20 | ||
101 to 200 | (($94.40))$100.50 | (($46.80))$49.80 | ||
201 to 400 | (($112.60))$119.90 | (($55.90))$59.50 | ||
401 to 600 | (($151.20))$161.00 | (($74.00))$78.80 | ||
601 and over | (($171.50))$182.60 | (($85.30))$90.80 | ||
(4) Irrigation machines, pumps, and equipment. | ||||
Irrigation machines. | ||||
(a) Each tower - When inspected at the same time as a service and feeder from (2) commercial/industrial | (($7.70))$8.20 |
(b) Towers - When not inspected at the same time as a service and feeder - 1 to 6 towers | (($112.60))$119.90 |
(c) Each additional tower | (($7.70))$8.20 |
(5) Miscellaneous - Commercial/industrial and residential. | |
(a) A Class 2 low-voltage thermostat and its associated cable controlling a single piece of utilization equipment or a single furnace and air conditioner combination. | |
(i) First thermostat | (($55.90))$59.50 |
(ii) Each additional thermostat inspected at the same time as the first | (($17.20))$18.30 |
(b) Class 2 or 3 low-voltage systems and telecommunications systems. Includes all telecommunications installations, fire alarm, nurse call, energy management control systems, industrial and automation control systems, lighting control systems, and similar Class 2 or 3 low-energy circuits and equipment not included in WAC 296-46B-908 for Class B work. | |
(i) First 2500 sq. ft. or less | (($64.90))$69.10 |
(ii) Each additional 2500 sq. ft. or portion thereof | (($17.20))$18.30 |
(c) Signs and outline lighting. | |
(i) First sign (no service included) | (($55.90))$59.50 |
(ii) Each additional sign inspected at the same time on the same building or structure | (($26.20))$27.90 |
(d) Berth at a marina or dock. | |
Note: Five berths or more will be permitted to have the inspection fees based on appropriate service and feeder fees from section (2) commercial/industrial above. | |
(i) Berth at a marina or dock | (($74.00))$78.80 |
(ii) Each additional berth inspected at the same time | (($46.80))$49.80 |
(e) Yard pole, pedestal, or other meter loops only. | |
(i) Yard pole, pedestal, or other meter loops only | (($74.00))$78.80 |
(ii) Meters installed remote from the service equipment and inspected at the same time as a service, temporary service or other installations | (($17.20))$18.30 |
(f) Inspection appointment requested for outside of normal working hours. | |
Regular fee plus surcharge of: | (($141.90))$151.10 |
(g) Generators. | |
Note: Permanently installed generators: Refer to the appropriate residential or commercial new/altered service or feeder section. | |
Portable generators: Permanently installed transfer equipment for portable generators | (($103.20))$109.90 |
(h) Electrical - Annual permit fee. | |
Note: See WAC 296-46B-901(13). | |
For commercial/industrial location employing full-time electrical maintenance staff or having a yearly maintenance contract with a licensed electrical contractor. Note, all yearly maintenance contracts must detail the number of contractor electricians necessary to complete the work required under the contract. This number will be used as a basis for calculating the appropriate fee. Each inspection is based on a 2-hour maximum. | |
Inspections | Fee | ||
1 to 3 plant electricians | 12 | (($2,735.80))$2,913.90 | |
4 to 6 plant electricians | 24 | (($5,474.70))$5,831.10 | |
7 to 12 plant electricians | 36 | (($8,211.90))$8,746.40 | |
13 to 25 plant electricians | 48 | (($10,950.90))$11,663.80 | |
More than 25 plant electricians | 52 | (($13,689.90))$14,581.10 | |
(i) Telecommunications - Annual permit fee. | |
Notes: (1) See WAC 296-46B-901(12). (2) Annual inspection time required may be estimated by the purchaser at the rate for "other inspections" in this section, charged portal-to-portal per hour. | |
For commercial/industrial location employing full-time telecommunications maintenance staff or having a yearly maintenance contract with a licensed electrical/telecommunications contractor. | |
2-hour minimum | (($226.00))$240.70 |
Each additional hour, or portion thereof, of portal-to-portal inspection time | (($112.60))$119.90 |
(j) Permit requiring ditch cover inspection only. | |
Each 1/2 hour, or portion thereof | (($55.90))$59.50 |
(k) Cover inspection for elevator/conveyance installation. This item is only available to a licensed/registered elevator contractor. | (($94.40))$100.50 |
(6) Carnival inspections. | |
(a) First carnival field inspection each calendar year. | |
(i) Each ride and generator truck | (($26.20))$27.90 |
(ii) Each remote distribution equipment, concession, or gaming show | (($7.70))$8.20 |
(iii) If the calculated fee for first carnival field inspection above is less than (($120.30))$128.10, the minimum inspection fee will be: | (($141.90))$151.10 |
(b) Subsequent carnival inspections. | |
(i) First 10 rides, concessions, generators, remote distribution equipment, or gaming show | (($141.90))$151.10 |
(ii) Each additional ride, concession, generator, remote distribution equipment, or gaming show | (($7.70))$8.20 |
(c) Concession(s) or ride(s) not part of a carnival. | |
(i) First field inspection each year of a single concession or ride, not part of a carnival | (($112.60))$119.90 |
(ii) Subsequent inspection of a single concession or ride, not part of a carnival | (($74.00))$78.80 |
(7) Trip fees. | |
(a) Requests by property owners to inspect existing installations. (This fee includes a maximum of one hour of inspection time. All inspection time exceeding one hour will be charged at the rate for progressive inspections.) | (($112.60))$119.90 |
(b) Submitter notifies the department that work is ready for inspection when it is not ready. | (($55.90))$59.50 |
(c) Additional inspection required because submitter has provided the wrong address or incomplete, improper or illegible directions for the site of the inspection. | (($55.90))$59.50 |
(d) More than one additional inspection required to inspect corrections; or for repeated neglect, carelessness, or improperly installed electrical work. | (($55.90))$59.50 |
(e) Each trip necessary to remove a noncompliance notice. | (($55.90))$59.50 |
(f) Corrections that have not been made in the prescribed time, unless an exception has been requested and granted. | (($55.90))$59.50 |
(g) Installations that are covered or concealed before inspection. | (($55.90))$59.50 |
(8) Progress inspections. | |
Note: The fees calculated in subsections (1) through (6) of this section will apply to all electrical work. This section will be applied to a permit where the permit holder has requested additional inspections beyond the number supported by the permit fee calculated at the rate in subsections (1) through (6) of this section. | |
On partial or progress inspections, each 1/2 hour. | (($55.90))$59.50 |
(9) Plan review. | |
(a) Plan review fee is 35% of the electrical work permit fee as determined by WAC 296-46B-906. | 35% |
(b) Plan review submission fee . | (($94.40))$100.50 |
(c) Supplemental submissions of plans per hour or fraction of an hour of review time. | (($112.60))$119.90 |
(d) Plan review handling fee. | (($26.20))$27.90 |
(10) Out-of-state inspections. | |
(a) Permit fees will be charged according to the fees listed in this section. | |
(b) Travel expenses: | |
All travel expenses and per diem for out-of-state inspections are billed following completion of each inspection(s). These expenses can include, but are not limited to: Inspector's travel time, travel cost and per diem at the state rate. Travel time is hourly based on the rate in subsection (11) of this section. | |
(11) Other inspections. | |
Inspections not covered by above inspection fees must be charged portal-to-portal per hour: | (($112.60))$119.90 |
(12) Variance request processing fee. | |
Variance request processing fee. This fee is nonrefundable once the transaction has been validated. | (($112.60))$119.90 |
(13) Class B basic electrical work labels. | |
(a) Block of 20 Class B basic electrical work labels (not refundable). | (($309.70))$329.80 |
(b) Reinspection of Class B basic electrical work to assure that corrections have been made (per 1/2 hour timed from leaving the previous inspection until the reinspection is completed). See WAC 296-46B-908(5). | (($55.90))$59.50 |
(c) Reinspection of Class B basic electrical work because of a failed inspection of another Class B label (per 1/2 hour from previous inspection until the reinspection is completed). See WAC 296-46B-908(5). | (($55.90))$59.50 |
(14) Provisional electrical work permit labels. | |
Block of 20 provisional electrical work permit labels. | (($309.70))$329.80 |
Notes: | (1) The department will deny renewal of a license, certificate, or permit if an individual owes money as a result of an outstanding final judgment(s) to the department or is in revoked status. The department will deny application of a license, certificate, or permit if an individual is in suspended status or owes money as a result of an outstanding final judgment(s) to the electrical program. |
(2) Certificates may be prorated for shorter renewal periods in one-year increments. Each year or part of a year will be calculated to be one year. | |
(3) The amount of the fee due is calculated based on the fee effective at the date payment is made. |
(1) General or specialty contractor's license per 24-month period. (Nonrefundable after license has been issued.) | |
(a) Initial application or renewal made in person, by mail, or by fax | (($332.30))$353.90 |
(b) Renewal fully completed using the online web process | (($287.50))$306.20 |
(c) Reinstatement of a general or specialty contractor's license after a suspension | (($67.20))$71.50 |
(2) Master electrician/administrator/electrician/trainee certificate. | |
(a) Examination application (nonrefundable) | |
Administrator certificate examination application. (Required only for department administered examinations.) (Not required when testing with the department's contractor.) | (($41.50))$44.20 |
(b) Examination fees (nonrefundable) | |
Note: Normal examination administration is performed by a state authorized contractor. The fees for such examinations are set by contract with the department. For written examinations administered by the department, use the following fee schedule. | |
(i) Master electrician or administrator first-time examination fee (when administered by the department) | (($100.20))$106.70 |
(ii) Master electrician or administrator retest examination fee (when administered by the department) | (($117.40))$125.00 |
(iii) Journey level or specialty electrician examination fee (first test or retest when administered by the department) | (($75.40))$80.30 |
(iv) Certification examination review fee | (($155.40))$165.50 |
(c) Original certificates (nonrefundable after certificate has been issued) | |
(i) Electrical administrator original certificate (except 09 telecommunication) | (($150.30))$160.00 |
(ii) Telecommunications administrator original certificate (for 09 telecommunications) | (($99.90))$106.40 |
(iii) Master electrician exam application (includes original certificate and application processing fee) ((($41.40))$44.20 is nonrefundable after application is submitted) | (($192.10))$204.60 |
(iv) Journey level, specialty, or reciprocal electrician application (includes original certificate and application processing fee) ((($41.40))$44.20 is nonrefundable after application is submitted) | (($107.60))$114.60 |
(v) Training certificate | |
(A) Initial application made in person, by mail, or by fax | (($52.60))$56.00 |
(B) Initial application fully completed online using the online web process | (($45.20))$48.10 |
(C) 0% supervision modified training certificate. Includes trainee update of hours (i.e., submission of affidavit of experience) ((($63.80))$67.90 is nonrefundable after application is submitted) | (($96.00))$102.20 |
(D) 75% supervision modified training certificate. | (($63.80))$67.90 |
(E) Unsupervised training certificate as allowed by RCW 19.28.161 (4)(b). | (($31.50))$33.50 |
(d) Certificate renewal (nonrefundable) | |
(i) Master electrician or administrator certificate renewal | |
(A) Renewal made in person, by mail, or by fax | (($189.90))$202.20 |
(B) Renewal fully completed using the online web process | (($165.00))$175.70 |
(ii) Telecommunications (09) administrator certificate renewal | |
(A) Renewal made in person, by mail, or by fax | (($126.50))$134.70 |
(B) Renewal fully completed using the online web process | (($109.00))$116.00 |
(iii) Late renewal of master electrician or administrator certificate | |
(A) Renewal made in person, by mail, or by fax | (($379.80))$404.50 |
(B) Renewal fully completed using the online web process | (($330.00))$351.40 |
(iv) Late renewal of telecommunications (09) administrator certificate | |
(A) Renewal made in person, by mail, or by fax | (($253.10))$269.50 |
(B) Renewal fully completed using the online web process | (($218.20))$232.40 |
(v) Journey level or specialty electrician certificate renewal | |
(A) Renewal made in person, by mail, or by fax | (($99.90))$106.40 |
(B) Renewal fully completed using the online web process | (($87.00))$92.60 |
(vi) Late renewal of journey level or specialty electrician certificate | |
(A) Renewal made in person, by mail, or by fax | (($199.90))$212.90 |
(B) Renewal fully completed using the online web process | (($174.00))$185.30 |
(vii) Trainee update of hours submitted more than 30 days after expiration of a training certificate | (($63.80))$67.90 |
(viii) Trainee certificate renewal | |
(A) Renewal made in person, by mail, or by fax | (($63.80))67.90 |
(B) Renewal fully completed using the online web process when the affidavit of experience is submitted per WAC 296-46B-942 (8)(d) | (($55.60))$59.20 |
(ix) Late trainee certificate renewal | |
(A) Renewal made in person, by mail, or by fax | (($89.60))$95.40 |
(B) Renewal fully completed using the online web process | (($78.00))$83.00 |
(e) Certificate - Reinstatement (nonrefundable) | |
(i) Reinstatement of a suspended master electrician or administrator's certificate (in addition to normal renewal fee) | (($67.20))$71.50 |
(ii) Reinstatement of suspended journey level, or specialty electrician certificate (in addition to normal renewal fee) | (($31.50))$33.50 |
(f) Assignment/unassignment of master electrician/administrator designation (nonrefundable) | (($49.80))$53.00 |
(3) Certificate/license. | |
(a) Replacement for lost or damaged certificate/license. (Nonrefundable.) | (($21.70))$23.10 |
(b) Optional display quality General Master Electrician certificate. | (($35.40))$37.70 |
(4) Continuing education courses or instructors. (Nonrefundable.) | |
(a) If the course or instructor review is performed by the electrical board or the department | |
The course or instructor review | (($63.90))$68.00 |
(b) If the course or instructor review is contracted out by the electrical board or the department | |
(i) Continuing education course or instructor submittal and approval (per course or instructor) | As set in contract |
(ii) Applicant's request for review, by the chief electrical inspector, of the contractor's denial | (($155.80))$165.90 |
(5) Copy fees. (Nonrefundable.) | |
Certified copy of each document (maximum charge per file): | (($70.70))$75.30 |
(a) First page: | (($31.50))$33.50 |
(b) Each additional page: | (($2.40))$2.50 |
(6) Training school program review fees. Initial training school program review fee. (Nonrefundable.) | |
(a) Initial training school program review fee submitted for approval. Valid for three years or until significant changes in program content or course length are implemented (see WAC 296-46B-971(4)). | (($736.80))$784.70 |
(b) Renewal of training school program review fee submitted for renewal. Valid for 3 years or until significant changes in program content or course length are implemented (see WAC 296-46B-971(4)). | (($368.30))$392.20 |
Electrical testing laboratory | |
Initial filing fee: (Nonrefundable) | (($700.60))$746.20 |
Initial accreditation fee: | |
1 product category | (($350.20))$373.00 |
Each additional category for the next 19 categories | (($139.90))$149.00 each |
Maximum for 20 categories or more | (($3,013.10))$3,209.20 |
Renewal fee: (Nonrefundable) | 50% of initial filing fee |
Renewal of existing accreditations | |
Each additional category for the next 19 categories | (($139.90))$149.00 each |
Maximum for 20 categories or more | (($3,013.10))$3,209.20 |
Engineer for evaluating industrial utilization equipment | |
Initial filing fee: (Nonrefundable) | (($700.60))$746.20 |
Renewal fee: (Nonrefundable) | 50% of initial filing fee |
Type of Fee | Period Covered by Fee | Dollar Amount of Fee |
Elevator contractor/mechanic application fee (not required for renewal of valid license) | Per application | (($ 92.20))$98.20 |
Elevator contractor/ mechanic examination fee | Per application | (($ 278.40))$296.50*** |
Reciprocity application fee | Per application* | (($ 92.20))$98.20 |
Elevator mechanic license | 2 years | (($ 185.40))$197.40 |
Elevator contractor license | 2 years | (($ 185.40))$197.40 |
Temporary elevator mechanic license application fee (not required for renewal) | Per application | (($ 92.20))$98.20 |
Temporary elevator mechanic license | 1 year | (($ 185.40))$197.40 |
Emergency elevator mechanic license | 30 days | (($ 45.70))$48.60 |
Elevator mechanic/contractor timely renewal fee | 2 years | (($ 185.40))$197.40 |
Elevator mechanic/contractor late renewal fee | 2 years | (($ 371.50))$395.60 |
Temporary elevator mechanic timely renewal fee | 1 year | (($ 185.40))$197.40 |
Temporary elevator mechanic late renewal fee | 1 year | (($ 371.50))$395.60 |
Training provider application/renewal fee | 2 years | (($ 185.40))$197.40 |
Continuing education course fee by approved training provider | 1 year** | Not applicable |
Replacement of any licenses | (($ 27.40))$29.10 | |
Refund processing fee | (($ 55.20))$58.70 |
* | Reciprocity application is only allowed for applicants who are applying for licensing based upon possession of a valid license that was obtained in state(s) with which the department has a reciprocity. |
** | This fee is paid directly to the continuing education training course provider approved by the department. |
*** | This fee may be collected by an outside vendor for some exams and may differ from the fee shown above. |
TOTAL COST OF INSTALLATION OR ALTERATION | FEE | |||
$0 to and including $1,000 | (($92.20))$98.20 | |||
$1,001 to and including $5,000 | (($138.70))$147.70 | |||
$5,001 to and including $7,000 | (($231.70))$246.70 | |||
$7,001 to and including $10,000 | (($278.40))$296.50 | |||
$10,001 to and including $15,000 | (($371.50))$395.60 | |||
OVER $15,000 for installation only* | (($520.20))$554.00 plus | |||
OVER $15,000 for alteration only* | (($371.50))$395.60 | |||
* Each additional $1,000 or fraction thereof | (($12.50))$13.30 | |||
Renewal of each construction and alteration permit | (($83.60))$89.00 |
Each personnel hoist or material hoist installation | (($371.50))$395.60 |
Note: | An operating certificate is also required for these types of conveyances. |
Processing fee for each refund | (($55.20))$58.70 |
Nonrefundable fees for processing the applications for each installation/major alteration | (($45.70))$48.60 |
Each reinspection of a conveyance per conveyance | (($185.40))$197.40 | ||
Plus every hour for each additional hour after the first hour | (($89.90))$95.70 |
Inspecting an increase in the height (jumping) of each personnel hoist or material hoist up to two hours | (($185.40))$197.40 | ||
Plus every hour for each additional hour | (($92.20))$98.20 |
Note: | This fee is for inspections occurring during regular working hours. |
On-site variance inspection per conveyance up to two hours | (($278.40))$296.50 | ||
Plus every hour for each additional hour | (($92.20))$98.20 |
Note: | This fee is for inspections occurring during regular working hours. |
A variance that does not require an on-site inspection per conveyance | (($92.20))$98.20 |
Annual fee for a conveyance in "red tag" status | (($45.70))$48.60 |
Note: | The department shall be provided with written approval from the building official, indicating that the conveyance is not required for building occupancy, when applying to have the conveyance placed in voluntary red tag status. |
Performing a decommission inspection | (($92.20))$98.20 |
Inspection per conveyance up to two hours | (($185.40))$197.40 | ||
Plus every hour for each additional hour | (($92.20))$98.20 | ||
Plus the standard per diem and mileage allowance granted to department inspectors |
Inspecting and testing of elevators used for construction | (($148.20))$157.80 |
TYPE OF CONVEYANCE | FEE | ||
Each inclined stairway chair lift in private residence | (($42.80))$45.50 | ||
Each inclined wheelchair lift in a private residence | (($42.80))$45.50 | ||
Each vertical wheelchair lift in a private residence | (($54.20))$57.70 | ||
Each dumbwaiter in a private residence | (($42.80))$45.50 | ||
Each inclined elevator at a private residence | (($154.00))$164.00 | ||
Each private residence elevator | (($99.10))$105.50 | ||
Duplication of a lost, damaged, or stolen operating permit | (($17.80))$18.90 |
Per hour or any portion thereof (including travel time) | (($110.80))$118.00 | ||
Plus the standard per diem and mileage allowance granted to department inspectors |
Rate per hour or portion thereof (including travel time) | (($110.80))$118.00 | ||
Plus the standard per diem and mileage allowance granted to department inspectors may be charged by the department |
Minimum fee for an after-hours inspection up to one hour | (($138.70))$147.70 | ||
Plus per hour for each additional hour | (($138.70))$147.70 | ||
Plus the standard per diem and mileage allowance granted to department inspectors |
TYPE OF CONVEYANCE | FEE | ||
Each hydraulic elevator | (($185.40))$197.40 | ||
Each roped-hydraulic elevator | (($231.70))$246.70 | ||
plus for each hoistway opening in excess of two | (($17.80))$18.90 | ||
Each cable elevator | (($231.70))$246.70 | ||
plus for each hoistway opening in excess of two | (($17.80))$18.90 | ||
Each cable elevator traveling more than 25 feet without an opening—for each 25 foot traveled | (($17.80))$18.90 | ||
Each limited-use/limited-application (—LULA) elevator | (($185.40))$197.40 | ||
Each escalator | (($153.90))$163.90 | ||
Each dumbwaiter in other than a private residence | (($99.10))$105.50 | ||
Each material lift | (($185.40))$197.40 | ||
Each incline elevator in other than a private residence | (($199.40))$212.30 | ||
Each belt manlift | (($185.40))$197.40 | ||
Each stair lift in other than a private residence | (($99.10))$105.50 | ||
Each wheel chair lift in other than a private residence | (($99.10))$105.50 | ||
Each personnel hoist | (($185.40))$197.40 | ||
Each grain elevator personnel lift | (($153.90))$163.90 | ||
Each material hoist | (($185.40))$197.40 | ||
Each special purpose elevator | (($185.40))$197.40 | ||
Each private residence elevator installed in other than a private residence | (($185.40))$197.40 | ||
Each sidewalk freight elevator | (($153.90))$163.90 | ||
Each hand-powered manlift or freight elevator | (($104.20))$110.90 | ||
Each moving walk | (($153.90))$163.90 | ||
Duplication of a damaged, lost, or stolen operating permit | (($17.80))$18.90 |
GENERAL INFORMATION | |||||||
Manufacture: | Manufacturer # | ||||||
1. | Building use: | 2. | Building occupancy: | ||||
3. | Type of construction: VB | 4. | Square footage of building: | ||||
5. | Valuation of the building shall be based on the following: | ||||||
• | Square footage of the building multiplied by the amount in the BVD valuation table . . . . | $ | . . . . . | ||||
6. | Total valuation: . . . . | $ | . . . . . | ||||
PERMIT FEE | |||||||
7. | Calculate from building permit fee table using the total valuation . . . . | $ | . . . . . | ||||
STRUCTURAL PLAN REVIEW FEE* | |||||||
8. | One year design review: | (Valid for one year) multiply the total on line 7 by ((0.483))0.514. . . . | $ | . . . . . | |||
9. | Master plan review: | (Valid for the code cycle) multiply the total on line 7 by ((0.690))0.734. . . . | $ | . . . . . | |||
* | Minimum plan review fee is 2 1/2 hours x (($105.00))$111.80 per hour | ||||||
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required) | |||||||
10. | Fire and life-safety plan review: | ||||||
a. | One year design—Multiply the total on line 7 by ((0.206))0.219. . . . | $ | . . . . . | ||||
b. | Master plan design—Multiply the total on line 7 by ((0.343))0.365. . . . | $ | . . . . . | ||||
• | Required for all structures that are more than 4,000 square feet and for all A and I occupancy | ||||||
PLUMBING PLAN-REVIEW FEE | |||||||
11. | Plumbing (($24.60 + $7.90))$26.20 + $8.40 per fixture . . . . | $ | . . . . . | ||||
12. | Medical gas (($24.60 + $7.90))$26.20 + $8.40 per gas outlet . . . . | $ | . . . . . | ||||
DESIGN RENEWAL OR ADDENDUM | |||||||
13. | ((13.82))14.71% of building permit + (($105.00))$111.80. . . . | $ | . . . . . | ||||
RESUBMITTAL | |||||||
14. | ((13.82))14.71% of building permit + (($105.00))$111.80. . . . | $ | . . . . . | ||||
ELECTRICAL PLAN-REVIEW FEE | |||||||
15. | See WAC 296-46B-906(9) for electrical review fees | ||||||
INSIGNIA FEES | |||||||
16. | FIRST SECTION | $ | ((31.30))33.30 | ||||
17. | EACH ADDITIONAL SECTION | $ | ((19.20))20.40 | ||||
TOTAL FEES | |||||||
18. | Total plan review fees: | Add lines 8 or 9 and 10 through 15 . . . . | $ | . . . . . | |||
19. | Total fees due: | Includes plan fees and insignia fees . . . . | $ | . . . . . | |||
20. | Total amount paid. . . . | $ | . . . . . | ||||
Group (2009 International Building Code) | IA | IB | IIA | IIB | IIIA | IIIB | IV | VA | VB |
A-1 Assembly, theaters, with stage | 211.15 | 203.98 | 198.73 | 190.05 | 178.25 | 173.30 | 183.31 | 162.97 | 156.05 |
A-1 Assembly, theaters, without stage | 193.16 | 185.99 | 180.74 | 172.06 | 160.31 | 155.36 | 165.32 | 145.04 | 138.12 |
A-2 Assembly, nightclubs | 163.22 | 158.56 | 154.17 | 148.00 | 138.96 | 135.24 | 142.52 | 126.06 | 121.36 |
A-2 Assembly, restaurants, bars, banquet halls | 162.22 | 157.56 | 152.17 | 147.00 | 136.96 | 134.24 | 141.52 | 124.06 | 120.36 |
A-3 Assembly, churches | 195.10 | 187.93 | 182.68 | 174.00 | 162.21 | 157.26 | 167.26 | 146.94 | 140.02 |
A-3 Assembly, general, community halls, libraries, museums | 163.81 | 156.64 | 150.39 | 142.71 | 129.91 | 125.96 | 135.97 | 114.63 | 108.71 |
A-4 Assembly, arenas | 192.16 | 184.99 | 178.74 | 171.06 | 158.31 | 154.36 | 164.32 | 143.04 | 137.12 |
B Business | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
E Educational | 176.97 | 170.85 | 165.64 | 158.05 | 146.37 | 138.98 | 152.61 | 127.91 | 123.09 |
F-1 Factory and industrial, moderate hazard | 97.87 | 93.28 | 87.66 | 84.46 | 75.44 | 72.26 | 80.79 | 62.17 | 58.48 |
F-2 Factory and industrial, low hazard | 96.87 | 92.28 | 87.66 | 83.46 | 75.44 | 71.26 | 79.79 | 62.17 | 57.48 |
H-1 High hazard, explosives | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | N.P. |
H-2, 3, 4 High hazard | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | 52.53 |
H-5 HPM | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
I-1 Institutional, supervised environment | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
I-2 Institutional, hospitals | 277.07 | 271.09 | 265.80 | 258.28 | 243.90 | N.P. | 252.23 | 227.88 | N.P. |
I-2 Institutional, nursing homes | 193.00 | 187.02 | 181.74 | 174.22 | 160.98 | N.P. | 168.16 | 144.96 | N.P. |
I-3 Institutional, restrained | 187.72 | 181.73 | 176.45 | 168.93 | 156.64 | 150.82 | 162.87 | 140.63 | 133.13 |
I-4 Institutional, day care facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
M Mercantile | 121.57 | 116.92 | 111.53 | 106.36 | 96.96 | 94.25 | 100.88 | 84.07 | 80.36 |
R-1 Residential, hotels | 166.21 | 160.43 | 155.99 | 149.29 | 137.39 | 133.80 | 145.70 | 123.43 | 119.10 |
R-2 Residential, multiple family | 139.39 | 133.61 | 129.17 | 122.47 | 111.23 | 107.64 | 119.54 | 97.27 | 92.94 |
R-3 Residential, one and two family | 131.18 | 127.60 | 124.36 | 121.27 | 116.43 | 113.53 | 117.42 | 108.79 | 101.90 |
R-4 Residential, care/assisted living facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
S-1 Storage, moderate hazard | 90.74 | 86.15 | 80.53 | 77.33 | 68.49 | 65.31 | 73.66 | 55.22 | 51.53 |
S-2 Storage, low hazard | 89.74 | 85.15 | 80.53 | 76.33 | 68.49 | 64.31 | 72.66 | 55.22 | 50.53 |
U Utility, miscellaneous | 71.03 | 67.02 | 62.71 | 59.30 | 52.86 | 49.43 | 56.33 | 41.00 | 39.06 |
a | Private garages use utility, miscellaneous |
b | Unfinished basements (all use group) = $15.00 per sq. ft. |
c | For shell only buildings deduct 20 percent |
d | N.P. = not permitted |
Total Valuation | Fee |
$1.00 to $500.00 | $23.50 |
$501.00 to $2,000.00 | $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 |
$2,001.00 to $25,000.00 | $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 |
$25,001.00 to $50,000.00 | $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 |
$50,001.00 to $100,000.00 | $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 |
$100,001.00 to $500,000.00 | $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 |
$500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 |
$1,000,001.00 and up | $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof |
INITIAL FILING FEE (first time applicants) | (($51.80))$55.10 | |||
DESIGN PLAN FEES: | ||||
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.382))1.471* | ||||
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.382))1.471* | ||||
RENEWAL FEE - 10% of permit fee × ((1.382))1.471 + | (($105.00))$111.80 | |||
RESUBMIT FEE - 10% of permit fee × ((1.382))1.471 + | (($105.00))$111.80 | |||
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.382))1.471 + | (($105.00))$111.80 | |||
PLUMBING PLAN FEE, (($24.60))$26.20 + PER FIXTURE FEE of | (($7.90))$8.40 | |||
MEDICAL GAS PLAN FEE, (($24.60))$26.20 + PER OUTLET FEE of | (($7.90))$8.40 | |||
Note: Mechanical systems are included in the primary plan fee | ||||
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy) | ||||
MASTER DESIGN - 25% of permit fee × ((1.382))1.471 | ||||
One year design 15% of the permit fee × ((1.382))1.471 | ||||
ELECTRICAL PLAN REVIEW - Find fee @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906 | ||||
RECIPROCAL PLAN REVIEW: | ||||
INITIAL FEE - MASTER DESIGN (minimum 3 hours) | (($105.00))$111.80 per hour | |||
INITIAL FEE - ONE YEAR DESIGN (minimum 2 hours) | (($105.00))$111.80 per hour | |||
RENEWAL FEE (minimum 1 hour) | (($105.00))$111.80 per hour | |||
ADDENDUM (minimum 1 hour) | (($105.00))$111.80 per hour | |||
PLANS APPROVED BY LICENSED PROFESSIONALS - 10% of permit fee × ((1.382))1.471 + | (($105.00))$111.80 | |||
FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM | (($105.00))$111.80 per hour | |||
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS - 5% of permit fee × ((1.382))1.471 + | (($105.00))$111.80 | |||
DEPARTMENT INSPECTION FEES | ||||
INSPECTION/REINSPECTION (Per hour** plus travel time* and mileage***) | (($105.00))$111.80 | |||
TRAVEL (Per hour) | (($105.00))$111.80 | |||
PER DIEM*** | ||||
HOTEL**** | ||||
MILEAGE*** | ||||
RENTAL CAR**** | ||||
PARKING**** | ||||
AIRFARE**** | ||||
DEPARTMENT AUDIT FEES: | ||||
AUDIT (Per hour*) | (($105.00))$111.80 | |||
TRAVEL (Per hour**) | (($105.00))$111.80 | |||
PER DIEM*** | ||||
HOTEL**** | ||||
MILEAGE*** | ||||
RENTAL CAR**** | ||||
PARKING**** | ||||
AIRFARE**** | ||||
ALTERATION INSPECTION (one hour minimum + alteration insignia fee) | (($136.50))$145.30 | |||
INSIGNIA FEES: | ||||
FIRST SECTION (NEW or ALTERATION) | (($31.30))$33.30 | |||
EACH ADDITIONAL SECTION (NEW or ALTERATION) | (($19.20))$20.40 | |||
REISSUED-LOST/DAMAGED | (($19.20))$20.40 | |||
OTHER FEES: | ||||
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***) | (($105.00))$111.80 | |||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($19.20))$20.40 | |||
REFUND FEE | (($34.30))$36.50 | |||
* | Minimum plan review fee is 2 1/2 hours at the field technical service rate |
** | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments |
*** | Per state guidelines |
**** | Actual charges incurred |
GENERAL INFORMATION | |||||||
Manufacture: | Manufacturer # | ||||||
1. | Building use: | 2. | Building occupancy: | ||||
3. | Type of construction: | 4. | Square footage of building: | ||||
5. | Valuation of the building shall be based on the following: | ||||||
• | Square footage of the building multiplied by the amount in the BVD valuation table . . . . | $ | . . . . . | ||||
6. | Total valuation: . . . . | $ | . . . . . | ||||
PERMIT FEE | |||||||
7. | Calculate from building permit fee table using the total valuation . . . . | $ | . . . . . | ||||
STRUCTURAL PLAN REVIEW FEE* | |||||||
8. | One year design review: | (Valid for one year) multiply the total on line 7 by ((0.483))0.514. . . . | $ | . . . . . | |||
9. | Master plan review: | (Valid for the code cycle) multiply the total on line 7 by ((0.690))0.734. . . . | $ | . . . . . | |||
* | Minimum plan review fee is 2 1/2 hours x (($118.20))$125.80 per hour | ||||||
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required) | |||||||
10. | Fire and life-safety plan review: | ||||||
a. | One year design—Multiply the total on line 7 by ((0.206))0.219. . . . | $ | . . . . . | ||||
b. | Master plan design—Multiply the total on line 7 by ((0.343))0.365. . . . | $ | . . . . . | ||||
• | Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy | ||||||
PLUMBING PLAN-REVIEW FEE | |||||||
11. | Plumbing (($24.60 + $7.90))$26.20 + $8.40 per fixture . . . . | $ | . . . . . | ||||
12. | Medical gas (($24.60 + $7.90))$26.20 + $8.40 per gas outlet . . . . | $ | . . . . . | ||||
DESIGN RENEWAL OR ADDENDUM | |||||||
13. | ((13.82))14.71% of building permit + (($118.20))$125.80. . . . | $ | . . . . . | ||||
RESUBMITTAL | |||||||
14. | ((13.82))14.71% of building permit + (($118.20))$125.80. . . . | $ | . . . . . | ||||
ELECTRICAL PLAN-REVIEW FEE | |||||||
15. | See WAC 296-46B-906(9) for electrical review fees | ||||||
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) | |||||||
16. | Notification to local enforcement agency fee: | $ | ((50.70))54.00 | ||||
INSIGNIA FEES | |||||||
17. | FIRST SECTION | $ | ((378.30))402.90 | ||||
18. | EACH ADDITIONAL SECTION | $ | ((33.60))35.70 | ||||
TOTAL FEES | |||||||
19. | Total plan review fees: | Add lines 8 or 9 and 10 through 15 . . . . | $ | . . . . . | |||
20. | Total fees due: | Includes plan fees, insignia fees, and NLEA fees . . . . | $ | . . . . . | |||
21. | Total amount paid. . . . | $ | . . . . . | ||||
Group (2009 International Building Code) | IA | IB | IIA | IIB | IIIA | IIIB | IV | VA | VB |
A-1 Assembly, theaters, with stage | 211.15 | 203.98 | 198.73 | 190.05 | 178.25 | 173.30 | 183.31 | 162.97 | 156.05 |
A-1 Assembly, theaters, without stage | 193.16 | 185.99 | 180.74 | 172.06 | 160.31 | 155.36 | 165.32 | 145.04 | 138.12 |
A-2 Assembly, nightclubs | 163.22 | 158.56 | 154.17 | 148.00 | 138.96 | 135.24 | 142.52 | 126.06 | 121.36 |
A-2 Assembly, restaurants, bars, banquet halls | 162.22 | 157.56 | 152.17 | 147.00 | 136.96 | 134.24 | 141.52 | 124.06 | 120.36 |
A-3 Assembly, churches | 195.10 | 187.93 | 182.68 | 174.00 | 162.21 | 157.26 | 167.26 | 146.94 | 140.02 |
A-3 Assembly, general, community halls, libraries, museums | 163.81 | 156.64 | 150.39 | 142.71 | 129.91 | 125.96 | 135.97 | 114.63 | 108.71 |
A-4 Assembly, arenas | 192.16 | 184.99 | 178.74 | 171.06 | 158.31 | 154.36 | 164.32 | 143.04 | 137.12 |
B Business | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
E Educational | 176.97 | 170.85 | 165.64 | 158.05 | 146.37 | 138.98 | 152.61 | 127.91 | 123.09 |
F-1 Factory and industrial, moderate hazard | 97.87 | 93.28 | 87.66 | 84.46 | 75.44 | 72.26 | 80.79 | 62.17 | 58.48 |
F-2 Factory and industrial, low hazard | 96.87 | 92.28 | 87.66 | 83.46 | 75.44 | 71.26 | 79.79 | 62.17 | 57.48 |
H-1 High hazard, explosives | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | N.P. |
H-2, 3, 4 High hazard | 91.74 | 87.15 | 82.53 | 78.33 | 70.49 | 66.31 | 74.66 | 57.22 | 52.53 |
H-5 HPM | 164.76 | 158.78 | 153.49 | 145.97 | 132.45 | 127.63 | 139.92 | 116.43 | 110.93 |
I-1 Institutional, supervised environment | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
I-2 Institutional, hospitals | 277.07 | 271.09 | 265.80 | 258.28 | 243.90 | N.P. | 252.23 | 227.88 | N.P. |
I-2 Institutional, nursing homes | 193.00 | 187.02 | 181.74 | 174.22 | 160.98 | N.P. | 168.16 | 144.96 | N.P. |
I-3 Institutional, restrained | 187.72 | 181.73 | 176.45 | 168.93 | 156.64 | 150.82 | 162.87 | 140.63 | 133.13 |
I-4 Institutional, day care facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
M Mercantile | 121.57 | 116.92 | 111.53 | 106.36 | 96.96 | 94.25 | 100.88 | 84.07 | 80.36 |
R-1 Residential, hotels | 166.21 | 160.43 | 155.99 | 149.29 | 137.39 | 133.80 | 145.70 | 123.43 | 119.10 |
R-2 Residential, multiple family | 139.39 | 133.61 | 129.17 | 122.47 | 111.23 | 107.64 | 119.54 | 97.27 | 92.94 |
R-3 Residential, one and two family | 131.18 | 127.60 | 124.36 | 121.27 | 116.43 | 113.53 | 117.42 | 108.79 | 101.90 |
R-4 Residential, care/assisted living facilities | 164.82 | 159.04 | 154.60 | 147.90 | 135.84 | 132.25 | 144.15 | 121.88 | 117.55 |
S-1 Storage, moderate hazard | 90.74 | 86.15 | 80.53 | 77.33 | 68.49 | 65.31 | 73.66 | 55.22 | 51.53 |
S-2 Storage, low hazard | 89.74 | 85.15 | 80.53 | 76.33 | 68.49 | 64.31 | 72.66 | 55.22 | 50.53 |
U Utility, miscellaneous | 71.03 | 67.02 | 62.71 | 59.30 | 52.86 | 49.43 | 56.33 | 41.00 | 39.06 |
a | Private garages use utility, miscellaneous |
b | Unfinished basements (all use group) = $15.00 per sq. ft. |
c | For shell only buildings deduct 20 percent |
d | N.P. = not permitted |
Total Valuation | Fee |
$1.00 to $500.00 | $23.50 |
$501.00 to $2,000.00 | $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 |
$2,001.00 to $25,000.00 | $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 |
$25,001.00 to $50,000.00 | $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 |
$50,001.00 to $100,000.00 | $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 |
$100,001.00 to $500,000.00 | $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 |
$500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 |
$1,000,001.00 and up | $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof |
INITIAL FILING FEE (first time applicants) | (($92.20))$98.20 | ||
DESIGN PLAN FEES: | |||
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × ((1.382))1.471* | |||
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × ((1.382))1.471* | |||
RENEWAL FEE - 10% of permit fee × ((1.382))1.471 + | (($118.20))$125.80 | ||
RESUBMIT FEE - 10% of permit fee × ((1.382))1.471 + | (($118.20))$125.80 | ||
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × ((1.382))1.471 + | (($118.20))$125.80 | ||
PLUMBING PLAN FEE, $24.60 + PER FIXTURE FEE of | (($7.90))$8.40 | ||
MEDICAL GAS PLAN FEE, (($24.60))$26.20 + PER OUTLET FEE of | (($7.90))$8.40 | ||
Note: Mechanical systems are included in the primary plan fee | |||
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy) | |||
MASTER DESIGN - 25% of permit fee × ((1.382))1.471 | |||
One year design - 15% of the permit fee × ((1.382))1.471 | |||
ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906 | |||
RECIPROCAL PLAN REVIEW: | |||
INITIAL FEE-MASTER DESIGN (minimum 3 hours) | (($118.20))$125.80 per hour | ||
INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours) | (($118.20))$125.80 per hour | ||
RENEWAL FEE (minimum 1 hour) | (($118.20))$125.80 | ||
ADDENDUM (minimum 1 hour) | (($118.20))$125.80 per hour | ||
PLANS APPROVED BY LICENSED PROFESSIONALS - 10% of permit fee × ((1.382))1.471 + | (($118.20))$125.80 | ||
FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM | (($118.20))$125.80 per hour | ||
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × ((1.382))1.471 + | (($118.20))$125.80 | ||
DEPARTMENT INSPECTION FEES | |||
INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***) | (($118.20))$125.80 | ||
TRAVEL (Per hour**) | (($118.20))$125.80 | ||
PER DIEM*** | |||
HOTEL**** | |||
MILEAGE*** | |||
RENTAL CAR**** | |||
PARKING**** | |||
AIRFARE**** | |||
DEPARTMENT AUDIT FEES: | |||
AUDIT (Per hour**) | (($118.20))$125.80 | ||
TRAVEL (Per hour**) | (($118.20))$125.80 | ||
PER DIEM*** | |||
HOTEL**** | |||
MILEAGE*** | |||
RENTAL CAR**** | |||
PARKING**** | |||
AIRFARE**** | |||
INSIGNIA FEES: | |||
FIRST SECTION | (($378.30))$402.90 | ||
EACH ADDITIONAL SECTION | (($33.60))$35.70 | ||
REISSUED-LOST/DAMAGED | (($92.20))$98.20 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***) | (($118.20))$125.80 | ||
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) | (($50.70))$54.00 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($18.70))$19.90 | ||
REFUND FEE | (($34.30))$36.50 | ||
* | Minimum plan review fee is 2 1/2 hours at the field technical service rate. |
** | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
*** | Per state guidelines. |
**** | Actual charges incurred. |
(a) Failure to have a certified installer on the installation site whenever installation work is being performed: | ||
First Final Violation | $250.00 | |
Each Additional Final Violation | $1,000.00 | |
(b) Failure to correct all nonconforming aspects of the installation identified by the local enforcement agency or by an authorized representative of the department within thirty days of issuance of notice of the same: | ||
First Final Violation | Warning | |
Second Final Violation | $250.00 | |
Third Final Violation | $500.00 | |
Each Additional Final Violation | $1,000.00 | |
(c) Failure by a certified installer to affix a certification tag to an installed manufactured or mobile home: | ||
First Final Violation | Warning | |
Second Final Violation | $250.00 | |
Third Final Violation | $500.00 | |
Each Additional Final Violation | $1,000.00 | |
(d) Transfer of certification tag(s) from a certified installer to another certified installer without prior written approval of the department: | ||
First Final Violation | Warning | |
Each Additional Final Violation | $250.00 | |
(e) Transfer of certification tag(s) from a certified installer to a noncertified installer: | ||
First Final Violation to Each Contractor in Violation | $250.00 | |
Each Additional Final Violation to Each Contractor in Violation | $1,000.00 | |
The following fees are payable to the department in advance: | ||
Installer test and certification | (($342.30))$364.50 | |
Homeowner test and approval | (($171.00))$182.10 | |
Manufactured home installation inspector test and certificate | (($171.00))$182.10 | |
Refund | (($33.90))$36.10 | |
Certification renewal | (($171.00))$182.10 | |
Continuing education class | (($68.20))$72.60 | |
Retake failed examination and training at scheduled class | (($51.10))$54.40 | |
Manufactured home installer training manual (on thumb drive) | (($16.90))$18.00 | |
Installer certification tag | (($11.70))$12.40 | |
L&I manufactured home installation inspection permit* | See WAC 296-150M-3000 for fee | |
* | Only available when L&I has an interagency agreement with the local enforcement agency in accordance with WAC 296-150I-0370. |
DESIGN PLAN FEES: | |||
STRUCTURAL ALTERATION | (($229.80))$244.70 | ||
RESUBMITTAL FEE | (($101.30))$107.80 | ||
ADDENDUM (Approval expires on the same date as original plan.) | (($101.30))$107.80 | ||
ELECTRONIC PLAN SUBMITTAL FEE (($6.90))$7.30 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | |||
DEPARTMENT INSPECTION FEES: | |||
Combination permit - Mechanical and electrical inspections | (($251.20))$267.50 | ||
Heat pump | (($251.20))$267.50 | ||
Air conditioning | (($251.20))$267.50 | ||
Air conditioning with replacement furnace | (($251.20))$267.50 | ||
Gas furnace installation includes gas piping | (($251.20))$267.50 | ||
Fire safety inspection | (($251.20))$267.50 | ||
MECHANICAL | |||
Gas*** piping | (($111.50))$118.70 | ||
Wood stove | (($111.50))$118.70 | ||
Pellet stove | (($111.50))$118.70 | ||
Gas*** Room heater | (($111.50))$118.70 | ||
Gas*** Decorative appliance | (($111.50))$118.70 | ||
Range: Changing from electric to gas*** | (($111.50))$118.70 | ||
Gas*** Water heater replacement | (($83.40))$88.80 | ||
ELECTRICAL | |||
Electric water heater replacement | (($139.50))$148.50 | ||
Electric water heater replacing gas*** water heater | (($139.50))$148.50 | ||
Each added or modified 120 volt circuit (maximum charge is two circuits) | (($139.50))$148.50 | ||
Each added 240 volt circuit (for other than heat pumps, air conditioners, furnaces, water heaters, ranges, hot tubs or spas) | (($139.50))$148.50 | ||
Hot tub or spa (power from home electrical panel) | (($139.50))$148.50 | ||
Replace main electrical panel/permanently installed transfer equipment | (($139.50))$148.50 | ||
Low voltage fire/intrusion alarm | (($139.50))$148.50 | ||
Any combination of furnace, range and water heater changing from electric to gas*** | (($139.50))$148.50 | ||
PLUMBING | |||
Fire sprinkler system | (($313.70))$334.10 | ||
Each added fixture | (($83.40))$88.80 | ||
Replacement of water piping system (this includes two inspections) | (($280.10))$298.30 | ||
STRUCTURAL | |||
Inspection as part of a mechanical/fire safety installation (cut truss/floor joist, sheet rocking) | (($125.10))$133.20 | ||
Reroofs (may require a plan review) | (($223.70))$238.20 | ||
Changes to home when additions bear loads on home per the design of a professional (also requires a plan review) | (($223.70))$238.20 | ||
Other structural changes (may require a plan review) | (($223.70))$238.20 | ||
MISCELLANEOUS | |||
OTHER REQUIRED INSPECTIONS (per hour*) | (($91.50))$97.40 | ||
ALL REINSPECTIONS (per hour*) | (($91.50))$97.40 | ||
Manufactured home installation inspection permit (only available in cities and counties with L&I inspection contract) | (($641.40))$683.10 | ||
Refund | (($27.50))$29.20 | ||
INSIGNIA FEES: | |||
REISSUED - LOST/DAMAGED | (($27.50))$29.20 | ||
IPIA | |||
DEPARTMENT AUDIT FEES | |||
REGULARLY SCHEDULED IPIA AUDIT: | |||
First inspection on each section (one time only) | (($45.80))$48.70 | ||
Second and succeeding inspections of unlabeled sections (per hour*) | (($101.30))$107.80 | ||
OTHER IPIA FEES: | |||
Red tag removal during a regularly scheduled IPIA audit (per hour* separate from other fees) | (($101.30))$107.80 | ||
Red tag removal at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Increased frequency surveillance (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Attendance at manufacturers training classes (per hour* only) | (($101.30))$107.80 | ||
Subpart "I" investigations (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Alterations to a labeled unit (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
IPIA Issues/Responses (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Monthly surveillance during a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Monthly surveillance at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Plant certifications, recertifications and addenda updates (per hour* plus travel time* and mileage** per each inspector) | (($101.30))$107.80 | ||
Response to HBT audit during a regularly scheduled IPIA audit (per hour*) | (($101.30))$107.80 | ||
Response to HBT audit at a time other than a regularly scheduled IPIA audit (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Alternative construction (AC) letter inspections at placement site (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
Replacement of HUD labels (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
State administrative agency (SAA) inspection fee (per hour* plus travel time* and mileage**) | (($101.30))$107.80 | ||
State administrative agency (SAA) dispute resolution filing fee | (($101.30))$107.80 | ||
State administrative agency (SAA) dispute resolution (per hour*) | (($101.30))$107.80 | ||
OTHER FEES: | |||
FIELD TECHNICAL SERVICE (per hour plus travel time* and mileage**) | (($94.20))$100.30 | ||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (one free copy per year upon request) | (($18.40))$19.50 | ||
VARIANCE INSPECTION FEE | (($223.70))$238.20 | ||
HOMEOWNER REQUESTED INSPECTION | (($223.70))$238.20 | ||
DECERTIFICATION OF A MOBILE/MANUFACTURED HOME | (($223.70))$238.20 | ||
DEMOLITION OF A MOBILE/MANUFACTURED HOME | (($223.70))$238.20 | ||
ENERGY CONSERVATION PERMIT | (($37.80))$40.20 | ||
NOTE: | Local jurisdictions may have other fees that apply. |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Gas means all gases; natural, propane, etc. |
INITIAL FILING FEE | (($47.70))$50.80 | |
DESIGN PLAN FEES: | ||
NEW PLAN REVIEW FEE WITHOUT STRUCTURAL REQUIREMENTS | (($135.60))$144.40 | |
NEW PLAN REVIEW FEE WITH STRUCTURAL REQUIREMENTS | (($179.30))$190.90 | |
RESUBMITTAL FEE | (($97.00))$103.30 | |
ADDENDUM (Approval expires on same date as original plan.) | (($97.00))$103.30 | |
PLANS APPROVED BY LICENSED PROFESSIONALS | (($33.80))$36.00 | |
FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM | (($97.00))$103.30 per hour | |
DEPARTMENT AUDIT FEES: | ||
AUDIT (per hour)* | (($97.00))$103.30 | |
TRAVEL (per hour)* | (($97.00))$103.30 | |
PER DIEM** | ||
HOTEL*** | ||
MILEAGE** | ||
RENTAL CAR*** | ||
PARKING*** | ||
AIRFARE*** | ||
DEPARTMENT INSPECTION FEES: | ||
INSPECTION (per hour)* | (($97.00))$103.30 | |
TRAVEL (per hour)* | (($97.00))$103.30 | |
PER DIEM** | ||
HOTEL*** | ||
MILEAGE** | ||
RENTAL CAR*** | ||
PARKING*** | ||
AIRFARE*** | ||
ALTERATION INSPECTION (One hour plus insignia alteration fee) | (($144.90))$154.30 | |
INSIGNIA FEES: | ||
STATE CERTIFIED | (($34.30))$36.50 | |
ALTERATION | (($47.70))$50.80 | |
REISSUED-LOST/DAMAGED | (($17.50))$18.60 | |
OTHER FEES: | ||
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**) | (($97.00))$103.30 | |
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($17.70))$18.80 | |
REFUND FEE | (($34.30))$36.50 | |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |
STATE PLAN | ||
INITIAL FILING FEE | (($41.30))$43.90 | |
DESIGN PLAN FEES: | ||
NEW PLAN REVIEW FEE | (($115.70))$123.20 | |
RESUBMITTAL FEE | (($83.60))$89.00 | |
ADDENDUM (Approval expires on same date as original plan.) | (($83.60))$89.00 | |
PLANS APPROVED BY LICENSED PROFESSIONALS | (($16.90))$18.00 | |
FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM | (($83.70))$89.10 per hour | |
DEPARTMENT AUDIT FEES: | ||
AUDIT (per hour)* | (($83.70))$89.10 | |
TRAVEL (per hour)* | (($83.70))$89.10 | |
PER DIEM** | ||
HOTEL*** | ||
MILEAGE** | ||
RENTAL CAR*** | ||
PARKING | ||
AIRFARE*** | ||
DEPARTMENT INSPECTION FEES: | ||
INSPECTION (per hour)* | (($83.70))$89.10 | |
TRAVEL (per hour)* | (($83.70))$89.10 | |
PER DIEM** | ||
HOTEL*** | ||
MILEAGE** | ||
RENTAL CAR*** | ||
PARKING*** | ||
AIRFARE*** | ||
ALTERATION INSPECTION (One hour plus insignia alteration fee) | (($125.20))$133.30 | |
INSIGNIA FEES: | ||
STATE CERTIFIED | (($30.70))32.60 | |
ALTERATION | (($41.30))43.90 | |
REISSUED-LOST/DAMAGED | (($14.70))$15.60 | |
OTHER FEES: | ||
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**) | (($83.70))$89.10 | |
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year) | (($15.50))$16.50 | |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |
SELF CERTIFICATION | ||
INITIAL FILING FEE | (($41.30))$43.90 | |
DESIGN PLAN FEES: | ||
NEW PLAN REVIEW FEE (one time fee) | (($117.30))$124.90 | |
RESUBMITTAL FEE | (($83.70))$89.10 | |
ADDENDUM (Approval expires on same date as original plan.) | (($83.70))$89.10 | |
ELECTRONIC PLAN SUBMITTAL FEE (($6.10))$6.40 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | ||
DEPARTMENT AUDIT FEES: | ||
AUDIT (per hour)* | (($83.70))$89.10 | |
TRAVEL (per hour)* | (($83.70))$89.10 | |
PER DIEM** | ||
HOTEL*** | ||
MILEAGE** | ||
RENTAL CAR*** | ||
PARKING | ||
AIRFARE*** | ||
DEPARTMENT INSPECTION FEES: | ||
INSPECTION (per hour)* | (($83.70))$89.10 | |
TRAVEL (per hour)* | (($83.70))$89.10 | |
PER DIEM** | ||
HOTEL*** | ||
MILEAGE** | ||
RENTAL CAR*** | ||
PARKING*** | ||
AIRFARE*** | ||
INSIGNIA FEES: | ||
SELF CERTIFIED | (($30.70))$32.60 | |
ALTERATION | (($41.30))$43.90 | |
REISSUED-LOST/DAMAGED | (($14.70))$15.60 | |
OTHER FEES: | ||
FIELD TECHNICAL SERVICE (per hour* plus travel time* and mileage**) | (($83.70))$89.10 | |
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year) | (($15.50))$16.50 | |
REFUND FEE | (($30.70))$32.60 | |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |
INITIAL FILING FEE | (($72.50))$77.20 | |||
DESIGN PLAN FEES: | ||||
INITIAL ONE YEAR DESIGN | (($211.20))$224.90 | |||
RENEWAL FEE | (($72.50))$77.20 | |||
RESUBMIT FEE | (($105.00))$111.80 | |||
ADDENDUM (Approval expires on same date as original plan) | (($105.00))$111.80 | |||
ELECTRONIC PLAN SUBMITTAL FEE (($7.00))$7.40 per page for the first set of plans and $1.00 per page for each additional set of plans. These fees are in addition to any applicable design plan fees required under this section. | ||||
Supplemental submissions of plans (resubmittals, addendums, renewals, code updates, etc.) shall be charged per hour or fraction of an hour* | (($124.50))$132.60 | |||
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS | (($19.20))$20.40 | |||
DEPARTMENT INSPECTION FEES: | ||||
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) | (($105.00))$111.80 | |||
TRAVEL (Per hour)* | (($105.00))$111.80 | |||
PER DIEM** | ||||
HOTEL*** | ||||
MILEAGE** | ||||
RENTAL CAR*** | ||||
PARKING*** | ||||
AIRFARE*** | ||||
DEPARTMENT AUDIT FEES: | ||||
AUDIT (Per hour*) | (($105.00))$111.80 | |||
TRAVEL (Per hour*) | (($105.00))$111.80 | |||
PER DIEM** | ||||
HOTEL*** | ||||
MILEAGE** | ||||
RENTAL CAR*** | ||||
PARKING*** | ||||
AIRFARE*** | ||||
INSIGNIA FEES: | ||||
FIRST SECTION | (($296.40))$315.60 | |||
EACH ADDITIONAL SECTION | (($28.30))$30.10 | |||
REISSUED-LOST/DAMAGED | (($72.50))$77.20 | |||
ELECTRICAL COMMERCIAL/INDUSTRIAL | ||||
Electrical Service/feeders 200 Amperage plus | ||||
Service/feeder | (($306.90))$326.80 | |||
Additional Feeder | (($57.90))$61.60 | |||
ELECTRICAL MULTIFAMILY RESIDENTIAL | ||||
Electrical Service/feeders 200 Amperage plus | ||||
Service/feeder | (($162.50))$173.00 | |||
Additional Feeder | (($41.00))$43.60 | |||
OTHER FEES: | ||||
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) | (($105.00))$111.80 | |||
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free per year) | (($19.20))$20.40 | |||
REFUND FEE | (($34.30))$36.50 | |||
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |
INITIAL FILING FEE | (($51.80))$55.10 | |
DESIGN PLAN FEES: | ||
INITIAL FEE - MASTER DESIGN | (($360.40))$383.80 | |
INITIAL FEE - ONE YEAR DESIGN | (($147.20))$156.70 | |
RENEWAL FEE | (($62.30))$66.30 | |
RESUBMIT FEE | (($105.00))$111.80 | |
ADDENDUM (Approval expires on same date as original plan) | (($105.00))$110.80 | |
PLANS APPROVED BY LICENSED PROFESSIONALS | (($91.60))$97.50 | |
FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM | (($96.90))$103.20 per hour | |
ELECTRICAL PLAN REVIEW - For medical units, find fees at http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906 | ||
RECIPROCAL PLAN REVIEW: | ||
INITIAL FEE - MASTER DESIGN | (($160.40))$170.80 | |
INITIAL FEE - ONE YEAR DESIGN | (($96.90))$103.20 | |
RENEWAL FEE | (($96.90))$103.20 | |
ADDENDUM | (($96.90))$103.20 | |
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST TWO SETS | (($19.20))$20.40 | |
DEPARTMENT INSPECTION FEES: | ||
INSPECTION/REINSPECTION (Per hour* plus travel time* and mileage**) | (($105.00))$111.80 | |
TRAVEL (Per hour)* | (($105.00))$111.80 | |
PER DIEM** | ||
HOTEL*** | ||
MILEAGE** | ||
RENTAL CAR*** | ||
PARKING*** | ||
AIRFARE*** | ||
ALTERATION INSPECTION (One hour plus insignia alteration fee) | (($157.30))$167.50 | |
INSIGNIA FEES: | ||
FIRST SECTION/ALTERATION | (($30.00))$31.90 | |
REISSUED-LOST/DAMAGED | (($19.20))$20.40 | |
EXEMPT | (($51.80))$55.10 | |
OTHER FEES: | ||
FIELD TECHNICAL SERVICE (Per hour* plus travel time* and mileage**) | (($105.00))$111.80 | |
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) | (($19.20))$20.40 | |
REFUND FEE | (($34.30))$36.50 | |
* | Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. |
** | Per state guidelines. |
*** | Actual charges incurred. |
Type of Fee | Period Covered by Fee | Dollar Amount of Fee |
Plumbing contractor For each issuance, renewal or reregistration of a license | This registration is valid for two years from date of issuance, renewal or reregistration, or until it is suspended or revoked | (($139.10))$148.10 |
Initial identification or change in designated plumber (nonrefundable) | (($50.00))$53.20 | |
Examination application for journey level, residential specialty, residential service, backflow certification or Reexaminations of medical gas endorsements | Per examination the department's fee. Normal examination administration is performed by a state authorized contractor. The fees for such examinations are set by contract with the department and are additional to the department's examination fees | (($189.80))$202.10 |
Domestic pump specialty application fee******* | Per application the department's fee. Normal examination administration is performed by a state authorized contractor. The fees for such examinations are set by contract with the department and are additional to the department's examination fees | (($189.80))$202.10 |
Reciprocity application* | Per application | (($189.80))$202.10 |
Trainee certificate** | One year or when hours are updated | (($56.40))$60.00 |
Temporary permit (not applicable for backflow assembly maintenance and repair specialty) | One hundred twenty days | (($94.20))$100.30 |
Journey level, residential specialty, or residential service certificate renewal or 1st card*** | Three years | (($227.90))$242.70 |
Domestic pump specialty plumber certificate renewal or 1st card*** | Three years | (($228.00))$242.80 |
Backflow assembly maintenance and repair specialty certificate renewal or 1st card*** | Three years | (($157.20))$167.40 |
Medical gas endorsement application | Per application | (($69.80))$74.30 |
Medical gas endorsement renewal or 1st card*** | Three years | (($156.70))$166.90 |
Medical gas endorsement examination fee**** | See note below. | |
Medical gas endorsement training course fee***** | See note below. | |
Domestic pump specialty examination fee**** | See note below. | |
Reinstatement of a plumbing contractor license | (($69.50))$74.00 | |
Reinstatement fee for residential and journey level certificates | (($304.70))$324.50 | |
Reinstatement fee for backflow assembly maintenance and repair specialty certificates | (($175.20))$186.60 | |
Reinstatement fee for domestic pump | (($456.30))$486.00 | |
Replacement fee for all certificates and licenses | (($25.60))$27.20 | |
Refund processing fee | (($27.50))$29.20 | |
Unsupervised trainee endorsement | (($40.70))$43.30 | |
Inactive status fee | (($40.70))$43.30 | |
Certified letter fee/verification of licensure | (($40.70))$43.30 | |
Required to cover the costs for the service of process in an action against a plumbing contractor, the contractor's bond, or the deposit under RCW 18.106.410 | (($55.00))$58.50 | |
Documents copied from a plumber's, trainee or plumbing contractor file | (($2.40))$2.50 per page maximum copy charge (($37.40))$39.80 | |
Continuing education new course fee****** | (($246.70))$262.70 | |
Continuing education renewal course fee****** | (($123.10))$131.10 | |
Continuing education classes provided by the department | (($14.90))$15.80 per continuing education training hour | |
(($9.90))$10.50 per continuing education training hour for correspondence and internet courses |
* | Reciprocity application is only allowed for applicants that are applying work experience toward certification that was obtained in state(s) with which the department has a reciprocity agreement. The reciprocity application is valid for one year. | |
** | The trainee certificate will expire one year from the date of issuance and must be renewed on or before the date of expiration. Trainee update fee required when hours are submitted outside of renewal period. | |
*** | This fee applies to either the original issuance or a renewal of a certificate. If you have passed the plumbers certificate of competency examination or the medical gas piping installer endorsement examination and paid the certificate fee, you will be issued a plumber certificate of competency or a medical gas endorsement that will expire on your birth date. The three-year renewal of a Medical Gas Piping Installer Endorsement must include a continuity affidavit verifying that brazing work has been performed every six months during the renewal cycle. | |
**** | This fee is paid directly to a nationally recognized testing agency under contract with the department. It covers the cost of preparing and administering the written competency examination and the materials necessary to conduct the practical competency examination required for the medical gas piping system installers endorsement or the domestic pump or pump and irrigation examination. This fee is not paid to the department. | |
***** | This fee is paid directly to a training course provider approved by the department, in consultation with the state advisory board of plumbers. It covers the cost of providing training courses required for the medical gas piping system installer endorsement. This fee is not paid to the department. | |
****** | This fee is for a three-year period or code cycle. | |
******* | The domestic pump specialty application is valid for one year. |