WSR 26-09-113
PERMANENT RULES
DEPARTMENT OF
LABOR AND INDUSTRIES
[Order 21-20—Filed April 21, 2026, 8:22 a.m., effective June 1, 2026]
Effective Date of Rule: June 1, 2026.
Purpose: The department of labor and industries (L&I) is adopting amendments to chapter 296-155 WAC, Safety standards for construction work, Part N, Excavation, trenching, and shoring, to require employers to complete a written work plan detailing appropriate risk analysis prior to beginning any work that requires a protective system.
Despite the existing requirement for employers to "ensure prompt and safe removal of injured employees from elevated work locations, trenches and excavations prior to commencement of work," inspection data revealed multiple fatalities and numerous injuries related to excavation and trenching work in Washington. The conclusions of fatality investigations in recent years suggest that a better approach to risk analysis could serve greatly to reduce the likelihood of similar fatalities in the future.
The adopted rule:
| |
| • | Creates a standalone definition section and adds a new definition of "work plan." |
| • | Requires a competent person to remain onsite any time trenching excavation work is being performed. |
| • | Requires completion of a written trench excavation work plan (provided on the L&I website) for any trench excavation that requires a protective system under WAC 296-154-657 (1)(a). Employers may also create their own work plan that meets the criteria outlined in the rule. |
| • | Addresses recordkeeping and training requirements of the trench excavation work plan. |
Citation of Rules Affected by this Order: New WAC 296-155-652; and amending WAC 296-155-650 and 296-155-655.
Other Authority: Chapter
49.17 RCW.
Adopted under notice filed as WSR 26-02-054 on January 6, 2026.
Changes Other than Editing from Proposed to Adopted Version: WAC 296-155-655 General protection requirements.
Subsection (12)(c), to provide further clarity to existing fall protection exemptions, added language "additional information regarding fall protection requirements and exceptions for trench excavations may be found at WAC 296-880-30005."
Subsection (13)(a), changed "on-site" to "on the job site" and clarified the subsection applies to trenching excavation work.
Subsection (13)(b), clarified the employer designates the competent person and added "trench excavation" to provide clarity that the subsection applies to trench excavation work plan.
Subsection (13)(b)(ii), added reference to WAC 296-155-657 for clarity and removed "provided that type C soil is assumed at the work site."
Subsection (13)(c), expanded definition of work plan to "trench excavation work plan." Added "trench excavation" before "work plan" to provide clarity that the subsection applies to trench excavation work.
Subsections (13)(c)(i) through (xiv), added corresponding subsection references for additional clarity of existing rule language.
Subsection (13)(c)(vii), added clarity that the competent person assess in addition to identifying potentially hazardous atmospheres.
Subsection (13)(c)(xv), changed "on-site" to "on the job site" for clarity.
Subsection (13)(d), added clarity that training of employee requirements are to the trench excavation work plan.
A final cost-benefit analysis is available by contacting Carmyn Shute, Administrative Regulations Analyst, L&I, Division of Occupational Safety and Health, P.O. Box 44620, Olympia, WA 98504-4620, phone 360-870-4525, fax 360-902-5619, email Carmyn.Shute@Lni.wa.gov, website https://www.lni.wa.gov/rulemaking-activity/.
Number of Sections Adopted in Order to Comply with Federal Statute: New 0, Amended 0, Repealed 0; Federal Rules or Standards: New 0, Amended 0, Repealed 0; or Recently Enacted State Statutes: New 0, Amended 0, Repealed 0.
Number of Sections Adopted at the Request of a Nongovernmental Entity: New 0, Amended 0, Repealed 0.
Number of Sections Adopted on the Agency's own Initiative: New 1, Amended 2, Repealed 0.
Number of Sections Adopted in Order to Clarify, Streamline, or Reform Agency Procedures: New 0, Amended 0, Repealed 0.
Number of Sections Adopted using Negotiated Rule Making: New 0, Amended 0, Repealed 0; Pilot Rule Making: New 0, Amended 0, Repealed 0; or Other Alternative Rule Making: New 0, Amended 0, Repealed 0.
Date Adopted: April 21, 2026.
Joel Sacks
Director
RDS-6756.5
AMENDATORY SECTION(Amending WSR 16-09-085, filed 4/19/16, effective 5/20/16)
WAC 296-155-650Scope((,))and application((, and definitions applicable to))of this part.
(((1)))Scope and application. This part applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.
(((2) Definitions applicable to this part.
Accepted engineering requirements or practices. Those requirements which are compatible with standards of practice required by a registered professional engineer.
Aluminum hydraulic shoring. A preengineered shoring system comprised of aluminum hydraulic cylinders (crossbraces) used in conjunction with vertical rails (uprights) or horizontal rails (walers). Such system is designed, specifically to support the sidewalls of an excavation and prevent cave-ins.
Bell-bottom pier hole. A type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a belled shape.
Benching (benching system). A method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels.
Cave-in. The separation of a mass of soil or rock material from the side of an excavation, or loss of soil from under a trench shield or support system, and its sudden movement into the excavation in quantity that it could entrap, bury, injure, or immobilize a person.
Competent person. One who can identify existing or predictable hazards in the surroundings that are unsanitary, hazardous, or dangerous to employees. Also has authorization or authority by the nature of their position to take prompt corrective measures to eliminate them. The person must be knowledgeable in the requirements of this part.
Cross braces. The horizontal members of a shoring system installed perpendicular to the sides of the excavation, the ends of which bear against either uprights or wales.
Excavation. Any person-made cut, cavity, trench, or depression in the earth's surface, formed by earth removal.
Faces or sides. The vertical or inclined earth surfaces formed as a result of excavation work.
Failure. The breakage, displacement, or permanent deformation of a structural member or connection so as to reduce its structural integrity and its supportive capabilities.
Hazardous atmosphere. A atmosphere which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury.
Kickouts. Accidental release or failure of a cross brace.
Protective system. A method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of adjacent structures. Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection.
Ramp. An inclined walking or working surface that is used to gain access to one point to another, and is constructed from earth or from structural materials such as steel or wood.
Registered professional engineer. A person who is registered as a professional engineer in the state of Washington. The registered professional engineer must comply with the Washington state department of licensing requirements, chapter 18.43 RCW. Sheeting. The members of a shoring system that retain the earth in position and in turn are supported by other members of the shoring system.
Shield (shield system). A structure that is able to withstand the forces imposed on it by a cave-in and thereby protect employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Additionally, shields can be either premanufactured or job-built in accordance with WAC 296-155-657 (3)(c) or (d). Shields used in trenches are usually referred to as "trench boxes" or "trench shields."
Shoring (shoring system). A structure such as a metal hydraulic, mechanical, or timber shoring system that supports the sides of an excavation and which is designed to prevent cave-ins.
Sides. See "faces."
Sloping (sloping system). A method of protecting employees from cave-ins by excavating to form sides of an excavation that are inclined away from the excavation so as to prevent cave-ins. The angle of incline required to prevent a cave-in varies with differences in such factors as the soil type, environmental conditions of exposure, and application of surcharge loads.
Stable rock. A natural solid mineral material that can be excavated with vertical sides and will remain intact while exposed. Unstable rock is considered to be stable when the rock material on the side or sides of the excavation is secured against caving-in or movement by rock bolts or by another protective system that has been designed by a registered professional engineer.
Structural ramp. A ramp built of steel or wood, usually used for vehicle access. Ramps made of soil or rock are not considered structural ramps.
Support system. A structure such as underpinning, bracing or shoring, which provides support to an adjacent structure, underground installation, or the sides of an excavation.
Tabulated data. Tables and charts approved by a registered professional engineer and used to design and construct a protective system.
Trench (trench excavation). A narrow excavation in relation to its length made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6m). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6 m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench.
Trench box. See "shield."
Trench shield. See "shield."
Uprights. The vertical members of a trench shoring system placed in contact with the earth and usually positioned so that individual members do not contact each other. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called "sheeting."
Wales. Horizontal members of a shoring system placed parallel to the excavation face whose sides bear against the vertical members of the shoring system or earth.))
NEW SECTION
WAC 296-155-652Definitions applicable to this part.
(1) Accepted engineering requirements or practices. Those requirements which are compatible with standards of practice required by a registered professional engineer.
(2) Aluminum hydraulic shoring. A preengineered shoring system comprised of aluminum hydraulic cylinders (crossbraces) used in conjunction with vertical rails (uprights) or horizontal rails (walers). Such system is designed, specifically to support the sidewalls of an excavation and prevent cave-ins.
(3) Bell-bottom pier hole. A type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a belled shape.
(4) Benching (benching system). A method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels.
(5) Cave-in. The separation of a mass of soil or rock material from the side of an excavation, or loss of soil from under a trench shield or support system, and its sudden movement into the excavation in quantity that it could entrap, bury, injure, or immobilize a person.
(6) Competent person. One who can identify existing or predictable hazards in the surroundings that are unsanitary, hazardous, or dangerous to employees. Also has authorization or authority by the nature of their position to take prompt corrective measures to eliminate them. The person must be knowledgeable in the requirements contained in this part.
(7) Cross braces. The horizontal members of a shoring system installed perpendicular to the sides of the excavation, the ends of which bear against either uprights or wales.
(8) Excavation. Any person-made cut, cavity, trench, or depression in the earth's surface, formed by earth removal.
(9) Faces or sides. The vertical or inclined earth surfaces formed as a result of excavation work.
(10) Failure. The breakage, displacement, or permanent deformation of a structural member or connection so as to reduce its structural integrity and its supportive capabilities.
(11) Hazardous atmosphere. An atmosphere which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury.
(12) Kickouts. Accidental release or failure of a cross brace.
(13) Protective system. A method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of adjacent structures. Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection.
(14) Ramp. An inclined walking or working surface that is used to gain access to one point to another, and is constructed from earth or from structural materials such as steel or wood.
(15)
Registered professional engineer. A person who is registered as a professional engineer in the state of Washington. The registered professional engineer must comply with the Washington state department of licensing requirements, chapter
18.43 RCW.
(16) Sheeting. The members of a shoring system that retain the earth in position and in turn are supported by other members of the shoring system.
(17) Shield (shield system). A structure that is able to withstand the forces imposed on it by a cave-in and thereby protect employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Additionally, shields can be either premanufactured or job-built in accordance with WAC 296-155-657 (3)(c) or (d). Shields used in trenches are usually referred to as "trench boxes" or "trench shields."
(18) Shoring (shoring system). A structure such as a metal hydraulic, mechanical, or timber shoring system that supports the sides of an excavation and which is designed to prevent cave-ins.
(19) Sides. See "faces."
(20) Sloping (sloping system). A method of protecting employees from cave-ins by excavating to form sides of an excavation that are inclined away from the excavation so as to prevent cave-ins. The angle of incline required to prevent a cave-in varies with differences in such factors as the soil type, environmental conditions of exposure, and application of surcharge loads.
(21) Stable rock. A natural solid mineral material that can be excavated with vertical sides and will remain intact while exposed. Unstable rock is considered to be stable when the rock material on the side or sides of the excavation is secured against caving-in or movement by rock bolts or by another protective system that has been designed by a registered professional engineer.
(22) Structural ramp. A ramp built of steel or wood, usually used for vehicle access. Ramps made of soil or rock are not considered structural ramps.
(23) Support system. A structure such as underpinning, bracing or shoring, which provides support to an adjacent structure, underground installation, or the sides of an excavation.
(24) Tabulated data. Tables and charts approved by a registered professional engineer and used to design and construct a protective system.
(25) Trench (trench excavation). A narrow excavation in relation to its length made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6m). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench.
(26) Trench box. See "shield."
(27) Trench shield. See "shield."
(28) Uprights. The vertical members of a trench shoring system placed in contact with the earth and usually positioned so that individual members do not contact each other. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called "sheeting."
(29) Wales. Horizontal members of a shoring system placed parallel to the excavation face whose sides bear against the vertical members of the shoring system or earth.
(30) Work plan. A written planning document in which the employer identifies any trench excavation an employee may enter that is four feet or greater in depth, or when a protective system is required, regardless of depth. See WAC 296-155-655(13) for requirements.
AMENDATORY SECTION(Amending WSR 22-15-089, filed 7/19/22, effective 8/19/22)
WAC 296-155-655General protection requirements.
(1) Surface encumbrances. You must remove or support surface encumbrances that are located so as to create a hazard to employees, as necessary, to safeguard employees.
(2) Underground installations.
(a) You must locate utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, prior to opening an excavation.
(b) You must contact utility companies or owners within established or customary local response times, advised of the proposed work, and asked to locate the underground utility installation prior to the start of actual excavation.
(c) When excavation operations approach the location of underground installations, you must determine the exact location of the installations by safe and acceptable means.
(d) While the excavation is open, you must protect underground installations, supported, or removed as necessary to safeguard employees.
(3) Access and egress.
(a) Structural ramps.
(i) Structural ramps that are used solely by employees as a means of access or egress from excavations must be designed by a competent person. Structural ramps used for access or egress of equipment must be designed by a competent person qualified in structural design, and must be constructed in accordance with the design.
(ii) Ramps and runways constructed of two or more structural members must have the structural members connected together to prevent displacement.
(iii) Structural members used for ramps and runways must be of uniform thickness.
(iv) Cleats or other appropriate means used to connect runway structural members must be attached to the bottom of the runway or must be attached in a manner to prevent tripping.
(v) Structural ramps used in lieu of steps must be provided with cleats or other surface treatments on the top surface to prevent slipping.
(b) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress must be located in trench excavations that are ((4))four feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.
(4) Exposure to vehicular traffic. You must provide employees exposed to vehicular traffic with, and they must wear, high-visibility garments meeting the requirements of WAC 296-155-200, General requirements for personal protective equipment (PPE).
(5) Exposure to falling loads. You must not permit any employee underneath loads handled by lifting or digging equipment. You must require employees to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling materials. Operators may remain in the cabs of vehicles being loaded or unloaded when the vehicles are equipped, in accordance with WAC 296-155-610 (2)(g), to provide adequate protection for the operator during loading and unloading operations.
(6) Warning system for mobile equipment. When mobile equipment is operated adjacent to an excavation, or when such equipment is required to approach the edge of an excavation, and the operator does not have a clear and direct view of the edge of the excavation, you must utilize a warning system such as barricades, hand or mechanical signals, or stop logs. If possible, the grade should be away from the excavation.
(7) Hazardous atmospheres.
(a) Testing and controls. In addition to the requirements set forth in parts B-1 and C of this chapter (296-155 WAC) and chapter 296-880 WAC to prevent exposure to harmful levels of atmospheric contaminants and to assure acceptable atmospheric conditions, the following requirements apply:
(i) Where oxygen deficiency (atmospheres containing less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, you must test the atmospheres in the excavation before employees enter excavations greater than ((4))four feet (1.22 m) in depth.
(ii) You must take adequate precautions to prevent employee exposure to atmospheres containing less than 19.5 percent oxygen and other hazardous atmospheres. These precautions include providing proper respiratory protection or ventilation in accordance with chapter 296-842 WAC.
(iii) You must take adequate precaution such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 10 percent of the lower flammable limit of the gas.
(iv) When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, you must conduct testing as often as necessary to ensure that the atmosphere remains safe.
(b) Emergency rescue equipment.
(i) Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, must be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment must be attended when in use.
(ii) Employees entering bell-bottom pier holes, or other similar deep and confined footing excavations, must wear a harness with a lifeline securely attached to it. The lifeline must be separate from any line used to handle materials, and must be individually attended at all times while the employee wearing the lifeline is in the excavation.
Note: | See chapter 296-62 WAC, Part M for additional requirements applicable to confined space operations. |
(8) Protection from hazards associated with water accumulation.
(a) Employees must not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline.
(b) If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations must be monitored by a competent person to ensure proper operation.
(c) If excavation work interrupts the natural drainage of surface water (such as streams), you must use diversion ditches, dikes, or other suitable means to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation. Excavations subject to runoff from heavy rains will require an inspection by a competent person and compliance with ((subdivisions)) (a) and (b) of this subsection.
(9) Stability of adjacent structures.
(a) Where the stability of adjoining buildings, walls, or other structures is endangered by excavation operations, you must provide support systems such as shoring, bracing, or underpinning to ensure the stability of such structures for the protection of employees.
(b) You must not permit excavation below the level of the base or footing of any foundation or retaining wall that could be reasonably expected to pose a hazard to employees except when:
(i) A support system, such as underpinning, is provided to ensure the safety of employees and the stability of the structure; or
(ii) The excavation is in stable rock; or
(iii) A registered professional engineer has approved the determination that the structure is sufficiently removed from the excavation so as to be unaffected by the excavation activity; or
(iv) A registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees.
(c) Sidewalks, pavements, and appurtenant structure must not be undermined unless a support system or another method of protection is provided to protect employees from the possible collapse of such structures.
(10) Protection of employees from loose rock or soil.
(a) You must provide adequate protection to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection must consist of scaling to remove loose material; installation of protective barricades at intervals as necessary on the face to stop and contain falling material; or other means that provide equivalent protection.
(b) You must protect employees from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection must be provided by placing and keeping such materials or equipment at least two feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.
(11) Inspections.
(a) Daily inspections of excavations, the adjacent areas, and protective systems must be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection must be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections must also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.
(b) Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, you must remove exposed employees from the hazardous area until the necessary precautions have been taken to ensure their safety.
(12) Fall protection.
(a) You must provide walkways where employees or equipment are required or permitted to cross over excavations. You must provide guardrails which comply with chapter 296-880 WAC, Unified safety standards for fall protection where walkways are ((4))four feet or more above lower levels.
(b) You must provide adequate barrier physical protection at all remotely located excavations. You must barricade or cover all wells, pits, shafts, etc. Upon completion of exploration and similar operations, you must backfill temporary wells, pits, shafts, etc.
(c) Additional information regarding fall protection requirements and exceptions for trench excavations may be found at WAC 296-880-30005.
(13) Trench excavations.
(a) A competent person must remain on the job site any time trench excavation work is being performed.
(b) The employer must have a competent person complete a written trench excavation work plan for any trench excavation into which an employee may enter and where a protective system is required under WAC 296-155-657 (1)(a). A written trench excavation work plan is not required when:
(i) The trench is four feet or less and a protective system is not required; or
(ii) When the trench excavations are sloped at an angle not steeper than one and one-half horizontal to one vertical (34 degrees measured from the horizontal) as described in WAC 296-155-657.
(c) The employer may use a trench excavation work plan available on the department's website, or may develop a trench excavation work plan that includes at minimum the following:
(i) Identify all trench excavations where a protective system is required as described in WAC 296-155-657;
(ii) Identify the classification of soil and rock deposits as described in WAC 296-155-66401, Appendix A;
(iii) Identify underground installations as described in subsection (2) of this section;
(iv) Describe the method of protecting underground installations when the trench excavation is open as described in subsection (2) of this section;
(v) Describe the method of protection from surface encumbrances as described in subsection (1) of this section;
(vi) Describe the method of stabilizing adjacent structures as described in subsection (9) of this section;
(vii) Identify and assess potentially hazardous atmospheres as described in subsection (7) of this section;
(viii) Describe the type of protective system to be provided as described in WAC 296-155-657;
(ix) Describe the procedure for the installation and removal of the protective system that protects employees from cave-ins, structural collapses, or from being struck by members of the protective system as described in WAC 296-155-657;
(x) Describe the frequency of inspections of trench excavations, the adjacent areas, and protective system for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions as described in subsection (9) of this section;
(xi) Describe the method of protection for employees from cave-ins when entering or exiting the areas protected by shields as described in subsection (10) of this section;
(xii) Describe the method of protecting workers in a trench excavation from loose soil, rock, or equipment that could pose a hazard by falling or rolling into the excavation as described in subsection (10) of this section;
(xiii) Describe the method of protection from hazards associated with water accumulation as described in subsection (8) of this section;
(xiv) Describe the safe means of egress from trench excavations as described in subsection (3) of this section;
(xv) Be available on the job site for inspection by the department.
(d) Training. Prior to permitting employees into any trench excavation where a protective system is required, the employer must ensure employees are trained and instructed on the requirements of the trench excavation work plan.